Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-Finance SURANGANI CHAMBA HIMACHAL PRADESH | CHAMBA | HIMACHAL PRADESH | 176317 | ₹7.1 L | L1 | Accepted-Finance Quoted rates are lowest |
| 2 | L2₹8.2 L+₹1.0 L (14.6%)Rejected-Finance VILLAGE BADDUN LOCALITY KATAULA TOWN KAMAND DISTT MANDI H P 175005 | KAMAND | MANDI | HIMACHAL PRADESH | 175005 | ₹8.2 L+₹1.0 L (14.6%) | L2 | Rejected-Finance Quoted rates are higher |
| 3 | Rejected-Technical | - | - | Rejected-Technical bidder is not technically qualify |
| Sl No | Description | Qty | Unit | M/S Reetika Associates & Construction L2 | Ravinder Kumar L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth within all lead and for all lift as directed by Engineer-in-Charge.
a) All kinds of soil as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 33.96 | Cum | 150 ₹5,094 | 80 ₹2,716.8 Lowest |
| 2.00 | Excavating holes more than 0.10 cum & up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within lead and lift.
a) Ordinary rock as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 38 | No. | 180 ₹6,840 | 100 ₹3,800 Lowest |
| 3.00 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 5 km, also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc., complete as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 8.1 | Cum | 650 ₹5,265 | 550 ₹4,455 Lowest |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a) 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 2.6 | Cum | 7,550 ₹19,630 | 5,500 ₹14,300 Lowest |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a)1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 18.24 | Cum | 7,000 ₹1,27,680 | 5,100 ₹93,024 Lowest |
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a)1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 5.16 | Cum | 6,300 ₹32,508 | 4,800 ₹24,768 Lowest |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form work for :
a)Foundations, footings, bases for columns as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 13.26 | Sqm | 350 ₹4,641 | 200 ₹2,652 Lowest |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form work for :
a) Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 30.4 | Sqm | 790 ₹24,016 | 350 ₹10,640 Lowest |
| 9.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 2,690.8 | Kg | 102 ₹2,74,461.6 Lowest | 104 ₹2,79,843.2 |
| 10.00 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
a) Two or more coats on new work as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 389.6 | Sqm | 140 ₹54,544 | 100 ₹38,960 Lowest |
Tender Value
₹9.9 L
EMD Value
₹19,790
Closing Date
14 Apr 2026, 6:00 pmClosed
Suprintending Engineer IIT Mandi Kamand
O/o Superintending Engineer, North Camps IIT Mandi, Kamand Distt. Mandi HP-175075
Provision of fencing and relocation of play equipment at Day Care Children park IIT Mandi North Campus
2026_IITMD_903375_1
IIT Mandi (CW)/SE-1930/2025 -26/4032-34 dated 20-03-2026
Open Tender
Civil Works
Item Rate
60 days
North Campus of IIT Mandi
Please refer to NIT
2 documents required · 2 mandatory
₹1,180
The Registrar IIT Mandi
₹19,790
30 Jul 2026
23 Mar 2026
16 Apr 2026
23 Mar 2026
14 Apr 2026
23 Mar 2026
23 Mar 2026 - 13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth within all lead and for all lift as directed by Engineer-in-Charge. a) All kinds of soil as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | |||||
| 2Excavating holes more than 0.10 cum & up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within lead and lift. a) Ordinary rock as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | |||||
| 3Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 5 km, also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc., complete as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | |||||
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | |||||
| 5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a)1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | |||||
| 6Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a)1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | |||||
| 7Centering and shuttering including strutting, propping etc. and removal of form work for : a)Foundations, footings, bases for columns as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | |||||
| 8Centering and shuttering including strutting, propping etc. and removal of form work for : a) Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | |||||
| 9Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | |||||
| 10Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : a) Two or more coats on new work as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_949524.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .