| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC | ₹2.0 L | 1 | Accepted-AOC Found in order |
| 2 | 2₹2.0 LRejected-AOC 354 636 PC 7 K SHAHEED BHAGAT SINGH INDIRA NAGAR LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹2.0 L | 2 | Rejected-AOC Not Found in order |
| 3 | 3₹2.0 LRejected-AOC 163 B KATGHAR QILA BAREILLY BAREILLY UTTAR PRADESH 243003 | BAREILLY | UTTAR PRADESH | 243003 | ₹2.0 L | 3 | Rejected-AOC Not Found in order |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
25 Mar 2021, 6:40 pmClosed
Executive Engineer
E. 400KV Substation Division, Bareilly
Checking Servicing Preventive Routine Minor Maintenance of Ingersoll Rand make and Elgi make Unit Air Compressors of 400KV and 220KV SF6 Circuit Breakers alongwith other associated Works at 400KV Sub Station Bareilly
2021_UPTCL_559167_2
E-Tender No. 13/400KV(B) /2020-21
Open Tender
Air Compressor
334 days
Electy. 400KV Substation
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer
₹3,000
9 Jul 2021
20 Mar 2021
26 Mar 2021
20 Mar 2021
25 Mar 2021
20 Mar 2021
20 Mar 2021 - 25 Mar 2021
Amount
Following Works are to be Carrying out at 400KV Sub Station Bareilly, with all Cost of Men, Misc. Consumable, T&P etc. Required for Satisfactory Completion of the Work as per Technical Specifications and Direction of the Supervising Engineer as per Details below :
Checking, Routine Servicing / Minor Maintenance of Unit Air Compressors of Ingersoll - Rand make (Model : 234; 16 Kg / cm2 capacity) & Elgi make (Model : THPC 200; 32.5 Kg / cm2 capacity) of 400KV SF6 CBs and Elgi make (Model : THPC 200; 20.5 Kg / cm2 capacity) of 220KV SF6 CBs installed at 400KV Sub Station Bareilly during the Period of 11 Months Year w.e.f. 01.04.2021 to 28.02.2022 on Monthly Basis. The Work includes Cleaning of Air Filter & Oil Chamber, Flushing & Filling of Fresh Compressor Oil as per Requirement, Attending of Fault of Electrical Circuits, Replacement of Defective / Old V-Belts, Oil Seal, Safety Valve, Drain Valve, Power Contractor, Relays, Switches etc., all to be Provided by the Department as per Requirement for Satisfactory Operation / Running of the Unit Air Compressors. (Servicing of 22 No. Unit Air Compressors Per Month × 11 Month = 242 No.
RUKMANI ENTERPRISES
PARTH ENGINEER AND ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid