Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 CrAccepted-AOC A 8 GREEN PARK NEW DELHI 110016 INDIA | NEW DELHI | SOUTH DELHI | DELHI | 110016 | ₹19.0 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹30.1 CrRejected-AOC | ₹30.1 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹33.7 CrRejected-AOC 15TH FLOOR EROS CORPORATE TOWER NEHRU PLACE NEW DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | ₹33.7 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹36.9 CrRejected-AOC | ₹36.9 Cr | L4 | Rejected-AOC L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically non-compliant |
| Sl No | Description | Qty | Unit | Consulting Engineers Group Ltd. L4 | Intercontinental Consultants and Technocrats Pvt. Ltd. L1 | SYSTRA MVA Consulting (India) Pvt. Ltd. L3 | Ayesa India Private Limited L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Schedule A: Detailed Design Consultancy (Architectural Design, E&M Design and Structural Proof checking) of Elevated and Underground Stations, Viaduct and Tunnels/Ramps | 1 | LS | 28,25,82,000 ₹28.3 Cr | 13,64,76,000 ₹13.6 Cr | 24,09,97,000 ₹24.1 Cr | 25,49,30,000 ₹25.5 Cr |
| 2.00 | Schedule B: Detailed design works under the heads of Architectural, E&M Detailed Design and structural design of the Depot cum workshop and its Ancillary Buildings detailed in the Scope of Work | 1 | LS | 6,78,73,000 ₹6.8 Cr | 3,00,00,000 ₹3 Cr | 6,00,00,000 ₹6 Cr | 3,50,00,000 ₹3.5 Cr |
| 3.00 | Schedule C: Payment in Man Months for Deployment of Expert on the project | 1 | LS | 1,82,00,000 ₹1.8 Cr | 2,40,00,000 ₹2.4 Cr | 3,59,80,000 ₹3.6 Cr | 1,06,50,000 ₹1.1 Cr |
Updated dates
Tender Value
₹43.3 Cr
EMD Value
₹25 L
Closing Date
1 Apr 2026, 3:00 pmClosed
Senior General Manager/Contract
Delhi Metro Rail Corporation, 5th floor, A-Wing, Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi-110 001
Engagement of DDC for Civil, Architectural and Building Services including E and M works for Prahladpura - Todi Mod Corridor and Government Hostel - Chandpole Spur including 2 depots of Jaipur metro rail project phase-II of RMRC.
2026_DMRC_898533_1
JCDD-02
Open Tender
Consultancy
1800 days
Jaipur
Please refer Tender documents.
12 documents required · 12 mandatory
₹23,600
DMRC Ltd Tender cell A/c 000705045337
₹25 L
Through Video Conference
12 May 2026
16 Feb 2026
2 Apr 2026
16 Feb 2026
1 Apr 2026
9 Mar 2026
16 Feb 2026 - 19 Feb 2026
20 Feb 2026
Schedule A: Detailed Design Consultancy (Architectural Design, E&M Design and Structural Proof checking) of Elevated and Underground Stations, Viaduct and Tunnels/Ramps
Schedule B: Detailed design works under the heads of Architectural, E&M Detailed Design and structural design of the Depot cum workshop and its Ancillary Buildings detailed in the Scope of Work
Schedule C: Payment in Man Months for Deployment of Expert on the project
Please Enable Macros to View BoQ information
Contract JCDD-02 : Engagement of Detail Design Consultant (DDC) for Civil, Architectural and Building Services including E&M works for Prahladpura - Todi Mod Corridor and Government Hostel – Chandpole Spur including 2 depots of Jaipur metro rail project phase-II of RAJASTHAN METRO RAIL CORPORATION LTD.(RMRC).
Schedule 'C'
Breakup of Schedule 'C' : Engagement of Experts
Viaduct Expert (SE-1)
Tunnelling Expert (SE-2)
Elevated Station & Depot Expert (SE-3)
Underground Station Expert (SE-4)
Underground Station Layout Expert (AE-1)
Elevated Station & Depot Layout Expert (AE-2)
Architectural Finishing Expert (AE-3)
Plumbing Expert (AE-4)
Underground Station Electrical Expert (EE-1)
Tunnel Ventilation & Air Conditioning Expert (EE-2)
Elevated Station & Depot Electrical Expert (EE-3)
Fire Services Expert (EE-4)
TOTAL AMOUNT
NOTES:
The amount quoted in figures shall be taken as final in case of any discrepancy.
Experts shall be deployed on the project for a period in months as specified against each position. The deployment of the Experts shall be in spells of 1 month at a time divided over the duration of the Contract, as per the schedule approved by DMRC.
The payment for deployment of Experts shall be made as per the actual deployment, on the basis of man month rate quoted. If the deployment of the Experts is not made or delayed (as per the agreed schedule and duration)for whatever reasons, a deduction of 1.5 times the man month rate shall be made for the duration of delay.
Payment shall be made only for the above-mentioned experts under Schedule C of the BoQ. Any other staff/personnel deployed (apart from the above-mentioned experts), as required for the project, throughout the contract duration and during any approved time extension (if any), shall have no additional cost/financial implication to the Employer.
The above rates shall be considered for processing any variations in case the need so arises in the execution of the contract.
Payment for the above- mentioned experts shall be done in INR only, under Schedule-C of the BoQ.
NOTE: The lumpsum amount quoted in Indian Rupees by the Tenderer shall be distributed in the manner specified for Schedule 'A', 'B' & 'C' of Financial Package for the purpose of payment only.
Contract JCDD-02 : Engagement of Detail Design Consultant (DDC) for Civil, Architectural and Building Services including E&M works for Prahladpura - Todi Mod Corridor and Government Hostel – Chandpole Spur including 2 depots of Jaipur metro rail project phase-II of RAJASTHAN METRO RAIL CORPORATION LTD.(RMRC).
ANNEXURE 13A PROFORMA FOR STATEMENT OF MINOR DEVIATIONS (Refer Clause C 2.2 and C15.1 of ITT)
The following are the particulars of minor deviations from the requirements of the Tender Document:
Note: 1. The Tenderer shall indicate price adjustment against each deviation in Annexure 13A of BOQ. This price is the price which the tenderer shall reduce from this tender price if deviation(s) is/are accepted by the Employer. 2. Where there is no deviation, please indicate ‘No Deviations’. In case, Performa of deviations is left as blank, it will be construed that the tenderer has not proposed any deviations from tender documents. 3. If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Annexure, it will have no effect. 4. All deviations have been listed and priced in the financial proposal and deviations not priced will be treated as null and void and stand withdrawn.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_944454.xls
BOQ • 0.33 MB
Tender_Documents.rar
Tender Documents • 5.35 MB
Download all tender documents and submit your bid