Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.9 LAccepted-AOC KALIKULANGARA CHERUVAYOOR | CHERUVAYOOR | KOZHIKODE | KERALA | 673645 | ₹91.9 L Quoted ₹92.2 L | L1 | Accepted-AOC Negotiated value of work, work awarded, agreement executed |
| 2 | L2₹92.9 LRejected-AOC | ₹92.9 L | L2 | Rejected-AOC L2 |
| 3 | L3₹93.0 LRejected-AOC | ₹93.0 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | ASBAR VAFA TK L1 | T K UBAIDULLA, UBAID ASSOCIATES L3 | ccg constructions L2 |
|---|---|---|---|---|---|---|
| 1.00Civil Work | ||||||
| 1.00 | 2.1.1
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 50 | sqm | 100 ₹5,000 | 125 ₹6,250 | 150 ₹7,500 |
| 1.00 | 4.4.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) erived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 15.34 | cum | 9,000 ₹1.4 L | 9,200 ₹1.4 L | 9,500 ₹1.5 L |
| 1.00 | 4.1.3
Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of centering, shuttering and finishing.1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.76 | cum | 8,600 ₹15,136 | 8,650 ₹15,224 | 8,800 ₹15,488 |
| 1.00 | 5.3
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, helves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : .5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural ources). | 5.87 | cum | 12,500 ₹73,375 | 13,000 ₹76,310 | 13,500 ₹79,245 |
| 1.00 | OD226201/2025-2026
Modified 5.33.2 - Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All work above plinth level upto floor V level. Concrete of M25 rade with minimum cement content of 330 kg /cum | 4.19 | cum | 12,500 ₹52,425 | 12,100 ₹50,747.40 | 12,800 ₹53,683.20 |
| 1.01 | 5.9.6
Centering and shuttering including strutting, etc. and removal of orm for:Columns, Pillars, Piers, Abutments, Posts and Struts | 71.5 | sqm | 940 ₹67,210 | 945 ₹67,567.50 | 960 ₹68,640 |
| 1.01 | 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 94.14 | sqm | 750 ₹70,605 | 710 ₹66,839.40 | 800 ₹75,312 |
| 1.01 | 5.9.7
Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 20 | sqm | 300 ₹6,000 | 700 ₹14,000 | 600 ₹12,000 |
| 1.01 | 5.9.16.2
Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsAbove 20 cm wide | 6.46 | sqm | 900 ₹5,815.80 | 200 ₹1,292.40 | 500 ₹3,231 |
Tender Value
₹93.2 L
EMD Value
₹50,000
Closing Date
18 Nov 2025, 5:00 pmClosed
GM(I)
KSIE
Construction of office building for Mananthavady Municipality, Wayanad District, Phase II
2025_KSIE_820021_1
CP/INFRA/LSGD/04
Open Tender
Civil Works - Buildings
120 days
Wayanad
as per tender document
6 documents required · 6 mandatory
₹8,850
₹50,000
Yes
24 Jan 2026
7 Nov 2025
20 Nov 2025
7 Nov 2025
18 Nov 2025
7 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
tender_document.pdf
Tender Documents • 0.32 MB
BOQ_1374857.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid