| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-Finance | ₹2.5 L | 1 | Accepted-Finance L1 |
| 2 | 2₹2.5 L+₹4,110 (1.64%)Rejected-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹2.5 L+₹4,110 (1.64%) | 2 | Rejected-Finance L2 |
| 3 | 3₹2.6 L+₹4,830 (1.93%)Rejected-Finance | ₹2.6 L+₹4,830 (1.93%) | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | SHRI RAM L2 | RAKESH KUMAR L3 | Habib Khan L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all lead and lifts in all kinds of soil such as pick work, jumper work, blasting work in soft/hard rock chiseling/wedging out of rock) where blasting is prohibited saturated soil including bailing/pumping out of water stacking the excavated soil in 15cm layers, when required into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | 3.6 | Cum | 475 ₹1,710 | 500 ₹1,800 | 450 ₹1,620 Lowest |
| 2.00 | Providing and laying cement mortar 1:6:12 (1cement: 6sand: 12 graded stone aggregate 40mm nminal size) and curing complete exclusding the cost of centring and shuttering in foundation and plinth to the entire satisfaction of the Engineer-in-charge. | 2.4 | Cum | 7,900 ₹18,960 | 7,900 ₹18,960 | 7,800 ₹18,720 Lowest |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor two ceiling not exceeding 4 mtr and removal of the same for in-situ reinforced concrete and plain concrete working:- | ||||||
| 3.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters buttresses, plinth and string courses and the like and to the entire satisfaction of the Engineer-in-charge. | 84 | Sqmt | 470 ₹39,480 | 490 ₹41,160 | 450 ₹37,800 Lowest |
| 4.00 | Providing and laying cement concrete 1:5:10 (1cement:5sand:10 graded stone aggregate 40mm nominal size) with 15% plum and curing complete excluding the cost of form work in retaining walls, breast walls , the size of plum shall usually be 150 to 300mm as per HPPWD specification and to the entire satisfaction of the Engineer-in-charge. | 21 | Cum | 8,600 ₹1,80,600 | 8,500 ₹1,78,500 Lowest | 8,500 ₹1,78,500 Lowest |
| 5.00 | Providing weepholes in brick masonry / stone masonry plain reinforced concrete, abutment, wing wall, return wall with 100 mm dia PVC pipe extending, through the full width of the structures with slopes of 1(V)20 (H) towards drawing face complete in all respect | 42 | Rmt | 325 ₹13,650 Lowest | 350 ₹14,700 | 325 ₹13,650 Lowest |
Tender Value
₹2.0 L
EMD Value
₹4,035
Closing Date
27 Jun 2026, 11:00 amClosed
Exeuctive Engineer
Jal Shakti Division Bilaspur
Restoration of rain damages of LWSS Kohlwin Kunala in Tehsil Sadar District Bilaspur (SH Construction of toe wall to protect the pump house, sump well and percolation well etc).
2026_HPIPH_136853_6
BLP-BLP-0736-NIT No. 3963-4062 Dated 16/06/2026
Open Tender
Civil Works
Item Rate
60 days
Sub Divison Bilaspur Section Bilaspur
Please refer Tender documents.
4 documents required · 4 mandatory
₹350
₹4,035
18 Jul 2026
19 Jun 2026
27 Jun 2026
19 Jun 2026
27 Jun 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches etc. in earth work in all lead and lifts in all kinds of soil such as pick work, jumper work, blasting work in soft/hard rock chiseling/wedging out of rock) where blasting is prohibited saturated soil including bailing/pumping out of water stacking the excavated soil in 15cm layers, when required into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | 3.6 | Cum | - | - |
| 2 | Providing and laying cement mortar 1:6:12 (1cement: 6sand: 12 graded stone aggregate 40mm nminal size) and curing complete exclusding the cost of centring and shuttering in foundation and plinth to the entire satisfaction of the Engineer-in-charge. | 2.4 | Cum | - | - |
| 3Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor two ceiling not exceeding 4 mtr and removal of the same for in-situ reinforced concrete and plain concrete working:- | |||||
| 3.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters buttresses, plinth and string courses and the like and to the entire satisfaction of the Engineer-in-charge. | 84 | Sqmt | - | - |
| 4 | Providing and laying cement concrete 1:5:10 (1cement:5sand:10 graded stone aggregate 40mm nominal size) with 15% plum and curing complete excluding the cost of form work in retaining walls, breast walls , the size of plum shall usually be 150 to 300mm as per HPPWD specification and to the entire satisfaction of the Engineer-in-charge. | 21 | Cum | - | - |
| 5 | Providing weepholes in brick masonry / stone masonry plain reinforced concrete, abutment, wing wall, return wall with 100 mm dia PVC pipe extending, through the full width of the structures with slopes of 1(V)20 (H) towards drawing face complete in all respect | 42 | Rmt | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
PWD6.pdf
Tender Documents • 0.40 MB
PWD8.pdf
Tender Documents • 1.32 MB
TC.pdf
Tender Documents • 0.17 MB
BOQ_202553.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .