General Manager, Gujarat Power Corporation Limited, Block No.8, 6th floor, Udyog Bhavan, Sector-11, Gandhinagar.
Various Civil Infrastructure Repair Works in Charanka Solar Park at Village: Charanka, Taluka: Santalpur, Dist. Patan, Gujarat
282963
GPCL/PD/2025-26/22
Open
Civil - All
Works
Gandhinagar
3 documents required · 3 mandatory
₹20,650
Gujarat Power Corporation Ltd
₹19.7 L
5 Mar 2026
5 Mar 2026
5 Mar 2026
6 Apr 2026
5 Mar 2026
4. Pre-Qualification Criteria (PQC) / Pre-Qualification Requirement (PQR) .......................................................
5. EARNEST MONEY DEPOSIT (EMD), SECURITY DEPOSIT & RETENTION MONEY, PERFORMANCE GUARANTEE
(The Steel, Cement & Brick Consumption list is attached to this Tender Document) ..................................
13. DISPUTE RESOLUTION & ARBITRATION, GOVERNING LAW CRITERIA: .......................................................
APPENDIX –I TENDERER’S EXPERIENCE/WORK EXPERIENCE ..................................................................................
APPENDIX-IV DECLARATION IN RESPECT OF CONFLICT OF INTEREST ...............................................................
APPENDIX-V TENDERER’s/FIRM’s DETAILS AND TENDER FEE, EMD DETAILS ...................................................
APPENDIX-VI ACKNOWLEDGEMENT OF TENDER DOCUMENTS ..............................................................................
APPENDIX-VII UNDERTAKING IN REGARD TO INTEREST OF ANY EMPLOYEE OF GPCL..........................................
ANNEXURE – VIII UNDERTAKING IN REGARD TO STOP DEAL / BANNED FOR BUSINESS DEALING / BLACK LIST
APPENDIX-IX TENDERER’s CONFIRMATION FOR RTGS/NEFT DETAILS FOR PAYMENT ...........................................
TENDER NOTICE No: GPCL/PD/2025-26/22
NOTICE INVITING TENDER (NIT)
Gujarat Power Corporation Ltd. invites online tenders for the “Various Civil Infrastructure Repair
Works in Charanka Solar Park at Village: Charanka, Taluka: Santalpur, Dist. Patan, Gujarat.”
Tender Papers & Specifications may be downloaded from Web site
https://tender.nprocure.com/ (To view, download and on-line submission) and GPCL website
https://gpcl.gujarat.gov.in/ (To view & download only). “All the relevant documents of tenders
to be submitted on-line only in form of scanned copy in online Bid”.
IMPORTANT DATES & AMOUNTS
Tender no. GPCL/PD/2025-26/22
Date of issue of Tender 05.03.2026
Date of Pre-Bid Meeting 12.03.2026
Last Date of bid submission through e-tender 06.04.2026 up to 18:00 Hrs.
Last Date for Physical receipt of Technical Bid
with all the relevant documents (By RPAD or
Speed Post or courier only)
{This is mandatory}
Date of online opening of the Preliminary 13.04.2026 at 12:00 Hrs. (Tentative, if
stage (i.e. Tender Fee & EMD Details) possible)
Date of online opening of Technical Bid
Shall be intimated to bidders through email/or
(Applicable only to Bidders who qualify in the
Preliminary Stage)
Shall be intimated to technically qualified
Date of online opening of Price Bid
bidders through email/or online.
INR / ₹. 6,56,88,720.00/- (inclusive of 1%
Estimated Cost labour cess and exclusive of 18% GST as
Tender fees (non-refundable) in the form of INR / ₹. 20,650/- including 18% GST as
DD only applicable (Non-refundable)
EMD in the form of DD only INR / ₹. 19,70,660/-
Security Deposit in the form of DD only 5% of Estimated cost or Total Contract Value
(whichever is higher)
12 Months (as per Gregorian Calender) from
Time limit of work date of acceptance of Work Order or Date of
commencement given by GPCL
Appropriate Class of Contractor as per “A” class & above
R&BD/CPWD/ Railway/ State Government /
Semi Government /Govt. Boards/
Corporation/ PSU
Bid Validity 180 days from the last date for submission of
The above-mentioned dates are subject to amendment, in which case the amendments shall be
publically intimated and shall follow.
IMPORTANT NOTE TO BIDDERS
a) In addition to bid submitted online, all the relevant documents as per requirement of the
Tender shall also be submitted physically along with the proof of Tender Fee and EMD in
sealed cover so that the same is received at GPCL (on the regular working days between 10:30
AM to 06:10 PM to the given address of GPCL) on or before the due date and time. GPCL would
not be responsible for any delay due to public holiday or other holidays or due to delay by Post
department. No Bid shall be accepted in any case after the due date and time of receipt of the
Bid, irrespective of delay due to postal services or any other reasons. “NO HAND DELIVERY”
will be allowed. All such documents should be strictly submitted by RPAD / Speed Post in
sealed cover only, otherwise the offer (bid) will not be accepted/considered and no any further
communication in the matter will be entertained. Please note that Price Bid is not to be
submitted in physical form. Price Bid submitted in physical form will be summarily rejected
and the offer (bid) of such bidder would be rejected.
b) Tender is invited in two bid online system. Bidder has to submit the two bids, i.e. Technical and
Price bid. Technical bid must contain:
i) Tender fee & EMD in the form of Demand Draft (DD) in sealed cover & Appendix-V scanned
& uploaded online along with Tender fees & EMD details.
ii) Technical bid with all requisite and supporting documents.
c) Technical Bid to be submitted both in physical as well as soft copy (online). It is mandatory for
all the bidders to submit their Technical Bid documents in both forms i.e. online (e-tendering)
as well as in hard copy in scheduled time. Technical bid in any one form i.e. either in soft copy
(online) or in hard copy (physical form), shall not be considered. It is mandatory for all Bidders
to submit their Price Bid through on-line (e-tendering) mode. Price Bids submitted in physical
form shall not be considered for its opening and only on-line submitted price bid will be
considered for evaluation. Bidders to note that Price Bid of only those Bidders shall be opened
(On-line tendering) who are found technically qualified and are found reasonably responsive to
GPCL’s Tender terms and conditions and Scope of Work. After technical bid is opened, for
modification / clarification, if any, all bidders shall be given an equal chance. Decision of the
GPCL regarding pre-qualification based on the documents furnished by the bidders will be final
and binding to all the bidders and no correspondence will be entertained from any of the
bidders in this regard.
d) Technical Bid envelope shall be super-scribed as: “Bid for Various Civil Infrastructure Repair
Works in Charanka Solar Park at Village: Charanka, Taluka: Santalpur, Dist. Patan, Gujarat”
All the envelopes/covers in main envelope shall be addressed to:
The Chief Project Officer,
Gujarat Power Corporation Limited,
Block No. 8, Sixth Floor, Udhyog Bhavan,
Sector – 11, Gandhinagar – 382011, Gujarat
The name & contact details of Bidder shall appear on all the envelopes/covers so that it is
possible to find out whose Bid it is without opening the envelopes/covers.
e) Tender fees & EMD to be submitted in the form of Demand Draft (DD) only in favour of the
‘Gujarat Power Corporation Limited’ payable at ‘Gandhinagar, Gujarat’. Tender Fees and
EMD shall be submitted in two separate envelopes. The envelope for Tender Fees & EMD
should be super-scribed as “Tender Fees” & “EMD”. Cheques are not acceptable. Bids without
Tender Fees and EMD will be out rightly rejected. Only those bidders who satisfy the tender
fees and EMD criteria shall be entertained for further evaluation.
For the purpose of realization of D.D., bidder must send D.D. in original through R.P.A.D. or
Speed post only addressed to:
Gujarat Power Corporation Limited,
Block No. 8, Sixth Floor, Udhyog Bhavan,
Sector – 11, Gandhinagar – 382011, Gujarat
& same must be submitted along with the Technical Bid in sealed cover with “Tender Fee” and
“EMD” super-scribed on it on or Before Scheduled Date and time as mentioned in this tender.
Otherwise the offer (bid) will not be considered (at the sole discretion of GPCL) and no any
further communication in the matter will be entertained.
f) Proof for Tender Fee & EMD shall be submitted in electronic format also through online
(by scanning) while uploading the bid for opening of the Preliminary Stage.
g) Any & all other documents required to be submitted in Technical bid like Valid experience
as per Pre-Qualification Criteria (PQC), registration certificate, solvency certificate as
demanded, List of orders executed in last (07) seven years, List of work orders on hand,
details of personnel etc. should be uploaded online through n-procure only. Offers which
are not digitally signed will not be accepted. Offers (bids) submitted in physical form only
(and not uploaded online) will not be accepted in any case.
h) “Pre-Bid Meeting” with the intending Bidders shall be held on 12.03.2026 at 11:30 Hrs
through online and/or physical mode. Parties interested to attend the Pre-Bid Meeting
should send their contact details including their email address and mobile number at Email:
[email protected]. Any technical/commercial query pertaining to this Tender should
be referred to:
The Chief Project Officer (CPO),
Gujarat Power Corporation Limited,
Block No.8, 6th Floor, Udhyog Bhavan,
Sector–11, Gandhinagar–382011, Gujarat
i) Bidders who wish to participate in this tender will have to procure or should have legally
valid Digital Certificate (Class III) as per Information Technology Act-2000, using which they
can sign their electronic bids. Bidders can procure the same from any of the license
certifying Authority of India or can contact (n)code solutions-a division of GNFC Limited,
who are licensed Certifying Authority by Government of India at address mentioned below.
Bidder may go through the e-tendering instruction for online Bid participation through n-
procure platform for further details and guidance for participation in the tendering process
through e-tendering.
In case of any further information regarding online bidding or if a Bidder needs any
assistance in accessing/ submission of online bid/ clarification or if training is required for
participating in online e-reverse bidding, then the Bidder can contact the following office
for assistance or training:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
Fax: 079-26857321 / 40007533, Email: [email protected]
Bidder may visit https://www.nprocure.com/html/faq.asp for information about
e- tendering registration process.
j) GPCL reserves the right to accept/reject any or all bids without assigning any reasons
thereof. Bidders are requested to be in touch with above-mentioned websites till opening
of the Price Bid (or awarding of the work order) to know the latest status.
k) The tender is subject to the provisions of the prevailing General Financial Rules (GFR) of
Government of India
Yours faithfully,
Chief Project Officer (CPO)
Gujarat Power Corporation Limited
Block No.8, 6th Floor, Udhyog Bhavan
Sector–11, Gandhinagar–382011, Gujarat
Email: [email protected]
DOCUMENTS CHECKLIST
Sr. Attached For Official
Complete sets of Bid (Technical) and related/other documents except Price Bid in Main
Signed Tender Documents (Copy of this Tender with sign
and official seal on every page) in Cover-I
Below Enclosures of the Bid i.e. documents required as
per PQC in Cover-II
A Valid registration certificate of appropriate class
Solvency certificate of INR / ₹. 50.00 lakhs & above (Valid
B certificate, i.e. Validity will be considered one year from
issue of certificate)
C Attested copy of GST Registration Certificate of Bidder.
D Submit copy of MSME Certificate (if applicable)
E Attested copy of PAN Card for Bidder.
Attested copy of Provident Fund Code of Bidder.
(Separate EPF code number allotted by RPFC & last six
months of current year EPF challan paid by copy is
Group Insurance: A copy of the valid insurance policy of
the insured labourer’s under W.C. Act.
H Signed copy of Schedule of Quantities (Un-priced)
Details of Partner(s) / Director(s) of the firm / Company
Partnership deed in case of partnership firm /
Memorandum of Association & Article of association in
case of company
Details of tools and tackles, owned and available for using
Proof for Bidders office in Gujarat or undertaking for
K setting up office in Gujarat/Site location if work is
Attested copy of Power of Attorney, if any, for signing the
Documentary Evidence/Proof for similar works completed
for GRC Material
APPENDIX–I: TENDERER’S EXPERIENCE/WORK
[List of orders executed in last (07) seven years (including works
executed in GPCL) along with copies of satisfactory completion
certificates (3A) obtained from respective department for works
completed during last 07 years.]
APPENDIX–II: WORKS TENDERED / IN HAND
O (List of works tendered / in hand works along with copies of
P APPENDIX-III: TENDERER’S DETAILS OF PERSONNEL
DOCUMENTS CHECKLIST
Sr. Attached For Official
APPENDIX-IV: DECLARATION IN RESPECT OF CONFLICT OF
APPENDIX-V: TENDERER’s/FIRM’s DETAILS AND TENDER
FEE, EMD DETAILS
APPENDIX-VI: ACKNOWLEDGEMENT OF TENDER
APPENDIX-VII: UNDERTAKING IN REGARD TO INTEREST
OF ANY EMPLOYEE OF GPCL
ANNEXURE–VIII: UNDERTAKING IN REGARD TO STOP
U DEAL / BANNED FOR BUSINESS DEALING / BLACK LIST
APPENDIX-IX: TENDERER’s CONFIRMATION FOR
RTGS/NEFT DETAILS FOR PAYMENT
W APPENDIX–X: TENDERER’S FINANCIAL TURNOVER
X Any other document as mentioned in PQC
Demand Draft of Tender Fees (in original) in
4 Demand Draft of EMD (in original) in Cover-IV
Documents as per Amendments/Addendum/
Corrigendum (if any) issued by GPCL
NOTE: ALL ABOVE SCANNED DOCUMENTS SHOULD ALSO BE SUBMITTED ONLINE THROUGH
See “Pre-Qualification Criteria (PQC)” of tender carefully.
In absence of any of the above documents, the Bid of the party/tenderer/firm is subject
to rejection and may be considered at the discretion of the GPCL only.
Mandatory: The Bidder should attach and send this document checklist along with the
Gujarat Energy Research and Management Institute (GERMI) (hereafter referred as the
“Consultant” appointed by GPCL) has prepared this document as Consultant to Gujarat Power
Corporation Limited (GPCL), an undertaking of Government of Gujarat to provide the
background / information for “Various Civil Infrastructure Repair Works in Charanka Solar
Park at Village: Charanka, Taluka: Santalpur, Dist. Patan, Gujarat” hereafter referred as the
Also, information is provided on the terms and conditions set out in this document and any
other terms and conditions subject to which such information is provided in Tender
This document is not an agreement, is not an offer or invitation to any other party. The
purpose of this document is to provide interested parties/bidders with information to assist
the formulation of their bid. The information is not intended to be exhaustive. Bidders are
required to make their own inquiries and respondents will be required to confirm in writing
that they have done so and they do not rely solely on the information in this document.
The information is provided on the basis that it is non – binding on GPCL and any of its
authorities or agencies or any of its respective officers, employees, agents or advisors.
GPCL reserves the right not to proceed with the project or to change the configuration of the
project, to alter the timetable reflected in this document or to change the process or
procedure to be applied.
While the “Consultant” has taken due care in the preparation of information contained herein
and believe it to be accurate, neither GPCL nor “Consultant” or any of its authorities or
agencies nor any of its respective officers, employees, agents or advisors gives any warranty
or make any representations, express or implied as to the completeness or accuracy of the
information contained in this document or any information which may be provided in
association with it.
No reimbursement of cost of any type will be paid to persons or entities submitting their bid.
ABOUT GPCL & BRIEF DESCRIPTION OF THE PROJECT
Gujarat Power Corporation Limited (GPCL) incorporated on 28th day of June 1990 under the
Companies Act, 1956, is a State Government Company promoted by the Government of
Gujarat. The Company is primarily engaged in the business of generation and distribution of
power through various sources and has been playing the role of developer and catalyser in the
energy sector in the state.
GPCL identifies the power projects based on various fuels, prepares techno-economic feasibility
reports for such power projects, identifies suitable private joint sector parties and implement
these jointly with the selected parties. After the power project is identified, GPCL obtains
various statutory and non-statutory clearances to be obtained for implementation of the power
project, such as, water and air pollution clearance, forest clearance, environmental and forest
clearance, civil aviation clearance etc. It also pursues the formalities related to acquisition of
land under the Land Acquisition Act and ties up the fuel linkages for the power project. It has
also been designated as Nodal Agency by the Government of Gujarat for development of Solar
The Gujarat Solar Park at village; Charanka, Dist; Patan, Gujarat developed by Gujarat Power
Corporation Limited is the Asia’s first Multi developer, Multi facility, Multi Technology and Multi
beneficiary Solar Park. It is an integrated hub of Solar Power generation which is first of its kind
Gujarat Power Corporation Limited (GPCL) intends to repair their civil infrastructures in the
Gujarat Solar Park (located at Charanka Village in Patan District of Gujarat State) for its
employees and visitors with regard to facilitation for official proceedings.
GPCL wishes to appoint a contractor for development of this project. The nature of services
to be provided by the appointed contractor will include, but will not be limited to the terms
and conditions contained herein this tender document.
The appointed contractor will be required to provide sufficient technically qualified and
experienced staff for providing the required level of service.
GERMI has been appointed as consultant i.e. the “Consultant” to the Gujarat Power
Corporation Limited (GPCL) in preparing tender of the project.
GERMI shall be providing the services of the Consultant i.e. the “Consultant” to the Gujarat
Power Corporation Limited (GPCL). This shall mean that the Consultant shall be working and
supplying all the details as per Tender and scope of work as and when directed and approved
by Gujarat Power Corporation Limited (GPCL).
All items of work, part of work or work itself shown on the drawings or mentioned in the
tender document are to be executed by the contractor. Non-appearance of any of the items
either in the drawings or in the tender shall not vitiate the purpose for which the building shall
be constructed. Any extra items shall be dealt appropriately in terms of provision of the
1. DEFINITION AND INTERPRETATION
1.1. Definitions:
a) The Contract means the documents forming the tender and acceptance thereof,
together with the documents referred to therein or individual work order in the case of
term contract, including these conditions, schedules and / or additional conditions
attached to the form of tender or individual work order, rate schedule, the specifications
and the drawings and all these documents as applicable taken together shall be deemed
to form the contract.
b) The “Tender Document” means the form of tender; the applicable schedules and/or
additional conditions and the specifications and/or drawings as issued to the contractors
for the purpose of preparing bid.
c) The expression “works” or “work” when used in the conditions of contract shall, unless
there be something in the subject or context repugnant to such construction means, the
works or the work contracted to be executed under or in virtue of the contract whether
original or altered.
d) The Tenderer means the applicant or bidder or the contractor (firm/agency).
e) The “Contractor” means the individual or firm or company, whether incorporated or not,
undertaking the works and shall include his or its legal personal representative,
successors and permitted assignees.
f) “GPCL” means the Gujarat Power Corporation Limited and the “Accepting Officer” means
the officer who is authorized to sign and signs the contract on behalf of the “GPCL.
g) The letters “CPO” means Chief Project Officer (GPCL) who in the case of measurement
and lump sum contract, direct the contract. The powers assigned to Chief Project Officer
(GPCL) in these conditions shall mean Chief Project Officer (GPCL) or any authority
equivalent or above them who in the case of measurement and lump sum contract, direct
the contract. The letters “CPO” means “Chief Project Officer” who administers and in the
case of the term contracts, directs the contract.
h) The “PMC Engineer” means all officers / staff / employees of the PMC Agency appointed by
the GPCL for project management and to supervise the works and/or part of the works and
other miscellaneous works.
i) “Approved” and “Directed” means the approval or direction (from hierarchy) of the
Chief Project Officer (or any authority equivalent or above it) to Project Head, or the
person deputed by CPO (or any authority equivalent or above it) for the particular
j) “B.S.” means the “British Standard” as issued by the British Standards institution. “A.S.”
means the American Standards as issued by the American Standard Institutions and
“I.S.” means the “Indian Standards” as issued by the Indian Standards Institutions.
Wherever the above-mentioned abbreviations are preferred to, in the specifications and
/ or work orders, they mean the addition with all amendments current at the date of
issue of tender documents of work orders.
In the case of measurement and terms of contracts “Specifications” means those
contained in Gujarat Power Corporation Limited schedule together with any
amendments etc. embodied in the tender documents, “Drawings” refer to those
accompanying the tender documents and/or any work orders referred therein.
k) The “Contract Sum” means the sum accepted or the sum calculated in accordance with the
prices accepted in the tender bid and/or the contract rate as payable to the contractor
for the fully executing and completed works.
l) “The date of completion” is the date or dates of completion of the work or any part of the
works set out or ascertained in accordance with the individual work order and the tender
documents or any subsequent agreed amendments thereto.
2. INSTRUCTIONS TO THE BIDDERS
PART A: GENERAL INSTRUCTIONS
Bidders are advised to read the instructions, evaluation norms and other terms and conditions
described in this document carefully before submitting their offer.
All interested parties are requested to understand this Tender in detail in order to comply with GPCL’s
requirements including but not limited to the fees and deadlines, selection criteria, selection
methodology, scope of work, and minimum technical standards. They shall strictly abide by all terms
prescribed in this Tender and provide accurate information to the best of their knowledge without
misleading the GPCL to be considered for participation in this Project.
2.1 All bids should be digitally signed. Offers submitted without digital signature will not be accepted.
2.2 In case GPCL finds that, there is an attempt of cartel in the prices, GPCL reserves the right to
consider or reject any or all the parties offer without assigning any reason thereof.
2.3 At any time before the submission of Proposals, GPCL may amend this document by issuing an
addendum/corrigendum, which shall be binding.
2.4 GPCL reserves the right to change, modify, add, alter the document or cancel the bidding process
without assigning any reasons thereof, at any stage during the bidding process before the Bid
2.5 The proposals shall be signed and submitted by the Authorized Signatory of the Agency/firm. The
authorization shall be attached in the Technical Proposal and shall be in the form of a written power
of attorney / board resolution or in any other form demonstrating that the representative has been
dully authorized to sign.
2.6 The bidder shall bear all costs associated with the preparation and submission of the proposal. GPCL
and their consultants shall not, under any circumstances, be responsible or liable for any such costs.
2.7 Neither GPCL nor its employees or consultants shall have any liability to any Bidder or any other
person under the low of contract, tort, the principle of restitution or unjust enrichment or
otherwise for any loss, expenses or damage which may arise from or be incurred or suffered in
connection with document, or any matter deemed to form part of this document, the award of the
work, or the information and any other information supplied by or on behalf of GPCL or its
employees, any consultants or otherwise arising in any way from the selection process.
2.8 GPCL reserves the right to delete any item of schedule-B for which contractor shall not have
any right to claim on this account. For any variation in the quantity of item of schedule-B the
contractor has to execute the work, however the payment will be made on actual work carried
out up to value of work for civil works.
2.9 GPCL reserves the right of altering the Drawings and nature of work by adding to or omitting any
items of work or portions of the same carried out without prejudice to this tender / awarded
2.10 GPCL reserves the right to carry out the work at other places mentioned in the scope, at the same
Rate, terms and conditions and mutually agreed upon under this tender.
2.11 Earnest Money Deposit, Security deposit and Retention Money will not bear any interest.
2.12 If the contractor does not pay security deposit and does not commence work as per tender
condition, E.M.D. paid by the contractor will be liable to be forfeited by the GPCL and in that case
GPCL may take necessary decision including but not limited to termination of contract and/or
debar the contractor for participating in future tenders/business of GPCL for period as per GPCL
2.13 The Bidders shall study the Conditions of site & shall resort to dewatering where necessary, by
appropriate methods & maintain reasonably dry areas to work at and no extra claim will be
entertained on this account.
2.14 The Contractor shall prepare all required roads to execute various items of this tender /
accepted contract & arrange all transport of materials & all such costs shall be taken care of
while quoting the rates. No extra payments shall be admissible towards such costs. On
completion, this shall be cleared if asked by GPCL at no extra cost.
2.15 Gujarat Power Corporation Limited shall not entertain any idle charges for site conditions or
any circumstances.
2.16 The bidder who have earlier been awarded contract by GPCL for any job which either they did
not accept or have abandoned or contract has been terminated by the GPCL for breach of
conditions, shall not be eligible to participate in the tender.
2.17 The Contractor shall take all requisite & necessary care to observe that no damage is occurred
to the Existing structures, if any. For any damage to the existing structures of Gujarat Power
Corporation Limited, the Contractor shall be held responsible.
2.18 The bidder shall carefully study the work to be carried out and site situation etc. GPCL will not
pay any extra or rate difference for any reason in case the contractor claims after acceptance of
Work Order / Contract to have misjudged the site condition.
2.19 The commercial bid (i.e. Price bid) shown in tender documents comprising Schedule-B shall be
filled up in on-line tender only by mentioning % of estimated cost only.
2.20 The percentage quoted shall include cost towards all materials, & machinery including
equipments, fixtures, labour, constructional equipments, fuel, scaffolding, staging ramps,
walkways, approach and haul road, temporary works, etc. bearing permanent to temporary
nature necessary for the completion of the work in all respects, except for those items specifically
mentioned to be furnished by the GPCL.
2.21 The percentage quoted by the Bidder must be inclusive of all required materials, labours,
transportation, loading, unloading, mobilization, de-mobilization, all applicable cess, levies,
duties, royalty, professional tax, turn over tax, all other taxes etc. as per Government rules but
excluding of GST. The contractor must also arrange for the transport of materials & include all
such costs in the percentage quoted by him to complete/finish the awarded work in all respects.
2.22 Percentage quoted by the Contractor should be firm and no escalation in percentage will be
allowed on any account to the contractor during the entire contract period till completion of
2.23 The percentage quoted by the contractor on total amount of all the items and schedules will be
2.23 The percentage quoted by the contractor on total amount of all the items and schedules will be
considered together for evaluation to calculate the final quoted amount of the price bid and
based on such total amount, L1 bidder will be finalized. If GPCL feels that there is lack of serious
based on such total amount, L1 bidder will be finalized. If GPCL feels that there is lack of serious
competition or any other reasons, GPCL may negotiate with L-1 party. If two bidders become L1,
then the preference will be given to the bidder who have higher average annual turnover of last
(03) three financial years ended on 01/03/2025.
2.24 Tender conditions shall be subject to and your entity shall be abiding by any amendments /
Circulars /Orders regarding revision in Technical and Commercial clauses issued by the Central
Govt./ Govt. of Gujarat / any other legal authority from time to time and shall be applicable to
2.25 As estimated cum ascertained by the Consultant, all rates provided in BOQ (Schedule B) is intended
to be comprehensive, covering everything from initial procurement and transport to the final
placement and completion of the item.
2.26 Quantity mentioned in schedule of quantities against each item is estimated cum ascertained by
the Consultant and no claim will be entertained on either increase or decrease in the quantity to
complete the work in all respect. For increased quantity no escalation will be considered and no
charges will be paid for all resources provided for this increased work. The quantity in “Bill of
Quantities” is estimated quantities and actual quantity as executed becomes payable at finalized
2.27 Any variation due to site condition/requirement, the contractor has to execute the item up to
plus minus 10% however no claim shall be entertained for variation in quantity due to change in
design to any extent.
2.28 The total cost of actual executed work (of all tender items together) may vary beyond ±10 % of
the cost of the estimated work mentioned in Work order. If the quantities decrease, the present
rates as mentioned will hold good and no price revision will be allowed. GPCL will not be liable to
pay any compensation or any additional cost in case of work is reduced or abandoned at any
point of time. If item quantity increases beyond 10% of the estimated quantity put to the tender
than the rate will be applicable either at estimated rate of GPCL or quoted rate of successful
contractor whichever is lower and no other charges will be considered. The decision of GPCL shall
be final and binding in such matter.
2.29 In case the quantities decrease to any extent, the finalized rates as mentioned in contract will
hold good and no escalation in rates will be allowed on any account. The finalized rates shall
remain valid till completion of the works.
2.30 During the execution of the work if it is found that the work is not progressing as per the schedule
progress programme approved by the GPCL & planned by the Contractor due to the reasons
attributable to the Contractor, suitable action shall be taken as per relevant clause of Tender and
GPCL may take such action as it may deem fit to ensure that the work is completed in time at
risks & cost of the contractor.
2.31 Work under this tender / accepted contract shall be completed in all respects within stipulated
period. However, interim mile stones to be jointly fixed.
2.32 Bidders must quote firm price only, till completion of work under contract & this is to be
confirmed by bidder while submitting his offer. No escalation towards labour and material/fuel
shall be paid in execution of this tender / accepted contract.
2.33 No price escalation on any account will be payable.
2.34 SITE VISIT: - The bidder is advised to visit the site and examine the site condition where in the
work is proposed to be carried out and to get himself fully acquainted at his own responsibility
for all information that may be necessary for quoting the tender bid and entering in to contract.
All cost and liabilities arising out of non-visiting the site shall be at bidders account.
2.35 Tenderer/bidder shall be deemed to have full knowledge of relevant documents, site conditions
etc. whether inspected or not by him.
2.36 Tender document & matters to be treated as confidential: All documents, correspondence,
decision & other matters concerning this tender shall be considered as of confident & restricted
nature by the contractor & he shall not divulge or allow access there to any unauthorized persons
2.37 Contactor to inform himself fully: The contractor shall be deemed to have carefully examined
the work & site conditions, the general conditions, the special conditions, specifications,
schedules, drawings and shall be deemed to have visited the site of the works & to have fully
informed himself regarding the local conditions.
2.38 Details for Pre-Bid Meeting: Should there be any doubts as to the meaning of any portion of these
general conditions or special conditions, scope of work, specifications or any other matter
concerning this tender, he shall in good time before submitting his bid, send for the particulars
thereof & submit them to the GPCL (under intimation to Consultant) in order that such doubt
may be removed. A Pre-Bid meeting shall be organized by GPCL to solve such queries/doubts (if
any) of bidders. The decision of GPCL in such matters shall be final and conclusive. The bidders
may submit their queries (if any) to the below Email ID’s before the Pre-Bid meeting.
a) [email protected] (GPCL)
The amendments/ addendum / corrigendum (if any) shall be notified to the bidders on n-
procure (https://tender.nprocure.com/) as well as on GPCL’s website
(https://gpcl.gujarat.gov.in/). The bidders are instructed to check the above websites till
awarding of the work order / contract. The amendments/ addendum / corrigendum (if any) shall
form part of the tender document. Any Clarification (s)/ Corrigendum (s)/ Amendment(s) issued
by GPCL subsequent to the date of issuance of the tender document will also be considered an
integral part of the tender Document. The Clarification (s)/ Corrigendum (s)/ Amendment(s)
issued by GPCL will be binding on the bidders and it will be assumed that the information
contained therein will have been taken into account by the bidder in its bid. No verbal
clarifications and information provided by GPCL or its employee(s) or its representative(s) or its
consultant(s) shall in any way be binding on GPCL unless subsequently confirmed through the
issuance of Clarification (s) / Corrigendum (s)/ Amendment(s).
2.39 A submission of Bid by a bidder / contractor implies that he has read the instructions and terms
& conditions of tender contained herein and has made himself aware of the scope and
specifications of the work contained in the tender. These rules and directions shall form part of
the work order / contract.
2.40 The authorized signatory of the applicant/bidder shall sign & seal (stamp) each page of the Tender
Document before submitting the bid.
2.41 The bid shall be declared non- responsive if the bid submitted is conditional.
2.42 The technical bid shall be opened on-line at date and time mentioned in the tender notice, if
possible, in the presence of bidders / parties who are present. After scrutiny of the technical bid,
if any party fails to fulfill the Pre-Qualification Requirement, the price bids of such bidders /
parties will not be opened. The price bid of technically qualified bidders / parties shall only be
opened on-line, if possible, on the date of opening of price bid.
2.43 The offer should be valid for acceptance for a minimum period of 180 days from the last date for
submission of Bid.
2.44 The successful Bidder will have to enter into an agreement with the GPCL on a non-judicial stamp
paper of appropriate value as per the law/ government rules in force (to be provided by the
successful Bidder) in the form approved by the GPCL covering all terms and conditions interlaid
that are advertised and stated in this tender form and those which may be agreed upon or
modified by both parties during subsequent correspondence / discussions / negotiations within
30 days of acceptance of Letter of Award (LOA).
2.45 Notwithstanding anything to the contrary contained in this TENDER, the detailed terms &
conditions specified in the Contract Agreement (to be executed later with the successful bidder
after the award of work) shall have overriding effect; provided, however, that any conditions or
obligations imposed on the Bidder hereunder shall continue to have effect in addition to its
obligations under the Contract Agreement.
PART B: SUBMISSION OF BID
(a) General terms:
i. A Bidder is eligible to submit only one Bid for this TENDER. A Bidder shall not be entitled to
submit another Bid either individually or in a Consortium, as the case may be.
ii. Notwithstanding anything to the contrary contained in this TENDER, the detailed terms
specified in the Contract Agreement (to be executed later with the successful bidder after the
award of work) shall have overriding effect; provided, however, that any conditions or
obligations imposed on the Bidder hereunder shall continue to have effect in addition to its
obligations under the Contract Agreement.
iii. The Bid shall be furnished in the formats mentioned in the TENDER document which shall be
duly signed by the Bidder‘s authorized signatory.
iv. The Bidder shall submit a Power of Attorney as Authorized Signatory authorizing the signatory
of the Bidder to commit to the Bid or as per their Company’s/firm’s format.
v. Any condition or qualification or any other stipulation contained in the Bid shall render the
Bid liable to rejection as a non-responsive Bid. The complete Bid shall be without alterations,
interlineations or erasures, except those to accord with instructions issued by the GPCL, or as
necessary to correct errors made by the Bidder, in which case such corrections shall be
initialed by the person or persons signing the Bid.
vi. The TENDER documents and all attached documents are and shall remain the property of the
GPCL and are transmitted to the Bidders solely for the purpose of preparation and the
submission of a Bid in accordance herewith. Bidders shall treat all information as strictly
confidential and shall not use it for any purpose other than for preparation and submission
of their Bid. The GPCL will not return any Bid or any information provided along therewith.
(b) Opening of Price Bid:
Bidders shall note that the Price Bid of only those Bidders will be opened who are found
technically qualified and responsive to GPCL ‘s Tender terms and conditions.
(c) Format and Signing of Bid
i. The Bidder shall provide all the information sought under this TENDER. The GPCL will
evaluate only those Bids that are received in the required formats and complete in all
ii. The Bid shall be typed or written in indelible ink and signed by the authorized signatory
of the Bidder who shall also initial each page, in blue ink. All the alterations, omissions,
additions or any other amendments made to the Bid shall be initialled by the person(s)
signing the Bid.
(d) Sealing and Marking of Bid
i. The Bid of the Bidder shall be contained in one (1) single ―Main Envelope
ii. The Main Envelope shall contain Envelope & Covers as follows:
“Original Envelope”
The Original Envelope shall contain the followings:
Cover-I: Signed Copy of the Tender Document(s)
(The cover should be duly marked as ‘Signed & Sealed Tender Documents’ including its
annexures, appendices, attachments, amendments, corrigendum and any other documents
as added or modified by GPCL as per the provisions in this Tender)
Cover-II: Enclosures of the Bid
(The cover should be duly marked as ‘Enclosures of the Bid’ and shall contain all documents
pertaining to the PQC)
Cover-III: Proof of Tender Fee
(The cover should be duly marked as ‘Proof of Tender Fee’)
Cover-IV: Proof of EMD
(The cover should be duly marked as ‘Proof of EMD’)
All envelopes /covers shall be sealed. The outer envelopes / covers shall clearly bear the
contact details of Bidder for identification.
iii. All original attested Tender Documents, Bid Enclosures, EMD and Tender Fee, and
Financial Proposal (unpriced) shall be contained in the Original Envelope.
iv. Envelope shall be clearly marked as “Original”,
v. The content of documents uploaded on n-Procurement portal and hard copies submitted
should be same and in case of any discrepancy all documents uploaded on n- Procurement
portal shall stay valid and will be considered by GPCL.
vi. All Bid documents shall be placed in hard binding and the pages shall be numbered
serially. Each page thereof shall be initialled in blue ink by the authorized signatory.
vii. The Main Envelope shall be super-scribed with the Tender No. & Name of Work and shall be
Chief Project Officer
Gujarat Power Corporation Limited,
Block No. 8, 6th Floor,
Udhyog Bhavan, Sector–11,
Gandhinagar–382011
viii. If the envelopes/covers are not sealed and marked as instructed herein, GPCL assumes no
responsibility for the misplacement or premature opening of the contents of the Bid
submitted and GPCL may exclude the Bid from evaluation.
(e) Bid Due Date
Bids should be submitted before the Deadline for Submission of Bid as specified in NIT.
GPCL may, in its sole discretion, extend the Bid due date by issuing an Amendment/
Addendum uniformly for all Bidders.
Bids received by the GPCL after the specified time on the bid due date shall not be eligible for
consideration and shall be summarily rejected. In case of the unscheduled holiday being
declared on the prescribed closing/opening day of the Bid, the next working day shall be
treated as the scheduled prescribed day of closing/opening of the Bid.
Bids submitted by fax, telex, telegram, e-mail/courier shall not be entertained and shall
(g) Modification and Withdrawal of Bids
In case any clarifications are sought by the GPCL after opening of Bids then the replies of the
Bidder should be restricted to the clarifications sought. Any Bidder who modifies its Bid
(including a modification which has the effect of altering the value of its Financial Proposal)
after opening of Bid without specific reference by the GPCL, shall render the Bid liable to be
rejected without notice and without further reference to the Bidder and its EMD shall be
No Bid may be withdrawn in the interval between the bid due date and the expiration of the
validity period of the Bid. Withdrawal or unsolicited modification of a Bid during this interval
shall result in the Bidder's forfeiture of its EMD.
(h) Tests of Responsiveness
Prior to evaluation of Bids, the GPCL shall determine whether each Bid is responsive to
the requirements of the TENDER. A Bid shall be considered responsive only if:
a. It is received in the manner prescribed in this TENDER
b. It is accompanied by the requisite Tender Fee and EMD
c. It is received with all the Enclosures of the Bid as prescribed in the PQC, Appendices etc.
d. Its Enclosures are received as per the formats specified in Appendices as well as the
e. It contains all the information (complete in all respects) as requested in this Tender
(in the same formats as specified)
f. It complies will all the terms, conditions and provisions specified in this Tender; and
it does not contain any conditions or deviations
g. The GPCL reserves the right to reject any Bid which is non-responsive and no request
for alteration, modification, substitution or withdrawal shall be entertained by the
GPCL in respect of such Bid.
3. SCOPE OF WORK & TECHNICAL SPECIFICATIONS
3.1. Scope of Work
The scope of this work is as per specifications and terms & conditions mentioned here
1) The site of the proposed work is situated at Charanka Solar Park at Village: Charanka Tal.
Santalpur Dist. Patan, Gujarat.
2) The tendered works are to be executed within the GPCL premises and shall include, but not
be limited to, essential civil repair and infrastructure development works such as CC drain
repair and reconstruction, construction of new culverts, road repair and new road
construction as per latest/prevailing IRC/MoRTH standards, construction of RCC protection
walls, and other miscellaneous civil rehabilitation works required for proper completion of
3) The Scope of work under this tender is inclusive of all kinds of labour, requisite materials to
complete the work in all respect. In the event of missing of above phrase in the description of
schedule of quantities, the same will not mean that materials and / or labour will be supplied
4) Any activity not specifically mentioned in the tender but necessary in the opinion of GPCL must
be carried out for successful completion of the job/ to make the project operational without
any extra cost to GPCL.
5) Before taking up construction activity; the contractor/agency has to cut the trees (after
obtaining permission from respective competent authority) which obstruct the working, of
any diameter, bushes, vegetation, i.e. roots, plant, shrubs, grass etc. including stacking and
crediting to GPCL as directed with no extra cost.
6) Work Completion: Time limit for completion of work is 12 months from the date of acceptance
of Work Order or Date of Commencement given by GPCL.
7) The work shall be completed within the period stipulated in the tender / work order. However,
it may be noted that Final Drawing shall be released progressively based on site clearance
arranged and according to the progress of work at site. Therefore, contractor shall have to
organize and coordinate the works to suit these. In the event of any delay due to the above or
due to any other reason not attributable to the contractor, reasonable extension in completing
the work may be given at the discretion and as decided by the GPCL. But no compensation or
idle charges will be paid to the contractor under any circumstances.
8) Any drawings / certificates or necessary approvals from the local authority including any NOC
or approval for drawings etc. mandated for the installation purpose of lift/elevator shall be
sought by the contractor & no extra charges towards the same shall be paid.
9) Under the “Building and Other Construction Workers (Regulation of Employment & Conditions
of Service) Act, 1996” (The BOCW Act, 1996), every owner, 30 days prior to commencement of
a construction activity, shall have to submit Notice as per prescribed specimen-4 to the office
under jurisdiction of the Director, Industrial Safety & Health for respective district, similarly,
under The BOCW Act, 1996, the certificate of registration of organization shall have to be
submitted to this office within 60 days of commencement of work.
3.2. Technical Specifications
1) The scope of work is explained in the Tender specifications. The work shall be carried out
according to the enclosed General Conditions, Technical Specifications & working
drawings approved by the GPCL.
2) The bidders shall note that no deviations from the technical specifications or commercial
Conditions in this tender are acceptable & it will be presumed that the bidder agrees
entirely with the specifications & general terms & conditions in this tender.
3) The contractor shall abide by the instructions for any technical specifications provided by
the Engineer-in-Charge. Further, in case of any discrepancy/doubt/clarification regarding
finalization of technical advice cum action at site, the decision of GPCL shall be final,
binding and conclusive.
4) However, with regard to any approval for material /item for using in project or approval
for any other matter pertaining to the project (& related), the decision of GPCL shall be
final, binding and conclusive.
3.3. Use of Materials:
1 The contractor shall have to use the best quality of materials in the work, as per the
specifications and relevant I.S. codes. In case the GPCL desires to carry out any field test/
laboratory test for any materials required for the work, the contractor shall arrange for the
same at his own cost. Further, for any finished works such as masonry, plastering, cube testing,
paving for all important concreting work etc., if any testing is required same shall be arranged
by the contractor at his own cost. The contractor shall have to maintain the regular records
for such testing and shall submit along with each R.A. bills. The testing records should be duly
certified by the PMC Engineer.
2 No collection of materials shall be made before it is got approved from the GPCL.
3 Materials, if and when rejected by the PMC Agency shall be immediately removed from site of
4 All installations pertaining to water supply and fixtures thereof as well as drainage lines shall
be deemed to be completed only after giving satisfactory tests by the contractor.
5 Approval to the samples of various materials given by the GPCL shall not absolve the
contractor from the responsibility of replacing defective material brought on site or materials
used in the work found defective at a later date. The contractor shall have no claim to any
payment or compensation whatsoever on account of any such material being rejected by PMC
6 Approval to any of the executed item for the work does not in any way relieve the contractor
of his responsibility for the correctness, soundness and strength of the structure as per the
drawing and specification.
7 Cement and steel will have to be consumed of following makes only. The works shall be
expected as per list of approved makes and the technical specifications. (MAKE LIST
ATTACHED SEPARATELY)
3.4. Special condition for use of cement in work:
1 The rate in Schedule-B is inclusive of cement cost. Contractor has to purchase fresh 53 grade
cement confirming as per IS: 12270 and of brand approved by PMC Agency.
2 Contractor has to construct pucca go down at site of work so that cement bags can be properly
preserved to avoid damage due to any kind of water.
3 Contractor has to bring sufficient cement bags and at no time less than 200 (two hundred.)
bags to maintain progress of work. The work should not suffer due to shortage of cement.
4 Cement should give the required strength.
5 Sufficient and timely supply of cement at site is responsibility of contractor. Nothing extra will
be paid on account of any reason to maintain progress of work and to complete the work in
6 Contractor has to submit material account for consumption of cement used with every bill.
Contractor has to submit the copy of cement purchase bill.
7 No negative variation will be allowed for consumption in cement than prescribed as per
booklet of technical specification of PWD or R&B Dept. / mix design and nothing will be paid
extra for over consumption.
8 Contractor is fully responsible for safety of cement at site; nothing will be paid extra on
account of safety.
9 If GPCL’s authorized representative wants to check cement stock at site, contractor has to
allow for the same at any time.
10 Contractor has to maintain and sign day to day cement receipt/consumption/balance account
register at site. It is the responsibility of PMC Agency to get maintained cement register from
contractor. The PMC Agency has to verify and countersign the same regularly.
11 As far as possible contractor has to maintain a supply of cement of only approved brand and
grade throughout the work.
12 Contractor shall utilize cement in work as prescribed in cement consumption schedule strictly.
Minimum cement consumption considered for cement concrete having grade of M-15 / M-20
/ M-25 is 290Kgs / 360Kgs / 380Kgs respectively. Contractor has to use minimum cement as
above. Contractor should not use less than the prescribed quantity of cement even in the case
of mix design recommends lower quantity.
13 Contractor will be allowed to carry out work only after physical verification of cement (by PMC
Agency) brought at site.
Drawings issued with the tender are indicative and for tender purpose only. Bidders shall have
to execute the work as per approved construction drawings released from time to time by GPCL.
3.6. Electricity Connection:
The electric power, at site, will be made available at one mutually agreed point, free of cost
(connection only) by Gujarat Power Corporation Limited only. Further distribution will have to
be carried out by the contractor as per requirements at their own cost. The necessary
consumption charges will be recovered as per the tariff rate of Gujarat Power Corporation
Limited or Discom applicable from time to time as per GPCL’s or Discom’s rules.
3.7. Water Supply Connection:
The contractor has to make his own arrangement of water for construction activity at his own
cost. However, if possible and departmental water source is available, GPCL will give the water
supply connection for construction activity free of cost at one mutually agreed point on
contractor’s request. Further distribution of water supply line will have to be carried out by the
contractor as per their requirement at their cost.
If water is supplied by GPCL, the charges thereupon will be levied by GPCL as under:
a) In case of non-metered water supply by GPCL, the recovery of water charges will be made
by GPCL at 0.5% (Zero-point five percent) of total cost of actual work done as per work
b) In case of metered water supply by GPCL, the recovery of water charges will be made by
GPCL at the rate of INR / ₹. 4.00 (INR / ₹. four) per 1000 liter.
c) The certificate for recovery of water charges towards water supplied by GPCL should be
attached with RA Bills/ Final Bill.
3.8. Attached with Tender
Annexure- A (Technical Specification)
Annexure-B (List of Approved Makes of Material)
Annexure-C (General Drawings)
Schedule-B / BOQ
4. Pre-Qualification Criteria (PQC) / Pre-Qualification Requirement (PQR)
The tender documents are in two separate bids i.e. technical bid (qualifying bid) and price bids
(commercial bid).
Along with online submission only technical bids shall be submitted in physical form. All below
documents must be submitted online as well as in physical copy along with Technical Bid.
4.1 The Earnest Money Deposit and Tender Fee: As mentioned in Tender notice under heading
“IMPORTANT DATES & DETAILS FOR TENDER FEE & EMD”.
4.2 Registration: Bidder quoting for the bid shall have valid registration in appropriate class.
The bidder should be registered in R & B/CPWD/ Railway/ State Government / Semi
Government /Govt. Boards, Corporation, PSU. The bidder shall submit registration
certificate along with the bid. Joint Venture/Tie ups will not be allowed.
4.3 The bidder must have office in Gujarat. In case, bidder do not have office in Gujarat, bidder
should give undertaking to open office in Gujarat within 30 days from the date of
4.4 The contractor/agency/firm should not have black listing history with any State
Government, Central Government, any Semi Government and any corporation. submit
the self-declaration.
4.5 MOU for Electrical and Mechanical works: The Bidder Must have a valid and inforce MOU with
registered contractors having Government approved Electrical license.
4.6 GST Registration & PAN card: The bidder must have Goods and Service Tax (GST)
registration and same shall be submitted along with the Tender. The tender of the bidder
without (GST) registration will not be considered. PAN number along with PAN card.
4.7 Work Experience:
The agency must have executed work of a similar nature and magnitude successfully in R &
B/CPWD/ Railway/ State Government / Semi Government /Govt. Boards, Corporation/
PSU as per work experience criteria, prior to the bid submission last date.
Contractor should submit evidence of having work experience in the form of work
completion certificate of executed works under single contract as main contractor of
similar nature with the departments like R & B/CPWD/ Railway/ State Government / Semi
Government /Govt. Boards, Corporation/ PSU. The contractor should submit the
satisfactory work completion certificate from respective department/organization.
Contractor has also to submit the details of works tendered and in hand with documentary
evidence thereof.
Contractor’s Experience of having successfully completed similar works during last
years ending last day of month previous to the one in which applications are invited
should be either of the following:
a. Three similar completed works costing not less than the amount equal to 27% of the
estimated cost.
b. Two similar completed work costing not less than the amount equal to 40% of the
estimated cost.
c. One similar completed work costing not less than the amount equal to 80% of the
estimated cost.
i. Similar work means Various Road and drain repair works / RCC road / Culverts / RCC
Protection wall and other misc. civil work.
ii. Contractor should submit evidence of having work experience in the form of work
completion certificate of executed works under single contract as main contractor of
similar nature of the departments like GETCO/GPCL/GUVNL/UGVCL/PGVCL & its
subsidiary companies/ Central Government/ State Government/ Railway / Semi-
Government/Public Sector Organization.
iii. The contractor should submit the satisfactory work completion certificate from
respective department/organization. Contractor has also to submit the details of works
tendered and in hand with documentary evidence thereof.
4.8 Criteria of financial turnover: Minimum Average Annual turnover for last 03 years (FY-22-
23, FY-23-24 & FY-24- 25) should be at least 100% of the estimated cost of the tender, as
certified by CA. Also, last 03 years (FY-22-23, FY-23-24 & FY-24- 25) annual audit report.
4.9 Solvency certificate of INR / ₹.50.00 lakhs & above (Valid Solvency certificate, i.e. Validity
will be considered one year from the issue of the certificate)
4.10 Details of Partner / Directors of the firm/Company: Partnership deed in case of
partnership firm / Memorandum of Association & Article of association in case of
4.11 Group Insurance: A copy of the valid insurance policy of the insured labourer’s under W.C.
Act. The contractor shall renew the same till completion of the work order / contract.
4.12 Details of personnel.
4.13 The details of tools and tackles, owned and available for using in this work.
4.14 Attested copy of Power of Attorney, if any, for signing the documents.
4.15 Separate employee provident fund code number towards bidder’s firm registered with
Regional PF Commissioner. Separate EPF code number allotted by RPFC & last six months
of current year EPF challan paid by copy is required.
4.16 Employees Provident Fund:
Bidders shall note that they possess P.F. Code No. in the name of the company [under
Employees Provident Fund Organization, Regional Office, Ahmedabad directive] obtained
from the concerned Authorities of their respective jurisdictions.
In the event of non–possession of the separate P.F. Code No. as detailed in the foregoing
para, the offer/bid shall summarily not be considered for the acceptance despite the
offer/bid is the lowest quoted offer in the price bid opening.
4.17 The selection criteria will emphasize that the bidder has completed similar type of project
completed by the bidder. The bidder has to submit the completion certificate with actual
work executed photographs of the completed works. The GPCL reserves the right of
physical inspection of completed projects of bidders. GPCL/ Consultant may visit and
inspect all the eligible works that have been executed and submitted by the bidders in the
technical bid. If Quality of workmanship is not found satisfactory in submitted
photographs/ site inspection, the GPCL reserves the right of selection or rejection of any
or all bidders without assigning any reason
Similar work means: Scope includes & executed for State Government, Central Government, Semi
Government, Municipal Corporation, Public Sector Unit, Public sector Organization of Corporate
office/Hostel Building/Guest house/ State Bhavan, Institutional building. Work includes Civil repair
work, including all services as required etc. all composite executed under one contract/ agreement
in last seven years in India (Private project work shall not be considered)
The completion certificates enclosed in support of experience for the similar work must clearly
indicate the following:
• Name of work/project
• Estimated cost, Tendered cost, Completion cost of project.
• Stipulated date of start
• Stipulated date of completion
• Actual date of completion
The agencies who do not fulfil the Pre-Qualification Criteria / Pre-Qualification Requirement &
work experience, their bid will not be evaluated further.
5. EARNEST MONEY DEPOSIT (EMD), SECURITY DEPOSIT & RETENTION MONEY, PERFORMANCE
GUARANTEE FOR WATER-PROOFING & ANTI-TERMITE TREATMENT
5.1 EARNEST MONEY DEPOSIT:
a) Estimated Cost: INR / ₹.6,56,88,720.00/- plus applicable GST
b) Earnest Money Deposit: INR / ₹. 19,70,660/-
In the event of bid being rejected, the EMD shall be returned after awarding of the work
order / contract to the successful bidder / contractor. The EMD of the successful bidder
shall be converted into security deposit and shall be returned as mentioned under Security
5.2 SECURITY DEPOSIT:
a) Security Deposit: 5% of Estimated cost or Total Contract Value (whichever is higher)
b) The Security Deposit to be paid by Demand Draft (DD) in favour of ‘GUJARAT POWER
CORPORATION LIMITED’ payable at ‘GANDHINAGAR, GUJARAT’ of any Nationalized
Bank, Scheduled Bank, Public Sector Banks & approved Private Sector Banks authorized
to undertake Government business as notified at present and amended time to time by
Finance department of Government of Gujarat. (Refer Appendix XI: List of Banks in this
Tender Document). GPCL will accept DD submitted towards Security Deposit of any
Nationalized/Scheduled Bank, all Public Sector Banks and approved Private Sector Banks like
IDBI Bank/Axis Bank/HDFC bank/ICICI Bank & Kotak Mahindra Bank which authorized to
undertake Government business as notified and amended time to time by finance
department, GOG. GPCL will not accept DD issued by Co-operative Bank.
c) The contractor shall pay total Security Deposit within 15 days from the date of acceptance
of Work Order / Contract.
d) The Security Deposit, subject to any deductions, will be released by GPCL upon the conclusion
of the maintenance period i.e. the Defects Liability Period (DLP). This release will take place
after GPCL has received a "No Objection Certificate" from the PMC Agency, which must meet
GPCL's satisfaction.
e) Further if original contract is extended then all the performance security deposit must be
extended accordingly.
5.3 RETENTION MONEY:
a) Retention Money will be deducted from RA bills at 5% of the value of the bill amount.
b) The Retention Money, subject to any deductions, will be released by GPCL upon the
conclusion of the maintenance period i.e. the Defects Liability Period (DLP). This release will
take place after GPCL has received a "No Objection Certificate" from the PMC Agency,
which must meet GPCL's satisfaction.
Any damages, costs, charges, expenses, and other amounts that the contractor may
owe to the GPCL as per the contract terms may be deducted from security deposit &
Retention Money. The GPCL is authorized to cash it for this purpose. Moreover, any
amounts owed to the contractor by the GPCL or from the total or remaining balance of
the encased securities may be refunded, transferred, and returned to the contractor
after the final bill is settled or after the contractor's obligation to maintain the work in
good condition has expired, whichever is later.
Security deposit and Retention money paid by the contractor shall be liable to be
forfeited by GPCL, if the contractor does not carry out the work in accordance with the
terms and condition of the tender. In such eventuality GPCL can complete the work at
the risk and cost of the Contractor.
6. GENERAL CONDITIONS OF THE CONTRACT (GCC) Part
These rules and directions shall form part of the work order / contract.
6.1 Notwithstanding anything contained to the contrary in the specification or tender in
subsequent exchange of correspondence, the conditions of contract shall be binding on the
contractor and any change or variations expressed or implied, however made in the said
conditions shall not be valid or operative unless expressly sanctioned by the GPCL. The contractor
shall be deemed to have fully informed himself and to have special knowledge of the provisions
of the conditions of contract herein contained.
6.2 Copies of specifications, design, drawings, estimated rates, scheduled rates and any other
documents required in connection with the work which will be signed by the PMC Agency for
the purpose of identifications shall be open for inspections by the contractor at his local site
office / container whenever asked by authorized representative of GPCL.
6.3 Whether the works are proposed to be executed according to the specifications recommended
by the contractor and approved by Gujarat Power Corporation Limited (after verification &
certification by PMC Agency), such specifications with designs and drawings shall form part of
the accepted tender.
6.4 The Tenderer’s receipts for payments made on account of any work, when executed by a firm
should be signed by all the partners except where the contractors are described in their bid as
a firm, in such case the receipt shall be signed in the name of firm including the partners or some
other person having authority to do so.
6.5 The Tenderer shall fill up the usual form stating at what percentage above or below rates
specified, he is willing to undertake the work. Only one rate or such percentage on all the
estimated rates or schedule rates shall be mentioned.
6.6 Tenderer who proposes any alternation in the work specified in the form in invitation to tender
or in the time allowed for carrying out the works or which contain any other conditions, will be
liable for rejection.
6.7 GPCL may open bids in the presence of any intending bidders / contractors who may be present
at that time. In the event of a bid being accepted, the contractor shall there upon, for the purpose
of identification, sign copies of the specifications and other documents.
6.8 GPCL shall have the right of rejecting all or any of the bids, without assigning any reasons
6.9 No receipt for any payment alleged to have been made by contractor in regard to any matter
relating to tender of the contract shall be valid or binding on the GPCL unless it is signed /
approved by the Chief Project Officer (or any authority equivalent or above it).
6.10 All works shall be measured, meet by standard measure and according to rules, custom and
usual in the use in the “Gujarat Power Corporation Limited / R&B Dept. / Board / Corporation”,
and no proposal to adopt alternative method will be accepted, the PMC Agency ’s decision as to
what is the usual method in use in the “Gujarat Power Corporation Limited / R&B Dept. / Board
/ Corporation” shall be final.
6.11 Every bidder / contractor shall, along with the bid a solvency certificate from the collector of
the district within which he resides, or a banker’s certificate of his financial stability, if he fails
to produce such a certificate his bid will not be considered.
6.12 All corrections and addition or pasted slips should be initialed.
6.13 Tenderer shall be deemed to have full knowledge of relevant documents, site conditions etc.
whether inspected or not by him.
6.14 Submissions of bid by a bidder / contractor implies that he has read the instructions and condition
of contract herein contained and has made himself aware of the scopes and specifications of
the work to be done and has made himself aware of the local conditions and other factors
bearing on the execution of the work.
6.15 Under no circumstances shall any contractor be entitled to claim enhanced rates for any item
of work order / contract.
a) Goods & Service Tax (GST):
The rates are excluding applicable GST under the GST Law or as applicable to Works Contract
Services from time to time which will be paid extra on a given taxable goods and/or services.
The amount and % of GST should clearly be indicated separately. GST means all applicable Tax
under GST Laws. (GST Laws means IGST Act, GST (Compensation to the State for Loss of Revenue)
Act, CGST Act, UTGST Act and SGSCT Act, 2017 and all related ancillary legislations)
Supplier/Contractor should charge GST in invoice at the rate as agreed to/mentioned in
acceptance of tender only and any deviation in the same shall not be accepted. Further, any
additional liability of GST (later on due to wrong mentioning of GST rate, misinterpretation of
HSN/SAC Code, etc.) over and above as charged in the invoice shall be borne by the
Supplier/Contractor. However, any refund received by the supplier/contractor on account of GST
charged from the company; such refund shall have to be passed on to the company, along with
interest if any. Such refund along with interest needs to be passed on suo-moto by the
supplier/contractor.
Further, the Company has a right to recover the amount of GST along with penal interest at the
rate of 15% per annum if GST charged is not paid/ short paid to the government or fail to upload
the details or uploads inaccurate particulars on GSTIN portal by the Supplier/Contractor within
the stipulated time limit.
In case, Govt. revises the rate of GST rate/code during the tenure of the contract, the provision
of GPCL statutory variation clause shall apply.
b) INPUT TAX CREDIT BENEFIT:
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of any
other additional item of their inputs/input services under the ambit of the Input Tax Credit provisions
under the GST Act, subsequent to the date of submission of the offer, the same should be passed on
to GPCL and contractor should inform such changes to GPCL from time to time.
c) STATUTORY VARIATION:
Any statutory increase or decrease in the taxes and duties including GST and cess as applicable or in
the event of introduction of new tax/cess or cessation of existing tax/cess subsequent to suppliers
offer if it takes place within the original contractual delivery date will be to GPCL’s account subject
to the claim being supported by documentary evidence.
However, if any decrease takes place after the contractual delivery date, the advantage will have to
be passed on to GPCL.
Statutory variation clause will not be applicable in case of Supplier/Contractor has opted for the
composition scheme under GST.
d) WELFARE CESS:
As per the Welfare Cess Act, the welfare cess @ 1% is applicable for civil worksand the same is
considered in the price bid.
THE WELFARE CESS WILL BE PAID TO THE CONTRACTOR ON ACTUAL WORK EXECUTED AMOUNT AS
PER WORK ORDER / CONTRACT. The contractor shall deposit 1% welfare cess as applicable to
respective government department. GPCL shall pay the welfare cess by way of reimbursement to
the contractor on production of documentary evidence of payment deposited thereof by the
The modality of payment/reimbursement of welfare cess will be as under:
(i) The contractor/ bidder will get them registered under Welfare Cess Act and submit the
documentary evidence to the concerned office.
(ii) Before release of payment of first R.A. Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
(iii) Before release of payment of subsequent R.A. Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A. Bill.
(iv) Before release of payment of Final bill, the contractor has to submit the documentary evidence
of payment of welfare cess of previous R.A. Bill as well as of final bill on final bill amount certified
(v) Before release of payment in case of 1st & Final Bill, the contractor has to deposit the 1% welfare
cess on bill amount as certified by GPCL and shall submit the documentary evidence of payment
deposited thereof.
(vi) The contractor shall produce the receipt of payment of welfare cess from the respective
Government Department before submission of final bill otherwise final bill of the work will not
be finalized. Welfare cess payment will be reimbursed on production of evidence.
(i) In case of any damage to equipment/machinery or structure/building of GPCL or any public
property due to negligence’s of contractor or any other reasons attributed to contractor the
decision of GPCL regarding the amount of recovery shall be final.
(ii) If the contractor fails to execute the work as per direction of PMC Agency within the time frame
given by GPCL time to time then GPCL shall get the work done through any other agency /
contractor and cost of execution of such work along with 15% overhead charges, plus applicable
tax shall be deducted from monthly bill / RA Bill / Final Bill of contractor (whom work order /
contract was awarded) over and above (any) recovery as per rules
7. GENERAL CONDITIONS OF CONTRACT (GCC) Part
These rules and directions shall form part of the work order / contract.
7.1 Change in the constitution of firm to be notified
In the case of tender by partnership firm, any change in the constitution of firm shall be
forthwith notified by the contractor to the PMC Agency and GPCL for their information.
7.2 Lump Sum in Estimate
When the estimate on which tender is made, includes lump sums in respect of parts of
the works, the contractor shall be entitled to payment in respect of the items of works
involved or the part of the work in question at the same rates as are payable under this
tender / accepted contract or such items or if the part of work in question is not in the
opinion of the PMC Agency capable to measurement the GPCL may at its discretion (after
recommendation and certification from the PMC Agency ) pay the lump sum amount entered
in the estimate. However, the decision of GPCL shall be final and conclusive against the
contractor with regard to any sum or sums payable to him under the provisions of the
7.3 Industrial Labour Laws
Note - In view of the New Labour Codes being brought into action by the Central
Government, the applicable draft rules namely Draft Code on Wages (Central) Rules,
2025; Draft Social Security Code (Central) Rules, 2025; Draft Occupational Safety,
Health and Working Conditions Code (Central) Rules, 2025; and Draft Industrial
Relations Code (Central) Rules, 2025 are being referred, as the Government of Gujarat
has not yet notified the corresponding state rules and the Central guidelines are
presently in force.
(a) Wages to be paid and time of payment etc. by the Contractor: -
i. The contractor shall pay to his labourers as may be specified under minimum wages
Act. The wages of every contract labour employed by him under this tender /
accepted contract shall be paid by him before the expiry of 7th day of the last day of
the month in respect of which the wages are payable (i.e. wages of a month have
to be paid by him in the first week of the next month). The payment shall be
disbursed in presence of Management Representative during the working hours
and the contractor shall get the entries certified in the register of wages by the
PMC Agency. Any default will result in cancellation of contract forthwith or else
the contractor shall be punishable to the extent of INR / ₹.100/- fine per each day.
ii. The contractor shall give his telephone number and address to the PMC Agency &
GPCL so that in case of labour trouble etc., the contractor can be contacted. The
contractor shall arrange to have his office outside/inside the work premises and
the contractor keep himself present throughout the working hours.
(b) Labour Laws: -
i) Persons below the age of 18 years shall not be employed for the work.
ii) No female worker shall be employed in the night shift between 7.00 p.m. to 6.00 a.m.
iii) Contractor shall maintain a valid labour license under the Contract Labour
(Regulation and Abolition Act) for employing necessary manpower to be required
by him. In the absence of such license the contractor Shall be liable to be
terminated without assigning any reason thereof.
iv) The contractor shall at his own expense comply with all labour laws and
keep the GPCL indemnified in respect thereof. Some of the major liabilities
under various labour and industrial laws which the contractor shall comply with,
i. Payment of contribution of wages of employer’s contributions towards
Provident Fund, Family Pension Scheme, Deposit Linked Insurance Scheme,
Administrative Charges etc. at the rates made applicable from time to time by
Government of Gujarat / Government of India or other Statutory Authorities.
ii. Payment of deposit in respect of each contract labour of the rate as applicable
time to time as per the rules of the office of the Commissioner of Labour as
per the Contract Labour Act (Regulation & Abolition).
iii. License Fee as prescribed under the contract Labour Act (Regulation and
Abolition) and Rules framed there under depending upon the number of
workmen employed by the contractor.
iv. Identity cards as prescribed under the labour laws with photo affixed thereto,
the same for identification.
v. Payment of retrenchment compensation, notice pay and other liabilities as
per Industrial Disputes Act. Any payment to the contractor’s employees arising
out of any claim of disputes under the Industrial Disputes Act – 1947 or any
vi. Provision of compensation in the case of accidental injury under workmen’s
compensation act
vii. Payment of crèche if the female labour employed is more than 30 numbers
viii. Maternity leave as per the provision of the Maternity Benefit Act.
The above are some of the major liabilities of the contractor in addition to
other liabilities prescribed under the various Labour Laws in force from time to
time from Statutory Authorities like State Government / Government of India
which the contractor shall have to comply with.
(c) Provident Fund and Family Pension Scheme
The contractor shall submit along with his bill (month wise or as applicable) a
statement regarding deductions against employees’ provident fund and family
pension scheme in respect of each concerned employees’ Provident Fund and Family
Pension scheme at the rate of 12 % (or at the rates made applicable by the
Government from time to time) of the wages. Contractor’s contribution and his
worker’s contribution towards provident fund and family pension scheme shall be
deposited by the contractor with regional Provident Fund Commissioner,
(d) Deposit Linked Insurance Scheme: -
The contractor shall have to deposit ½ % of the wages in-respect of employees who is
a member of the Provident Fund as the contribution to the Deposit Linked Insurance
Scheme with Regional Fund Commissioner, Ahmedabad. No compensation /
Reimbursement will be given to contractor for compliance of labour laws.
(e) Administrative Charges: -
Administrative charges for maintaining Provident Fund Account shall be deposited
by the contractor with Regional Provident Fund Commissioner, Ahmedabad at the
rates applicable.
(f) Paid Leave Facility
Paid leave facility at the rate of one day for every 20 days worked by the contract
laborer shall be provided by the contractor to his workers. He shall maintain Leave
records/ Leave Cards for individual laborer which shall be duly verified and approved/
certified by PMC Agency.
(g) Workmen’s Compensation Act and Group Insurance: -
The contractor shall cover all his employees under Workmen’s Compensation Fund
and under the Liability Insurance. The contractor shall employ adequate number of
experienced staff at site for daily supervision and for maintenance of various registers
and records required under the law and contract. No payment for supervision shall
(h) The GPCL reserves the right to terminate the contract at any time during the contract
period without giving notice of termination or any reasons thereof.
(i) The GPCL will be entitled to deduct directly from the bills, to be paid to the Sub-
contractor and Labourers any sum or sums payable by contractor, on account of
contractor’s default in respect of all liabilities referred to in above clauses.
Notwithstanding the foregoing, GPCL shall not be liable in case for any payment to
any person employed by the contractor or its agent.
(j) No provision in the tender document or accepted contract shall classify any workmen or
employees of the contractor or any sub-contractor as workmen or employees of the
GPCL, nor shall it place any obligation or liability on the GPCL regarding such workmen or
(k) No Compensation or escalation will be paid towards maintenance of records, raising
the rates than minimum wages, engaged skill or higher skilled qualified supervisor /
workers whose payment made by the contractor. It shall have to be borne by
contractor only.
(l) No Compensation / Reimbursement / Escalation or extra charges will be paid towards
implementation/ compliance of the provision of various labour laws applicable to the
contractor such as Provident fund and family pension scheme, minimum wages Act,
Linked insurance scheme, paid leave facilities, Workmen compensation, Group
insurance, Contract Labour (Abolition and Regulation) Act 1970, Payment of wages
Act, Industrial Disputes Act-1947, Maternity Benefit Act, Family Pension, Creches
Deposit Linked insurance scheme.
NOTE: -Any Other Act prevailing at the time of execution of work, over and above act
specified herein shall be binding to the contractor
7.4 Labour conditions:
a) The contactor shall comply with the labour laws laid as may be current & shall
furnish the returns & information as may be specified from time to time.
b) The contractor shall as far as possible obtain his requirements of labour, skilled
& unskilled from the local areas.
c) The contractor shall pay wages as per the latest circulars applicable at the times for the
minimum wages to be paid to unskilled, semiskilled & skilled labour prescribed by the
Govt. of Gujarat. The PMC Agency and/or GPCL shall have the authority to remove from
the work site any person, who may be considered unfit or undesirable & no responsibility
shall be accepted by the GPCL for any delay or extra expense caused towards the
completion of the work by such removal.
d) The contractor shall provide reasonable facilities to the labour employed by him. The
usual facilities are weather proof shelter for rest & meal, supply of whole some drinking
water, facilities for obtaining food, reasonable washing & sanitary facilities, special
facilities for women workers, suitable residential accommodation, general sanitation &
health measures etc.
e) The implementation of any & all provisions of this clause in no way entitles the
contractor to claim in this tender / accepted contract.
7.5 Local Laws:
a) All local laws in force at the time entering into the contract & those enacted there after
shall be binding on the contractor & he shall abide by the same.
b) All import duties, Sales Tax & other local taxes (if applicable) shall be borne by the
contractor & they shall be deemed to have been covered by this quoted rate.
7.6 Acceptance of terms & conditions on submission of bid
Submission of bid or acceptance of work order / contract shall imply acceptance of the
terms & conditions of this tender by contractor.
7.7 Employment of Scarcity Labour
If government declares a state of scarcity or famine to exist in any village situated within
20kms of the work, the piece worker / contractor shall employ upon such part of the
work as are suitable for unskilled labour; any person certified to him by the GPCL (after
recommendation and certification by the PMC Agency ) or by any person to whom GPCL
may have delegated this duty in writing to be in need of relief and shall be bound to pay
wages to such person not below the minimum wages, which Government may have fixed
in this behalf from time to time. Any implementation of this clause shall be decided by
the Chief Project Officer (or any authority equivalent or above it) whose decision shall be final
and binding on the piece worker / contractor.
7.8 Data to be furnished by Contractor
Prior to the commencement of work the contractor shall submit a bar chart showing
detailed programme for completing the work within time limit to the PMC Agency for
any corrections or update within a week from the date of acceptance of
work order / contract. GPCL shall be the final authority to approve the detailed
programme for completion of the work within time limit by the contractor. No change
in the approved plan & layout shall be carried out without specific written approval of
7.9 Samples of descriptive Data:
Samples of descriptive data that require approval must be submitted by the Contractor
to the PMC Agency well in advance of the intended use of such materials, allowing for
their inspection and testing (at cost of contractor), and consequently, their approval by
the GPCL subject to recommendation & certification by the PMC Agency . The samples
should be clearly labeled to indicate the name of the material, the place of manufacture,
and the intended location of use, among other details. If any samples fail to meet the
specified testing requirements, this will be adequate grounds for rejecting any
additional samples from that source.
7.10 Baselines & Grades:
The available Permanent Bench Mark may be located by the contractor in the RE Park.
The Contractor shall establish semi-permanent baselines and cross lines at sufficiently
spaced intervals with benchmarks, at his own cost and risk. The Contractor shall supply
all necessary pillars, equipment, materials, and labor for the establishment of the grade
lines and bench marks, and he shall be accountable for their maintenance throughout
the entire construction period. The Contractor is responsible for executing the work
according to the lines, levels, and grades as specified in the drawings or indicated by the
PMC Agency. Any survey work required shall be checked by the PMC Agency. However,
this does not exempt the Contractor from ensuring the accuracy of the survey or the
temporary and permanent Benchmarks.
7.11 Contactor not to dispose of soil:
The contractor is prohibited from selling, disposing of, or removing, except for the
purposes outlined in this tender / accepted contract, any sand, ballast, earth, rock, or
other substances or materials obtained from any execution related to this tender /
accepted contract or produced on-site at the time of land possession delivery.
Furthermore, such substances, materials, and products shall remain the property of
GPCL and must be disposed of in the manner and location specified by the PMC Agency,
after receiving approval from GPCL.
7.12 Gold, Silver, Minerals, Oil Relics, etc. found on the Site:
All gold, silver, oil relics, or other minerals, of any description & all precious stones, coins,
treasures relic, antiquities, & other similar things that shall be found in or upon the site shall
be the property of the GPCL. The contractor shall return the gathered things as above to
7.13 Fencing, lighting & ventilation:
The contractor is obligated to ensure proper lighting, fencing, guarding, and the
implementation of all necessary safety measures for all tasks included in this tender or
accepted contract. This includes the appropriate provision of temporary roadways,
footways, guard fences, caution notices, etc., as required for the work to accommodate and
protect workmen, foot passengers, or other traffic, as well as the representatives of GPCL
and residents of nearby villages and public property. The contractor shall also be liable for
any accidents that may arise due to his negligence in taking timely precautions.
All works and access routes must be sufficiently illuminated with electric lights to meet the
instructions / recommendations of the PMC Agency to ensure the satisfaction of GPCL. The
power and lighting connections, along with wiring equipment, will be subject to inspection
and approval by the Electrical Inspector or any other Officer / Dept. / Agency authorized by
the GPCL / GOG under the Indian Electricity Act. Any modifications, alterations, or omissions
must receive approval from the GPCL, following recommendations and certification from
the PMC Agency, and must be certified by the Electrical Inspector or authority appointed by
GPCL / GOG. Work areas, such as excavation faces of borrow pits and filling areas, must be
adequately illuminated with floodlights to meet the instructions / recommendations of the
PMC Agency to ensure the satisfaction of GPCL.
7.14 Explosive Procurement & Storage:
Explosives, petrol, oils, fuels, &other inflammable materials shall be stored strictly in
accordance with the rules of the Explosive Department. The contractor shall at his own
expense construct & maintain proper magazines which are required for the storage of
explosive & arrange for storage facilities for oils, petrol, fuels etc. for use in connection
The contractor shall at his own cost obtain the necessary license for the storage & use
of explosives, oils, petrol, diesel etc. The GPCL shall not take any responsibility
whatsoever in connection with the storage or use of explosives on the site, any accident
which occurs in the connection at site or nearby village or vicinity. All operations of the
contractor in which or for which explosives are employed shall be at the risk of the
contractor & upon his own responsibility.
7.15 Cleaning up & Recoveries:
a) The contractor shall at all-time keep the construction areas & his labour colony &
storage areas free from accumulation of waste, or rejected materials.
b) Prior to the completion of the work the contractor shall remove all rubbish from &
about the premises, & tools, tackles, machinery, left out materials, consumable,
rejected materials, scaffolding etc. which are not the part of the permanent
work/structure. The premises will be left fully satisfactorily to the GPCL; thereafter
only the completion certificate will be issued (after recommendation and
certification by the PMC Agency).
c) Contractor’s inventory of equipment & machinery:
The contractor shall prepare & maintain an inventory of all machinery,
equipment, temporary rolling stock, and plant purchased or hired for the use of
this tender / accepted contract’s execution.
d) Progress Schedule:
Contractor shall furnish a Construction Schedule on acceptance of Work Order /
Contract, in quadruplicate, indicating the date of start, the monthly progress
expected to be achieved & anticipated completion of each major items of the work
under this tender / accepted contract & procurement of equipment, machinery & other
materials. The schedule should be such as is practicable of achievement the whole
work in the time limit & of the particular items on due date specified in the work order
/ contract & shall have the recommendation and certification by the PMC Agency for
approval by the GPCL. Detailed schedules for each working season showing the
progress month by month to be achieved is to be submitted to the PMC Agency and
GPCL. The PMC Agency and GPCL is empowered to ask for more detailed progress
schedule week by week for any item or for all items & the contractor shall comply
when asked for.
e) The GPCL shall have, at all times the right without in any way violating this tender /
accepted contract, or forming grounds for claim to alter the order of the works or any
part thereof & the contractor shall after receiving such direction proceed in the order
directed. The contractor shall revise the progress schedule accordingly & submit to
the GPCL in four copies (after getting it checked and certified by the PMC Agency).
f) The contractor shall furnish sufficient machinery, equipment, labourers & materials
for such hours & shifts as may be necessary to maintain/achieve the progress of the
scheduled, after getting instructions from PMC Agency and/or GPCL.
g) The progress schedules shall be in the form of bar charts, statements &/or reports as
may be necessary & directed by the PMC Agency and/or GPCL.
h) Unsatisfactory Progress: In the case of unsatisfactory progress by the contractor not
proceeding as per the Scheduled Programme approved by the GPCL, suitable actions
shall be taken in accordance with the Tender Terms & Conditions or accepted contract
or as per the discretion of GPCL.
7.16 Recoveries:
Recoveries due from the contractor, up to the end of the month previous to the one in
which the bill is prepared shall be made from bills approved for payment every month
or at other periods when the bills are prepared, for the enlisted, but not limited to, in
the order of priorities & extents.
(a) Penalty, if Leviable, Expenditure, in full, incurred by the GPCL on contractor’s behalf
in respect of labour, machinery, equipment etc.,
(b) Charges for services such as water & power supply, etc. in full,
(c) Hire charges for GPCL’s or Government machinery if any,
(d) Other recoveries not specifically mentioned but recoverable.
7.17 Other contracts for the suspension stoppage or curtailments of work:
If, at any time during the execution of the contract documents, the PMC Agency requires
the entire work or any part specified in the tender to be halted for any duration, or decides
that the entire work or part of it need not be executed by the contractor, in such case the
PMC Agency must notify the contractor in writing under intimation to GPCL and the
contractor shall have to abide by the decision taken by GPCL. The contractor shall then
suspend or cease work, either fully or partially, as applicable. In such cases, the contractor
shall not have any claims for payment or compensation for any profits or benefits that could
have been gained from the complete execution of the work, which were not realized due to
the incomplete nature of the work, nor for any losses incurred from materials purchased or
intended for purchase, or for the unemployment of labor hired by him. Furthermore, the
contractor shall not have any claims for compensation due to modifications made to the
original specifications, drawings, designs, and instructions that may result in a reduction of
the work initially planned. However, if materials have already been procured or agreed to
be procured by the contractor prior to receiving the aforementioned notice, GPCL (after
recommendation and certification from PMC Agency) may compensate the contractor for
any losses incurred, provided that the materials are not in excess of requirements and are
of approved quality. The amount of such compensation will be determined by the Chief
Project Officer (or any authority equivalent or above it) on behalf of GPCL, whose decision
will be final. The decision of GPCL in such matter shall be final, binding and conclusive against
the contractor.
The GPCL may order the contractor to suspend any work on account of bad weather; rain or
storm & such other adverse climate conditions & the contractor shall comply with the
same. The contractor shall not be entitled to any compensation for such suspensions of
7.18 Other contractors:
Apart from the work in this tender / accepted contract, the other works connected with
in this tender / accepted contract will be simultaneously going on either departmentally
or through any other contractors. The contractors shall co-operate with others to their
fullest extent & shall allow each other every facility & coordination for the execution of
their works simultaneously & satisfactorily, during their action of machinery or
execution of any other co-ordination works, the contractor will have to co-operate as
directed by the PMC Agency and/or GPCL. In such cases the contractor shall not be entitled
for any compensation on account of reduction or stoppage of labour force / machinery
/ equipment, etc.
In the matter of dumps, haul roads, drainage, diversion & the like, each contractor shall
take into considerations the needs & the requirements of the other contractors if any
working in the vicinity. Further no contractor shall take or cause to be taken any stops or
action that may cause disruption, discontent or disturbance to the work, labour
arrangements etc. to other contractors. Any action, by any contractor, which the GPCL
in the unquestioned discretion may consider as infringement of the above code, would
be considered as a breach of the contract conditions & the GPCL may take such action
as may deem fit against the contractor & the action taken shall be considered as final &
7.19 Performa returns:
The contractor shall maintain Performa, charts & details regarding machinery,
equipment, materials, labour, personnel & other matters as may be specified by the
PMC Agency and/or GPCL time to time.
7.20 Insurance:
The contractor shall procure or arrange for the Subcontractor to procure insurance
coverage in amounts approved by the GPCL & sufficient to protect against the following
risks arising out of the work.
a) Accidents & professional & non-professional sickness of all laborers & personnel
engaged in the work as required by Law pursuant to Workmen’s Compensation Act,
1923 or Revised version thereof.
b) Injury or death to third parties including without limitation injury or death caused by
any of the construction aids or vehicles or rented machinery, equipment used by the
contractor or subcontractor whether at the site or elsewhere.
c) Damage to contractors tools, machinery, construction equipment, form works,
scaffolding materials etc. due to floods, earthquake or any such cause.
d) Damage to the existing permanent structures of the GPCL & nearby villages,
equipment/items of the GPCL OR of the co-contractors working in the area for other
e) All the above conditions referred for the insurance cover, shall be in effect from the date
of commencement of the work until the GPCL has accepted the work.
f) In the policies covering the insurances referred to above, the GPCL, contractor & the
subcontractor shall be as co-ensured where possible.
g) The cost of insurance shall be borne by the contractor.
The final payment to the contractor will not be released until the contractor provides the
GPCL with complete receipts in exchange, along with an affidavit confirming that, to the best
of his knowledge or information, the releases and materials for which a lien could be filed
have been addressed. Should any lien remain unresolved after all payments have been
completed, the contractor is obligated to reimburse the GPCL for any funds that the latter
may be required to pay in order to settle such a lien, which includes all associated costs and
reasonable attorney fees.
7.22 Special conditions:
The successful Bidder, on acceptance of the work order / contract will submit within a
week’s time his planning/programme of works, for the scrutiny of the PMC Agency in a
PERT/BAR Chart Format, clearly indicating the inputs given by PMC Agency for necessary
action by GPCL.
The contractor will organize his tasks in a manner that allows for simultaneous progress
on all fronts released by the GPCL, ensuring that the entire project is completed within
the designated time frame.
The work commencement date will start from the date of acceptance of work order or
date of commencement given by GPCL. However interim mile stone to be jointly
fixed after acceptance of work order.
The successful bidder will have to depute his authorized representative to attend progress
review meetings to be held at site or at the GPCL’s Head Office at Gandhinagar.
The contractor will be responsible for complying with all rules & regulation & the labour
laws applicable to him & the GPCL will not be responsible for any lapses committed by
them. If there is any claim from the Govt. Authority pertaining to the contractor the same
amount will be deducted from the contractor’s bill. The contractor shall depute sufficient
numbers of qualified engineers / supervisors to look after work. The engineers /
supervisors shall remain present at site at all the times. In no circumstances, contractor
shall be allowed to continue work without engineering supervision.
7.23 Other Conditions of Contract
i. The contractor shall at his own expense make all necessary provisions for housing, water supply,
and sanitary arrangements for his employees as well as for works and shall pay direct to the
authorities concerned, all rates and taxes.
ii. The contractor shall make his own arrangements for the necessary approach, road, for
transport of materials and be responsible for the compensation on account of damage to
crop etc. & shall till completion of work including the Defect Liability Period.
iii. All the royalty charges, other duties & all taxes will be paid by the contractor and no extra
be claimed on this account, if otherwise explained.
iv. Go-downs or sheds hired or constructed for storing of controlled materials and more
particularly of cement shall be such as would prevent the materials from getting damaged
v. It will be absolutely incumbent on the contractors to have on the site of work only such of the
materials as have been duly passed by the PMC Agency. Materials that have been rejected
must on no account be allowed to remain on the site, and in spite written order to do so,
any such rejected material is on the site beyond a period of 48 hours’ notice, the GPCL shall
have the right to remove it, at the risk and cost of the contractor and even to destroy it.
vi. It must be distinctly understood that conditions of contract and of claims in respect of extra
work, will not be allowed unless the works to which they relate is clearly without the spirit
and meaning of the specifications or unless such works are certified by the PMC Agency and
claimed for in specified manner.
vii. On completion of the work, the site shall be cleared by the contractor within the stipulated
period, and ground brought to original state and they shall not be entitled for any extra
claim on this account.
viii. General Specifications of the relevant Indian standard specification shall also apply.
ix. Damage to work clause:
The works whether fully constructed or not and all materials, machinery, plant, tools,
temporary buildings and other things connected there shall be at the risk and in the sole
charge of the contractor, until the works have been delivered, completed to the satisfaction
of the PMC Agency and certificate from him to the effect is obtained. Until such delivery, the
contractor shall at their own cost, take all the precautions reasonably necessary, to keep all
the aforesaid works, materials, machinery, plant, tools, temporary buildings and other
things connected with the works, free from any loss or damage and in the event of the same or
any part thereof being lost or damaged, shall forthwith within the possible speed, reinstate and
made good such loss or damage at contractor’s own cost.
x. Any components or part of the work shall not be given to any sub-contractor without
approval of the GPCL. The whole responsibility of the execution of the work, as per the terms
and conditions of the contract, will entirely rest on the main contractor. The main contractor
shall always keep his responsible representative, preferably a technical hand, on work site
with powers to sign M.R.s. and take necessary decision and implement the instructions
issued in the interest of efficient execution of the works.
xi. The PMC Agency will fix the hours of work, and no work shall be executed beyond that
period, during night time or in absence of the PMC Agency. The box measures shall be filled
only in the presence of the PMC Agency.
xii. Contractor will be asked to present the sample of materials and the approved samples will
be preserved at the site of work, and no change in the approved sample will be allowed,
without the written permission of the GPCL.
xiii. In any work is not executed according to the specifications, and the directions of the PMC
Agency and/or GPCL, the same will be rejected, and the contractor has to re-execute the
same without any financial implication to the GPCL.
xiv. Contractor will have to communicate the name of his authorized agent, who shall be present on
the works, and shall be authorized to sign the material requisitions, receive instruction given
verbally or on the order book, on behalf of the contractor.
xv. The contractor will have to sign the tender document / conditions of contract, and execute
the agreement, send the list of previous works executed, solvency certificate and pay up
the security deposits, failing to that, the bid will be rejected and earnest money deposited
will be forfeited. The value of the stamp paper and stamp duty charges shall be borne by
the contractor.
xvi. Tenderer must return the form of tender, with the specifications and the schedule of
quantities, and rates and other schedules duly signed on each page. Any bid not bearing
signature of the tenderer on all the documents accompanying the bid is liable to be
xvii. Before submitting his bid, unit rates, which shall be for the finished work complete,
including charges involved in testing, maintenance for a period of 60 months (05 years), the
tenderer shall closely examine the specifications and carefully study the drawings and all
documents, which form a part of the contract, to be entered into by the accepted tenderer.
xviii. The Tenderer shall must visit the site of work and see himself the site conditions regarding
water, labour conditions, rates and approach roads during all seasons and all other matters
affecting the works before submitting the bid.
xix. The submission of bid by a contractor implies that, he has read these instructions, the conditions
of contract etc. and has made himself aware of the scope and specifications of the work to be
done, and of conditions and rates, and local conditions and other factors bearing on the
executions of the work. The GPCL will not therefore, after acceptance contractor’s rate, pay
any extra charge for lead or for any other reason. In case the contractor is found later on, to
have misjudged the site conditions.
xx. The tender document shall be written legibly and free from erasure, over writing or
conversions of figures. Correction where unavoidable, shall be made by crossing out,
initialing, dating and rewriting.
xxi. The GPCL or its officers, who accept bid, shall have the right of rejecting all or any of the bids,
and will not be found/bind to accept the lowest offer not to assign any reasons whatever,
for the rejection of any bid or all bids.
xxii. The tender notice to tenderers shall form a part of the contract.
xxiii. The entire work is to be completed, within the stipulated time limit. The contractor will not
be eligible for any extra for the idle period of works, or waiting period that may be required
to suit other consideration, and no claims for compensations on account of such, will be
considered. However, in case of delay due to circumstances beyond the control of
contractors, either in date of commencement or due to, waiting during construction,
extension in time may be considered for completion of works, without any penalty to the
xxiv. The contractor shall keep full time qualified Civil Engineers at the site, who shall be fully
authorized to receive and comply with such instructions, as given by the PMC Agency
and/or GPCL. The name of such Engineer with his qualifications and experience shall be
intimated by the contractor. The GPCL shall have the right to demand the removal of any
technical personnel, skilled or unskilled workmen, who in his opinion are considered to
cause bad workmanship in the execution of works or to cause indiscipline.
xxv. The GPCL reserves the right to make any change in the design and the plans of the works
and the contractor shall be bound to carry out them at the rates tendered. No claim or
compensation will be allowed on this account.
xxvi. Bills shall be submitted by the contractor monthly (or as applicable) on or before the date fixed
by the GPCL, for all works executed in the previous months.
xxvii. Should this tender / the work order be accepted, the contractor hereby agree to abide by
and fulfill all the terms and provisions of the “Tender & contract for works” as applicable,
and in default thereof to pay to the GPCL the sums of money due or penalty decided by
xxviii. The contractor shall assist and liaison for obtaining the completion certificate from local
authorities, obtain lift license, obtain sewerage and water supply connection. Contractor
shall get the site inspected and attend to various inspections to settle the matter.
Contractor shall keep the PMC Agency and GPCL appraised on all these procedures and
xxix. The contractor shall keep instruction book on site, for taking site instruction from time to
time. This book shall be made available on site whenever asked for.
xxx. The contractor shall pay wage to the workers, as per minimum wages act as declared by the
Government time to time.
xxxi. The contractor shall follow all labour laws of Govt.
xxxii. Contractor shall arrange for testing of material to be used in the work or finished product,
if desired by the PMC Agency and/or GPCL. The provision shall be made in the unit rate
quoted for this.
xxxiii. The full value of the “Earnest Money Deposit” paid herewith, shall be forfeited by the GPCL,
if the contractor fails to deposit the full amount of specified security deposit, within
stipulated time.
7.24 CEMENT CONSUMPTION SCHEDULE
The proportion of cement with coarse aggregate and the fine aggregate for cement concrete
works & with sand in case of cement mortar will be in accordance with the under mentioned
schedule showing the consumption of cement in bags. The PMC Agency will adjust the
proportion of cement irrespective of the mix mentioned in the description of the items, to
ensure the consumption of the cement as per prescribed schedule. The tendered rate will
be considered to have been based on the consumption of cement in this schedule and
nothing extra will be paid on this account.
a. If the quantity of cement shown as utilized in the work, is observed to be less than permitted
as below then work will be accepted at reduce rate at the discretion of PMC Agency, if
Table showing the cement required to be consumed in civil work items.
(The Steel, Cement & Brick Consumption list is attached to this Tender Document)
Note: (1) Consumption figures mentioned against each item is for theoretical consumption. This
consumption may vary + 5 %
General: Please refer latest edition of relevant Indian Standard Specification or Code i.e.
General relevant I.S. of B.I.S. shall prevail for all items including materials,
measurements etc.
For full description of items covered in Schedule “B”, the R&B Dept. / PWD detailed
specifications laid down and amended from time to time in the booklet “General Technical
Specifications for Building Works” or manuals available at this office shall be followed and
binding and shall form part of the contract. The bidders are intimated to go through the same
before submission of bid. The said booklet, manuals and documents can be seen in the office
of PMC Agency and/or GPCL. The specifications are not however intended to cover every
detail and the works shall be executed according to the spirit of the specifications laid down
and the best prevailing R&B Dept. / P.W.D. practice. The clarification to any clause in detailed
specifications shall be sought from the latest edition of relevant I.S. specification and codes.
Where these specifications are at variance with the specification laid down in the I.S. Books
stated above, the former will be applicable. As regarded matters not covered by any of the
above specification, the recommendation of the PMC Agency shall be considered by GPCL
for further necessary action and GPCL’s decision shall be treated as final and shall be
binding upon the contractor. The contractor is expected to get clarified any doubt about
specification, etc. before submitting his bid by discussing with the PMC Agency and GPCL.
7.25 SAFETY CODE
i. There shall be maintained at a readily accessible place first aid appliances including
adequate supply of sterilized dressings and cotton wool.
ii. An injured person shall be taken to a public hospital without loss of time, in case where
injury necessitates hospitalization.
iii. Suitable and strong scaffolds should be provided for workmen for all works that cannot
safely be done from ground.
iv. No portable single ladder shall be over 9 meters in length. The width between the side
rails shall not be less than 30 cm. (clear) and the distance between two adjacent rungs
shall not be more than 30 cm. when a ladder is used, an extra mazdoor shall be engaged
for holding the ladder.
v. The excavated material shall not be placed within 1.5 meters of the edge of the trench or
half of the depth of trench whichever is more. All trenches and excavation shall be
provided with necessary fencing and lighting.
vi. Every opening in the floor of a building or in a working platform be provided with suitable
means to prevent the fall of persons or materials by providing suitable fencing or railing
whose minimum height shall be 1 meter.
vii. No floor, roof or other part of the structure shall be so overloaded with debris or
materials as to render it unsafe.
viii. Workers employed on mixing and handling materials such as Asphalt, cement mortar or
concrete and lime mortar should be provided with protective footwear and rubber hand
ix. Those engaged in welding works should be provided with welder’s protective eye-shields
x. (i) No paint containing lead or lead products shall be used except in the form of paste or
readymade paint.
(i) The workers should be supplied suitable facemasks for when the paint is applied in the
form of spray or surface having lead paint dry rubbed and scrapped.
xi. The contractor shall supply overcoats to the painters and adequate facilities shall be
provided to enable the working painters to wash during the period of cessation of work.
xii. Hoisting machines and tackle used in the works, including their attachments,
anchorage and supports shall be in perfect condition.
xiii. The ropes used in hoisting or lowering material or as a means of suspension shall be of
durable quality and adequate strength and free from defects.
The drawings provided with the tender are for general guidance only. Detailed and final
drawings shall be issued to the successful bidder during execution.
In case of any discrepancy between the tender drawings and actual site conditions, the
Contractor shall immediately inform the PMC and Gujarat Power Corporation Limited (GPCL)
in writing and obtain necessary clarification before proceeding with the work.
The decision of Gujarat Power Corporation Limited / Engineer-in-Charge shall be final and
binding on the Contractor.
8. WORK EXECUTION CRITERIA:
8.1 Start of Work:
The contractor shall not enter upon or commence any portion of the work except with
the written permission of GPCL, failing which the contractor shall have no claim to ask
for measurement of or payment for work & shall be responsible for any claims or
damages that may arise due to such unauthorized commencement or entry. No
compensation shall be allowed for any delay caused in starting the work on account of
any delay in clearance of the work site.
8.2 Speed of work:
The contractor shall at all times maintain the speed of work to confirm to the latest
operative progress schedule but the GPCL may at any time with sufficient notice in writing
direct the contractor to slow down or to accelerate any part or the whole work for any
reason (which shall not be questioned whatsoever) & the contractor shall comply with
such orders of the GPCL. The compliance of such orders shall not entitle the contractor
to any claim or compensation.
8.3 Work to execute to the satisfaction of the PMC Agency & GPCL:
The contractor shall proceed with the work with diligence & expedition & the whole of
the work herein specified as well as the mode of execution shall be under the supervision
& the direction of PMC Agency & shall be carried on to the entire satisfaction of the PMC
Agency & GPCL’s authorized representative, who shall have full powers to order the
contractor to alter, enlarge or diminish the form, dimensions, positions, or quantities of
any of the work or to make use of materials & workmanship of different descriptions &
qualities from this herein specified. In the case of any class of work for which there are
no Technical Specifications, these shall be carried out in accordance with the latest IS
Codes & in the event of being no relevant IS Code, the works shall be carried out in
accordance with the directions & instructions of the PMC Agency at site.
8.4 Workmanship:
The work shall be executed in thoroughly substantial manner with workmanship of best
quality & strictly in accordance with the specifications & with the drawings, or with such
other drawings or written instructions as may from time to time be furnished to the
contractor, in accordance with terms of this tender / accepted contract & shall be
completed in every respect with workmanship implied & necessary according to the fair
interpretation & meaning of the same & should there be any discrepancy between
the drawings & specifications or any difference or dispute as to the dimensions to be
worked out or the mode of doing periodical quantity of the work to be executed or with
respect to any subject arising out of this tender / accepted contract, the decision of the
PMC Agency will be considered for resolution of the matter after approval from GPCL.
However, the decision of GPCL shall be final, binding and conclusive.
8.5 Measurements to be provisional & subject to correction:
Every measurement for running payment on account of work done shall be subject to
adjustment or final measurements. In case there is disagreement between such
intermediate & final measurements, the latter shall prevail. Before excavation, site levels
shall be recorded by the contractor jointly with the PMC Agency and GPCL’s authorized
representative and two copies, duly signed by contractor and PMC Engineer shall be
immediately submitted to GPCL’s Head Office, Gandhinagar for record and reference.
8.6 Approval for loose sample / materials:
a) The contractor shall get approval of all loose sample prior to procurement. All
woodwork shall be seasoned. All ply shall be as per ‘list of approved makes of material’
confirming to latest IS code & latest version from approved make only. A manufacturer’s
certificate for the same shall be furnished. The contractor shall arrange for inspection
at its manufacturing workshops in various stages of furniture execution from loose to
finish product. For all the items to be executed based on contractor’s shop drawings,
the contractor (after recommendation and certification from PMC Agency) shall get
approval on the shop drawings from GPCL before execution of the item. Upon approval
of shop drawings one sample of the item shall be prepared for recommendation and
certification by the PMC Agency and only after approval by GPCL the further
multiplication of the item shall be processed.
b) Materials, its sample approval, its procurement and storage: The Contractor should
make his own arrangement to obtain all materials required for the work, except
otherwise stated. All materials shall, so far as procurable, be of the respective kinds
described in the Schedule of Items/Quantities and/or specifications and in accordance
with the PMC Agency 's instructions, and the Contractor shall upon the request of the
PMC Agency furnish him with all invoices, accounts, receipts and other vouchers to
prove that the materials comply therewith. The Contractor shall at his own cost arrange
for and/or carry out any test of any materials which the PMC Agency and/or GPCL may
c) The Contractor shall submit, samples of all the finishing materials, to the GPCL for
approval, as recommended, certified and directed by the PMC Agency much in advance,
so as to avoid any complications regarding availability. Also, whenever samples are to
be prepared for approval the same shall be prepared immediately on receipt of the
drawings and got approved by the GPCL (after recommendation and certification by
PMC Agency). The contractor will maintain proper records of materials and other inputs.
It shall be periodically reported to the GPCL and PMC Agency. Contractor shall submit
the copy of material inventory along with every R.A. Bill.
d) Approval of the samples of various materials given by the GPCL (after recommendation
and certification by the PMC Agency) shall not absolve the Contractor from the
responsibility of replacing defective material brought on site or materials used in the
work found defective at a later date. The Contractor shall have no claim to any payment
or compensation whatsoever on account of any such materials being rejected by the
GPCL and/or PMC Agency. No collection of material shall be made before it is
recommended and certified by PMC Agency and approved by the GPCL.
e) The PMC Agency and/or GPCL shall, during the progress of the works, order in writing
from time to time the removal from the works, within a period specified in the order, of
any materials which in his/their opinion are not in accordance with the specifications or
his/their instructions , the substitution of proper materials, and the removal and proper
re-execution of any work executed with materials or workmanship not in accordance
with the drawings, specifications or instructions; and the Contractor shall forthwith
carry out such order at his own cost. In case of default on the part of the Contractor to
carry out such order, the GPCL shall have the power to employ and pay other persons
to carry out the same; and all expenses consequent thereon, or incidental thereto, as
certified by the PMC Agency shall be borne by the Contractor, or may be deducted by
the GPCL from any moneys due, or that may become due, to the Contractor.
8.7 Works under direction of PMC Agency
All works to be executed under the contract shall be executed under the direction of
PMC Agency and subject to the approval of the Chief Project Officer (or any authority
equivalent or above it) on behalf of the GPCL who shall be entitled to direct at what point
or points and in what manner they are to be commenced and from time to time carried on.
8.8 Decision of GPCL to be final
The ruling of the Chief Project Officer (or any authority equivalent or above it) on behalf of
the GPCL will be final, conclusive, and binding on all specifications, designs, drawings, and
instructions referred to herein, as well as on the quality of workmanship or materials
employed, or any other questions, claims, rights, matters, or issues of any nature that may
arise from or relate to the contract, designs, drawings, specifications, estimates,
instructions, orders, or these conditions, or otherwise regarding the works or the execution
or failure to execute the same, whether such issues arise during the work's progress or after
its completion or abandonment.
8.9 Works to be executed in accordance with specifications, drawings, orders etc.
The contractor is obligated to carry out every aspect of the work in a robust and skilled
manner, ensuring that both the materials and all other components comply strictly with
the specifications. The contractor must also adhere precisely, completely, and faithfully
to the designs, drawings, and written instructions pertaining to the work, which have
been signed by the PMC Agency and stored in his office. The contractor is entitled to
access these documents for inspection at the office or on the work site during office
hours. Moreover, if the contractor wishes, he may, at his own cost, produce or arrange
for copies of the specifications and all related designs, drawings, and instructions.
8.10 Action where no specifications.
In the case of any class of work for which there is no such specifications mentioned in
this tender, such work shall be carried out in accordance with the R&B Dept. / PWD
specifications and if there are no R&B Dept. / PWD specifications available, the work shall
be carried out in all respects in accordance with the instructions and requirements of
the PMC Agency of the GPCL.
8.11 Errors, Omissions & Discrepancies
In all cases of errors, omissions, doubts or discrepancies in the dimensions, or discrepancies
in the drawings & items of work on specifications, reference shall be made to the PMC
Agency whose elucidation & elaboration shall be considered by GPCL for final approval. The
decision of GPCL in such matter shall be final and conclusive.
8.12 The contractor shall be held responsible for any error that may occur in the work thorough
lack of such reference.
a) Temporary structures may be erected by the contractor for storage sheds, offices, and
residential etc. for non-commercial use on land, handed over to him at his own expense
& with the permission of the GPCL.
b) The contractor shall preserve all existing vegetation such as trees on or adjacent, to the
works site which, do not interfere with the construction as determined by the GPCL.
c) The contractor shall take all possible precautions in cutting trees authorized for removal
to avoid any unnecessary damage to vegetation & trees not to be cut & to structures or
to workmen, & shall be responsible for any damage if it occurs in such operations.
d) All produce from cutting of trees, grass etc. shall be the property of GPCL & shall be
stacked at the directed places by PMC Agency. No claim shall be made for such tree
cutting & stacking of trees/produce or grass etc. by the contractor.
e) The land shall as herein before mentioned be handed over to GPCL / Owner of Land
immediately after the completion of the work under this tender / accepted contract.
Also, no land shall be held by the contractor longer than the GPCL shall deem fit &
necessary & the contractor shall, on due notice by the GPCL, vacate & return the land
which the PMC Agency may certify as no longer required by the contractor for purposes
8.13 Rates for works not entered in Estimate or Schedule of Rate of the District
If the additional and altered work includes any class of work for which no rate is specified
in this tender / accepted contract, then such class of work shall be carried out at the rates
entered in the Schedule of Rates of the R&B Dept. of respective District or at the rate
mutually agreed upon between the GPCL (after recommendation and certification from PMC
Agency) and the contractor, whichever are lower. The decision of GPCL in this matter shall
be final and binding on the contractor.
If additional or modified work, for which no rate is specified in the Schedule of Rates (of
the Division / R&B Dept. of the respective district), is instructed to be performed before
the agreed rates are established, the contractor must, within seven days of receiving
the order to execute the work, notify GPCL of the rate the contractor intends to charge
for such work. Should the GPCL disagree with this proposed rate, in such case GPCL shall
inform the contractor in writing, and GPCL retains the right to cancel the order for that
class of work and to proceed in a manner deems appropriate to GPCL. It is understood
that if the rates have been determined as previously mentioned, the contractor will only
be entitled to payment for the work completed or expenses incurred prior to the
determination date of the rate, based on the rates set by the GPCL. In case of any
disputes, the decision made by the Chief Project Officer (or any authority equivalent or
above it) on behalf of GPCL will be final, binding and conclusive against the contractor.
8.14 Work to be opened to Inspection, Contractor or Responsible Agent to be present
All works under execution or in course of execution in pursuance of the contract shall at
all times be open to the inspection and supervision of the Chief Project Officer (or any
authority equivalent or above it) and/or his subordinates and contractor shall at all
times, during the usual working hours and at all other times at which reasonable notice
of the intension of the Chief Project Officer (or any authority equivalent or above it)
and/or his subordinates to visit the works shall have been given to the contractor, during
which period either the contractor should be present to receive order and instruction, or
have a responsible agent duly accredited in writing, present for that purpose. Orders given
to the contractor’s duly authorized Agent shall be considered to have the same force and
effect as if they had been given to the contractor himself.
8.15 Inspection of Works:
The PMC Agency and GPCL’s authorized representatives shall have at all times power to
inspect the works, wherever in progress, either on site, on the contractor’s premises in
connection with this tender / accepted contract. Further, the contractor shall not allow
any person other than the PMC Agency and GPCL’s authorized representatives to the work
8.16 Access to site & work on site:
The PMC Agency and/or GPCL’s authorized representative may time to time enter upon
any lands which may be in the possession of the contractor under this tender / accepted
contract, for the purpose of executing any work not included in this tender / accepted
contract & may execute by other contractors at his/their opinion & the contractor shall
in accordance with the requirements of the PMC Agency and/or GPCL’s authorized
representative, afford all reasonable facilities for execution of the works including
occupation of lands by structure or otherwise for any other contractor employed by the
GPCL & his workmen or for the execution on or near site of the works not included in
the contract. The contractor shall not be entitled for any extra claims on such
8.17 Employment of Technical Persons
The contractors who are registered under class ‘B’ & above shall employ the technically
qualified personnel from recognized technical institution as per requirement of their
respective class according to Government guidelines for executing the work of the GPCL.
The contractor shall maintain Engineers (B. E / B. Tech in Civil Engineering) & Supervisors
(Diploma in Civil Engineering or any Graduate) of sufficient training & relevant
experience (minimum 02 years) to supervise & execute the work as a whole. All orders
& directions given to such engineers, supervisors or other staff shall be deemed to have
been given to the contractor. Further the GPCL may by due notice, desire a high-ranking
member of the engineering / supervisor staff of the contractor to be present on any
specified inspection & the contractor shall comply with such directions. The contractor
shall maintain Engineers (B. E / B. Tech in Electrical Engineering) of sufficient training &
relevant experience (minimum 02 years) to supervise & execute the electrical works as
8.18 Notice to be given before work is covered up.
The contractor is required to provide a written notice of no less than 5 days to the PMC
Agency (under intimation to GPCL) prior to covering up or otherwise rendering any work
inaccessible for measurement. This is to ensure that the work can be measured and accurate
dimensions taken by PMC Agency before it is covered or made inaccessible. Furthermore,
no work shall be covered or made inaccessible without the written consent of GPCL’s
authorized representative. Should any work be covered or made inaccessible without the
requisite notice or consent, it must be uncovered at the contractor's expense. Failure to do
so will result in no payment or allowance being made for such work or the materials used in
8.19 Date of completion (Time for Work Completion):
a) Time limit for completion of work is 12 months from the date of acceptance of Work
Order or Date of Commencement given by GPCL.
b) If Completion of Work is not adhered to as stipulated in the contract or the contractor
abandons the work then GPCL shall be at liberty to execute the work at Contractor’s
risk and cost and if thereby any extra expenditure is involved, the same shall be
debited to Contractor’s account. If GPCL is unable to execute and complete the work
from alternate source in time and if GPCL suffers any consequential loss, Contractor
will have to bear the same. GPCL in that case will forfeit the security deposit (and
retention money) and will also have the right to recover from the contractor the
amount towards damages suffered by GPCL.
c) Generally, the Monsoon period will be considered from 15th June to 15th September.
During this period if contractual work suffers thereon then extension of time limit may
be considered and for which no liquidated damages shall be leviable and in such case
the certificate issued by PMC Agency showing the reasons for suffering the works is
required to be submitted and which will be considered as final for time limit extension.
However, decision of GPCL shall be final and binding in such matter.
d) If rain occurs before or after the above-mentioned period and the contractual work
suffers thereon, then extension of time limit may be considered and for which no
liquidated damages shall be leviable. In such case the certificate issued by PMC
Agency showing the reasons for suffering the works is required to be submitted and
which will be considered as final for time limit extension. However, decision of GPCL
shall be final and binding in such matter.
e) The contractor shall complete the whole work & hand over to the GPCL on or before
the date specified in the work order.
f) Provided always that if in the opinion of the GPCL the completion of the works shall
be delayed by any change of original design or by the order of the GPCL, of any
altered, modified, substituted or additional works or by strikes, lock outs or
stoppages of labour, or revolution, riots, civil or political disturbance or by the
contractor not being given possession of the site or by the GPCL taking possession of
& using the site or part thereof or the works or part thereof or any part of the work or
by the not receiving any orders, drawings, instructions or directions in time or by the
suspensions in the works or by fire, flood exceptionally bad weather tempest , storm
or by from unforeseen circumstances (& whether the same shall be due to any act or
omission of the GPCL or its representatives), the GPCL may in the unfettered
discretion thinks fit either forthwith or at a later time & from time to time not
withstanding that the prescribed or extended time for completion has expired or
work have been completed, extend the date for the completion of the works to such
a date as deemed fit as practical & acceptable.
Successful agency will not execute the excess quantity in any item than provided
in the tender without the approval of GPCL and payment of excess quantity
beyond the permissible limit will be dealt with according to the tender clause. The
decision of GPCL in this regard shall be final and binding.
Extra item/ Additional work would be executed by contractor only on getting the
instructions and approval from GPCL. Such items will be executed only if special
expertise needed and major financial implications not involved. If there may be
any extra work, contractor has to bring to the notice of GPCL well in advance
with expected cost of execution and time required for the same.
9. PENALTY DEDUCTION & COMPENSATION CRITERIA:
9.1 Compensation for the delay/ Penalty for late delivery
a) The time limit allowed for carrying out the work as entered in the tender shall strictly
observed by the contractor and shall be reckoned from the date of acceptance of Work
Order or Date of Commencement given by GPCL. The penalty for delay shall be applicable
@ 1% per week or part thereof (of the delay period) on the contract value plus applicable
Tax if any as applicable subject to maximum 10% of the amount of contract value of the
work. The penalty will be invariably deducted from the bills of the contractor and no
refund will be given unless the Chief Project Officer (or any authority equivalent or above
it) approves the waiver/reduction in penalty for inordinate delay beyond 10 weeks, i.e.
for very unsatisfactory progress due to reasons attributable to contractor, GPCL may take
decision after giving the 10 days’ notice in writing to contractor for termination of contract
and carrying out the remaining work at the risk of defaulting contractor from some other
agency/contractor by recovering additional cost incurred to GPCL if any from the
defaulting contractor. GPCL’s decision in the matter shall be final and the contractor will
have no claim for compensation for any loss sustained by him owing to such actions.
Due consideration will be given for waiver/levy of penalty (excluding GST already
collected & paid to the Govt. treasury thereon) only for the reasons absolutely beyond
contractor’s control (Viz. Force Majeure conditions as laid down in the DGS & D, Clause
reproduced hereunder) for which documentary evidence will have to be provided. The
reasons for delay attributable to GPCL as well as to party / contractor will be brought out
clearly while putting the proposal for waiver/reduction in penalty.
[1] The request for extension in time limit giving reasons and supporting documents shall
have to be made by the contractor within one month of the completion of the
[2] Any request made on / after the date for completion of the contract shall not be
entertained and rejected outrightly without any correspondence.
[3] No request for waiver / levy of penalty will be entertained/ reviewed during execution
9.2 D.G.S. & D. FORCE MAJEURE CLAUSE
“If, at any time during the continuance of this tender / accepted contract , the
performance in whole or in part by either party of any obligation under this tender /
accepted contract shall be prevented or delayed by reason of any war, hostility, act of
the public enemy, civil commotion, sabotage fires, floods, explosion, epidemics,
quarantine restrictions, strikes, lockouts or acts of God (hereinafter referred to as
event)”, then notice of the happening of any such event is to be given by either party to
the other within twenty one days from the date of occurrence thereof, neither party shall
by reason of such event be entitled to terminate this tender / accepted contract nor shall
either party shall have any claim for damages against the other in respect of such non-
performance or delay in performance, and work under the contract shall be resumed as
soon as practicable after such event has come to end or ceased to exist,
and the decision of GPCL as to whether the works have been so resumed or not shall be
final and conclusive.
It will be contractor’s responsibility to ensure that work is completed in stipulated time
limit. However, if on account of reasons beyond ones control e.g. as laid down in the DGS
& D Force Majeure Conditions, GPCL may consider extension of contractual period
without statutory variations and without price variation.
9.3 Compensation:
All sums payable by a contractor by way of compensation under any of these conditions
shall be considered as a reasonable compensation to be applied to the use of GPCL,
without reference to the actual loss or damage sustained and whether any damage has
not been sustained.
9.4 Action and Compensation payable in case of Bad Work
If at any point, prior to the refund of the security deposit (and retention money) to the
contractor, it becomes evident to the PMC Agency and/or authorized representative of GPCL
overseeing the work that any task has been performed with unsound, imperfect, or unskilled
workmanship, or with materials of inferior quality, or that any materials or items supplied by
the contractor for the execution of the work are unsound or of a quality inferior to that
stipulated in the contract, or are otherwise not in compliance with the contract, it shall be
permissible for the PMC Agency to notify the contractor in writing (under intimation to GPCL)
of this situation. Consequently, despite the fact that the work, materials, or items in question
may have been inadvertently approved, certified, and compensated for, the contractor shall
be obligated to promptly rectify, remove, or reconstruct the specified work in whole or in
part, as necessary, or if required, shall remove the specified materials or items and provide
other suitable materials or items at his own expense. Should he fail to do so within a
timeframe specified by the PMC Agency in the aforementioned written notification, the
contractor shall incur a penalty of one percent (1%) on the estimated amount for each day of
continued failure, not exceeding ten days. In the event of such failure, GPCL may rectify,
remove, and re-execute the work or replace the materials or items in question, at the
contractor's risk and expense. Should the PMC Agency deem that any inferior work or
materials described above may be accepted or utilized, GPCL shall have the discretion to
accept them at reduced rates that the PMC Agency may determine. However, the decision of
GPCL in this matter shall be final, binding and conclusive against the contractor.
When visible verification of any work is not achievable, if the PMC Agency and/or authorized
representative of GPCL perceives that the work has been completed with unsatisfactory,
flawed, or unskilled workmanship, or with materials of lesser quality, the PMC Agency shall
perform random sample tests. The contractor will be responsible for the expenses incurred
for these tests. If any part of the work is subsequently found to be defective or constructed
with inferior materials, the contractor shall be compensated/penalized for the entire work at
an amount determined by the GPCL (after recommendation and certification from PMC
Agency), based on the lowest quality of work identified in the sample tests. The decision of
the Chief Project Officer (or any authority equivalent or above it) on behalf of GPCL, shall be
final, binding and conclusive against the contractor.
Sample Test shall mean:
(ii) In relation to any work as specified in this tender, such test as may be considered
necessary by the PMC Agency.
Explanation: II
Cost of the sample test shall mean cost incurred for the purpose of taking Samples & test
and for restoring tested work to its original condition.
9.5 No Claim for Variation in Quantities of Work
Quantities shown in the tender are approximate and no claim shall be entertained for
quantities of work actually executed, being either more or less up to any extent than
those entered in the tender or less than those entered in the tender or estimate.
9.6 No Claim for Compensation for Delay in staring work
No compensation shall be allowed for any delay caused into starting of work on account
of acquisition of land and in the case of clearance for works or any delay in according
sanction to estimates.
9.7 No Claim for Compensation for delay in execution of work
No compensation will be granted for any delays in the execution of the work due to water
accumulation in borrow pits or compartments. The rates encompass hard or cracked soil,
excavation in mud, sub-soil water, or water present in borrow pits, and no claims for
additional rates will be considered unless explicitly stated and detailed in the tender.
9.8 Time Limit for any Compensation Claims by the Contractor
Under no circumstances, whatsoever, shall the contractor be entitled to any compensation
from GPCL on any account unless the contractor has claimed in writing to the GPCL within
one month of the cause thereof. Such matters shall be initially investigated by the PMC
Agency. The recommendation and certification of PMC Agency in this matter shall be
considered by GPCL and decision of GPCL shall be final, binding and conclusive against
the contractor.
9.9 Extension of Time Limit
If the contractor shall desire an extension of the time limit for completion of the work on
the ground of his having been unavoidably hindered in its execution or on any other
ground, he shall apply in writing to the Project Head and he may, if in his opinion there are
reasonable grounds for granting extension, recommend such extension as he may think
necessary or proper for such extension then he shall submit same extension proposal with
his recommendation to Chief Project Officer (or any authority equivalent or above it). The
decision of the Chief Project Officer (or any authority equivalent or above it) in this regard
shall be final and binding to the contractor. Any delay attributed to GPCL may be
compensated only by way of extending the time limit.
“Extension to delivery of contract with/without penalty and/or reduction of Penalty is to
be granted by the Chief Project Officer (or any authority equivalent or above it) on behalf
9.10 Extension of Time Limit in consequence of Addition or Alteration.
The duration for the completion of the work shall be extended in accordance with the ratio
of the increase in costs due to modifications or additions relative to the original contract
work. The recommendation & certification from the PMC Agency will be considered by GPCL
in this matter and decision of GPCL regarding above said ratios shall be deemed conclusive.
No compensation shall be provided for any alterations or restrictions on the work to be
performed. If, at any time during the execution of the contract documents, the PMC Agency
requires the entire work or any part specified in the tender to be halted for any duration, or
decides that the entire work or part of it need not be executed by the contractor, in such
case the PMC Agency must notify the contractor in writing under intimation to GPCL and
the contractor shall have to abide by the decision taken by GPCL. The contractor shall then
suspend or cease work, either fully or partially, as applicable. In such cases, the contractor
shall not have any claims for payment or compensation for any profits or benefits that could
have been gained from the complete execution of the work, which were not realized due to
the incomplete nature of the work, nor for any losses incurred from materials purchased or
intended for purchase, or for the unemployment of labor hired by him. Furthermore, the
contractor shall not have any claims for compensation due to modifications made to the
original specifications, drawings, designs, and instructions that may result in a reduction of
the work initially planned. However, if materials have already been procured or agreed to
be procured by the contractor prior to receiving the aforementioned notice, GPCL (after
recommendation and certification from PMC Agency) may compensate the contractor for
any losses incurred, provided that the materials are not in excess of requirements and are
of approved quality. The amount of such compensation will be determined by the Chief
Project Officer (or any authority equivalent or above it) on behalf of GPCL, whose decision
will be final. The decision of GPCL in such matter shall be final, binding and conclusive against
the contractor.
9.11 Alteration in Specifications and Designs not to invalidate Contracts.
The GPCL shall have powers to make any alteration, or addition to the original
specification, designs, and instructions that may appear to GPCL to be necessary or
advisable during the progress of the work and the contractor shall be bound to carry out
the work in accordance with any instructions in this connection which may be given to
him in writing, signed by the PMC Agency and such alterations shall not invalidate the
contract. Any additional work which the contractor may be directed to do in the manner
above specified as part of the work shall be carried out by the contractor on the same
conditions in all respect on which he agreed to do the main works, and at the same rates
as are specified in the tender for the main work.
Where, however, the works is to be executed according to the designs, drawing and
specifications recommended by the contractor and accepted by the PMC Agency for
further approval from GPCL and if approved by GPCL, the alteration above referred to
shall be within the scope of such designs, drawings, and specifications appended to the
10. SUBLET & CANCELLATION OF CONTRACT CRITERIA:
10.1 Subletting of contract, Rescission of Contract and Forfeiture of Deposit.
The contractor shall not assign or sublet any work, without the prior written approval of
the GPCL and if the contractor assigns or sublet his contract, or attempt to do so or
become insolvent or commence any proceedings to be adjudicated as insolvent or make
any composition with creditors, attempt to do so, GPCL may, by notice in writing rescind
the contract. Also, if any bribe, gratuity, gift, loan, perquisite, reward or advantage
pecuniary or otherwise shall either directly or indirectly be given, promised or offered by
the contractor (or any of his personnel/staff/servants, or agents, or any person) to any
representative of GPCL or PMC Agency in any way relating to his office or employment
or if any such officers or persons shall become in any way directly or indirectly interested
in the contract, GPCL may, by 10 days’ notice in writing, rescind the contract. In the event
of a contract being rescinded the Security Deposit (& retention money) of the contractor
shall there upon stand forfeited and be absolutely at the disposal of GPCL and the same
consequences shall ensure as if the contract has been rescinded under clause 10.2 thereof
and in addition the contractor shall not be entitled to recover or be paid for any work
thereof actually performed under the contract.
There will be generally no objection on the component parts if the work, being given over to
responsible subcontractors but GPCL shall under no circumstances recognize these
subcontractors & the responsibility of executing the work in the accordance with the
conditions of contract will entirely rest on the main contractor. However written consent of
GPCL shall be obtained before subletting.
The main contractor will therefore always have the very responsible member, preferably a
technical hand present on the works with power to sign all work orders issued on the site of
work & to take requisite actions in the interest of efficient execution of work.
10.2 Action when whole of Security Deposit (& Retention Money) is forfeited
In any case in which under any clause or clauses of this tender / accepted contract, the
contractor shall have tendered himself to pay compensation amounting to the whole of
his security deposit (and retention money) or in the case of abandonment for the work
owing to serious illness or death of the contractor or any other cause, the Chief Project
Officer (or any authority equivalent or above it) on behalf of the GPCL, shall have powers
to adopt, (a) under following course (b) as he may deem best suited to the interest of the
a. To rescind the contract (for which rescission notice of 10 days) in writing to the
contractor under the hand of the Chief Project Officer (or any authority equivalent or
above it) shall be conclusive evidence and in that case the security deposit (and
retention money) of the contractor shall stand forfeited and absolutely at the disposal
b. To ensure that the contractor's work is assessed and to remove any uncompleted
portions from his responsibilities, assigning them to another contractor for completion. In
such instances, any additional costs incurred beyond the amount that would have been paid
to the original contractor, had he completed the entire work, shall be determined by a
written certificate from the PMC Agency, which shall be final and conclusive. These excess
expenses shall be the responsibility of the original contractor and will be deducted from any
payments owed to him by the GPCL under the contract or from his security deposit (and
retention money).
In the event of the above courses being adopted by the GPCL, the contractor shall have
no claim to compensation for any loss sustained by him by reason of his having
purchased or procured any materials or entered into any engagements or made any
advances on account of or with a view to the execution of the work or the performance
of the contract. And in case the contract shall be rescind under the provision aforesaid,
the contractor shall not be entitled to recover or be paid any sum for any works thereof
actually performed by him under this tender / accepted contract unless and until the
PMC Agency shall have certified in writing the performance of such works and the
amount payable to him in respect thereof and he may be entitled to be paid the amount
so certified (by PMC Agency ) after approval of Chief Project Officer (or any authority
equivalent or above it) on behalf of the GPCL.
10.3 Notice for unsatisfactory progress
If the progress or a particular portion of the work is unsatisfactory the Chief Project
Officer (or any authority equivalent or above it) on behalf of the GPCL, whose decision
shall be final, shall notwithstanding that the general progress of work is satisfactory; be
entitled to take action under Clause 10.2 after giving the contractor 10 days’ notice in
writing and the contractor will have no claim for compensation for any loss sustained by
him owing to such actions.
10.4 Action in the case of Default by Contractor
In any instance where the powers granted to the Chief Project Officer (or any authority
equivalent or above it) under Clause 9.9 & 10.2 have not been exercised, the failure to
exercise such powers shall not be interpreted as a waiver of any conditions herein. These
powers shall remain exercisable in any subsequent case of default by the contractor, for
which the contractor is deemed liable to compensate the full amount of his security
deposit (and retention money). The contractor's liability for both past and future
compensation shall remain intact, even if the Chief Project Officer (or any authority
equivalent or above it) acts under Clause 10.2. Should the Chief Project Officer (or any
authority equivalent or above it) choose to do so, he may take possession of any tools,
plants, materials, and stores at the work site that belong to the contractor or have been
procured by the contractor for the execution of the work, (may) compensating for them
at the contract rates or, if those rates are not applicable, at current market rates
certified by the PMC Agency , whose certification may be considered for further
necessary action by the Chief Project Officer (or any authority equivalent or above it).
Alternatively, the Chief Project Officer (or any authority equivalent or above it) may
issue a written notice to the contractor or his authorized representatives, requiring the
removal of such tools, plants, materials, or stores from the premises within a specified
timeframe. Should the contractor fail to comply with this requisition, the Chief Project
Officer (or any authority equivalent or above it) shall have the final authority regarding
the expenses of removal and the proceeds from any sale of such items, which shall be
conclusive against the contractor. The decision of GPCL in this matter shall be final and
binding on the contractor.
10.5 Violation by GPCL does not invalidate the contract
No violation or failure to comply by the GPCL with any of the agreements outlined herein
shall invalidate this tender / accepted contract or exempt the contractor from its
obligations and performance, in whole or in part. However, upon request by the
contractor and at the sole discretion of the GPCL, an extension of time may be granted
to the contractor concerning such violation or failure to comply by the GPCL.
10.6 Foreclosure of contract:
a) In case of any necessity arising due to local working conditions, land/lease issues or
any unforeseen reason not in the control of the GPCL or of the Contractor,
Committee comprising of representative of GPCL, Contractor and technical expert
shall be constituted. The said Committee will look into the reasons/causes and
analyse the conditions as to whether the work awarded is feasible to continue with
the existing terms and conditions of the contract or any other available option or to
Fore Close the contract in the interest of both the GPCL and the Contractor.
b) After study of the prevailing conditions of the contract under execution, committee
may recommend to Fore Close the contract keeping in view the financial implication
to both the GPCL and Contractor.
c) Guideline/Modality of the Fore Closure of the contract shall be decided by the
committee considering the work executed and unexecuted, period of the contract
completed and balance period of the contract, value of the work executed and value
of the work unexecuted etc.
d) Decision of GPCL for Fore Closure of the contract on the recommendations of the
committee shall be final and binding to the Contractor.
10.7 Rights of GPCL:
For any reasons, if it is required, the GPCL reserves rights to cancel, terminate,
amend and/or alter the contract and/or bifurcate and/or reduce the contract work
at any time without giving any notice to the Contractor and without incurring any
responsibility. For such cases, Contractor shall have to take away his labour, tools,
tackles, machinery, equipment etc. and shall leave the site at once and shall have to
carry out the instructions of the GPCL.
11. PAYMENT CRITERIA:
11.1 Completion Certificate
Upon the completion of the work, the Contractor will be provided with a Completion
Certificate by GPCL, subject to the recommendation and certification from the PMC Agency.
Nevertheless, no such certificate will be issued, nor will the work be regarded as complete,
until the works are taken over, appropriately tested, and rendered operational, as necessary.
Furthermore, the work must be measured by the PMC Agency, or if measurements have
been taken by the PMC Engineer, they must receive approval from the Project Head and
Chief Project Officer (or any authority equivalent or above it). The measurements (after
approval by GPCL) will be binding and conclusive against the contractor.
11.2 Effect of the Certificate
No payment may be made for any completed work estimated to cost less than INR / ₹.
25,00,000/- until the entire work has been completed and a certificate of completion
has been issued. However, for completed works estimated to exceed INR / ₹.
25,00,000/-, the contractor may be entitled to receive payments upon submitting a
monthly bill / RA Bill, corresponding to the portion of the work that has been verified,
recommended and certified by the PMC Agency. The certificate of such
recommendation and the amount certified by the PMC Agency for payment to the
contractor shall be considered for further necessary action by GPCL and the decision of
GPCL shall be deemed final and conclusive against the contractor. All such interim
payments shall be considered as advances towards the final payment and shall not be
regarded as payments for work that has been completed. Furthermore, these payments
do not prevent the PMC Agency and/or GPCL’s authorized representative from
demanding the removal and reconstruction of any work deemed bad, unsound,
imperfect, or unskillful. Additionally, such payments shall not be interpreted as an
acknowledgment of the proper execution of the contract or any part thereof, nor shall
they affect the PMC Agency’s and/or GPCL’s authorized representative’s authority
regarding the final settlement and adjustment of accounts or alter the contract in any
manner. The contractor must submit the final bill within one month from the
completion date. If not, the certificate from PMC Agency regarding the measurement
and total amount certified for payment for the work shall be considered for further
and total amount certified for payment for the work shall be considered for further
necessary action by GPCL and the decision of GPCL shall be final and binding on the
contractor. GPCL reserves the right to amend the payment methodology (if required)
as per discretion of GPCL.
11.3 Payment to Contractors
The rates for several items of works estimated to cost more than INR / ₹. 25,00,000/-
agreed to, shall be valid only when the item concerned is accepted, having been
completed full, in accordance with the sanctioned specification and duly verified and
certified by the PMC Agency. In case, where the items of the work, are not accepted, as
so completed the GPCL (after verification, recommendation and certification by the PMC
Agency) may make payment on account of such items at such reduced rates, as GPCL may
consider reasonable in the preparation of final or running accounts bills.
11.4 Mode of Payment:
The contractor has to submit the confirmation/details for payment to be received through
RTGS/ NEFT option duly confirmed by bank as per attached format against bills pursuant
to the work order issued by GPCL. The payment against bills will be made within 30 (thirty)
days after submission of bills along with all the required supporting documents in all
respects including “Recoveries”, directly to the contractor’s specified bank account after
deducting TDS for Income tax etc. In case of any query/doubt or shortage of supporting
documents, GPCL may hold the payment till clarification of the query/doubt or till
submission of the shortfall documents and no interest shall accrue on it.
Note: The bills submitted by contractor should be duly verified and certified by the PMC
Agency with recommendation for payment to be released to the contractor. GPCL
reserves the right to amend the payment methodology (if required) as per discretion
of GPCL. Payments shall be released on the availability of funds with the GPCL.
The contractor will have to submit running bill for the works executed. RA bill amount
should be proportionately to the contract value and time limit of the work. Each running
bill shall be accompanied with detailed measurement sheets duly certified by the PMC
Agency as per following manner and with documents.
a) Bill should be prepared and submitted as per the item sequence mentioned in
the bills of quantity attached with the work order.
b) Each running bill shall be accompanied with detailed measurement sheets duly
certified by the PMC Agency.
c) Measurement and abstract sheet should be prepared on Contractors
letterhead and all pages should be stamped and signed by the contractor. The
page number should be given to all measurement and abstract sheet of the bill.
d) All pages of Measurement and abstract sheet should be signed by the
concerned Engineer of PMC Agency.
e) The measurement and abstract of the RA bill must be prepared with showing
each running bill quantity and cumulative quantity (with all previous bill
f) With each RA bill Reinforcement steel and cement consumption, item wise
statement should be submitted along with balance quantity available.
g) Contractor has to mention their name of firm along with the name of man
power in attendance, wages sheet and PF challan.
h) Retention money deposit will be deducted from RA bills at 5% of the value of
the bill amount.
i) Security deposit will be deducted at 5% on the exceeded bill amount of the
actual contract value in case it exceeds the contract value.
Bills for completed works along with the necessary supporting documents are to be
submitted by the contractor (after obtaining proper verification and certification from
the PMC Agency with a recommendation for payment to be released to the contractor)
for all works executed under the specified Running Bill. The PMC Engineer shall take or
arrange for the necessary measurements for verification, and the claim, as far as it is
admissible, shall be settled, if possible, within 30 (thirty) days from the submission of
the bills with the required documents for payment. If the contractor fails to submit the
bill within the designated time, the PMC Agency may measure the work in the presence
of the contractor or their duly authorized agent, whose counter signature on the
measurement shall be adequate authorization, and the PMC Agency may prepare a bill
from such measurements, which shall be considered by GPCL for further necessary
action and the decision of GPCL shall be binding on the contractor in all respects.
11.6 Access to the contractor’s book:
Whenever it is considered necessary by the PMC Agency and/or GPCL to ascertain the
actual cost for execution of any particular item of work, the GPCL may do so by directing
the contractor to produce the original invoices.
11.7 Interest on money due to the contractor:
The contractor shall not be entitled to receive the interest on the payment due to him upon
measurements or otherwise or on any balance payable to the contractor. Also, contractor
shall not be allowed to relate it with the progress of work at site in any case.
Successful agency will not execute the excess quantity in any item than provided
in the tender without the approval of GPCL and payment of excess quantity
beyond the permissible limit will be dealt with according to the tender clause. The
decision of GPCL in this regard shall be final and binding.
Extra item/ Additional work would be executed by contractor only on getting the
instructions from GPCL. Such items will be executed only if special expertise
needed and major financial implications not involved. If there may be any extra
work, contractor has to bring to the notice of GPCL well in advance with expected
cost of execution and time required for the same.
12. CONTRACTOR’s OBLIGATION CRITERIA:
12.1 Contractor’s Liabilities
The Contractor is required to furnish, at his own cost, all materials, tools, equipment,
appliances, implements, ladders, ropes, tackles, scaffolding, and any temporary works
necessary for the proper execution of the project. This obligation extends to items in their
original, modified, or substituted forms, regardless of whether they are included in the
specifications or other documents that are part of the contract or mentioned in these
conditions. The Contractor must meet the requirements of the PMC Agency and/or GPCL’s
authorized representative concerning any matters for which PMC Agency and/or GPCL’s
authorized representative is entitled to satisfaction or requests. Additionally, the Contractor
shall be responsible for the transportation of these items to and from the work site.
Moreover, the Contractor has to provide, at no extra charge, the appropriate number of
personnel for setting out works, as well as for counting, weighing, and assisting in the
measurement and examination of the work or materials, both at the time of execution and
periodically thereafter. If the Contractor fails to provide such personnel, GPCL may supply
them at the Contractor's expense, with costs deducted from any payments due to the
Contractor under the contract or from his security deposit (and retention money), or a
portion thereof. The Contractor must also provide all necessary fencing and lighting to
protect the public from accidents and is obligated to bear the costs of defending any legal
actions, suits, or proceedings that may arise due to neglect of the above precautions. He is
also responsible for paying any damages and costs awarded in such legal matters to affected
individuals or those that may be settled with the Contractor's consent in order to resolve
any claims made by such individuals.
12.2 Contractor Liable for all Damages
Compensation for any damage caused, whether intentionally or unintentionally, by the
contractor and his personnel/laborers, both within and outside the boundaries of GPCL's
property, will be assessed by the PMC Agency. The assessment made by the PMC Agency,
subject to the final decision of Chief Project Officer (or any authority equivalent or above it)
upon appeal, shall be conclusive. The contractor is obligated to pay the determined
compensation amount; failure to do so will result in recovery of the amount as damages or
deduction by GPCL from any payments owed to the contractor under this tender / accepted
contract or otherwise.
The contractor is responsible for covering the costs associated with defending any legal
actions or proceedings initiated by any individual for injuries sustained due to a lack of
precautions to prevent disasters like fire spread or any other calamity (arising due to
contractor’s negligence). Additionally, the contractor shall be liable for any damages and
costs awarded by the court as a result of such negligence.
12.3 Liability for accidents to persons:
a) The contractor or subcontractor shall indemnify the GPCL against any claims that may arise
under the Workmen’s Compensation Act, 1923, or any statutory modifications, or
otherwise, for damages or compensation due to any accident or injury caused by the fault
of the contractor or subcontractor, sustained by any workmen or other individuals
employed by the contractor or subcontractor.
In every instance where, by virtue of subsection (1) of section 12 of the Workmen’s
Compensation Act, 1923, the GPCL is required to pay compensation to a workman
employed by the contractor or subcontractor in the execution of the work, the GPCL shall
recover from the contractor the amount of compensation paid. Without prejudice to the
rights of the GPCL under subsection 12 of the aforementioned Act, this amount shall be
reimbursed to the GPCL within 30 days. Should this not occur, the GPCL reserves the right
to recover the amount, or any portion thereof, by deducting it from any payments owed to
the contractor under this tender / accepted contract or otherwise.
The GPCL shall not be obligated to address any claims made against either party under
section 12, subsection (1) of the said Act, except upon a written request from the contractor
and upon the contractor providing the GPCL with full security for all costs for which the
GPCL may become liable as a result of considering such claims.
b) The contractor and/or subcontractor named in the contract shall indemnify the GPCL
against all claims based upon injury or death to any person in the employment of the
contractor or sub contactor, or to the third parties to the extent of any sums recovered
under the insurance policy.
c) In the event of an accident resulting in the death of a workman employed by the contractor
or subcontractor, which is severe enough to potentially lead to the death of any workman,
the contractor must notify the PMC Agency and GPCL in writing within 24 hours of the
occurrence of such an event. The contractor or subcontractor shall indemnify the GPCL for
any loss or damage incurred, whether directly or indirectly, due to their failure to provide
notification as specified, including any penalties or fines that may be imposed on GPCL as a
result of GPCL's failure to issue a notice under the Workmen’s Compensation Act or to
comply with the provisions of the aforementioned Act concerning such an accident.
12.4 Liability for damage to works & materials:
a) The contractor shall during the progress of the work, properly protect the works &
materials placed at his disposal, & shall remain answerable & liable for all accidents,
damages. Loss etc. & shall be made good in the most complete & substantial manner
by & at the sole cost of the contractor & to the reasonable satisfaction of the PMC
Agency & GPCL’s authorized representative. If the contractor fails to make good such
losses, damages within the specified time given by the GPCL, the GPCL shall be at liberty
to recover the amount towards such expenses fixed by the Chief Project Officer (or any
authority equivalent or above it) & shall be recovered from the amount due under this
tender / accepted contract to the contractor.
b) Further the contractor shall, at all times, protect & preserve all materials, machinery,
equipments, allied structures etc., materials & so acquired by himself for the execution
of the work. All reasonable requests and instructions of the PMC Agency & GPCL’s
authorized representative to enclose or especially protect any of the above shall be
expeditiously complied with at no extra cost.
c) If the PMC Agency & GPCL’s authorized representative considers that the work, asked
for in the aforesaid Para, is not sufficiently & satisfactorily protected by the contractor,
on requests made for, the GPCL shall be entitled to
arrange for such protection at its unfettered discretion & recover the cost thereof from
the contractor.
d) Until the work shall be or deemed to be taken, over as aforesaid, the contractor shall
also be liable for & shall be deemed to have indemnified the GPCL in respect of all
damage or injury to any person or any property of the GPCL or of others in villages
nearby, occasioned by the negligence of the contractor or his workmen, or his
subcontractor, or by defective /ill methods of working.
e) Materials, tools, machinery brought on the site of work:
All materials, tools, tackles, machinery, etc., that the contractor brings to and delivers
on the site for the work shall, at the time of their delivery, be considered the property
of the GPCL. This property is to be utilized solely for the purpose of the work and shall
not be removed or taken away by the contractor or any other individual without the
explicit permission of the GPCL. The contractor shall bear full responsibility for any loss,
destruction, or damage to these items. The GPCL reserves the right to place a lien on
such materials, tools, tackles, and machinery for any amounts that may be owed to the
GPCL by the contractor prior to the completion of the works. The GPCL may dispose of
any such materials, tools, tackles, and machinery in a manner it deems appropriate and
apply the proceeds towards settling any outstanding amounts. However, subject to this
lien and the power of sale, any surplus materials, tools, tackles, and machinery shall
remain the property of the contractor, who may remove and dispose of them as he sees
12.5 Contractor to Indemnify the GPCL
The contractor shall indemnify and keep indemnified the GPCL and every officer and
employees of the GPCL and also PMC Agency and his staff against all actions,
proceedings, claims, demands, costs and expenses whatsoever arising out of or in
connection with the matters referred in above clauses and elsewhere and against all
actions, proceedings, claims, demands, costs and expenses which may be made against the
GPCL by any workman / employee of the contractor or any sub-contractor and / or from
any liability may arise to any workman / employees of the contractor or any sub-
contractor under any law, rule or regulation having the force of law claims under
workmen’s compensation Act, 1923, the employee’s Provident Act, 1952, and / or the
contract Labour (Abolition and Regulation) Act, 1970. The GPCL shall not be liable for or
in respect of or in consequence of any accident or injury to any workmen or other person
in the employment of the contractor or his sub- contractors, and the contractor shall
indemnify and keep indemnified GPCL against all such damage and compensation and
against all claims, demands, proceedings costs, charges and expenses whatsoever in
respect thereof or in relation thereto.
12.6 Maintenance Period / Defect Liability Period (DLP)
a) The maintenance period for the work shall be 60 months (05 years) from the date of
completion of work as certified by the PMC Agency. The Security Deposit & Retention
Money (after deductions if any) will be released by GPCL on completion of maintenance
period / DLP and after receiving of “No Objection Certificate” from PMC Agency to the
satisfaction of GPCL.
b) The Contractor shall be responsible to make good and remedy at his own expense within
such period as may be stipulated by the GPCL, any defect which may develop or may be
noticed before the expiry of the period hereto from the certified date of completion by the
PMC Agency. Any defects or faults which may appear within the DLP due to materials or
workmanship not being in accordance with the Contract shall be made good by the
Contractor at his own cost within one calendar month from the date of notice given by PMC
Agency to the Contractor or any other dates as agreed with the GPCL.
c) The contractor shall provide a team of experienced maintenance engineers, gardeners &
labourers during the Defects Liability Period.
d) If the contractor fails to make good the defective Goods and/or Services within the
period stipulated by the PMC Agency or GPCL, the GPCL may itself make good the
defective Goods and/or Services at the contractor’s risk and cost and the contractor
must reimburse such costs on demand from the GPCL.
e) For the avoidance of any doubt, any repairs or restoration because of usual wear or tear
in the Project or any component thereof shall form a part of the Maintenance
obligations of the Contractor.
f) During this period the PMC Agency and GPCL’s authorized representative would
monitor, in accordance with Good Industry Practice, the defects arising and activities
undertaken by the contractor so as to ensure compliance with the rectification. The
specific activities to be undertaken would include the following:
(i) inspect the Project Facilities frequently and as and when exigencies require to
ascertain conformity with Project Requirements;
(ii) ascertain the cost of rectification of defects;
(iii) suggest suitable remedial measures/ procedures, where necessary.
In the event of Emergency, the PMC Agency and GPCL’s authorized representative shall
assist the contractor in dealing with the same and if necessary, require or permit, as the
case may be, the contractor to take such appropriate steps or measures including
decommissioning of any Project Facilities where necessary.
g) Any maintenance tasks performed by the contractor shall undergo inspection and
certification by the PMC Agency, ensuring satisfaction for GPCL
13. DISPUTE RESOLUTION & ARBITRATION, GOVERNING LAW CRITERIA:
13.1 Dispute Resolution Mechanism
Any dispute, difference, or question (“Dispute”) arising out of or in connection with
this Work Order/Contract, including its interpretation, execution, performance, or
termination, shall first be attempted to be resolved amicably through mutual
discussions between the Parties. The Parties shall endeavour to resolve such Dispute
within sixty (60) days from the date on which either Party issues a written notice
raising the Dispute.
If the Dispute is not resolved amicably within the aforesaid period, the Dispute shall
be referred for adjudication exclusively to the Gujarat Public Works Contracts
Disputes Arbitration Tribunal established under the Gujarat Public Works Contracts
Disputes Arbitration Tribunal Act, 1992, and the Parties agree to be bound by and
proceed strictly in accordance with the provisions of the said Act.
The proceedings before the Tribunal shall ordinarily be conducted at Gandhinagar or
Ahmedabad, Gujarat, in accordance with the procedural rules of the Tribunal, and
the costs of such proceedings shall be borne in accordance with the orders passed
by the Tribunal. This dispute resolution clause shall survive the expiry, completion,
or termination of this Work Order/Contract, and pending final resolution of any
Dispute, the Contractor shall continue to perform its obligations under the Contract
without suspension, unless otherwise directed in writing by GPCL.
13.2 GOVERNING LAW:
This Tender and subsequent Contract shall be construed and interpreted in accordance
with and governed by the laws of India.
APPENDIX –I TENDERER’S EXPERIENCE/WORK EXPERIENCE
(On Official Letter Head of Company/Firm)
( To be filled, signed & duly stamped. Scanned copy of the same to be submitted online
Details of similar jobs executed during last 7 years by the Contractor & the name with address of
a person; whom reference can be
made by the GPCL, if required.
[Tenderer shall submit the information in the Format detailed here under]
Name & Value Of Construction Constructi s to
Sr. Description Work Period on Period whom
of Work Executed as per for the Reference
(INR / ₹.) Contra Completio may
• Bidder may add rows in the above table (format) as per their list of projects.
• Consideration of similar experience for past projects shall be as per PQ
APPENDIX – II WORKS TENDERED / IN HAND
(On Official Letter Head of Company/Firm)
(To be filled, signed & duly stamped. Scanned copy of the same to be submitted online
Details of other Works, tendered for & in hand, as on the last date of the Submission of
this bid: [Tenderer shall submit the information in the Format detailed here under]
Work Work on hand Work tendered for Remarks
Cost of Anticipate when d Date
Tender Estimated
Remaini d Date of decisio or
ng work Completi n is period
APPENDIX-III TENDERER’S DETAILS OF PERSONNEL
(On Official Letter Head of Company/Firm)
( To be filled, signed & duly stamped. Scanned copy of the same to be submitted online
The List of Technical Personnel intended to be placed at the Work by the
Contractor: [Tenderer shall submit in the Format detailed here under]
Description Professional
Sr. &Details of Experience &
Name Qualification Remarks
no. position details of
works carried out
APPENDIX-IV DECLARATION IN RESPECT OF CONFLICT OF INTEREST
( To be filled, signed & duly stamped. Scanned copy of the same to be submitted online
in n-procure and Original Stamp To Be Submitted along with physical bid before last date of
bid submission)
On Non-Judicial Stamp Paper of Rs.300/-
Sr. Particulars
01 Name of Firm
Office Address Phone
Works Address as per
Vendor Registration Phone
Private Limited Company/Public Limited
04 Type of Firm Company/Limited Liability Partnership
(LLP)/Partnership Firm/Proprietor or Firm (Tick
whichever is applicable)
05 CIN/ LLPIN of Firm
06 GST No. of Firm
NamesofallDirectors/LLPPartners/Partners/Proprietors of Bidder
Firm with DIN (if a n y ) and full address (as on the bid
submission date)
Sr. Full Name DIN Full Residential Address
The details of the Legal Representative/Agent of the Bidder Firm are as follows:
Full Name o f Legal
Representative/Agent
Whether an employee of Bidder-
Firm or not? (Yes/No)
Office Land-line Nos.
Whether acting as Legal Representative
/ Agent in any other Private Limited
Company or Public Limited Company or
Limited Liability Partnership (LLP) o r
Partnership Firm or
Proprietor Firm? If yes, give names.
WHEREBY DECLARE AND CONFIRM THAT no bid has been submitted for the quoted
item by any other Private Limited Company or Public Limited Company or Limited
Liability Partnership (LLP) or Partnership Firm or Proprietor Firm in which any
relative of any Director or Partner or Proprietor of Bidder Firm’s a Director, Partner
or Proprietor. The word “relative” is defined as under: The Companies Act,2013
Section 2 (77) “relative’’, with reference to any person, means anyone who is
related to another, if—
(1) They are members of a Hindu Undivided Family;
(2) They are husband and wife; or
(3) A person shall be deemed to be the relative of another, if he or she is
related to another in the following manner, namely: -
a. Father, including step-father,
b. Mother, including step-mother,
c. Son, including step-son,
f. Daughter’s husband,
g. Brother including step-brother,
h. Sister including step-sister.
WE FURTHER DECLARE THAT we have carefully read and understood the
clause relating to ‘Conflict of Interest ’of Tender No. . The detailed Clause
“A bidder shall not have conflict of interest with other bidders for particular
quoted item. Such conflict of interest can lead to anti-competitive practices to
the detriment of Procuring Entity’s interests. The bidder found to have a
conflict of interest shall be disqualified. A bidder may be considered to have a
conflict of interest with one or more parties in this bidding process for particular
quoted item, if:
a) They have proprietor/partner(s)/Director(s)in common; or
b) They receive or have received any director in direct subsidy/financial
stake from any of them; or
c) They have the same legal representative/agent for purposes of this bid; or
d) They have relationship with each other, directly or through common third
parties, that puts them in a position to have access to information about
or influence on the bid of another bidder; or
e) Bidder participates in more than one bid in this bidding process.
Participation by a bidder in more than one Bid will result in the
disqualification of all bids in which the parties are involved. However, this
does not limit the inclusion of the components/ sub-assembly/
assemblies from one bidding manufacturer in more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their
principal manufacturers, one agent cannot represent two manufacturers
or quote on their behalf in a particular tender enquiry. One manufacturer
can also authorize only one agent/dealer. There can be only one bid from
1. The principal manufacturer directly or through one Indian agent on his
2. Indian/foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation
of the design or technical specifications of the contract that is the subject
h) In case of a holding company having more than one independently
manufacturing units or more than one unit having common business
ownership / management, only one unit should quote. Similar restrictions
would apply to closely related sister companies. Bidders must proactively
declare such sister/common business/management units in same/similar
line of business.
i) Bidder shall not act in contravention/ violation to the provisions of
competition act, as amended from time to time.”
We here by certify that our Firm M/s (Firm Name) do not have any
do conflict of interest with other bidders for particular quoted item
viz. (Item Name) .
We hereby declare and confirm that the above information and particulars
are true and correct.
Place: Signature of Director/Partner
/Proprietor/Authorized
Signatory Date:
Stamp/Seal of Firm
APPENDIX-V TENDERER’s/FIRM’s DETAILS AND TENDER FEE, EMD
(On Official Letter Head of Company/Firm)
(To be filled, signed & duly stamped. Scanned copy of the same to be submitted online in n-
procure along with Tender Fee & EMD details)
1) NAME OF FIRM/AGENCY:
2) TYPE OF FIRM (WITH SUPPORTING DOCUMENTS):
(PARTNERSHIP / PROPRIETORSHIP / LLP / OTHER)
SPECIFY IF OTHER:
Name of Directors if not proprietary:
Name of owner, if Proprietary, with Phone/ Mobile No:
5) REGISTERED / CORRESPONDENCE ADDRESS:
6) NAME OF CONTACT PERSON:
7) CONTACT NUMBER OF PERSON:
9) REGISTRATION NO. WITH ORGANIZATION:
10) SSI/NO (ENCLOSE COPY):
11) LABOUR LICENSE NO:
12) PF A/C CODE NO:
13) TENDER FEE AMT. & DD NO & DATE:
14) EMD AMOUNT & DD NO & DATE:
SEAL OF FIRM SIGN OF AUTHORIZED PERSON
APPENDIX-VI ACKNOWLEDGEMENT OF TENDER DOCUMENTS
(On Official Letter Head of Company/Firm)
(To be filled, signed & duly stamped. Scanned copy of the same to be submitted online in n-
procure ALONG WITH Technical bid documents)
I/ we hereby has/have read the above tender documents along with annexures / appendixes
and agree for Legal and/or statutory compliance as per prevailing law / act / guideline /rule/
requirement of authority like PF, ESIC, bonus, leave wages, safety rules, various labour laws,
etc amended time to time and accordingly submitting my/our offer.”
Stamp/Seal of Firm
APPENDIX-VII UNDERTAKING IN REGARD TO INTEREST OF ANY
EMPLOYEE OF GPCL
(On Official Letter Head of Company/Firm)
Sub: Undertaking in regard to Interest of GPCL employee thereof.
Ref: TENDER NOTICE No.
Declaration regarding Relationship with employee: -
Every bidder should, at the time of submission of bid, give a declaration as under.
“If in any bidder’s Company/firm the interest (i.e. shareholding in company and share in
partnership firm) of any employee of the tendering company or his/her relative as defined in
section-2(77) of the Company’s Act 2013 is 10% or more, the tendering company will not deal
with such Company/Firm at all.
Tenderer therefore must specifically disclose this fact in his technical bid, non-disclosure of such
facts would immediately disqualify the tenderer for further dealing with the tendering
Signature of the Tenderer
Seal of the Firm
ANNEXURE – VIII UNDERTAKING IN REGARD TO STOP DEAL / BANNED
FOR BUSINESS DEALING / BLACK LIST THEREOF
(On Official Letter Head of Company/Firm)
Sub: Undertaking in regard to Stop Deal / Banned for Business dealing / Black List Thereof.
Ref: TENDER NOTICE No.
All bidders will have to furnish the following undertaking duly filled in, signed and stamped
for each quoted item of the tender along with the Technical Bid.
authorized signatory of M/S here by
certify that M/S and their Proprietor / any
Partner / any directors of the firm is not stop deal and /or banned for business dealing and
/ or black listed by GUVNL or their any subsidiary company, or other
SEBs/Government/Semi Government/PSU departments.
APPENDIX-IX TENDERER’s CONFIRMATION FOR RTGS/NEFT DETAILS
(To be filled, signed & duly stamped. Scanned copy of the same to be submitted
online in n-procure)
(On Official Letter Head of Company/Firm)
The Chief Project Officer
Gujarat Power Corporation
Block No. 8, Sixth Floor,
Gandhinagar – 382011, Gujarat
Sub: Confirmation/details for payment to be received through RTGS / NEFT option against
our Supply/ services pursuant to the AT/WO issued by GPCL against the Tender
We hereby confirm that we are willing to opt for payment to be received through RTGS
/NEFT. The bank details duly confirm by bank, for receipt of payment against material
supply/services, miscellaneous dues.
1) Account No. :
2) Type of Account :
4) Branch Name & Address :
5) Contact No. of the branch :
Communication Details
We authorize you to deduct necessary bank charges of NEFT/RTGS. We have forwarded
a soft copy of the above details to [email protected] on date
Yours faithfully,
(Signature & Name of auth. sign. with company/firm stamping)
Bank Confirmation
Certified that the furnished above bank details are correct as per our records.
Bank's Stamp Authorized
APPENDIX –X TENDERER’S FINANCIAL TURNOVER
(On Official Letter Head of Company/Firm)
(To be filled, signed & duly stamped. Scanned copy of the same to be submitted
online in n-procure)
Financial turnover:
Sr Item Details
01 Average Annual Financial Financial Year Turnover In INR / ₹.
turnover during the last 3 years, 2024-25
at least 30% of the estimated cost 2022-23
of the tender. Supporting Average Annual Financial
documents including Audited turnover
Balance Sheet with CA’s
Certificate should be produced
Signature of Chartered Accountant with Seal Signature and stamp of the
APPENDIX –XI: LIST OF BANKS (FOR DEMAND DRAFT)
SCHEDULED PUBLIC SECTOR BANKS (INDIAN) SCHEDULED FOREIGN BANKS
1. State Bank of India. 1. American Express Bank Ltd.
2. State Bank of Bikaner and Jaipur 2. Bank of American NT & SA
3. State Bank of Hyderabad 3. Bank of Tokyo Ltd.
4. State Bank of Mysore. 4. BNP Paribas
5. State Bank of Patialia. 5. Barclays Bank Plc
6. State Bank of Travancore. 6. Citi Bank NA.
7. Allahabad Bank 7. Deutsche Bank A.G.
8. Andhra Bank 8. Hongkong & Shanghai Banking Corpn.
9. Bank of Boroda 9. Standard Chartered Bank
10. Bank of India 10. JP Morgan Chase Bank NA
11. Bank of Maharashtra
12. Canara Bank SCHEDULED PRIVATE SECTOR BANKS (INDIAN)
13. Central Bank of India 1. ING Vysya Bank
14. Corporation Bank 2. Axis Bank Ltd.
15. Dena Bank 3. ICICI Bank
16. Indian Bank 4. HDFC Bank
17. Oriental Bank of Commerce 5. IndusIand bank
18. Punjab National Bank 6. Kotak Mahindra Bank
19. Punjab and Sind Bank
20. Syndicate Bank
21. Union Bank of India
23. Vijaya Bank.
Annexure 1- GENERAL TECHNICAL SPECIFICATIONS
All measurements shall be made in the metric system. Different items of work shall
be measured in accordance with the procedure set forth in the relevant sections read in
conjunction with General conditions of contract. The same shall not, however, apply in
the case of lumpsum items. All measure- and computation unless of herewise indicated
shall be carried nearest to the following limits as per respective part of IS 1200 Methods
of Measurement of Building and Civil Engineering Works.
( ii ) Height, depth or thickness of earthwork, subbase, base, Surfacing and structural
members………………………… 5 mm.
In recording dimensions of work the sequence of length, width and height or depth or
thickness shall be followed.
Controlled cement concrete has to be used for all RCC work. The contractor has to use the
materials i.e. sand, Kapchi, cement etc. from selected source. The contractor has to be get
mix design done, either from GETI or any government laboratory approved by GPCL. After
submitting and getting approval of the same form concerned Executive Engineer shall
immediately start the mix design and no extra time shall be permitted.
Once mix design is approved, the materials must be used from selected source has to
be changed, then contractor has to get approval of mix design again at his own expense.
For this extra time shall be permitted. In the mix design if the cement
consumption per cubic meter is less than below minimum content then proportionate
recovery will be done.
During mix design. For different grades of concrete maximum water cement ratio and
minimum cement content as per given blow must be taken care of. The cement content
must not be less than that mentioned below.
Concrete Grade Maximum water Minimum cement content
cement Ratio Kg/m³
2. MEASUREMENTS OF LEAD FOR MATERIALS:
Where lead is specified in the contract for construction materials. the same shall be
measured as described here under.
Lead shall be measured over the shortest practicable route and not the one actually
taken and decision of the Engineer- in - charge in this regard shall be taken as final. Distances
shall be measured in units of 100 meters.
1. Sources of Material:
The Contractor shall notify the Engineer of his proposed sources of materials prior to
delivery. If it is found after trial that sources of supply previously approved do not produce
uniform and satisfactory products, or if the product from any other source proves
unacceptable at any time, the Contractor shall furnish acceptable material from other
sources at his own expense.
Stones shall be of the type specified. It shall be hard, sound, and free from cracks, decay
and weathering and shall be freshly quarried from an approved quarry. Stone with round
surface shall not be used.
The stones, when immersed in water for 24 hours, shall not absorb water by more than
per cent of their dry weight when tested in accordance with IS:
The length of stones shall not exceed 3 times its height nor shall they be less than twice its
height plus one joint. No stone shall be less in width than the height and width on the base
shall not be greater than three-fourth of the thickness of the wall nor less than 150 mm.
Cement to be used in the works shall be as per the List of Approved Make. If contractor
wants to use any other brand, then contractor shall be prior permission from the engineer
in charge before using.
a) Ordinary Portland cement, 53 Grade, conforming to IS:
Cement conforming to IS: 12269 may be used provided the minimum cement content
mentioned elsewhere from durability considerations is not reduced. From strength
considerations, these cements shall be used with a certain caution as high early strengths
of cement in the 1 to 28-day range can be achieved by finer grinding and higher constituent
ratio of C3S/C2S, where C3S is Tricalcium Silicate and C2S is Dicalcium Silicate. In such
cements, the further growth of strength beyond say 4 weeks may be much lower than that
traditionally expected. Therefore, further strength tests shall be carried out for 56 and
days to fine tune the mix design from strength considerations.
Total chloride content in cement shall in no case exceed 0.05 per cent by mass of cement.
Also, total sulphur content calculated as sulphuric anhydride (SO3) shall in no case exceed
per cent and 3.0 per cent when tri- calcium aluminate per cent by mass is upto 5 or greater
than 5 respectively.
4. Coarse Aggregate
For plain and reinforced cement concrete (PCC and RCC) or pre-stressed concrete (PSC)
works, coarse aggregate shall consist of clean, hard, strong, dense, non-porous and durable
pieces of crushed stone, crushed gravel, natural gravel or a suitable combination thereof
or other approved inert material. They shall not consist pieces of disintegrated stones, soft,
flaky, elongated particles, salt, alkali, vegetable matter or other deleterious materials in
such quantities as to reduce the strength and durability of the concrete, or to attack the
steel reinforcement. Coarse aggregate having positive alkali silica reaction shall not be
used. All coarse aggregates shall conform to IS: 383 and tests for conformity shall be carried
out as per IS: 2386, Parts I to VIII.
The contractor shall submit for the approval of the Engineer, the entire information
indicated in Appendix A of IS:
Maximum nominal size of coarse aggregate for various structural components in PCC, RCC
or PSC, shall conform to Section
The maximum value for flakiness index for coarse aggregate shall not exceed 35 per cent.
The coarse aggregate shall satisfy the following requirements of grading:
Table 1 Requirement of Coarse Aggregate (Extracted from IS 383-1970)
Gradation IS Sieve Size % By Weight Passing the Sieve
Single Size 63 mm 100 – –
Single Size 40 mm 85-100 100 –
Single Size 20 mm 0-20 85-100 -
Single Size 12.5 mm – – 85-100
Information to be Furnished by the Supplier A-1 Details of Information
A-1.1 When requested by the purchaser or his representative, the supplier shall provide the
following particulars:
a) Source of supply, that is, precise location of source from where the material were obtained.
b) Trade group of principal rock type
c) Physical characteristics
d) Presence of reactive minerals
e) Service history, if any.
A-1.2 Subject to prior agreement, the supplier shall furnish such of the following additional
information, when required by the purchaser:
f) Specific gravity
g) Bulk density
h) Moisture content
i) Absorption value
j) Aggregate crushing value or aggregate impact value
k) Abrasion value
l) Flakiness-index
m) Presence of deleterious materials
n) Potential reactivity of aggregate
o) Soundness of aggregate
5. Sand/Fine Aggregate
For masonry work, sand shall conform to the requirements of IS:
For plain and reinforced cement concrete (PCC and RCC) or pre-stressed concrete (PSC)
works, fine aggregate shall consist of clean, hard, strong and durable pieces of crushed
stone, crushed gravel, or a suitable combination of natural sand, crushed stone or gravel.
They shall not contain dust, lumps, soft or flaky, materials, mica or other deleterious
materials in such quantities as to reduce the strength and durability of the concrete, or to
attack the embedded steel. Motorized sand washing machines should be used to remove
impurities from sand. Fine aggregate having positive alkali- silica reaction shall not be used.
All fine aggregates shall conform to IS: 2386, (Parts 1 to VIII). The Contractor shall submit to
the Engineer the entire information indicated in Appendix A of IS: 383. The fitness modulus
of fine aggregate shall neither be less than 2.0 nor greater than 3.5. Zone of fine
aggregate/coarse sand shall be “Zone II”. If the material is not satisfied the zone criteria,
material shall not be used in RCC/PCC works. Whenever material arrive at site, it is
contractor’s responsibiltiy to check the material on site before use by Engineer-in-charge.
Sand/fine aggregate for structural concrete shall conform to the following
grading requirements:
Table 2 Requirement of Sand/Fine Aggregate:
IS Sieve size Per cent by Weight Passing the Sieve
Zone I Zone II Zone
6. Reinforcement/Untensioned Steel:
For plain and reinforced cement concrete (PCC and RCC) or pre-stressed concrete (PSC)
works, the reinforcement/un-tensioned steel as the case may be shall consist of the
following grades of reinforcing bars.
Table 3 Grades of Reinforcement:
Grade Bar Type conforming to Characteristic Elastic
Designation governing IS Specification Strength fy MPa Modulus GPa
S 240 IS:432 Part I Mild Steel Bar 240
IS: 1786 High YieldStrength
Deformed Bars(HYSD)
Other grades of bars conforming to IS: 432 and IS: 1786 shall not be permitted.
All steel shall be procured from original producers; no re-rolled steel shall be incorporated
Only new steel shall be delivered to the site. Every bar shall be inspected before assembling
on the work and defective, brittle or burnt bar shall be discarded. Cracked ends of bars shall
Fusion-bonded epoxy coated reinforcing bars shall meet the requirements of IS:
Additional requirements for the use of such reinforcement bars have been given below:
a) Patch up materials shall be procured in sealed containers with certificates from the agency
who has supplied the fusion bonded epoxy bars.
b) PVC coated G.I. binding wires of 18G or 16G shall only be used in conjunction with fusion
bonded epoxy bars.
c) Chairs for supporting the reinforcement shall also be of fusion bonded epoxy coated
d) The cut ends and damaged portions shall be touched up with repair patch up material.
e) The bars shall be cut by saw-cutting rather than flame cutting.
f) While bending the bars, the pins of work benches shall be provided with PVC of plastic
g) The coated steel shall not be directly exposed to sun rays or rains and shall be protected
with opaque polyethelene sheets or such other approved materials.
h) While concreting, the workmen or trolleys shall not directly move on coated bars but
can move on wooden planks place on the bars.
When specified in the contract, protective coating prescribed by CECRI shall be provided
in conformance to specifications given in Appendix 1000/I. The CECRI coating process
shall be allowed to be implemented at the site of works provided a representative of the
Institute is present throughout the duration of the coating process who shall certify that
the materials and workmanship are in accordance with prescribed specifications
developed by the Institute.
Water used for mixing and curing shall be clean and free from injurious amounts of oils,
acids, alkalis, salts, sugar, organic materials or other substances that may be deleterious
to concrete or steel. Potable water is generally considered satisfactory for mixing
concrete. Mixing and curing with sea water shall not be permitted. As a guide, the
following concentrations represent the maximum permissible values:
To neutralize 200 ml sample of water, using phenolphthalein as an indicator, it
should not require more than 2 ml of 0.1 normal NaOH.
To neutralize 200 ml sample of water, using methy1 orange as an indicator, it
should not require more than 10 ml of 0.1 normal HCl.
The permissible limits for solids shall be as follows when tested in accordance with IS: 3025:
Table 4 Permissible Limits (max):
Organic : 200 mg/lit
Inorganic : 3000 mg/lit
Sulphates (SO4) : 500 mg/lit
Chlorides (Cl) : 500 mg/lit*
Suspended matter : 2000 mg/lit
In case of structures of lengths 30m and below, the permissible limit of chlorides may
be increased upto 1000 mg/lit.
All samples of water (including potable water) shall be tested and suitable measures
taken where necessary to ensure conformity of the water to the requirements stated
The pH value shall not be less than
8. Concrete Admixtures
Admixtures may be added to the concrete before or during mixing with a view to
modifying. one or more of the properties of concrete in the plastic or hardened state.
2. Mineral Admixtures:
Any of the following mineral admixtures may be used as part replacement of Portland
Cement with the approval of the Engineer.
Fly ash: conforming to of IS:3812-3
Granulated slag: Ground granulated slag obtained by grinding granulated slag
conforming to IS:
Silica fume: Silica fume is very fine, non- crystalline 8iO" obtained as a by- product of
Silicon and Ferro - Silicon alloy industries and shall confirm to IS:15388
3. Chemical Admixtures
Information Required from the Manufacturer
Chemical admixtures are proprietary items of manufacture and shall be obtained only
from established manufacturers with proven track record,
quality assurance and full fledged facilities for the manufacture and testing of concrete.
The contractor shall provide the following information concerning each admixture, after
obtaining the same from the manufacturer:
a) Normal dosage and detrimental effects, if any, of under dosage and over dosage.
b) The chemical names of the main ingredients.
c) The chloride content, if any, expressed as a percentage by weight of the admixture.
d) Values of dry material content, ash content and relative density which can be used for
Uniformity Tests.
e) Whether it leads to the entrainment of air when used as per the manufacturer's
recommended dosage, and if so to what extent.
f) Confirmation regarding its compatibility with type of cement.
g) Whether it increases the risk of corrosion of reinforcement or other embedments.
h) Whether it affects the durability of concrete adversely.
Physical and Chemical Requirements
Admixtures shall conform to the requirement of IS: 9103, In addition, the following
conditions shall be satisfied.
a. "Plasticisers" and "Super-Plasticisers" shall meet the requirements indicated for
"Water reducing Admixture".
b. Except where resistance to freezing and thawing and to disruptive action of deicing
salts is required, the air content offreshly mixed concrete in accordance with the
pressure method given in IS:1199, shall not be more than 2 percent higher than that
of the corresponding control mix and in any case not more than 3 percent of the test
c. The chloride content of the admixtures shall not exceed 0.2 percent when tested in
accordance with IS 6925. In addition, the maximum permissible limit of chloride
content of all the constituents as indicated in Section 1700 of these
Specifications shall also not be exceeded.
d. Uniformity tests on the admixtures are essential to compare qualitatively the
composition of different samples taken from batch to batch or from the same batch
at different times.
The tests that shall be performed along with permissible variations are as follows:
Dry Material Content: within 3 percent and 5 percent of liquid and solid
i. Ash content within 1 percent of the value stated by the manufacturer.
ii. Relative Density (for liquid admixtures): within 2 percent of the value stated by the
e. All tests relating to concrete admixtures shall be conducted periodically at an
independent laboratory and the results compared with the data given by the
9. Storage of Material
All materials shall be stored at proper places so as to prevent their
deterioration, intrusion of foreign matter and ensure their satisfactory quality
and fitness for the work. The storagespace must also permit easy inspection,
removal and re-storage of the materials. All suchmaterials, even though stored
in approved go-downs/places, must be subjected to acceptancetest prior to
their immediate use.
Bricks shall not be dumped at site,' but shall be stacked in regular tiers as they
are unloaded, To minimize breakage and defacement. Bricks selected for use
in different situations shall be stacked separately. Sufficient supply of bricks
as required for the works, shall be available at site at any time.'
Aggregate stockpiles may be made on ground that is hard, well
drained and devoid of vegetation.
Coarse aggregates, unless otherwise agreed by the Engineer in writing, shall
be delivered to the site in separate sizes (2 sizes when nominal size is 25 mm
or less and 3 sizes when the nominal size is 32 mm or more). In case of
aggregates placed directly on the ground the material in the stock pile only up
to a level of 30 cm above the ground level shall be taken out and used initially.
Remaining material shall be permitted to be used in the final stages of work
only after II has been fully cleaned.
Cement shall be transported, handled and stored on the site in such a manner
as to avoid Deterioration or contamination. Cement shall be stored above
ground level in perfectly dry and water-tight sheds and shall be stacked to a
height of not more than ten bags. Wherever bulk storage containers are used,
their capacity should be sufficient to cater to the requirement at site. The
containers shall be cleaned at least once every 3 months.
Cement shall be used in the sequence in which it is delivered at site. Each
consignment shall be stored separately so that it may be readily identified and
inspected. Any consignment or part of a consignment of cement which has
deteriorated in any way during storage, shall not be used in the' works and shall
be removed from the site by the Contractor at his own cast.
The Contractor shall prepare and maintain proper records at site in respect of
delivery, handling, storage and use of cement and these records shall be
available for inspection by the Engineer at all times.
The Contractor shall submit a daily return to the Engineer showing the quantities of
cement received and issued during the project and in stock at the end of the week.
The Contractor shall prepare and maintain cement register on daily basis. If the
contractor has failed to maintain records or find to do any inapproprite manner,
GPCL’s decision is final regarding dismiss the contract or giving penalty.
5. Reinforcement / Untensioned Steel
The reinforcement bars, shall be stored above the surface of the ground upon
platforms, skids or other supports, and shall be protected from mechanical
injury and from deterioration by exposure.
6. Pre-stressing Materials
All pre-stressing steel, sheathing, anchorages and sleeves or couplers shall be
protected during transportation, handling and storage. The pre-stressing steel,
sheathing and other accessories shall be stored under cover from rain or damp
ground and protected from the ambient atmosphere if it is likely to be
aggressive. Period of storage at site must be kept to the absolute minimum.
a) Tendons: Wires, strands and bars from which tendons are to be fabricated shall
be stored about 300 mm above the ground in a suitably covered and closed
space so as to avoid direct climatic influences and to protect them from splashes
from any other materials and from the cutting operation of an oxy- acetylene
torch or arc welding process in the vicinity. Under no circumstances shall tendon
material be subjected to any welding operation or on-site heat treatment or
metallic coating such as galvanizing. Storage facilities and the procedures for
transporting material into or out of the store, shall be such that the material does
not become kinked or notched. Wires or strands shall be stored in large
diameter coils which enable the tendons to be laid out straight. As a guide, for
wires above 5 mm dia, coils of about 3 m dia without breaks or joints shall be
obtained from manufacturer. Protective wrapping for tendons shall be
chemically neutral. All pre- stressing steel must be provided with temporary
protection during storage.
b) Anchorage Components: The handling and storing procedures shall
maintain the anchorage components in a condition in which they can
subsequently perform their function to an adequate degree. Components shall
stored so that mechanical damage and detrimental corrosion are prevented.
The corrosion of the gripping and securing system shall be prevented. The use
of correctly formulated oils and greases or of other corrosion preventing
material shall be guaranteed by the producer to be non-aggressive and non -
Pre-stressing steel which shall be absolutely clean and without any signs of rust,
shall bestored in a closed store having single door with double locking
arrangements and no windows. The air inside the store shall be kept dry as far
as possible by using various means to the satisfaction of the Engineer, so as to
eliminate the possibility of initial rusting of pre- stressing steel during storage.
Instrument measuring the air humidity shall be installed inside the store.
The pre-stressing steel shall be coated with water-soluble grease.
All pre-stressing steel shall be stored at least 300 mm above ground level and
shall be invariably wrapped with a protective covering of tar paper or
polythene or any other approved material.
The Contractor should ensure that pre-stressing steel is used within 3 months
of its manufacture. He should chalk out his pre-stressing programme in such a
manner as to avoid the possibility of initial corrosion before placing in position.
Water shall be stored in containers/tanks covered at top and cleaned at regular
intervals in order to prevent intrusion of foreign matter or growth of organic
matter. Use of water from shallow, muddy or marshy sources, shall not be
permitted. The intake pipe shall be suitably enclosed to exclude silt, mud, grass
and other solid materials and there shall be a minimum depth of 0.60 m of water
below the intake at all times.
10. Test and standard of Acceptance
All materials, even though stored in an approved manner shall be
subjected to an acceptance test in accordance with the relevant IS
specification prior to their immediate use.
Independent testing of cement for every consignment shall be done by the
Contractor at site or in the laboratory approved by the Engineer before use. Any
cement with lower quality than that shown in manufacturer's certificate shall
be debarred from use. In case of imported cement, the same series of tests shall
be carried out before acceptance.
1. Testing and Approval of Material
The Contractor shall furnish Manufacturing test certificates from the
manufacturer/supplier of materials along With each batch of material(s)
delivered to site.
The Contractor shall set up a field laboratory with necessary equipment for
testing of all materials, finished products used in the construction as per
requirements of conditions of contract and the relevant specifications. The
testing of all the materials shall be carried outby the Engineer for which they
shall make all the necessary arrangements and bear the entire cost.
Test which cannot be carried out in the field laboratory have to be got done at
the Contractor’s cost at any recognized laboratory/testing establishments
approved by the Engineer.
2. Sampling of Materials
Samples provided to the Engineer for inspection are to be in labeled boxes
suitable for storage.
Samples required for testing and approval must be supplied well in advance
by at least 48hours or before the minimum period required for carrying out
the relevant tests. Delay to works arising from the late submission of samples,
will not be acceptable as a reason for delay in completion of the works.
If materials are brought from abroad, the cost of sampling/testing whether in
India or abroad shall be borne by the Contractor.
The contractor shall arrange the transportation to bring the material to lab
and also make arrangement of Engineer-in-charge and project supporting
staff if they want to witness the tests.
Samples shall be taken only in the presence of Engineer-in-charge or staff
official authorized by Engineer-in-charge. The contractor shall not take
samples in absence of above personnel otherwise the sample is counted as
“null sample”. The contractor have to tell Engineer-in-charge about sampling
before 24 hours to be sampling. If Engineer-in-charge is not available because
of any reason, his decision shall be final whether sampling shall be delayed or
authorise any staff personnel to present in sampling.
3. Rejection of Materials not conforming to the Specifications.
Any stack or batch of material(s) of which sample(s) does (do) not conform to
the prescribed tests and quality shall be rejected by the Engineer and such
materials shall be removed from site by the Contractor at his own cost. Such
rejected materials shall not be made acceptable by any rectifications.
4. Testing and Approval of Plant and Equipment
All plants and equipment used for preparing, testing and production of
materials for incorporation into the permanent works, shall be in accordance
with manufacturer’s specifications and shall be got approved by the Engineer
Form work shall include all temporary or permanent forms required for forming
the concrete of the shape, dimensions and surface finish as shown on the
drawing or as directed by the Engineer, together with all props, staging,
centering, scaffolding and temporary construction required for their support.
The design, erection and removal of form work shall conform to IRC:
“Guidelines for Design and Erection of False work for Road Bridges” and these
Specifications.
All materials shall comply with the requirements of IRC: 87. Materials and
components used for form work shall be examined for damage or excessive
deterioration before use / re-use and shall be used only if found suitable after
necessary repairs. In case of timber form work, the inspection shall not only
cover physical damages but also signs of attacks by decay, rot or insect attack
or the development of splits.
Forms shall be constructed with metal or timber. The metal used for forms shall
be of such thickness that the forms remain true to shape. All bolts should be
countersunk. The use of approved internal steel ties or steel or plastic spacers
shall be permitted. Structural steel tubes used as support for forms shall have
a minimum wall thickness of 4 mm. Other materials conforming to the
requirements of IRC: 87 may also be used if approved by the Engineer.
3. Design of Form work
a) The Contractor shall furnish the design and drawing of complete form work (i.e.
the forms as well as their supports) for approval of the Engineer before any
erection is taken up. If proprietary system of form work is used, the Contractor
shall furnish detailed information as per Appendix 1500/I to the Engineer for
b) Notwithstanding any approval or review of drawing and design by the Engineer,
the Contractor shall be entirely responsible for the adequacy and safety for form
c) The design of the form work shall confirm to provisions of IRC:87. It shall ensure
that the forms can be conveniently removed without disturbing the concrete.
The design shall facilitate proper and safe access to all parts of form work for
d) In the case of pre-stressed concrete superstructure, careful consideration shall
be given to redistribution of loads on props due to pre-stressing.
a. The form work shall be robust and strong and the joints shall be leak-proof. Balli
shall not be used as staging. Staging must have cross bracings and diagonal
bracings in both directions. Staging shall be provided with an appropriately
designed base plate resting on firm strata.
b. The number of joints in the form work shall be kept to a minimum by using large
size panels. The design shall provide for proper “soldiers” to facilitate alignment.
All joints shall be leak proof and must be properly sealed. Use of PVC T-section
is essential to prevent leakage of grout.
c. As far as practicable, clamps shall be used to hold the forms together. Where use
of nails is unavoidable minimum number of nails shall be used and these shall be
left projecting so that they can be withdrawn easily. Use of double headed nails
shall be preferred.
d. Use of ties shall be restricted, as far as practicable. Wherever ties are used they
shall be used with HDPE sheathing so that the ties can easily be removed. No
parts prone to corrosion shall be left projecting or near the surface. The
sheathing shall be grouted with cement mortar of the same strength as that of
e. Unless otherwise specified, or directed, chamfers or fillets of sizes 25 mm x
mm shall be provided at all angles of the form work to avoid sharp corners. The
chamfers, bevelled edges and mouldings shall be made in the form work itself.
Opening for fixtures and other fittings shall be provided in the shuttering as
directed by the Engineer.
f. Shuttering for walls, sloping members and thin sections of considerable height
shall be provided with temporary openings to permit inspection and cleaning
out before placing of concrete.
g. The form work shall be constructed with pre-camber to the soffit to allow for
deflection of the form work. Pre-camber to allow for deflection of form work
shall be in addition to that indicated for the permanent structure in the
h. Where centering trusses or launching trusses are adopted for casting of
superstructure, the joints of the centering trusses, whether welded, riveted or
bolted should be thoroughly checked periodically. Also, various members
of the centering trusses should be periodically examined for proper alignment
and unintended deformation before proceeding with the concreting. They shall
also be periodically checked for any deterioration in quality due to steel
i. The form work shall be so made as to produce a finished concrete true to shape,
line and levels and dimensions as shown on the drawings, subject to the
tolerances specified in respective sections of these Specifications, or as directed
by the Engineer.
j. Where metal forms are used, all bolts and rivets shall be countersunk and well
ground to provide a smooth, plane surface. Where timber is used it shall be well
seasoned, free from loose knots, projecting nails, splits or other defects that
may mar the surface of concrete.
k. Forms shall be made sufficiently rigid by the use of ties and bracings to prevent
any displacement or sagging between supports. They shall be strong enough to
withstand all pressure, ramming and vibration during and after placing the
concrete. Screw jacks or hard wood wedges where required shall be provided to
make up any settlement in the form work either before or during the placing of
l. The form work shall take due account of the calculated amount of positive or
negative camber so as to ensure the correct final shape of the structures, having
regard to the deformation of false work, scaffolding or propping and the
instantaneous or deferred deformation due to various causes affecting pre-
stressed structures.
m. Suitable camber shall be provided to horizontal members of structure,
especially in long spans to counteract the effects of deflection. The form work
shall be so fixed as to provide for such camber.
n. The form work shall be coated with an approved release agent that will
effectively prevent sticking and will not stain the concrete surface. Lubricating
(machine oils) shall be prohibited for use as coating.
5. Formed Surface and Finish
The form work shall be lined with material approved by the Engineer so as to
provide a smooth finish of uniform texture and appearance. This material shall
leave no stain on the concrete and so fixed to its backing as not to impart any
blemishes. It shall be so fixed to its backing as not to impart any blemishes. It
shall be of the same type and obtained from only one source throughout for the
construction of any one structure. The Contractor shall make good any
imperfections in the resulting finish as required by the Engineer. Internal ties
and embedded metal parts shall be carefully detailed and their use shall be
subject to the approval of the Engineer.
(i) Special measures in the design of form work shall be taken to ensure that it does
not hinder the shrinkage of concrete. The soffit of the form work shall be so
designed as to ensure that the form work does not restrain the shortening
and/or hogging of beams during pre-stressing. The forms may be removed at
the earliest opportunity subject to the minimum time for removal of forms with
props retained in position.
(ii) Where necessary, form work shall be so arranged that the soffit form, property
supported on props only can be closed with the same grade of concrete as the
adjoining structure immediately after removal of form work ensuring watertight
(iii) Any cut-outs or openings provided in any structural member to facilitate
erection of form work shall be closed with the same grade of concrete as the
adjoining structure immediately after removal of form work ensuring watertight
(iv) Provision shall be made for safe access on, to and about the form work at the
levels as required.
(v) Close watch shall be maintained to check for settlement of form work during
concreting. Any settlement of form work during concreting shall be promptly
(vi) Water used for curing should not be allowed to stagnate near the base plates
supporting the staging and should be properly drained.
7. Preparation of Form work before Concreting
The inside surfaces of forms shall, except in the case of permanent form work
or where otherwise agreed to by the Engineer be coated with a release agent
supplied by approved manufacturer or of an approved material to prevent
adhesion of concrete to the form work. Release agents shall be applied strictly
in accordance with the manufacturer’s instructions and shall not be allowed to
come into contact with any reinforcement or pre-stressing tendons and
anchorages. Different release agents shall not be used in form work for exposed
Before re-use of forms, the following actions shall be taken:
(i) The contact surfaces of the forms shall be cleaned carefully and dried
before applying a release agent.
(ii) It should be ensured that the release agent is appropriate to the surface to be
coated. The same type and make of release agent shall be used throughout on
similar form work materials and different types should not be mixed.
(iii) The form surfaces shall be evenly and thinly coated with release agent. The
vertical surface shall be treated before horizontal surface and any excess wiped
(iv) The release agent shall not come in contact with reinforcement or the hardened
All forms shall be thoroughly cleaned immediately before concreting.
The Contractor shall give the Engineer due notice before placing any concrete
in the forms to permit him to inspect and approve the form work, but such
inspection shall not relieve the Contractor of his responsibility for safety of form
work, men, machinery, materials and finish or tolerances of concrete.
8. Removal of Form work
The scheme for removal of form work (i.e. de-shuttering and de-centering)
shall be planned in advance and furnished to the Engineer for scrutiny and
approval. No form work or any part thereof shall be removed without prior
approval of the Engineer.
The form work shall be so removed as not to cause any damage to concrete.
Centering shall be gradually and uniformly lowered in such a manner as to
permit the concrete to take stresses due to its own weight uniformly and
gradually to avoid any shock or vibration.
Where not specifically approved, the time of removal of formwork (when
ordinary Portland cement is used without any admixtures at an ambient
temperature exceeding 10 degrees Celsius) shall be as under:
Table 5 Stripping of Form work
a Walls, piers, abutments, columns 12 to 48 hours as may be decided
and vertical faces of by the Engineer
structural members
b Soffits of Slabs (with props left 3 days
c Props (left under slabs) 14 days
d Soffit of Girders (with props left 7 days
e Props(left under girders) 21 days
9. Re-use of Formwork
When formwork is dismantled, its individual components shall be examined
for damage and damaged pieces shall be removed for rectification. Such
examination shall always be carried out before being used again. Before re-
use all components shall be cleaned of deposits of soil, concrete or other
unwanted materials. Threaded parts shall be oiled after cleaning.
All bent steel props shall be straightened before re-use. The maximum
deviation from straightness is 1/600 of the length. The maximum permissible
axial loads in used props shall be suitably reduced depending upon their
condition. The condition of the timber components, plywood and steel
shuttering plates shall be examined closely for distortion and defects before
10. Specialized Formwork
Specialized formwork may be required in the case of slip form work,
underwater concreting, segmental construction etc. Such specialized
formwork shall be designed and detailed by competent agencies and a set of
complete working drawings and installation instructions shall be supplied to
the Engineer. The site personnel shall be trained in the erection and
dismantling as well as operation of such specialized formwork. In case
proprietary equipment is used, the supplier shall supply drawings, details,
installation instructions, etc., in the form of manuals along with the formwork.
Where specialized formwork is used, close co- ordination with the design of
permanent structure is necessary.
For slip form the rate of slipping the formwork shall be designed for each
individual case taking into account various parameters including the grade of
concrete, concrete strength, concrete temperature, ambient temperature,
concrete admixtures, etc. in the case of segmental construction, the concrete
mix shall be normally designed for developing high early strength so that the
formwork is released as early as possible.
In order to verify the time and sequence of striking/removal of specialised
formwork, routine field tests for the consistency of concrete and strength
development are mandatory and shall be carried out before adoption.
For specialised formwork, the form lining material may be either plywood or
steel of appropriate thickness. Plywood is preferred where superior quality of
surface is desired, whereas steel sheeting is normally used where large
numbers of repetitions are involved.
11. Tests and Standard of Acceptance
The material shall be tested in accordance with these Specifications and shall
meet the prescribed criteria.
The work shall conform to these Specifications and shall meet the prescribed
standards of acceptance.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
G.C.101- TYPICAL DETAIL OF BOX CULVERT NEAR REQIRED LOCATION.pdf
G.C.102- TYPICAL DETAIL OF BOX CULVERT NEAR ROHA PLANT.pdf
G.C.103- TYPICAL DETAIL FOR DRAIN REPAIR.pdf
G.C.104- TYPICAL DETAIL FOR NEW RCC DRAIN.pdf
G.C.105- PROTECTION WALL DRAWING.pdf
G.C.106- TYPICAL DETAIL FOR SLAB OF BOX CULVERT AT RESURFACING ROAD.pdf
G.C.107- TYPICAL DETAIL FOR SLAB OF CAUSEWAY AT RESURFACING ROAD.pdf
G.C.108- TYPICAL RCC ROAD LAYOUT.pdf
Civil Tender for Various Civil Infra Charanka.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .