| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC VILL KHAISHERGARH SIRSA 2024R17838 | SIRSA | L1 | Accepted-AOC LOA | |
| 2 | L2₹3.5 L+₹75,637 (27.9%)Rejected-Finance 00 LALPUR KICHHA ROAD RUDRAPUR KICHHA RUDRAPUR UDHAM SINGH NAGAR UTTARAKHAND 263148 | UDAM SINGH NAGAR | UTTARAKHAND | 263148 | L2 | Rejected-Finance Highest | |
| 3 | L3₹3.7 L+₹1.0 L (37.4%)Rejected-Finance 179 GURU ROAD PATEL NAGAR PATEL NAGAR DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | L3 | Rejected-Finance Highest | |
| 4 | Rejected-Technical | - | Rejected-Technical Non Responsive |
Tender Value
₹2.5 L
EMD Value
₹4,940
Closing Date
14 Jul 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NAVEEN RATHEE
ED - Ambala
construction of SDO Civil Complex at Radaur in Distt Yamuna Nagar ( Pdg. Utility Shifting of electrical H Poles)
2025_HRY_456804_1
20252FADB6CF 9300 437C BFA2 8FE45F42A3FB663BAR
Open Tender
Civil Works
Works
60 days
Ambala Cantt
construction of SDO Civil Complex at Radaur in Distt Yamuna Nagar ( Pdg. Utility Shifting of electrical H Poles)
2 documents required · 2 mandatory
₹500
₹4,940
Yes
30 Jul 2025
7 Jul 2025
15 Jul 2025
8 Jul 2025
14 Jul 2025
8 Jul 2025
Amount
SITC of PCC Pole 9 Mtr. Long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of PCC Pole 11 Mtr. Long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of Stay set with Elbo 6`/8` required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of Stay wire 7/8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of X - Plate for Stay required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of ACSR 3 SWG (30 plus 50 plus 50) required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of GSL No. 8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of MS Angle Iron 100/50mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of MS Angle Iron required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of MS Flat Iron required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of MS nuts and bolts off size required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of MS D Strup required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT Insulator required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT Fuse Unit Board required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of Guy insulator for LT Stay required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of Guy insulator for Stay (disc) required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of 4/C PVC Cable 10/16 mma required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of 4/C PVC Cable 25 MM2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT AB Cable 50 plus 35 MM2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of LT AB Cable 120 plus 70 MM2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of 2C PVC Cable 10/16MM2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of 11KV pin insulator with pin required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of 11KV Disc insulator with Fitting required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of Earthing Rod required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of T/F Plateform Set without J-Bolt required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of J-Bolt for T/F plate form set required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
SITC of 11 KV GO Switch required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Erection of H Pole with 2 Nos. Stay complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Erection of P/M S/STN 63 KVA T/F complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Erection of 3 Phase meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Erection of Single Phase meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of H Pole with 2 Nos. Stay complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of PCC Pole 9 mtr complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of ACSR SWG off size complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of P/M S/STN 63 KVA T/F complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of 4/c PVC Cable off size complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of 2/c PVC Cable off size complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of 3 Phase meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Dismental of Single Phase meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
Fabrication Charges of steet items including painting and Transportation Charges upto site of work complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ).
S R Enterprises (BID ID -1295649)
Kamal Electrical (BID ID -1296261)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .