Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹5.2 L+₹21,037.34 (4.18%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.5 L+₹49,000.54 (9.73%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹5.6 L+₹56,692.75 (11.3%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | RAMESH KUMAR T G L3 | C J JOY L4 | VIJAYAKUMAR L1 | SHAMSUDHEEN .T.U L2 |
|---|---|---|---|---|---|---|---|
| 1.00Appendix 1 - Cleaning of LBMC between Ch:33/000 km to 42/000 km | |||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 195.72 | cum | 203.52 ₹39,833.54 | 190 ₹37,187.37 | 185.49 ₹36,304.66 Lowest | 193.22 ₹37,817.6 |
| 1.00 | OD2623/2026-2027:Engaging hydraulic excavator for levelling up sand / silt removal of Debris/water hyacinth in accordance with requirements of lines , grades and cross sections and transporting to the near by dips within all lifts and lead up to 1000 meters | 188 | hour | 1,159.76 ₹2,18,034.88 | 1,050 ₹1,97,400 Lowest | 1,057 ₹1,98,716 | 1,101.04 ₹2,06,995.52 |
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,083.34 | sqm | 14.37 ₹15,567.52 | 15 ₹16,250.03 | 13.09 ₹14,180.86 Lowest | 13.64 ₹14,776.69 |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 23,440 | sqm | 7.32 ₹1,71,580.8 | 8 ₹1,87,520 | 6.67 ₹1,56,344.8 Lowest | 6.95 ₹1,62,908 |
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 25 | each | 435.13 ₹10,878.25 | 500 ₹12,500 | 396.57 ₹9,914.25 Lowest | 413.1 ₹10,327.5 |
| 2.00Appendix - 3- Water Distribution | |||||||
| 2.00 | OD2622/2026-2027:Engaging coolie for removing floating bodies and branches of trees, slipped earth , water hyacinth, shutter and sluice operation, night canal watching and all other water distribution related works as per the direction of departmental officers at site. | 82 | each | 854.92 ₹70,103.44 | 1,000 ₹82,000 | 779.16 ₹63,891.12 Lowest | 811.64 ₹66,554.48 |
| 2.00 | OD2619/2026-2027:Engaging hydraulic excavator for levelling up sand /silt/ removal of Debris / Kulavazha in accordance with requirements of lines , grades and cross sections , and transporting to the Nearby Dips within all lifts and lead up to 1000m | 20 | hour | 1,159.76 ₹23,195.2 | 1,200 ₹24,000 | 1,057 ₹21,140 Lowest | 1,101.05 ₹22,021 |
| 2.00 | OD2620/2026-2027:Supplying mobil oil for lubrication of mechanical arrangements in the canal system during water distribution period | 4 | Litre | 421.49 ₹1,685.96 | 400 ₹1,600 | 384.14 ₹1,536.56 Lowest | 562.5 ₹2,250 |
Tender Value
₹7.0 L
EMD Value
₹17,489
Closing Date
8 Aug 2026, 6:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
O/o THE ASSISTANT EXECUTIVE ENGINEER, KPIP SUBDIVISION No. 1 OTTAPPALAM
GENERAL - KPIP - AM - 2026 27 Jungle clearance Silt removal and canal cleaning works of LBMC between Ch 33/000 km to 42/000 km including water distribution through LBMC for the year 2026-27-General Civil Work
2026_Irrig_863190_1
IRR/PI/TR/2580/2026_5_2_1/1
Open Tender
Civil Works - Canal
Item Rate
365 days
LBMC OF SECTION 2/1 OTTAPPALAM
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,545
Yes
₹17,489
Yes
25 Sept 2026
30 Jul 2026
11 Aug 2026
30 Jul 2026
8 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix 1 - Cleaning of LBMC between Ch:33/000 km to 42/000 km | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.2 | cum | - | - |
| 1.002 | OD2623/2026-2027:Engaging hydraulic excavator for levelling up sand / silt removal of Debris/water hyacinth in accordance with requirements of lines , grades and cross sections and transporting to the near by dips within all lifts and lead up to 1000 meters | - | hour | - | - |
| 1.003 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.004 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.005 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | - | each | - | - |
| 2Appendix - 3- Water Distribution | |||||
| 2.001 | OD2622/2026-2027:Engaging coolie for removing floating bodies and branches of trees, slipped earth , water hyacinth, shutter and sluice operation, night canal watching and all other water distribution related works as per the direction of departmental officers at site. | - | each | - | - |
| 2.002 | OD2619/2026-2027:Engaging hydraulic excavator for levelling up sand /silt/ removal of Debris / Kulavazha in accordance with requirements of lines , grades and cross sections , and transporting to the Nearby Dips within all lifts and lead up to 1000m | - | hour | - | - |
| 2.003 | OD2620/2026-2027:Supplying mobil oil for lubrication of mechanical arrangements in the canal system during water distribution period | - | Litre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1460086.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
epaymentformnew.pdf
Tender Documents • 0.11 MB
Formoftender.pdf
Tender Documents • 0.07 MB
FormatIntegritypact.pdf
Tender Documents • 0.20 MB
preliminaryagreement.pdf
Tender Documents • 0.30 MB
BOQ_1460086.xls
BOQ • 0.30 MB
Affidavit.pdf
Tender Documents • 0.10 MB
SBD21LBMC.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .