Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.4 LAdmitted-Finance | ₹80.4 L | L1 | Admitted-Finance |
| 2 | L2₹80.7 L+₹27,584.28 (0.34%)Admitted-Finance | ₹80.7 L+₹27,584.28 (0.34%) | L2 | Admitted-Finance |
| 3 | L3₹93.7 L+₹13.2 L (16.4%)Admitted-Finance | ₹93.7 L+₹13.2 L (16.4%) | L3 | Admitted-Finance |
| 4 | L4₹1.1 Cr+₹28.1 L (34.9%)Admitted-Finance | ₹1.1 Cr+₹28.1 L (34.9%) | L4 | Admitted-Finance |
| 5 | L5₹1.1 Cr+₹29.2 L (36.3%)Admitted-Finance | ₹1.1 Cr+₹29.2 L (36.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GUDDU SINGH RAWAT L5 | VIRENDRA PRASAD L4 | ANIL ASWAL L7 | JAYDEV PRASAD L2 | Janak Singh L1 | JABAR SINGH L3 | Kalyan Singh Rawat L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer in charge (75476 16-1) | 499 | Cum | 462.77 ₹2,30,922.23 | 458.12 ₹2,28,601.88 | 465.1 ₹2,32,084.9 | 340.69 ₹1,70,004.31 | 339.52 ₹1,69,420.48 Lowest | 395.34 ₹1,97,274.66 | 463.94 ₹2,31,506.06 |
| 2.00 | Random Rubble Stone Masonry laid in 1:5 cement and sand mortar. | 360 | Cum | 4,866.45 ₹17,51,922 | 4,817.54 ₹17,34,314.4 | 4,890.9 ₹17,60,724 | 3,582.58 ₹12,89,728.8 | 3,570.36 ₹12,85,329.6 Lowest | 4,157.27 ₹14,96,617.2 | 4,878.67 ₹17,56,321.2 |
| 3.00 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 | 1,344 | Sqm | 94.92 ₹1,27,572.48 | 93.97 ₹1,26,295.68 | 95.4 ₹1,28,217.6 | 69.88 ₹93,918.72 | 69.64 ₹93,596.16 Lowest | 81.09 ₹1,08,984.96 | 95.16 ₹1,27,895.04 |
| 4.00 | Providing concrete for plain/reinforced concrete in openfoundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 | 22.8 | Cum | 8,471.73 ₹1,93,155.44 | 8,386.59 ₹1,91,214.25 | 8,514.3 ₹1,94,126.04 | 6,236.72 ₹1,42,197.22 | 6,215.44 ₹1,41,712.03 Lowest | 7,237.16 ₹1,65,007.25 | 8,493.01 ₹1,93,640.63 |
| 5.00 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P 5 and royaltiies etc.complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 294 | Cum | 2,450.69 ₹7,20,502.86 | 2,426.06 ₹7,13,261.64 | 2,463 ₹7,24,122 | 1,804.15 ₹5,30,420.1 | 1,797.99 ₹5,28,609.06 Lowest | 2,093.55 ₹6,15,503.7 | 2,456.84 ₹7,22,310.96 |
| 6.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, inbreast walls, retaining walls, parapets, scuppers, etc. including supply of allmaterial, labour, T&P and royalties etc. complete as per drawing andtechnical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 261 | Cum | 4,321.38 ₹11,27,880.18 | 4,277.95 ₹11,16,544.95 | 4,343.1 ₹11,33,549.1 | 3,181.32 ₹8,30,324.52 | 3,170.46 ₹8,27,490.06 Lowest | 3,691.64 ₹9,63,518.04 | 4,332.24 ₹11,30,714.64 |
| 7.00 | Specifiction Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3.6 11-04-1-2 | 120 | Cum | 7,519.61 ₹9,02,353.2 | 7,444.04 ₹8,93,284.8 | 7,557.4 ₹9,06,888 | 5,535.8 ₹6,64,296 | 5,516.9 ₹6,62,028 Lowest | 6,423.79 ₹7,70,854.8 | 7,538.51 ₹9,04,621.2 |
| 8.00 | Proi, iding. Loq,ering into trenches rvilh true to alignnrent. -a.v'ing & hinting ol lu1l ienghts of HDPE Pipes ol'specilied grade as perlS:"1984-1995 and spec ilications. wit)r testing of pipe line includingsupplt of iointing materials. A PE-63 Grade; PN-6.0 (6.0 Ks,Kmz\ | 6,000 | Rmt | 985.05 ₹59,10,300 | 975.15 ₹58,50,900 | 990 ₹59,40,000 | 725.18 ₹43,51,080 | 722.7 ₹43,36,200 Lowest | 841.5 ₹50,49,000 | 987.53 ₹59,25,180 |
Tender Value
₹1.1 Cr
EMD Value
₹3.0 L
Closing Date
13 Aug 2026, 5:00 pmClosed
EE IRRIGATION PUROLA
EE IRRIGATION DIVISION PUROLA
Renovation/Repair work of devra guradi irrigation canal in mori blaock of uttakashi district
2026_IRDCE_98357_3
06/EE/2026-27 Date 28-07-2026
Open Tender
Civil Works
Item Rate
270 days
Purola Distt Uttarkashi
As per technical bid
2 documents required · 2 mandatory
₹4,720
EE ID PUROLA
₹3.0 L
EE ID PUROLA
26 Aug 2026
1 Aug 2026
14 Aug 2026
1 Aug 2026
13 Aug 2026
1 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer in charge (75476 16-1) | 499 | Cum | - | - |
| 2 | Random Rubble Stone Masonry laid in 1:5 cement and sand mortar. | 360 | Cum | - | - |
| 3 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 | 1,344 | Sqm | - | - |
| 4 | Providing concrete for plain/reinforced concrete in openfoundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 | 22.8 | Cum | - | - |
| 5 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P 5 and royaltiies etc.complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 294 | Cum | - | - |
| 6 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, inbreast walls, retaining walls, parapets, scuppers, etc. including supply of allmaterial, labour, T&P and royalties etc. complete as per drawing andtechnical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 261 | Cum | - | - |
| 7 | Specifiction Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3.6 11-04-1-2 | 120 | Cum | - | - |
| 8 | Proi, iding. Loq,ering into trenches rvilh true to alignnrent. -a.v'ing & hinting ol lu1l ienghts of HDPE Pipes ol'specilied grade as perlS:"1984-1995 and spec ilications. wit)r testing of pipe line includingsupplt of iointing materials. A PE-63 Grade; PN-6.0 (6.0 Ks,Kmz\ | 6,000 | Rmt | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.52 MB
BOQ_116061.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .