Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹72,000
Closing Date
23 Jun 2026, 6:00 pm4d left
Similar tender results from the same govt authority in the past 3 years.
Chief Officer
BID DOCUMENTS FOR OPERATION & MAINTENANCE OF 5.20 MLD SBR TYPE SEWAGE TREATMENT PLANT AT KHEDA INCLUDING ALL MECHANICAL, ELECTRICAL, INSTRUMENTATION EQUIPMENT’S AND CIVIL STRUCTURES AS PER TENDERS CONDITION & SPECIFICATION FOR 01 YEARS (YEAR 2026-27) (2nd Attempt)
314696
2026-27
Open
AMC/Maintenance Contracts
Kheda
3 documents required · 3 mandatory
₹2,832
Chief Officer Kheda Nagarpalika
₹72,000
16 Jun 2026
16 Jun 2026
16 Jun 2026
23 Jun 2026
16 Jun 2026
Date of Technical Bid Opening Date 01/07/2026 at 11:00 Hours IST Onwards
Date of Price Bid Document Opening To be declared time to time based on
technical bid evaluation Date 01/07/2026 at
KHEDA NAGARPALIKA
Sr No Section Description Page No
1 Invitation for Bid (IFB)
2 Section -1 Instructions to Bidders
3 Section -2 Qualification Information
4 Section -3 Conditions of Contract
5 Section -4 Contract Data
6 Section -5 Conditions of Contract for O & M
7 Section -6 SPECIAL TERMS AND CONDITIONS
8 Section -7 Form of Bid
9 Section -8 Bill of Quantities
10 Section -9 Securities and Other Forms
11 Section -10 Drawings
12 Section -11 Documents to be furnished by Bidder
INVITATION FOR BID
NATIONAL COMPETITIVE BIDDING
1. The Kheda Nagarpalika invites bids for the construction of works detailed in the table. The bidders
may submit bids for any or all of the following works.
Packa Name of work Approximate Bid Cost of Period of Class of
ge No. value of works security Document completion Registration /
(Rs.) (Rs.) Category of
1 As Per NIT & Details 72,00,000/- 72,000/- 2832.00 12 MONTHS Class “D”
Given Below (O & M Cost) (1 Year)
NAME OF WORK: BID DOCUMENTS FOR “OPERATION & MAINTENANCE OF 5.20 MLD SBR
TYPE SEWAGE TREATMENT PLANT AT KHEDA INCLUDING ALL MECHANICAL, ELECTRICAL,
INSTRUMENTATION EQUIPMENT’S AND CIVIL STRUCTURES AS PER TENDERS CONDITION &
SPECIFICATION FOR 01 YEARS (YEAR 2026-27) (2nd Attempt)”
2. Prospective / Interested bidder may download the Bid Documents from website
https://www.nprocure.com free of cost till the Time and Date as mentioned on online NIT at
website https://www.nprocure.com.
3. However, Bidder who is submitting the Bid Online will have to pay the Bid Document Fee / Tender Fee
through Demand Draft only of any Schedule Bank payable at KHEDA and in favour of ‘Chief
Officer, Kheda’. Once the Bid is received online, Bid Document / Tender Fee will not be refundable.
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee against Bid Security /
EMD shall be submitted in electronic format through online (by scanning) while uploading the
bid, this submission shall mean that bid document / tender fee and Bid Security / EMD has been
received. Accordingly, the offer of only those shall be opened whose Bid Document / Tender Fee
and Bid Security / EMD have been received electronically. However, for the purpose of realization
of Demand Draft, and FDR / Bank Guarantee bidder shall send the same in original through R.P.A.D.
so as to reach to ‘Chief Officer, Kheda, within mentioned in NIT (Days) from the last day of bid
Penetrative action for not submitting Demand Draft / FDR / Bank Guarantee in original to Chief
Officer / Tender Inviting Authority by bidder shall be initiated.
4. Bids received online, will be opened on the time, date and place as specified in the online NIT at
website https://www.nprocure.com in the presence of the bidders or their authorized
representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the bids will be
opened on the next working day at the same time and venue.
5. A pre bid meeting will be held on --------------- at 00:00 hrs. at the office of Kheda Nagarpalika to
clarify the issues and to answer questions on any matter that may be raised at that stage as
stated in clause 9.2 of ‘instructions to Bidders’ of the bidding documents.
6. Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and should be rounded
off to the next thousand rupees.
7. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of the tender
submission date and time. After the tender submission date and time, the bidder cannot modify /
edit / withdraw their submitted offer in any case. No written or online request in this regard shall be
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last date of submission of
Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending discussion,
conferences or site visits will not be reimbursed by the Employer or Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with tender are liable to be
rejected.Any change in format or conditional Bank Guarantee will not be accepted and the bidder will
be considered non-responsive.All the bidders are instructed to fill in information strictly in
accordance with the format given in the checklist /qualification document / tender document.It is
mandatory for the bidders to supply each and every information as asked strictly in electronic
format at appropriate places only.
G. Blank / insufficient information shall be treated as nil information and shall result in disqualification.
H. Even if the bidder has been qualified in a similar or larger size of project in the past, it shall not be
deemed to be a ground / reason for not giving required information for this work / bid.
I. Information supplied for earlier projects shall not be considered while evaluation of this bid. The
Government will not ask for any other information, unless it is found absolutely necessary by the
competent authority.
J. If found necessary, the contractor will be intimated for negotiation,
(i) Bid Document Fee / Tender Fee
(ii) Bid Security / EMD or Valid EMD Exemption Certificate of Appropriate Class of Registration of
Approved Contractors
(iii) Registration Certificate of Appropriate Class
(iv) Current Financial Bank Solvency Certificate Not Less Than 20 % Of Estimated Amount
(vi) GST Number
(vii) Last Three Year IT return copy and seal and sign of CA
(viii) Turn Over certificate 30 % of Estimated Amount in Average of Last Three Year
(ix) Partnership Deed (if applicable)
(x) Work Experience, if necessary
(xi) Contractor shall submit EPF/PF Account number, certificate With Hard Copy of Tender. And necessary
document of above Registration at time of every R.A. Bill With name of employees
(xii) Tendered Should Not Be Blacklisted anywhere in India (Notarized Affidavit on Rs. 300 Stamp)
(xiii) Other Documents, as required…
Note: -A Notarized Affidavit For this Specific Tender ID By Contractor Specified That All The
Documents Provided By Him/her Are Genuine
INSTRUCTIONS TO BIDDERS
Section 1: Instructions to Bidders
Table of Clauses
Page No. Page No.
A. General D. Submission of Bids
1. Scope of Bid 9 19. Sealing and Marking of Bids
2. Source of Funds 9 20. Deadline for Submission of
3. Eligible Bidders 9 21. Late Bids
4. Qualification of the 9 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding 16 E. Bid Opening and Evaluation
7. Site Visit 16 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding 17 26. Examination of Bids and
Documents Determination of
9. Clarification of Bidding 17 27. Correction of Errors
10. Amendment of Bidding
28. Evaluation and Comparison
of Financial Bids
C. Preparation of Bids
11. Language of Bid
12. Documents Comprising 19 F. Award of Contra
13. Bid Prices 19 31. Award Criteria
14. Currencies of Bid and 20 32. Employer’s Right to Accept
Payment any Bid and to Reject any
15. Bid Validity 20 33. Notification of Award and
Signing of Agreement
16. Bid Security 20 34. Performance Security
17. Alternative Proposals By 21 35. Advance Payment and
Bidders Security
18. Format and Signing of
36. Correct or Fraudulent
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction of works
(as defined in these documents and referred to as ‘the works”) detailed in the table
given in IFB. The bidders may submit bids for any or all of the works detailed in the
table given in IFB.
1.2 The successful bidder will be expected to complete the works by the intended
completion date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their
derivatives (bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat for
centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
statement that the Bidder is neither associated, nor has been associated, directly or
indirectly, with the consultant or any other entity that has prepared the design,
specifications, and other documents for the Project or being proposed as Project
Manager for the Contract. A firm that has been engaged by the Employer to provide
consulting services for the preparation or supervision of the works, and any of its
affiliates, shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
preliminary description of the proposed work method and schedule, including
drawings and charts, as necessary. The proposed methodology should include a
program of construction backed with equipment planning and deployment duly
supported with broad calculations and quality assurance procedures proposed to be
adopted justifying their capability of execution and completion of work as per technical
specifications, within stipulated period of completion.
4.2 Submit a written power of attorney authorizing the signatory of the bid to submit the
4.3 Submit Qualification requirements specifying financial capacity, technical capacity,
minimum acceptable levels with regards to Bidder's experience in relevant projects and
other relevant factors such as work in hand, future commitments, and litigation history.
4.4 Submit proposals regarding work methods, scheduling and re sourcing which shall be,
provided in sufficient detail to confirm the bidders’ capability to complete the works
in accordance with the specifications and the time for completion.
4.5 Joint Venture / consortium are not allowed in this bid.
4.6 QUALIFICATION CRITERIA:
(Applicable for the works which require Post Qualification)
4.6.1 Qualification will be based on Applicant’s meeting all the following minimum pass/
fail criteria regarding the Applicant’s general and particular experience, personnel
and equipment capabilities and financial positions, as demonstrated by the
applicant’s responses in the forms attached to the letter of application (specified
requirement for joint ventures are given under para 4.6 below) Subcontractors
experience and resources shall not be taken in to account in determining the
applicants compliance with the qualifying criteria To qualify for more than one
contract, the applicant must demonstrate having experience and resources sufficient
to meet the aggregate of the qualification criteria for each contract given in
paragraphs 4.5.4, 4.5.5 and 4.5.9 below
4.6.2 Base year and Escalation
The base year shall be taken as Current financial year
Following enhancement factors will be used for the costs of works executed and the
financial figure to a common base value for works completed in India.
Year Financial Year Multiplying factor
Base year of inviting tender 2024-2025
Applicant should indicate actual figures of costs and amount for the works executed
by them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign currency the
above enhanced multiplying factors will not be applied. Instead, the current market
exchange rate (State Bank of India BC Selling rate as on the last date of submission of
the bid) will be applied for the purpose of conversion of the amount in foreign
currency into India rupees.
4.5.3. General Experience.
The Applicant shall meet with the following minimum criteria:
4.5.3.1 QUALIFYING CRITERIA OF APPLICANT
MINIMUM QUALIFYING CRITERIA:
To qualify, each bidder in the same name and style should have achieved the
following performances:
List of Mandatory documents to be submitted
If bidder fails to submit below documents or mandatory criteria are not fulfilled,
bidder shall be considered as not qualified and their financial bid shall not be open.
To qualify, each bidder in the same name and style should have achieved the
following performances:
a) Registration:
A Certificate of Contractor’s registration certificate 'D' Class OR Above in Govt. of
Gujarat (R&B / WRD / GWSSB / Board, Corporation, and Government Undertaking /
Organizations of state government). (Scanned copy)
b) EMD/Tender Fee
As per Tender Notice
c) Solvency Certificate
Scanned Copy of the Solvency Certificate as approved by State Government.
(Bank Solvency certificate of nationalized bank or bank indicated in latest G R of FD
of the amount not less than Rs. 14.40 Lakhs. The bank solvency should be of the
current calendar year.)
Bidder must have achieved minimum annual financial turnover (at current price
level) from contract receipt of works (in all classes of civil engineering construction
works only) of Rs. 21.60 Lakhs. last three financial years i.e. from 2023-24 to 2025-
26. (C.A. Certificate must be attached).
e) SIMILAR NATURE OF WORK:
The bidder must have completed similar nature of work for any state govt. / central
govt. / PSU i.e. 2 years of Operation and Maintenance (O&M) for Minimum 1 MLD in
STP/WTP within last Seven (7) financial years i.e. from Year 2018- 19 to 2024-25 up
to one month prior to last Date of submission of the bid of Value not less than:
One completed works costing not less than the amount equal to 80% of the
Two completed works costing not less than the amount equal to 50% of the
Three completed works costing not less than the amount equal to 40% of the
OPERATION & MAINTENANCE:
The bidder shall have successfully completed design, construction and
commissioning including operation & maintenance for minimum 1 MLD STP/WTP (for
minimum 2 year after commissioning, inclusive of defect liability period), in single
project cost contract of similar nature (as narrated above) amounting to above
mentioned amount last Seven (7) years from one month prior to last date of
submission of bid.
Note: The amount of works shown above means project cost.
The bidder shall have successfully completed design, construction and commissioning
including operation & maintenance for minimum 1 MLD STP/WTP for minimum
years in single contract of similar nature (as narrated above) amounting to above
mentioned amount in last Seven (7) years from one month prior to last date of
submission of bid.
PHYSICAL CRITERIA:
The bidder must have successfully carried out minimum quantities of the following
work in any one project during last Seven (7) i.e. from Year 2018-19 To 2024-25 and
up to one month prior to last date of submission of the bid.
I) The works for which bidder have not entered in to contract agreement will
not be considered
II) The above experience shall be within last Seven (7) financial years i.e. from
Year 2018-19 to 2024-25 and up to one month prior to last date of submission of
the bid for which Form -3A/11 must be submitted.
III) Experience as sub-contractor shall not be considered.
The experience of works executed in Government (State/Central), Board,
Corporation, and Government Undertaking / PSU/ Organizations of state & central
government shall only be considered for evaluation. The experience certificate
from the client equivalent to not below the rank of Executive Engineer shall be
considered. The experience of sublet works shall not be considered.
IV) All MOU’s shall be on a Non Judicial stamp paper of appropriate value duly
notarized and signed by respective authorized representatives.
V) The Bidder / MOU partners contract should not have been terminated / blacklisted
/ debarred in any State Govt / Nagarpalikas / Central Govt. / Any state Govt
Organization, Urban Local body and/or its undertaking company or its SPV,
Asian Development Bank/ World Bank or similar international funding agencies
organizations due to delay in projects during last seven years.
VI) The works for which bidder have not entered in to contract agreement will
not be considered.
VII) If the bidder claiming Technical/ Physical Eligibility Criteria for the works has
completed any of the works in joint venture with any other company then,
along with the experience certificates, the firm shall submit the joint venture
agreement for that particular work. Experience certificates not accompanied by
joint venture agreement shall not be considered for evaluation. The credit for
the bidder which has completed a work in joint venture is allocated as
1. If the bidder has completed the work as a member in the project, then the
bidder can claim credit for the entire scope of the work in proportion to the
stake (e.g. if the capacity of the ESR executed is 30 ML and if the firm has
executed the project as member with a 40% stake then the firm can claim
credit for (40% x 30 ML) 12 ML works. A statutory auditor certificate
specifying the payments received for the project should be submitted. In the
event of percentage participation in the project calculated through the
statutory auditor certificate differs from the percentage in the Joint Venture
Agreement, the percentage participation calculated through payments
received shall be considered for evaluation purposes.
Note: The above condition shall also apply to Clause ‘Similar Nature of
work’ under financial criteria.
Financial Bid of only those contractors whose technical bids are found
Qualified by the department shall be opened online. The time and date of
opening of financial bid of contractors qualifying the technical bid shall be
communicated to them later on.
No any Price Variation or Rate difference clause applicable. If is there any
clause regarding to the adjustment of price / Price variation / price escalation
mentioned in this tender it will be treated
4.5.4. Personnel Capabilities.
Bidder need to submit inhouse NABL Accredited Laboratory Setup and submit
relevant certificate with NABL scope for testing.
If any bidder does not having in house NABL Accredited Laboratory Setup then
submit MOU of respected agency and submit relevant documents as above.
4.5.5. Financial Position
The Applicant should give undertaking that he has access to, or has available,
liquid assets (aggregate of working capital, cash in hand and uncommitted bank
guarantees) and / or credit facilities up to 25 percent of the value of the
contract / contracts applied.
4.5.6. The audited balance sheets for the last Seven (7) years should be submitted,
which must demonstrate the soundness of the applicant’s financial position,
showing long – term profitability including an estimated financial projection
for the next two years If necessary, the employer will make inquiries with the
applicant’s bankers.
4.5.7. Litigation History
The Applicant should provide accurate information on any litigation or
arbitration resulting from contracts completed or under execution by him
over the last seven years. A consistent history of awards against the
Applicant or any partner of a joint venture may result in failure of the
4.5.8. Disqualification
Even though the applicants meet the above criteria, they are subject to
be disqualified if they have:
Made misleading or false representation in the forms, statements submitted,
and / or Record of poor performance such as abandoning the work,
rescinding of contract for which the reasons are attributable to the non –
performance of the contractor; consistent history of litigation awarded
against the applicant or financial failure due to bankruptcy. The rescinding
of contract of a joint venture on account of reasons other than non –
performance, such as Most Experienced partner of joint venture pulling out,
court directions leading to breaking up of a joint venture before the start of
work, which are not attributable to the poor performance of the contractor
will, however, not affect the qualification of the individual partners.
JV NOT APPLICABLE-
4.6.1. Qualification of a joint venture does not necessarily qualify any of its partners
individually or as a partner in any other joint venture. In case dissolution of a
joint venture, each one of the constituent firms may qualify if they meet all the
qualification requirements, subject to the written approval of the Employer.
4.7. Bid Capacity.
Applicants who meet the minimum qualification criteria will be qualified only if their
available bid capacity at the expected time of bidding is more than the total
estimated cost of the works. The available bid capacity will be calculated as under:
Assessed Available Bid Capacity = (A*N*2-B), where
A = Performance of the Bidder for maximum annual turnover for last seven financial year
updated at the financial year 2023-24. (Current completed financial year)
B = Value of the existing commitments as on date of bid submission for works
(complete or partial) to be completed in the next 12 Months (1 years). The details shall
be countersigned by the Executive Engineer or the equivalent officer of the employer on
whose behalf the firm is carrying out the works.
N = Years prescribed for completion of the work for which bids are invited.
12 Months (1 years) (Equivalent to duration of the project)
Note: - In Case of joint venture, the available bid capacity will be applied for each
partner to the extent of his proposed participation in the execution of the work.
4.7 Even though the bidders meet the above qualifying criteria, they are subject to be
disqualified if they have:
- Made misleading or false representation in the forms, statements and Attachments the
submitted in proof the qualification requirements; and / or Record of poor performance
such as abandoning the works, not properly completing the contract, inordinate delay in
completion, litigation history, or financial failures etc.; and/ or Participated in the
previous bidding for the same work and had quoted unreasonably high bid prices and could
not furnish rational justification to the employer.
4. One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of
alternatives that have been permitted or requested) will cause all the proposals with the
bidder’s participation to be disqualified.
6. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission
of his Bid, and the Employer will in no case be responsible and liable for those
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit
and examine the Site of work and its surrounding and obtain all information
that may be necessary for preparing the Bid and entering into a contract for
construction of the Works.
The costs of visiting the site shall be at the Bidder’s own expense.
The Site Visit shall be carried out on or before 23/06/2026. A Site Visit
Certificate, duly signed and stamped by the Clerk - Drainage Department and/or
Sanitary Inspector, shall be obtained and submitted along with the Bid.
Submission of the Site Visit Certificate is mandatory. Bids not accompanied by a
valid Site Visit Certificate.
B. BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and addenda
issued in accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders I
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Conditions of Contract for O & M V
11 Documents to be furnished by bidder VI
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the
bidder in compliance to section 2 will be prepared by him and furnished as Volume-
V in two parts (refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, technical specifications, bill of quantities, forms, Annexes
and drawings in the Bid Document. Failure to comply with the requirements of Bid
Documents shall be at the bidder’s own risk. Pursuant to clause 26 here of, bids
which are not substantially responsive to the requirements of the Bid Documents
shall be rejected.
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may
notify the Employer in writing or through E-mail at the Employer’s address
indicated in the invitation to bid. The Employer will respond to any request for
clarification which he received earlier than 15 days prior to the deadline for
submission of bids. Employer’s response will be published on website including a
description of the enquiry but without identifying its source.
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer
will assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his discretion, extend as
necessary the deadline for submission of bids, in accordance with Sub-Clause
C. PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause
8.1) shall be in two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in Clause15.1
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e.
technical as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders Volume I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
6 Form of Bid Volume III
7 Bill of Quantities
8 Securities and other forms
9 Drawings Volume IV
10 Conditions of Contract for O & M Volume V
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on the
priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line-item total (both in figures and
words)for all items of the Works described in the Bill of Quantities along with total bid price
(Both in figures and words). Items for which no rate or price is entered by the bidder will not be paid for
by the Bill of Quantities.
13.3 Bidder need to quote including gst amount in this tender and all extra other expenses
including transportation and all.
13.4 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the
Conditions of Contract.
13.5 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the Condition
of Contract (Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 T h e unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees. All
payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 180 days after the deadline date
forbid submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer
may request that the bidders may extend the period of validity for a specified period. A bidder
may refuse the request without forfeiting his bid security. A bidder agreeing to the request will
not be required or permitted to modify his bid, but will be required to extend the validity of his
security for a period of the extension, and in compliance with Clause 16 in all respects.
16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in
column 4 of the table of IFB for this particular work. This Bid security shall be in favour of
Employer as named in Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in Volume III. (Bank
Guarantee is applicable only for Bid Estimated Amount of 01 Crore and above) and Bank
Guarantee of Schedule and Private Banks shall be considered as per GoG Finance Department’s
Circular No. FD/MSM/e- file/4/2023/0057/D.M.O. Date 21/04/2023 or as per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank approved
by the Reserve Bank of India.
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety for the
bid shall be valid for 45 days beyond the validity of the bid i.e. total validity of 120+45 = 165 Days
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as indicated in
Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer as non-responsive.
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end of the
bid validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has signed
the Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid validity.
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) #If found necessary, the bidder will be intimated for negotiation, He will be intimated
maximum three times within the validity period for negotiation, If contractor does not respond
in time, his Bid Security (EMD) will be forfeited and his tender will be rejected. Punitive action
will be taken on such contractors. (As per GoG R&B Dept’s Gr. No. S/22/2017/6369/D,
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or time for
completion), basic technical design as indicated in the drawing and specifications. Conditional
offers or alternative offers will not be considered further in the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of
these Instructions to bidder as the “Technical Bid “and “Financial Bid” in separate parts to be
D. SUBMISSION OF BIDS
19. Sealing and Marking of Bids:
19.1 The Bidder shall seal the original and copy of the Bid in separate envelopes, duly
marking the envelopes as "ORIGINAL" and "COPY". These envelopes (called as inner
envelopes) shall then be put inside one outer envelope.
19.2 The inner and outer envelopes shall
(a) be addressed to the Employer at the following address:
KHEDA Nagar Palika,
TA. Kheda, Dist: Kheda
In addition to the identification required in Sub-Clause 19.2, the inner envelopes shall indicate the
name and address of the bidder to enable the bid to be returned unopened in case it is declared
late, pursuant to Clause
19.3 If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website
specified above not later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with Clause 10, in which case all right and obligation of the
Employer and the bidders previously subject to the original deadline will then be subject to the
Any Bid received by the Employer after the deadline prescribed in Clause 20 will be returned
unopened to the bidder
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribed in
Clause 20 or pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of bids and
the expiration of the original period of bid validity specified in Clause 15.1 above or as
extended pursuant to Clause 15.2 may result in the forfeiture of the Bid security pursuant to
E. BID OPENING AND EVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made pursuant to
Clause 22, in the presence of the Bidders or their representatives who choose to attend at
time, date and the place specified in Appendix in the manner specified in Clauses 20 and 23.3,
In the event of the specified date of Bid opening being declared a holiday for the Employer, the
Bids will be opened at the appointed time and location on the next working day.
The “Technical Bid” shall be opened. The amount, form and validity of the bid security furnished
with each bid will be announced. If the bid security furnished does not conform to the amount and
validity period as specified in the invitation for bid (ref. Column 4 and paragraph 3), and has
not been furnished in the form specified in Clause 16, the technical bid will not be opened.
(i) Subject to confirmation of the bid security by the issuing Bank, the bids
accompanied with valid bid security will be taken up for evaluation with respect to the
Qualification information and other information furnished in part I of the bid pursuant to
(ii) If required, the bidder will be asked in writing to clarify his Qualification
Documents with respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the clarification
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the
Evaluation Committee will finalize the list of responsive bidders whose financial bids are
eligible for consideration.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only these
bidders will be opened. The responsive Bidders’ names, the Bid prices, the total amount of
bidders will be opened. The responsive Bidders’ names, the Bid prices, the total amount of
each bid, any discount and such other details as the Employer may consider appropriate, will be
announced by the Employer at the opening.
23.7 the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only these
bidders will be opened. The responsive Bidders’ names, the Bid prices, the total amount of
bidders will be opened. The responsive Bidders’ names, the Bid prices, the total amount of
each bid, any discount, and such other details as the Employer may consider appropriate, will be
announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information
disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of Bids
and recommendations for the award of a contract shall not be disclosed to Bidders or any
other persons not officially concerned with such process until the award to the successful
Bidder has been announced. Any effort by Bidder to influence the Employer’s processing of
Bids or award decisions may result in the rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may, at
his discretion, ask any Bidder for clarification of his Bid, including breakdowns of unit rates. The
request for clarification and the response shall be in writing or by e- mail, but no change in the
price or substances of the Bid shall be sought, offered, or permitted except as required to
confirm the correction of arithmetic errors discovered by the Employer in the evaluation of the
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter relating
to his Bid opening to the contract is awarded. If the Bidder wishes to bring additional
information to the notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation, bid
comparison or contract award decision may result in the rejection of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine whether
each Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has been properly
signed; (c) is accompanied by the required securities and; (d) is substantially responsive to the
requirements of the Bidding document. During the detailed evaluation of the “Financial Bid”,
the responsiveness of the bids will be further determined with respect to the remaining bid
conditions, i.e., priced bill of quantities, technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms,
conditions and specifications of bidding documents, without material deviation or reservation.
A material deviation or reservation is one (a) which affects in any substantial way the scope,
quality, or performance of the Works; (b) which limits in any substantial way, inconsistent with
the Bidding documents, the Employer’s rights or the Bidder’s obligations under the Contract; or
(c) whose rectification would affect unfairly the competitive position of other Bidders
presenting substantially responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the Employer,
and may not subsequently be made responsive by correction or withdrawal of the nonconforming
deviation or reservation.
27. Correction of Errors
27.1 Bids determined to be substantially responsive will be checked by the Employer for any
arithmetic errors. Errors will be corrected by the Employer as follows:
(a) where there is a discrepancy between the rates in figures and in words, the rate in
words will govern; and
(b) where there is a discrepancy between the unit and the line-item total resulting from
multiplying the unit rate by the quantity, the unit rate as quoted will govern.
27.2 The amount stated in the Bid will be adjusted by the Employer in accordance with the
above procedure for the correction of errors and, with the concurrence of the Bidder, shall be
considered as binding upon the Bidder. If the Bidder does not accept the corrected amount
the Bid will be rejected, and the Bid security may be forfeited in accordance with Sub-Clause
28. Evaluation and Comparison of Financial Bids
28.1. The Employer will evaluate and compare only the Bids determined to be substantially
responsive in accordance with Sub-Clause 26.2.
28.2. The Employer reserves the right to accept or reject any variation or deviation. Variation
and deviations and other factors, which are in excess of the requirements of the Bidding
documents or otherwise result in unsolicited benefits for the Employer, shall not be taken in to
account in Bid evaluation.
28.3. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract, will not be taken in
to account in Bid evaluation.
28.4. If the Bid of the successful Bidder is seriously unbalanced in relation to the Engineer’s
estimate of the cost of work to be performed under the contract the Employer may require
the Bidder to produce detailed consistency of those prices with the construction methods and
schedule proposed. After evaluation of the price analyses, the Employer may require that the
amount of the performance security set forth in Clause 34 be increased at the expense of the
successful /bidder to a level sufficient to protect the Employer against financial loss in the
event of default of the successful Bidder under the Contract.
28.5. A bid which contains several items in the bill of Quantities which are unrealistically
priced low and which cannot be substantiated satisfactorily by the bidder may be rejected as
non-responsive.
F. AWARD OF CONTRACT
29. Award Criteria
29.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid has
been determined.
(i) to be substantially responsive to the Bidding documents and who has offered the lowest
evaluated Bid Price; and
(ii) To be within the available bid capacity adjusted to account for his bid price which is
the lowest evaluation in any of the packages opened earlier than the one consideration.
In no case, the contract shall be awarded to any bidder whose available bid capacity is less
than the evaluated bid price, even if the said bid is the lowest evaluated bid. The contract will in
such cases be awarded to the next lowest bidder at his evaluation bid price.
30. Employer’s Right to accept any Bid and to reject any or all Bids
30.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any
Bid, and to cancel the Bidding process and reject all Bids, at any time prior to the award of
contract, without thereby incurring any liability to the affected bidder or Bidder or any
obligation to inform the affected Bidder or Bidders of the grounds for the Employer’s action.
31. Notification of Award and Signing of Agreement
31.1. The Bidder whose Bid has been accepted will be notified of the award by the Employer
prior to expiration of the Bid validity period by cable, telex or facsimile confirmed by
registered letter. This letter (hereinafter and in the condition of contract called the “Letter of
Acceptance”) will state the sum that the Employer will pay the Contractor in consideration of the
execution, completion, and maintenance of the Works by the Contractor as prescribed by the
Contract (hereinafter and in the Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to the
furnishing of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the
successful Bidder. It will be signed by the Employer and to the successful Bidder, within
days following the notification of award along with the Letter of Acceptance. Within 21 days
of receipt, the successful Bidder will sign the Agreement and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the
Employer will promptly notify the other Bidders that their Bids have been unsuccessful.
32. Performance Security
32.1. (A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder
shall furnish to the Employer an irrevocable and unconditional guarantee from a Bank in the
form set forth in Section 8 (the “Performance Security”) for an amount equal to 5% (five
percent) of its Contract Price. In case of bids mentioned below, the successful Bidder, along
with the Performance Security,
Shall also furnish to the Authority an irrevocable and unconditional guarantee from a Bank in
the same form given at Section 8 towards an Additional Performance Security (The
“Additional Performance Security”) for an amount calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but up to 20% of
the Estimated Project Cost, then the Additional Performance Security shall be calculated @ 20%
of the difference in the (i) Estimated Project Cost (as mentioned in Bid Document) - Minus
10% of the Estimated Project Cost and (ii) Contract Price offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of the Estimated
Project Cost, then the Additional Performance Security shall be calculated @ 30% of the
difference in the (i) Estimated Project Cost (as mentioned in Bid Document) - Minus 10% of
the Estimated Project Cost and (ii) Contract Price offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the Performance
(B) The Performance Security shall be valid beyond 60(sixty) days of the Defects Liability
Period and the Additional Performance Security shall be valid beyond 28 (twenty-eight) days of
Project Completion Date.
32.2. If the performance security is provided by the successful Bidder in the form of a
Bank Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India and acceptable to
the Employer. As per GoG Finance Department’s Circular No. FD/MSM/e-file/4/2023/0057/D.M.O.
Date 21/04/2023 or as per their latest amendment.
32.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause
shall constitute sufficient grounds for cancellation of the award and forfeiture of the Bid
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as stipulated in
the Conditions of Contract, subject to maximum amount, as stated in the Contract Data.
36. Corrupt of Fraudulent Practices
36.1 The Employer will reject a proposal if it determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in completing for the contract in
question and will declare the firm ineligible, either indefinitely or for a stated period of time, to
be awarded a contract with National Highways Authority of India/ State PWD and any other
agencies, if it at any time determines that the firm has engaged in corrupt or fraudulent
practices in completing for the contractor, or in execution.
36.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of the
Conditions of Contract.
APPENDIX TO ITB
Clause Reference
With respect to
1. The Name of the Employer is KHEDANagar Palika. [ Cl.1.1]
2. The last seven years.
3. This Annual Financial Turnover Amount is Rs. 279.00 Lacks [Cl.4.5.3.1
4. Value of Work is Rs. 7200000/- (Incd. GST)
5. The cost of / Drainage / Sewerage works is Rs.
6. Liquid assets and / or availability of credit facilities is Rs.………… [Cl.4.5.6]
7. Price level of the financial year 2024-2025 [Cl. 4.5.2]
8. The pre-bid meeting will take place at Nagarpalika Office [Cl. 9.2.1]
9. The technical Bid will be opened at the office of the Nagarpalika on
01/07/2026 11.00Hrs. (If Possible)
10. Address of the Employer: Kheda Nagarpalika, A T . PO & TA. KHEDA
11. The bid should be submitted latest by As stated on online NIT [Cl. 20.1 &
12. The bid will be opened at Kheda Nagarpalika As stated on online NIT [Cl. 23.1]
13. The Bank Draft in favor of Chief officer Kheda nagarpalika
14. Escalation factors (for the cost of works executed and financial figure [Cl.4.5.2]
to a common base value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender 2024-2025
#LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[Reference CL. 4.5.5]
#Employment of a qualified site Engineer by the Contractor. – CVs submission
Sr. Designation Duty No of Persons Qualification
1 Plant Manager General 01 B.E. ( Chem, Env, Mech,
Etc) B.Tech/ DIE
2 Shitf In charge Shift 02 B.E. ( Chem, Env, Mech,
Etc) B.Tech/ DIE
3 Lab Technician General 01 B.E/B. Sc. (Chem.)
Electrical 01 Diploma/ Bechler of
4 General Engineering/ITI
5 Mechanical General 01 Diploma/ Bechler of
Engineering/ITI
6 Plant Operator Shift 02 ITI/12 Th/Eqv.
Helper cum Sweeper
7 General 01 Un-skill
8 Shift 02 Highly Skilled
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
# Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this work as
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of the work to be
executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed is
more than Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum one Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs but
more than Rs.5 lakhs.
4. Minimum two Diploma Civil Engineers for the work when the cost of work to be executed is
less than Rs. 5 lakhs. The Engineer so employed for the Government work must have
sufficient experience to handle the work independently. Such an Engineer shall have to stay
at the site of work and he shall not be entrusted with other duty except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer, Employment of a
separate Engineer will not be necessary provided that the Engineer partner himself attends the
execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the Chief Officer-in-
charge of the work the Name, Qualifications, copy of marksheet, Colour Photograph and the
appointment order issued such engineers engaged for this contract work. If 15 days after issue of
work order such designated Site Engineers do not resume or do not remain present on site of work,
the recovery at the rate of Rs.15,000-00 per month per Engineer will be made from the
bills/deposit/dues of the contractor. Such recovery shall be non-refundable.
QUALIFICATION INFORMATION
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for the
purpose of post qualification as provided for in Clause 4 of the Instruction to Bidders. This
information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach Copy)
Place of registration
Principal place of business
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil engineering constructions 2018-2019
Work performed in the last Seven years 2019-2020
(in Rs. Lakhs) 2021-2022
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub- contractor
will also be considered the sub-contract involved execution of a l l main items of work
described in the bid documents, provided further that all other qualification criteria are
satisfied (in the same name) on works of a similar nature over the last seven years** and in
current year before the submission of the bid.
Project Name of the Description of Contract Value of Date of Stipulated Actual date Remark
Name Employer work No. contract issue of period of of explaining
(Rs. work completion completion* reasons for
Crore) order delay & work
*Attach certificate(s) from the Engineer(s)in-charge
** Immediately preceding the financial year in which bids are received.
#1.3.2 Quantities of work executed as prime contractor, work performed, in the past as a
nominated sub-contractor, will also be considered provided the sub-contract involved
execution of all main items of work described in the bid document, provided, further that
all other qualification criteria are called (in the same name and style) in the last seven years**
and in current year before the submission of the bid.
Year Name of Name of Quantity of work performed (Cum/MT) Remarks*
the work the Cement Masonry Earth Bituminous (indicate
Employer Concret+65 Works Work contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works
which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description Place Contract Name & Value Stipulated Value of Anticipated
of works & No. Address Contract Period of Works* Of
State of (Rs. Cr) Completion remaining completion
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref.
Clause 4.5.5). The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from whom
Leased to be Capacity Conditions to be
procured purchased
1.6 Qualifications and experience of key personnel required for administration and
execution of the contract. Attach biographical data. Refer also to Sub Clause 9.1 of
the Conditions of Contract.
Position Name Qualification Year of Year of experience
Experience in the proposed
(General) position
1.7 Proposed sub-contract and firms involved
Sections of the Value of Sub- Sub-Contractor Experience in
works Contractor (Name & Address) similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary
work/ building electrification works.
1.8 Financial reports for the last seven years: balance sheets, profit and loss statements,
auditors’ reports (in case of companies/corporations), etc. List them below and attach
1.9 Evidence of access to financial resources to meet the qualification requirements:
cash in hand, lines of credit, etc. List them below and attach copied documents.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who
may provide references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party Employer Cause of Amount Remarks
(ies) Dispute Involved showing
1.12 Statement of compliance under the requirements of Sub Clause 3.2 of the instruction
to Bidders. (Name of Consultant engaged for project preparations is * ....................... )
1.13 Proposed work method and schedule. The Bidder should attach descriptions,
drawings and charts as necessary to comply with the requirements of the Bidding
documents. (Refer ITB Clause 4.1)
2. Additional Requirements
2.1 Bidders should provide any additional information required to fulfill the
requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
* Fill the name of Consultant
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR AVAILABILITY OF
CREDIT FACILITIES
(CLAUSE 4.5.6 OF ITB)
BANK CERTIFICATE
This is to certify that M/s. is a reputed company with
a good financial standing.
If the contract for the work, namely is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent of
Rs. to meet their working capital requirements for executing the above
during the contract period.
Senior Bank Manager
Address of the Bank
4 I, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct.
5 The undersigned also hereby certifies that neither our firm M/s
have not abandoned any work of
Government of Gujarat/Government of India/any Board or Corporation under
Government of Gujarat/Government of India nor any contract awarded to us for such works
have been rescinded, during last seven years prior to the date of this bid.
6 The undersigned hereby authorize(s) and request (s) any bank, person, firm or corporation
to furnish pertinent information deemed necessary and requested by the Department to
verify this statement or regarding any (our) competence and general reputation.
7 The Undersigned understands and agrees that further qualifying information may be
requested, and agrees to furnish any such information at the request of the Department/
Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
I, the undersigned do hereby undertake........ that our firm
up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A General Page D. Cost Control
1 Definitions 41 37 Bill of Quantities
2 Interpretation 42 38 Changes in the Quantities
3 Language and Law 43 39 Variations
4 Engineer’s Decisions 43 40 Payments for Variations
5 Delegations 43 41 Cash Flow Forecasts
6 Communications 43 42 Payment Certificates
7 Sub-Contractors 43 43 Payments
8 Other Contractors 43 44 Compensations Events
9 Personnel 44 45 Tax
10 Employer’s & Contractor Risk 44 46 Currencies
11 Employers Risks 44 47 Price Adjustment
12 Contractor’s Risk 44 48 Retention
13 Insurance 44 49 Liquidateddamages
14 Site Investigations Reports 45 50 Bonus
15 Queries about the Contract 45 51 Advance Payment
16 Contractors to Construct the 45 52 Securities
17 The Works to be Completed By the
Intended Completion Date
18 Approval by the Engineer 45 54 Cost of Repair
20 Discoveries 46 E. Finishing the Contract
21 Possession of the Site 46 5 Completion
22 Access to the Site 46 56 Taking Over
23 Instructions 46 57 Final Account
24 Disputes 46 58 Operating and Maintenance
25 Procedure for Disputes
59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 48 62 Release from Performance
28 Extensions of the Intended
completion date
F. Special Conditions of Contract
30 Delays Ordered by The Engineer 48 63 Labour
31 Management Meetings 49 64 Compliance with labour
regulations Arbitration
32 Early Warning 49 65
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
CONDITIONS OF CONTRACT
Terms which are defined in the Contract Data are not also defined in the Conditions of
Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities forming part of the Bid
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified by the Engineer in
accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to execute, complete
and maintain the Works till the completion of Defects Liability Period. It consists of the
documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which comprise the
The Contractor is a person or corporate body whose Bid to carry out the Work has been
accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the Contractor to the
Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and thereafter as adjusted
in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and calculated from
the Completion Date.
The Employer is the party who will employ the Contractor to carry out the Works.
The Engineer is the person named in the Contract Data (or any other competent person
appointed and notified to the contractor to act in replacement of the Engineer) who is
responsible for supervising the Contractor, administering the Contract, certifying payments
due to the Contractor, issuing and valuing Variations to the Contract, awarding extensions of
time, and valuing the Compensations Events.
Equipment is Contractor’s machinery and vehicles brought temporarily to the site to
construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s Letter of Acceptance.
The Intended Completion Date is the date on which it is intended that the Contractor
shall complete the Works. The Intended Completion Date is specified in the Contract Data.
The Intended Completion Date may be revised only by the Engineer by issuing an extension
Materials are all supplies, including consumables, used by the contractor for incorporation
Plant is any integral part of the work which is to have mechanical, electrical, electronic or
chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding documents
and are factual interpretive reports about the surface and subsurface conditions at the
Specifications means the Specifications of the works included in the Contract and any
modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor shall
commence execution of the works. It does not necessarily coincide with any of the Site
Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the Contractor to
carry out a part of the work in the Contract which includes work on the Site.
Temporary Works are works designed, constructed, installed, and removed by the
Contractor which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works.
The Works are what the Contract requires the Contractor to construct, install, and turn over to
the Employer, as defined in the Contract Data.
2. 0 Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male also
means female or neuter and the other way around. Heading have no significance.
Words have their normal meaning under the language of the Contract unless
specifically defined. The Engineer will provide instructions clarifying queries about
Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended Completion Date
apply to any Section of the Works (other than references to the Completion Date and
Intended Completion date for the whole works)
2.3 The documents forming the Contract shall be interpreted in the following order
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the Contract.
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in the
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide contractual
matters between the Employer and the Contractor in the role representing the Employer.
5.1 The Engineer may delegate any of his duties and responsibilities to
other people after notifying the Contractor and may cancel any delegation after notifying the
6. Communications
6.1 Communications between parties which are referred to in the conditions are
effective only when in writing. A notice shall be effective only when it is delivered (in
terms of Indian Contract Act).
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified in
contract data, with the approval of the engineer but may not assign the Contract without
the approval of the Employer in writing. Subcontracting shall not alter the Contractor’s
obligations. Sub-contracting of supply or specific items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for the part
of work to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors, public
authorities, utilities and the Employer between the dates given in the Schedule of other
Contractor. The Contractors shall as refer to in the Contract Data, also provide facilities and
services for them as described in the Schedule. The employer may modify the schedule of
other contractors and shall notify the contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as
referred to in the Contract Data to carry out the functions stated in the Schedule or other
personnel approved by the Engineer. The Engineer will approve any proposed
replacement of key personnel only if their qualifications, abilities, and relevant experience
are substantially equal to or better than those of the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of the
Contractor Staff or his work force stating the reasons the Contractor shall ensure that the
person leaves the Site within seven days and has no further connection with the work in the
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s risks, and the
Contractor carries the risks which these Contracts states are Contractor’s risk.
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as they
directly affect the execution of the Works, the risks of war, hostilities, invasion, act of
foreign enemies, rebellion, revolution, insurrection or military or usurped power, civil war,
riot commotion or disorder (unless restricted to the Contractor’s employees), and
contamination from any nuclear fuel or nuclear waste or radioactive toxic explosive.
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and death
which arise during and in consequence of the performance of the Contract other than the
excepted risks are the responsibility of the Contractor.
13.1 The Contractor shall provide, in the joint names of the Employer and the Contractor,
insurance cover from the Start date to the end of the Defects Liability Period, in the
amounts and deductibles stated in the Contract data for the following events which are due
to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and Equipment) in
connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to the
Engineer for the Engineer’s approval before the Start Date. All such insurance shall provide
for compensation to be payable in the types and proportions of currencies required to rectify
the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates required, the
Employer may affect the insurance which the Contractor should have provided and recover
the premiums the Employer has paid from payments otherwise due to the Contractor or, if
no payment is due, the payment of the premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the approval of the
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation reports
referred to in the Contract Data, supplemented by any information available to the Bidder.
15. Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the
specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date
and shall carry out the Works in accordance with the programme submitted by the Contractor,
as updated with the approval of the Engineer, and complete them by the Intended
Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the proposed
Temporary works to the Engineer, who is to approve them if they comply with the
Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for design of the
Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the Temporary
works where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary or
permanent work are subject to prior approval by the Engineer before their use.
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly
discovered on the site is the property of the Employer. The contractor is to notify the
engineer of such discoveries and carry out the Engineer’s instructions for dealing with them.
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If possession of
a part is not given by the date stated in the Contract Data the Employer is
deemed to have delayed the start of the relevant activities and this will be a Compensation
21.2 If within 25% of the time limit of the project, 80% of possession of the site is not
handed over to the Contractor, then contractor/ Employer may fore-close the contract.
Contractor/Employer has to foreclose the work within 30 days after lapse of 25%-time
limit and after 30 days foreclosure option will be closed.
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the
Engineer access to the Site, to any place where work in connection with the Contract is
being carried out or is intended to be carried out and to any place where materials or plants are
being manufactured/ fabricated/ assembled for the works.
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to
works which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s accounts and
records relating to the performance of the Contractor and to have them audited by
auditors appointed by the Employer, if so required by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that the decision was
wrongly taken, the decision shall be referred to Chief Officer (Higher Authority) within
days of the notification of the Engineer's decision. If the issue is not resolved, any party can
refer the matter for conciliation within 15 days from the decision given by the Chief Officer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the decision
of the Engineer-in-charge, both the parties have to refer to the Chief Officer concern
for the conciliation process.
If the dispute is not resolved through the conciliation process, he may refer the dispute to
Gujarat Public Works Contract Dispute Arbitration Tribunal. If the Contractor fails to refer a
claim / dispute to the Higher Authority within 14 days of the notification of the Engineer's
decision, the Contractor shall not be entitled to any additional payment/claim if he doesn’t
follow the above sequence in stipulated time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration procedure
stated in the Special Conditions of Contract.
26.1 Within the time stated in the Contract Data the Contractor shall submit to the
Engineer for approval a Programme showing the general methods, arrangements orders,
and timing for all the activities in the works along with monthly cash flow forecast.
26.2 An update of the Programme shall be a programme showing the
actual progress achieved on each activity and the effect of the progress achieved on the
timing of the remaining work including any changes to the sequence of the activities.
26.3 The Contractor shall submit to the Engineer, for approval an updated programme at
intervals no longer than the period stated in the Contract data. If the Contractor does not
submit an updated programme within this period, the Engineer may withhold the amount
stated in the Contract data from the next payment after the date on which the overdue
programme has been submitted.
26.4 The Engineer’s approval of the programme shall not alter the Contractor’s
obligations. The Contractor may revise the programme and submit it to the Engineer again
at any time. A revised programme is to show the effect of Variations and Compensations
27. Extension of the Intended Completion Date
27.1 The Engineer shall extend the Intended Completion Date if a compensation Event
occurs or a Variation is issued which makes it impossible for completion to be achieved
by the Intended Completion Date without the Contractor taking steps to accelerate the
remaining work and which would cause the Contractor to incur additional cost.
27.2 The Engineer shall decide whether and by how much to extend the Intended
Completion Date within 35 days of the Contractor asking the Engineer for a decision upon
the effect of a compensation event or Variation and submitting full supporting information. If
the Contractor has failed to give early warning of a delay or has failed to cooperate in
dealing with a delay, the delay by this failure shall not be considered in assessing the new
Intended Completion Date.
27.3 The Engineer shall within 14 days of receiving full justification from the contractor for
extension of Intended Completion Date refer to the Employer his decision. The employer
shall in not more than 21 days communicate to the engineer the acceptance or otherwise of
the Engineer’s decision. If the employer fails to give his acceptance, the Engineer shall not
grant the extension and the contractor may refer the matter under Clause
28. Delays Ordered by the Engineer
28.1 The Engineer may instruct the Contractor to delay the start or progress of any activity
within the works.
29. Management Meetings
29.1 Either the Engineer or the Contractor may require the other to attend a management
meeting. The business of a management meeting shall be to review the plans for
remaining work and to deal with matters raised in accordance with the early warning
29.2 The Engineer shall record the business of management meetings and is to provide
copies of his record to those attending the meeting and to the Employer. The responsibility
of the parties for actions to be taken is to be decided by the Engineer either at the
management meeting or after the management meeting and stated in writing to all who
attended the meeting.
30. Early Warning
30.1 The Contractor is to warn the Engineer at the earliest opportunity of specific likely
future events or circumstances that may adversely affect the quality of the work, increase
the Contract price or delay the execution of works. The Engineer may require the
contractor to provide an estimate of the expected effect of the future event or
circumstance on the contract price and completion date. The estimate is to be provided by
the Contractor as soon as reasonably possible.
30.2 The Contractor shall cooperate with the Engineer in making and considering
proposals for how the effect of such an event or circumstance can be avoided or reduced by
anyone involved in the work and in carrying out any resulting instruction of the Engineer.
C. QUALITY CONTROL
31. Identifying Defects/ Defect liability period
31.1 : Defect liability period: The contractor shall be responsible to make good and
remedy at his own expense any defect which may develop or may be noticed before the
period mentioned hereunder from the certified date of completion. The Engineer in charge
shall give the contractor a notice in writing about the defects and the contractor shall make
good the same within 15 days of receipt of the notice. In the case of failure on the part of the
contractor, the Engineer- in-charge may rectify or remove or re-execute the work at the risk
& cost of the contractor. The Engineer-in-charge shall be entitled to appropriate the
whole or any part of the amount of security deposit towards the expenses, if any, Incurred
by him in rectification, removal or re-execution. The Defects Liability period shall be as
(a) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put tender), the
period shall be 36 (Thirty Six) months from the certified date of completion or one monsoon,
whichever is later.
(b) For major projects costing more than Rs. 1 crore, the period shall be 36 Months (03 Year)
from the certified date of completion.
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated 31/8/2009,
PRCH/102013(2976) 2759-N, Dated 27/05/2013 and Circular No.TNC/10/2016/Clause
17A (Correction/(1)C Dated 12/05/2016]
32.1 If the engineer instructs the Contractor to carry out a test not specified in the
Specification to check whether any work has a Defect and the test shows that it does, the
Contractor shall pay for the test and any samples. If there is no defect the test shall be a
Compensation Event.
32.2 #1% of the amount of work done should be deducted from R.A. Bill of the
contractor for testing the quality of material workmanship, irrespective of actual charges.
32.3 Agency has to establish testing laboratory on site for the various test to be carried
out in the work for this purpose agency shall construct a pukka laboratory building with all
facility on site at location specified by the engineer in charge.
33. Correction of defects
33.1 The engineer shall give notice to the Contractor of any defects before the end of the
defects Liability Period, which begins at Completion and is defined in the contract data. The
Defects Liability Period shall be extended for as long as Defects remain to be corrected.
33.2 Every time notice of a Defect is given, the Contractor shall correct the notified defect
within the length of time specified by the Engineer’s notice.
34. Uncorrected Defects
34.1 If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect corrected, and the
Contractor will pay this amount.
D. COST CONTROL
35. Bill of Quantities
35.1 The bill of Quantities shall contain items for the constructions, installation, testing
and commissioning work to be done by the Contractor.
35.2 The bill of Quantities is used to calculate the Contract price. The Contractor is
paid for the quantity of the work done at the rate in the Bill of Quantities for each item.
36. Change in the Quantities
36.1 The Engineer shall have power to make any alterations in or addition to the
original specifications , drawings, designs and instructions that may appear to him to be
necessary or advisable during the progress of the work and the contractor shall be bound
to carry out the work in accordance with any instruction in this connection which may be
given to him in writing signed by the Engineer and such alteration shall not invalidate the
contract and any additional work which the contractor may be directed to do in the
manner above specified as part of the work shall be carried out by the contractor on the
same conditions in all respects on which he agreed to do the main work and at the same
rate as are specified in the tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the tender by
more than 110%, the contractor will be paid for the quantity in excess of 110%, at the
rate entered in the SOR of the year during which the excess in quantity is first executed.
37.1 All Variations shall be included in updated programmes produced by the
38. Payments for Variations
38.1 If the additional or altered work includes any class of work for which no rate is
specified in this contract, then such class of work shall be carried out as under.
(i) At the rate derived from the item within the contract which is comparable to the
one involving additional or altered class of work; where there are more than one
comparable items, the item of the contract which is nearest in comparison with regard to
class or classes of the work involved shall be selected and the decision of the
Superintending Engineer as to the nearest comparable item shall be final and binding on the
(ii) If the rate cannot be derived in accordance with (i) above, such class of works
shall be carried out at the rate entered in the Schedule of Rates of the division
for the year in which the tender was received, increased or decreased by the percentage by
which the tender amount is more or less as compared to the amount arrived at the rates
in the “Schedule of Rates” of the Division in the year in which the tender was received. If the
Schedule of rates of the Division does not contain all the items, the percentage increase or
decrease of the tender shall be calculated considering such items which were included in
the “Scheduled Rates” of the division for the year and for materials consumed on such item
the rate to be charged would be the basic rate taken into account for fixing the rate in S.O.R.
referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of
work shall be carried out at the rate decided by the competent authorities on the basis of
detailed rate analysis after hearing the contractor before a Committee of two
Superintending Engineers stationed at the same place or the nearest place.
38.2 If the additional or altered work, for which no rate is entered in the “Schedule of
Rates” of the Division is ordered to be carried out before the rate is agreed upon, then the
contractor shall within seven days of the date of receipt by him of the order to carry out the
work, inform the Engineer-in-charge of the rate, which it is his intention to charge for such
class of work and if the Engineer in charge does not agree to this rates, he shall by notice in
writing be at liberty to cancel his order to carry out such class of work and arrange to carry
it out in such manner as he may consider it advisable, provided always that if the
contractor shall commence work or incur any expenditure in regard thereof before the
rates shall have been determined as lastly herein before mentioned, then in such cases he
shall only be entitled to be paid in respect of the work carried out or expenditure incurred
by him prior to the date of the determination of the rate as aforesaid according to such rate
or rates as shall be fixed by the Engineer-in-charge. In the event of the dispute, the decision
of the Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs, drawings and
specifications recommended by the contractor and accepted by the competent authority, the
alternation above referred to shall be within the scope of such designs, drawings and
specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion that the
increase in the cost occasioned by alterations bears to the cost of the original work and the
certificate of the Engineer-in-charge as to such proportion shall be final and conclusive.
39. Cash Flow Forecasts
39.1 When the programme is updated, the contractor is to provide the engineer
with an updated cash flow forecast.
40. Payment certificates.
40.1 The Contractor shall submit to the Engineer monthly statements of the
estimated value of the work completed less the cumulative amount certified previously.
40.2 The Engineer shall check the Contractor’s monthly statement within 14 days and
certify the amount to be paid to the Contractor after taking in to account any credit or debit
for the month in question in respect of materials for the works in the relevant amounts
and under conditions set forth in sub-clause
32.3 of the Contract Data (secured Advance).
40.3 The value of work executed shall be determined by the Engineer.
40.4 The value of work executed shall comprise the value of the quantities of the
items in the Bill of Quantities completed.
40.5 The value of work executed shall include the valuation of variations and
compensation events.
40.6 The Engineer may exclude any item certified in a previous certificate or reduce
the proportion of any item previously certified in any certificate in the light of later
41.1 Payments shall be adjusted for deductions for advance payments, retention,
other recoveries in terms of the contract and taxes at source, as applicable under the law.
The Employer shall pay the Contractor the amounts certified by the Engineer within 28 days
of the date of each certificate.
41.2 Payment of GST (prevailing rates) on the amount payable under the contract to
the Contractor will be made by the Employer. Hence, it is the responsibility of the contractor
to pay the GST to the concerned Authority.
41.3 Items of the works for which no rate or price has been entered in will not be
paid by the Employer and shall be deemed covered by other rates and prices in the Contract.
42. Compensation events
42.1 The following are compensation Events unless they are caused by the
(a) The Employer does not give access to a part of the Site by the site Possession
date stated in Contract data to the Contractor
42.2 In case of compensation event occurs and it prevents the work being
completed beyond the Intended Completion Date then Authority will approve EOT with
eligible contractual price escalation.
43.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing on due
date of bid submission including GST. However, any subsequent changes in the tax
structure by Government after due date of bid submission will be compensated (+/-)
on availability or submission of actual documentation. Contractor will have to intimate
Engineer regarding changes occurred in the tax structure after bid submission. If the
contractor fails to provide such information and if any financial obligation may arise due
to change in tax structure, same will be recovered from the contractor.
43.2 GST will be shown separately on the bills. Hence, it is the responsibility of the
contractor to shown the GST to the concerned Authority.
44. Currencies.
44.1 All payment shall be made in Indian Rupees.
45. Price Adjustment
45.1 Contract price shall be adjusted for increase or decrease in rates and price of
labour, materials, fuels and lubricants in accordance with the following principles and
procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date
given in the contract data up to end of the initial intended completion date or extensions
granted by the Engineer and shall not apply to the work carried out beyond the stipulated
time for reasons attributable to the contractor.
(b) The price adjustment shall be determined during each month from the
formula given in the contract data.
(c) Following expressions and meanings during to the work done during each
R = Total value of work done during the month. It would include the amount of
secured advance granted, if any, during the month less the amount of secured advance
recovered, if any during the month. It will exclude value for works executed under
variations for which price adjustment will be worked separately based on the terms
mutually agreed.
45.2 To the extent that full compensation for any rise or fall in costs to the contractor
is not covered by the provisions of this or other clause in the contract, the unit rates and
prices included in the contract shall be deemed to include amounts to cover the contingency
of such other rise or fall in costs.
46.1 The Employer shall retain from each payment due to Contractor the
proportion stated in the Contract Data until Completion of the whole of the Works.
46.2 On Completion of the whole of the Works half the total amount retained is
46.2 On Completion of the whole of the Works half the total amount retained is
repaid to the Contractor and half when the Defects Liability Period has passed and the
Engineer has certified that all Defects notified by the Engineer to the Contractor before the
end of this period have been corrected.
46.3 On completion of the whole works, the contractor may substitute retention
money with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money deducted by the Employer
under the provision of this clause, Employer shall consider the said request of the
Contractor provided that the refund hereunder shall be made in tranches of not less than
1% (One Percent) of the Contract Price and Contractor furnishes an irrevocable and
unconditional Bank guarantee for an equal amount substantially in the format of Bank
Guarantee for Performance Guarantee enclosed with SBD and valid up to 60 day beyond the
scheduled / extended Defects Liability Period. On completion of the whole works, the
contractor has however an option to submit a fresh irrevocable and unconditional Bank
Guarantee for an amount equal to 5% of the total value of work executed substantially in the
format of Bank Guarantee for Performance Guarantee enclosed with SBD and valid up to
days beyond the Defect Liability Period and yet refund the Retention Money Bank
Guarantee submitted for refund of Retention Money.
47. Liquidated Damages
47.1 The Contractor shall pay liquidated damages to the Employer at the rate per day
stated in the Contract Data for each day that the Completion Date is later than the Intended
Completion Date (for the whole works or the milestone as stated in the contract data). The
total amount of liquidated damages shall not exceed the amount defined in the Contract
total amount of liquidated damages shall not exceed the amount defined in the Contract
Data. The Employer may deduct liquidated damages from payment due to the Contractor.
Payment of liquidated damages does not affect the Contractor’s liabilities.
47.2 If the Intended Completion Date is extended after liquidated damages have
been paid, the Engineer shall correct any overpayment of liquidated damages by the
Contractor by adjusting the next payment certificate. The Contractor shall not be entitled
for any interest on the over payment calculated from the date of payment to the date of
47.3 If the contractor fails to comply with the time for completion as stipulated in the
tender, then the contractor shall pay to the employer the relevant sum stated in the
Contract Data as Liquidated damages for such default and not as penalty for everyday or part
of day which shall elapse between relevant time for completion and the date stated in the
taking over certificate of the whole of the works on the relevant section, subject to the limit
stated in the contract data.
The employer may, without prejudice to any other method of recovery deduct the amount of
such damages from any monies due or to become due to the contractor. The payment or
deduction of such damages shall not relieve the contractor from his obligation to complete
the works on from any other of his obligations and liabilities under the contract.
47.4 If, before the Time for Completion of the whole of the Works or, if applicable any
Section, a Taking Over Certificate has been issued for any part of the Works or of a
Section, the liquidated damages for delay in completion of the remainder of the Works or of
that Section shall, for any period of delay after the date stated in such Taking-Over-
Certificate, and in the absence of alternative provisions in the Contract, be reduced in the
proportion which the value of the part so certified bears to the value of the whole of the
Works or Section, as applicable. The provisions of this Sub-clause shall only apply to the rate
of liquidated damages and shall not affect the limit thereof.
51.1 The performance Security (including additional security for unbalanced bids)
shall be provided to the Employer no later than the date specified in the Letter of
Acceptance and shall be issued in an amount and form and by a bank or surety acceptable to
the Employer, and denominated in Indian Rupees. The performance Security shall be valid
until a date 60 days from the date of expiry of Defects Liability Period and the additional
security for unbalanced bids shall be valid until a date 28 days from the date of issue of the
certificate of completion.
52. Cost of Repairs.
52.1 Loss or damage to the Works or Materials to be incorporated in the Works
between the Start date and the end of Defects Correction periods shall be remedied by
the Contractor at the Contractor’s cost if the loss or damages arises from the Contractor’s
acts or omissions.
E. FINISHING THE CONTRACT
53.1 The Contractor shall request the Engineer to issue a Certificate of Completion of the
works and the Engineer will do so upon deciding that the work is completed.
54. Taking Over
54.1 The Employer shall take over the Site and the Works within seven days of the
Engineer issuing a certificate of Completion.
55. Final Account
55.1 The Contractor shall supply to the Engineer a detailed final account of the total
amount that the Contractor considers payable as full and final settlement of all claims under
the Contract for items before the end of the Defects Liability Period. The Engineer shall
issue a Defect Liability Certificate and certify any final payment that is due to the
Contractor within 56 days of receiving the Contractor's account if it is correct and
complete. If it is not, the Engineer shall issue within 56 days a schedule that states the
scope of the corrections or additions that are necessary. If the Final Account is still
unsatisfactory after it has been resubmitted, the Engineer shall decide on the amount
payable to the Contractor and issue a payment certificate, within 56 days of receiving the
Contractor’s revised account.
55.2 If reversal in characteristic of tender (L1 becoming L2) on account of excesses and
savings in final account is observed, the Engineer/Employer shall be at liberty to restrict
the final payment of BOQ items to the lowest amount evaluated of the bids considering the
final quantities and the rates quoted including the rebates if any. Payment of variation
items shall however be made at the rates approved by the Employer, within 90 days from
the physical completion of work.
56. Operating and Maintenance Manuals
56.1 If “as built” drawings and/or operating and maintenance manuals are required, the
Contractor shall supply them by the dates stated in the Contract data.
56.2 If the Contractor does not supply the Drawings and/or manuals by the dates stated
in the Contract data, or they do not receive the Engineer’s approval, the Engineer shall
withhold the amount stated in the Contract Data from payments due to the Contractor.
57. Termination
57.1 The Employer or the Contractor may terminate the Contract if the other party causes a
fundamental breach of the Contract.
57.2 Fundamental breaches of Contract include, but shall not be limited to the following:
a) The contractor stops work for 28 days when no stoppage of work is shown on the
current programmed and the stoppage has not been authorized by the Engineer
b) The Engineer instructs the Contractor to delay the progress of the Works and the
instructions is not withdrawn within 28 days;
c) The Employer or the Contractor is made bankrupt or goes into liquidation other than for
a reconstructions or amalgamation
d) A payment certified by the Engineer is not paid by the Employer to the Contractor
within 56 days of the date of the Engineer’s certificate
e) The Engineer gives Notice that failure to correct a particular Defect is a fundamental
breach of Contract and the Contractor fails to correct it within a reasonable period of time
determined by the Engineer;
f) The Contractor does not maintain a security which is required;
g) The Contractor has delayed the completion of works by the number of days for which
the maximum amount of liquidated damages can be paid as defined in the Contract data; and
h) If the Contractor, in the judgment of the Employer has engaged in corrupt or fraudulent
practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving
or soliciting of anything of value to influence the action of a public official in the
procurement process or in contract execution. “Fraudulent practice” means a
misrepresentation of facts in order to influence a procurement process or the execution of a
contract to the detriment of the borrower, and includes collusive practice among Bidders
(prior to or after bid submission) designed to establish bid prices at artificial non-
competitive levels and to deprive the Borrower of the benefits of free and open
57.3 When either party to the Contract gives notice of a breach of contract to the Engineer
for a cause other than those listed under Sub Clause 59.2 above, the Engineer shall decide
whether the breach is fundamental or not.
57.4 Notwithstanding the above, the employer may terminate the Contract for
58. Payment upon Termination
58.1 If the Contract is terminated because of a fundamental breach of Contract by the
Contractor, the Engineer shall issue a Certificate for the value of the work done less advance
payments received up to the date of the issue of the Certificate, less other recoveries due in
terms of the contract, less taxes due to deducted at source as per applicable law and less the
percentage to apply to the work not completed as indicated in the Contract data.
Additional Liquidated Damages shall not apply. If the total amount due to the Employer
Additional Liquidated Damages shall not apply. If the total amount due to the Employer
exceeds any payment due to the Contractor the difference shall be a debt payable to the
58.2 If the Contract is terminated at the Employer’s convenience or because of a
fundamental breach of Contract by the Employer, the Engineer shall issue a certificate for
the value of the work done, the cost of balance material brought by the contractor and
available at site, the reasonable cost of removal of equipment, repatriation of the
Contractor’s personnel employed solely on the works, and the Contractor’s cost of
protecting and securing the Works and less advance payment received up to the date of
the certificate, less other recoveries due in terms of the contract and less taxes due to
deducted at source as per applicable law.
59.1 All materials on the Site, Plant Equipment’s, Temporary Works and Works are deemed
to be property of the Employer, if the Contract is terminated because of a contractor’s default.
60. Release from Performance
60.1 If the Contract is frustrated by the outbreak of war of by any other event entirely
outside the control of either the Employer or the Contractor the Engineer shall certify that
the Contract has been frustrated. The Contractor shall make the Site safe and stop work as
quickly as possible after receiving this certificate and shall be paid for all work carried out
before receiving it and for any work carried out afterwards to which commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make his own
arrangements for the engagement of all staff and labour, local or other, and for their
payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the Engineer a return in detail,
in such form and at such intervals as the Engineer may prescribe, showing the staff and the
numbers of the several classes of labour from time to time employed by the Contractor
on the site and such other information as the Engineer may require.
62. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub- contractor shall abide at
all times by all existing labour enactments and rules made thereunder, regulations,
notification and bye laws of the State or central Government or local authority and any
other labour law (including rules), regulations, bye laws that may be passed or
notifications that may be issued under any labour law in future either by the State or the
Central Government or the local authority. Salient features of some of the major labour laws
that are applicable to the construction industry are given below. The Contractor shall keep
the Employer indemnified in case any action is taken against the Employer by the
competent authority on account of contravention of any of the provisions of any Act or
rules made thereunder, regulations or notifications including amendments. If the Employer
is caused to pay or reimburse, such amounts as may be necessary to cause or observe, or
for observance of the provisions stipulated in the notifications/bye
laws/Acts/Rules/regulations including amendments, if any, on the part of the Contractor, the
Engineer/employer shall have the right to deduct any money due to the Contractor including
his amount of performance security. The Employer/Engineer shall also have the right to
recover from the Contractor any sum required or estimated to be required for making
good the loss or damage suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be treated as the
employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO
ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923: - The Act provides for compensation in case of
injury by accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972: - Gratuity is payable to an employee under the Act on
satisfaction of certain conditions on separation if an employee has completed 5 years’
service or more on death, the rate of 15 days wages for every completed year of service. The
Act is applicable to all establishments employing 10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952: - The Act Provides for
monthly contributions by the employer plus workers @ 10% or 8.33% The benefits payable
under the Act are:
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951: - The Act provides for leave and some other benefits to
women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970: The Act provides for certain
welfare measures to be provided by the Contractor to contract labour and in case the
Contractor fails to provide, the same are required to be provided, by the Principal
Employer by Law. The principal Employer is required to take Certificate of Registration and
the Contractor is required to take license from the designated Officer. The Act is applicable
to the establishments or Contractor of Principal Employer, if they employ 20 or more
contract labour.
F) Minimum Wages Act 1948: - The Employer is supposed to pay not less than the
Minimum Wages fixed by appropriate Government as per provisions of the Act, if the
employment is a scheduled employment. Construction of Building, Roads, Runways are
scheduled employment.
G) Payments of wages Act 1936: - It lays down as to by what date the wages are to be paid,
when it will be paid and what deductions can be made from the wages of the workers.
H) Equal remunerations Act 1979: - The Act provides for payment of equal wages for
work of equal nature to Male and Female workers and for not making discrimination against
female employees in the matter of transfer, training and promotions etc.
I) Payments of Bonus Act 1965: - The Act is applicable to all establishments
employing 20 or more employees. The Act provides for payments of annual bonus
subject to a minimum of 8.33% of wages and maximum of 20 % of wages to employees
drawing Rs. 3500/- per month or less. The bonus to be paid to employees getting Rs,
2500/- per month or above Rs. 3500/- per month shall be worked out by taking wages as
Rs. 2500/- per month only. The Act does not apply to certain establishments. The newly
set-up establishments are exempted for five years in certain circumstances. Some of the
State Governments have reduced the employment size from 20 to 10 for the purpose of
applicability of this Act.
J) Industrial Disputes Act 1947: - The Act lays down the machinery and procedure for
resolutions of Industrial disputes, in what situations a strike or lock-out becomes illegal
and what are the requirements for laying off or retrenching the employees or closing down
the establishment.
K) Industrial employment (standing Orders) Act 1946: - It is applicable to all
establishments employing 100 or more workmen (employment size reduced by some of the
State and Central Government to 50). The Act provides for laying down rules governing
the conditions of employment by the Employer on matters provided in the Act and get the
same certified by the designated Authority.
L) Trade Unions Act 1926: - The Act lays the procedure for registration of trade unions
of workmen and employers. The Trade Unions registered under the Act have given certain
immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986: - The Act prohibits employment
of children below 14 years of age in certain occupations and process and provides for
regulation of employment of children in all other occupations and processes. Employment of
Child labour is prohibited in Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditions of
service) Act 1979:- The Act is applicable to an establishment which employs 5 or more
inter-state migrant workmen through an intermediary (who has recruited workmen in one
state for employment in the establishment situated in another state).The inter-state migrant
workmen, is an establishment to which this Act becomes applicable, are required to be
provided certain facilities such as housing, medical aid, traveling expenses from home upto
the establishment and back, etc.
O) The Building and Other Construction workers (Regulation of employment and
Conditions of Service) Act 1996 and the Cess Act of 1996: - All the establishments
who carry on any building or other constructions work and employ 10 or more workers are
covered under this Act.
All such establishments are required to pay cess at the rate not exceeding 2% of the cost of
construction as may be modified by the government. The Employer of the establishment is
required to provide safety measures at the Building or construction work and other
welfare measures, such as canteens, First Aid facilities, Ambulance, Housing accommodations
for workers near the workplace etc. The Employer to whom the Act applies has to obtain a
registration certificate from the Registering Officers appointed by the Government.
P) Factories Act 1948: - The Act lays down the procedure for approval of plans before
setting up a factory, health and safety provisions, welfare provisions, working hours,
annual earned leave and rendering information regarding accidents or dangerous
occurrences to designated authorities. It is applicable to premises employing 10 persons or
more with aid of power or 20 or more persons without the aid of power engaged in the
manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent
authority as per rule. The royalty charges paid shall be borne by the contractor
and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof from time
to time shall be applicable.
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management plan for
best energy use, waste management, the reduction of pollution as in EMS
(Environmental Management system) ISO-14001-
63. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
63.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision was wrongly
taken, the decision shall be referred to # Chief Officer (Higher Authority) within 14 days
of the notification of the Engineer's decision. If the issue is not resolved, any party can refer
the matter for conciliation within 15 days from the decision given by the # Chief Officer.
a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the decision
of the #Superintending Engineer, both the parties have to refer to the #Chief Officer
concerned for the conciliation process.
b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with the
decision of the Superintending Engineer, both parties have to refer to the
#Secretary, Roads & Building Department, Government of Gujarat for the
conciliation process.
If the dispute is not resolved through the conciliation process, contractor may refer
the dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If the
Contractor fails to refer a claim / dispute to the Higher Authority within 14 days of
the notification of the Engineer's decision, the Contractor shall not be entitled to
any additional payment/claim if he doesn’t follow the above sequence in stipulated
time. However, during such period, he would not stop the work in any case.
Clause Reference With respect To
Item marked “N/A” do not apply to this Contract.
1. The Employers is [CL.1.1]
Name: Regional commissioner municipality, Address:
Gandhinagar, Gujarat
Name of authorized Representative The Chief Officer, Kheda Nagarpalika
2. The Engineer is Clerk - Drainage Department,
Kheda Nagarpalika, BECHRAJI
Name of Authorized Representative: Mr.
3. The Defects Liability Period is 3 (Three) years from the date of [CL.1.1&33]
4. The Start Date shall be 1st days for the date of issue of the Notice [CL.1.1]
to proceed with the work.
5. The Intended Completion Date for the whole of the works is 36 [CL.1.1,17&2]
Months after start of work with the following milestones:
Milestone dates: [CL.2.2& 49.1]
Physical works to be completed Period from the start date
6. The Site is located at As per name of Work, Ta. Kheda, Dist : Kheda
7. The name and identification number of the Contract is: OPERATION
& MAINTENANCE OF 5.2 MLD SBR TYPE SEWAGE TREATMENT
PLANT AT KHEDA INCLUDING ALL MECHANICAL, ELECTRICAL,
INSTRUMENTATION EQUIPMENT’S AND CIVIL STRUCTURES AS
PER TENDERS CONDITION & SPECIFICATION FOR 1 YEARS AT-
KHEDA NAGARPALIKA
8. The works consist of etc. With items as per B.O.Q. The works
shall, inter alia, include the following, as Specified or as
(A) Other Items
Any Other Items as required to full fill all contractual obligations as per the Bid
10. The following documents also form part of the Contract:
As per clause 2-3 [CL.2.3(9)]
11. The law which applies to the Contract is the law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death [CL13]
is Rs. 5 lakhs per occurrence with the number of occurrences limited to four. After each
occurrence, the contractor will pay an additional premium necessary to make insurance valid for
four occurrences always
17. Site Investigation report
18. The Site Possession dates shall be …………………….. [CL.21]
19. The period for submission of programme for approval of the [CL. 27.1]
engineer shall be 21 days from the issue of Letter of Acceptance.
20. The period between program updates will be …….. days. [CL.27.3]
21. The amount to be withheld for late submission of an updated [CL. 27.3]
programme shall be Rs ........................... lakhs
22. The following events shall also be Compensation Events Substantially [CL.
adverse ground conditions encountered during the course of execution of work
not provided for in the bidding document
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring additional
mobilization by the contractor, e.g. ordinary soil to rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps, etc. not
caused by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(iv) River training requiring protection of permanent work
(v) Presence of historical, archaeological or religious structures, monuments interfering with the
(vi) Restriction of access to ground imposed by civil, judicial, or military authority
23. The currency of the Contract is Indian Rupees [CL. 46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not
found applicable in a work, the weight component of that commodities {i.e.
‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as indicated in SBD for the
purpose of Price Adjustment} shall be clubbed with the weight component
of ‘Other Material’ (Pm), such that the gross % weight of the components
shall remain as 100%.
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to labour
shall be paid in accordance with the following formula:
VL = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for local labour
L0 = The consumer price index for industrial workers for the State on
days preceding the scheduled date of opening of technical Bids as
published by Labour Bureau, Ministry of Labour, Government of India
Li = The consumer price index for industrial workers for the State for the
month under consideration as published by the Labour Bureau, Ministry of
Labour, Government of India.
Pl = Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost of cement procured by the contractor
Vc = Increase or decrease in the cost of work during the month under consideration due to
changes in rates for cement.
C0 = The all-India wholesale price index for Ordinary Portland Cement on 28 days
preceding the scheduled date of opening of technical bid as published
by the Office of the Economic Adviser, Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Ci = The all India average wholesale price index for Ordinary Portland Cement for
the month under consideration as published by Office of the Economic Adviser, Department
for Promotion of Industry and Internal Trade, Ministry of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel procured by the contractor
shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under consideration due to
changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel - Long Products Rebars) on 28 days
preceding the date of opening of Bids as published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade, Ministry of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel - Long Products Rebars) for
the month under consideration as published by Office of the Economic Adviser, Department for
Promotion of Industry and Internal Trade, Ministry of Commerce & Industry.
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long products Rebars has been
chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid in accordance
with the following formula
Vb = Increase or decrease in the cost of work during the month underconsideration due to changes
in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the nearest centre on the day 28 days
prior to the scheduled date of opening of technical bid.
Bi = The official retail price of bitumen of IOC depot at the nearest centre for the 15th day of the
month under consideration.
Pb = Percentage of bitumen component of the work
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and
lubricant) shall be paid in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month under consideration due to changes
in rates for fuel and lubricants.
Fo = The official retail price of High-Speed Diesel (HSD) at the existing consumer pumps of IOC
at the nearest centre on the day 28 prior to the date of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps of IOC at the nearest centre
for the 15th day of the month of the under consideration.
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil has been chosen to
represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and Machinery spare
procured by the Contractor shall be paid in accordance with the following formula
Vp= Increase or decrease in the cost of work during the month under consideration due to
changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of machinery for mining,
quarrying and Construction for the month under consideration as published Office of the
Economic Adviser, Department for Promotion of Industry and Internal Trade, Ministry of
Commerce & Industry.
Pi = The all India average wholesale price index for manufacturer of machinery for mining,
quarrying and Construction for the month under consideration as published Office of the
Economic Adviser, Department for Promotion of Industry and Internal Trade, Ministry of
Commerce & Industry.
Pp = Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and parts has been chosen to
represent the Plant and Machinery Spares group
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials
other than cement, steel, bitumen and POL procured by the contractor shall be paid in
accordance with the following formula
Vm = Increase or decrease in the cost of work during the month under consideration due to
change in rates for local materials other than cement, steel, bitumen and POL.
M0 = The All Indian wholesale price index (all commodities) on 28 days preceding the
scheduled date of opening of technical Bids, as published by the Office of the Economic
Adviser, Department for Promotion of Industry and Internal Trade, Ministry of
Commerce & Industry.
Mi= The All India wholesale price index (all commodities) for the month under consideration as
published by the Office of the Economic Adviser, Department for Promotion of Industry
and Internal Trade, Ministry of Commerce & Industry.
Pm = Percentage of local material components (other than cement, steel, bitumen and POL) of the
The following percentage will govern the price adjustment for the entire contract:
2. Cement – Pc ……%
6. Plant & Machinery Spares Pp ......................................%
25. The proportion of payments retained (retention money) shall be 6% {CL. 48} from each
bill subject to a maximum of 5% of final contract price.
26. Amount of Liquidated damages forFor Whole of work {CL.49} (1/2000)th of the
delay in completion of works Initial contract price, rounded off to the
Thousand, per day. For sectional
Completion (wherever specified In item
of Contract data) (1/2000)th of initial
contract price for #5 km Section, rounded
off to the nearest thousand per day.
27. Maximum limit of liquidated damages 10 percent of the Initial {CL. 49}
For delay in completion work Contract Price rounded off to
the nearest thousand
28. Amount of Bonus for early completion Amount of bonus for early
completion of work shall be given as per CL.50 of Section-3
29. Maximum limit of bonus for early 5 percent of the Contract {CL. 50}
Completion of work Price
performance of the contract) and on
submission of unconditional Bank
Guarantee for amount of advance
31. The securities shall be for the following minimum amounts equivalent {CL. 52} As a percentage
of the Contract Price:
Performance Security for 5 percent of contract price plus Rs. …………….. (to be decided after
evaluation of the bid) as additional security in terms of ITB Clause
The standard form of Performance security acceptable to the Employer shall be an
unconditional Bank Guarantee of the type as presented in Section 8 of the Bidding Documents.
32. The Schedule of Operating and maintenance Manuals…..N/A. {CL. 58}
33. The date by which “as– built” drawings (in scale as directed) in 2 sets {CL. 58} are
required within 28 days of the issue of certificate of completion of the whole or section of the work,
as the case may be.
34. The amount to be withheld for failing to supply “as built” drawings {CL. 58} by the Date
required is Rs Lakhs.
35. The following events shall also be fundamentals breach of contract: {CL.59.2} “The
Contractor has contravened Sub- clause 7.1 and Clause 9 of GCC”
36. The percentage to apply the value of the work not completed representing {Cl 60} the
Employer’s additional cost for completing the Works shall be 20 per cent.
Conditions of Contract for O & M
KHEDA NAGARPALIKA TALUKA:
KHEDA, DISTRICT: KHEDA
Bid Documents for “OPERATION & MAINTENANCE OF 5.2 MLD SBR TYPE
SEWAGE TREATMENT PLANT AT KHEDAINCLUDING ALL MECHANICAL,
ELECTRICAL, INSTRUMENTATION EQUIPMENT’S AND CIVIL STRUCTURES AS PER
TENDERS CONDITION & SPECIFICATION FOR 01 YEARS (YEAR 2026 TO 2027)
ESTIMATED COST: RS. 72,00,000/-
KHEDA NAGARPALIKA
TALUKA: Kheda, DISTRICT: Kheda
CONDITIONS OF CONTRACT
FOR OPERATION AND MAINTENANCE
(ADMINISTRATIVE PROVISIONS)
The following additional clauses shall apply only during the Operation and Maintenance period.
1. DEFINITIONS AND INTERPRETATION
1.1. Definitions: In these Conditions of Contract (“Conditions”) the following words
and expressions shall have the meanings hereby assigned to them, except where the
context otherwise requires.
1.1.1. “Applicable Law” means all national (or State) legislation, statutes, ordinances and
other Laws and regulations and by laws of any legally constituted public authority.
1.1.2. “Contract” means the contract agreement, these conditions, the Employer’s
requirements, the Tender and the further documents (if any) which are listed in the
contract agreement.
1.1.3. “Contractor’s Equipment” shall mean all equipment, instruments, tools, machinery and
other appliances and things of the Contractor at the Site required for the fulfilment of
the obligations of the Contractor under these Conditions.
1.1.4. “Contractor’s Personnel” means the contractor’s representative and all personal whom
the contractor utilizes on site, who may include the staff, labour, & other employees of
the contractor and of each sub–contractor & any other personnel assisting the
Contractor in the execution of the work.
1.1.5. “Dispute” shall have the meaning given to it in Clause 15 of these Conditions.
1.1.6. “Employer’s Risk” shall include the risks mentioned as Employers risks in the General
Conditions and shall include any negligence or misconduct on the part of the
Employer and also any event of Force Majeure as provided in Clause 12 of these
1.1.7. “Employer’s Personnel” means the Employer’s Representative, the assistants and
all other staff, labour and other employees of the Employer and of the Employer’s
representative, and any other personnel notified to the contractor, by the Employer or
the Employer’s representative, as Employer’s personnel.
1.1.8. “Employer’s Requirements” means the document entitled Employer’s requirements,
as included in the contract, and any additions and modifications to such document in
accordance with the contract. Such document specifies the purpose, scope, and / or
design and / or other technical criteria, for the works.
1.1.9. “Facility” shall mean the entire system to be designed and constructed including
the equipment’s, buildings, structures, ramps, pits, pipes, fencing, lighting, testing
and analysis equipment, tools, computers, software programs, safety equipment, plant
machinery, supplies, instruments and inventory incorporated therein, as well as all
open areas within the Site, and including any additions, modifications, alterations,
replacement and repairs as may be made thereto from time to time.
1.1.10. “Force Majeure” shall mean those events mentioned in Clause 12 of these Conditions.
1.1.11. “General Conditions” shall mean the conditions of tender issued by Employer Kheda
Nagarpalika for O&M works of projects.
1.1.12. “Good Operating Practices” means the standards, practices, methods and procedures
as practiced internationally and in India conforming to all Applicable Law and that
degree of skill, diligence, prudence and foresight which would reasonably be expected
from a skilled and experienced contractor engaged in India in the same type of
undertaking under the same or similar circumstances as the Contractor pursuant to
these Conditions.
1.1.13. “O & M Contract” shall mean the contract or part of any other contract having
scope of Operation and Maintenance of facilities, entered in between the Employer and
the Contractor pursuant to these Conditions.
1.1.14. “O & M Completion Certificate” shall mean the certificate to be issued by the Employer
on the completion of all the obligations of the Contractor under these Conditions.
1.1.15. “O & M Services” shall mean those services specified in Schedule [1] which the
Contractor is obligated to perform under these Conditions.
1.1.16. “O & M Standard” shall mean the standards: As set forth in the tender documents
a) As required pursuant to Applicable Law;
b) Set out in the Performance Guarantee; and
c) For the functioning of the Facility as required in accordance with the Contract including
such requirements as may be mentioned in the Employer’s Requirements.
d) For the functioning of the Facilities set forth in these Conditions.
1.1.17. “O & M Manual” shall have the meaning for manual of Operation and Maintenance
prepared by the contractor.
1.1.18. “O & M Period” shall have the meaning set out in Clause.
1.1.19. “O & M Price” shall mean the amount of Operation & Maintenance as agreed upon
1.1.20. “Party” shall mean each of the Contractor and the Employer and Parties shall mean
both of them together.
1.1.21. “Performance Guarantees shall mean the guarantee that the Facility shall be
operated continually satisfying the minimum performance parameters set out in
1.1.22. “Successor Contractor” shall have the meaning given to it in Clause.
1.1.23. “Site” shall means that specific area specified in the bid documents & shall include any
other places as may be specifically designed by the Employer from the time to time as
forming part of the site.
1.1.24. “Taking over Date” shall mean the date of issue of the taking over certificate at the end
of the Operation and Maintenance period.
1.1.25. “Taking over Certificate” means the certificate to be issued by Kheda Nagarpalika
/ ULB to the Contractor at the successful completion of the Operation and Maintenance
1.1.26. “Termination” shall have the meaning given to it in Clause [13] of these Conditions.
1.2 Interpretation: In these conditions, except where the context requires otherwise.
1.2.1. words indicating one gender include all genders,
1.2.2. words indicating the singular also include the plural and words indicating the plural
also include the singular,
1.2.3. Provisions including the word „agree‟, „agreed‟ or „agreement‟ require the agreement
to be recorded in writing;
1.2.4. „written‟ or „in writing‟ means hand- written, type- written, printed or
electronically made, and resulting in a permanent record;
1.2.5. The marginal words and other headings shall not be taken into consideration in the
interpretation of these Conditions;
1.2.6. The words „include,‟ „includes‟ and „including‟ are not limiting;
1.2.7. As used in these Conditions, all defined terms include the plural as well as the singular;
1.2.8. Any agreement, document or drawing defined or referred to in these Conditions
shall include amendment, modification and supplement thereto and waiver thereof as
may become effective from time to time, except where otherwise indicated;
1.2.9. Any reference to any Clause or Sub – Clause shall unless specified otherwise mean a
Clause or Sub-Clause of these Conditions; and
1.2.10. Any rights of the Employer to make any inspections or to review any document shall not
create any obligation on the Employer to conduct such inspections or reviews to detect
any errors, inaccuracies, ambiguities or other potential problems. No inspection or
approval by or on behalf of the Employer shall operate as a waiver of any provision of
these Conditions, any obligation of Contractor under these Conditions, or any of the
rights of the Employer hereunder, except as expressly agreed in writing by the
1.3. Scope during Trial run and Defect Liability period:
1.3.1. The scope of work under this contract includes trial run and maintenance of the STP(s)
as a whole and its parts as an individual component as well. Under this the contractor
has to run the scheme completely and will have to prove performance of each
component individually and of whole scheme as per the standards laid down in
contract. During this period the contractor shall have to appoint necessary staff for
running and maintenance of scheme. The candidature of the staff being engaged by
contractor shall have to be approved by the Engineer-in-Charge. During this period
Engineer-in-Charge/Nagarpalika will appoint staff to check the performance of
project and also get hands on training to run and maintain
the scheme. Contractor and his staff will arrange training for the staff to the satisfaction of
Engineer In-charge. The period of trial run, testing and commissioning will be three
(03) calendar months from the date of actual completion of the scheme as certified by
the Engineer In-charge. Defect liability period will start from successful
commissioning of the Plant.
1.4. Commencement and Duration of O & M part of contract
1.4.1. “The O & M Period” shall commence from the date of issue of „Certificate of successful
commissioning‟ of the facilities including three calendar month trial run period or till
prescribed parameters are not attained & whichever is later of the two and shall
continue operation & maintenance of entire system for 4 years including three years
defect liability period there from.
1.5. Applicable Law
1.5.1. The Contractor shall comply with all Applicable Law relevant to the Contractor’s
Personnel, including Applicable Law relating to their employment, health, safety,
welfare, immigration and emigration, and shall allow them all their legal rights.
1.5.2. The Contractor shall require his employees to obey all Applicable Laws, including
those concerning safety at work.
1.5.3. In the event Employer becomes liable to any Employer’s Personnel, any Governmental
authority (including but not limited to any fines or penalties levied by or payable to
such authority) or to any other third party under the provisions of any Applicable Law
resulting from Contractor’s failure to comply with such Applicable Law, Contractor
shall reimburse Employer for all payments required to be made by Employer to such
Employers Personnel, Governmental authority or any other third party, plus the actual
expenses that Employer may incur in investigating, settling or defending any litigation
or threatened litigation.
1.6. Assignment
1.6.1. The Contractor will not be entitled to sub-contract any part of his obligation
under these Conditions to any third party .
1.7.1. Emergencies
In the event of an emergency endangering any life or property, the Contractor shall
immediately take such action as may be necessary to prevent, avoid or mitigate
injury, damage or loss and shall, as soon as possible, report any such incidents,
including his response thereto to the Employer.
1.7.2. Contractor Action
The Contractor shall utilize his personnel to take such action as may be necessary in
accordance with Good Operating Practices in the event of an emergency.
Notwithstanding anything to the contrary herein, the Contractor may incur any
expenditure or take any
other operating actions as the Contractor deems to be necessary (in accordance with Good
operating practices) in the case of emergencies affecting the Facilities or the
operation of the Facilities to counteract the effects where the Contractor considers
immediate action is required to safeguard lives or property. In case such emergency
was caused due to an Employer’s Risk then the Employer shall reimburse such
reasonable expenses that might have been incurred by the Contractor in relation
thereto acting in accordance with Good Industry Practices.
1.8. Notification
1.8.1. In the event of an emergency the Contractor shall forthwith notify the Employer of the
emergency, the expenditures made and the operating actions taken.
1.8.2. If the Employer considers that an emergency has arisen in relation to the Facilities, the
Employer may give written notice to the Contractor specifying the nature of the
emergency which it has identified and the manner in which it requests such
emergency to be rectified. The Contractor shall rectify such defect with all due
diligence. If such emergency is on account of an Employer‟s Risk then the Contractor
shall be reimbursed all costs and expenses reasonably incurred by the Contractor for
any actions taken by it pursuant to such direction or notice. If the Contractor fails to
comply with such direction or notice promptly, the Employer shall be entitled to
procure that it or any third party takes such actions as may be necessary to remedy
such breach by the Contractor. Any costs that may be incurred by the Employer in this
regard shall be reimbursed to him in full by the Contractor and shall be a debt due
to him from the Contractor.
1.9. Inspections
Notwithstanding any provisions of these Conditions and without prejudice to any of the
other rights vested by the Contractor under these Conditions, The Employer shall have
the right at all times to inspect the Facilities and the Contractor shall co-operate
in every manner with the representatives of the Employer inspecting the Facilities and
allow them access to every part of the Facilities and produce any records requested.
2. OPERATION OF THE FACILITIES
2.1. Operation of the Facilities
2.1.1. On Employer appointing the Contractor to perform and undertake the O & M Services
and all other obligations set out and in accordance with these Conditions during the
O&M Period. The Contractor shall accept the appointment and acknowledges a
duty to perform such obligations.
2.1.2. The Contractor shall be in complete charge of and have custody and control over and
responsibility for the Facilities, and the Contractor shall perform or cause to be
performed on behalf of the Employer all O & M Services for the Facilities and shall
supply or cause to be supplied all materials required there for in accordance with the
O & M Standard.
2.1.3. The Contractor shall also acknowledge that the Employer and the Employer’s
Personnel and other contractors may be carrying out work at the Facilities
and shall endeavour to fully co-operate and work in a manner so as not to cause
any obstruction or hindrance to them.
2.1.4. The Contractor shall remain an independent Contractor and not an agent,
employee and nothing in these Conditions or the O & M part of contract shall be
deemed to create a Joint Venture between the Employer and the Contractor.
2.2. Responsibility of the Contractor:- The Contractor shall be solely and exclusively
responsible for:
2.2.1. The contractor shall be responsible for smooth and satisfactory operation and
maintenance of the plant on round the clock basis for a period of 4 (Four) years from
the date of completion of trial run and commissioning of sewerage Treatment Plant.
2.2.2. Obtaining all necessary permits and consents required by Applicable Law or any
Governmental authority for the Contractor to carry out the O & M Services;
2.2.3. The procurement of all goods and services necessary to ensure compliance with
his obligations under these Conditions,
2.2.4. Making available suitably qualified and trained personnel to perform the O & M
2.2.5. Perform the O & M Services in accordance with the O & M Manuals prepared by the
Contractor and as approved by the Engineer in Charge and maintain the Facilities in
good repair and condition and ensure that the Facilities are well and suitably
maintained at all times in accordance with Good Operating Practices and in
accordance with these Conditions;
2.2.6. Procuring and administering all chemicals and other consumables, tools,
equipment, spare parts and other materials (which shall be of good quality and
unused) necessary for the operation and maintenance of the Facilities;
2.2.7. Maintaining a system of records to identify all inventories related to the Facilities and
preparing and providing to the Employer a complete accounting of such inventory for
every fiscal quarter;
2.2.8. Arranging for the testing and recalibration of all scales, meters, gauges and other
measuring devices at the Facilities on an annual basis and maintain the
Calibration certificates as records unless otherwise stated in the O & M part of
2.2.9. For providing any and all relevant information required by the Employer.
2.2.10. Contractor shall ensure that the treatment plant is run on continuous basis and
shut down if any subject to obtaining prior permission / approval of the Employer.
Generally major repair encountered in any unit shall be attended as quickly as
2.2.11. The contractor shall monitor the performance of the Sewerage treatment plant;
conduct the analysis of the influent as well as effluent quality after treatment.
2.2.12. Contractor shall initiate and take adequate actions to ensure smooth and
satisfactory performance/ running of the plants on a 24 hours/ round the clock basis.
2.2.13. For the smooth running of the plant all the required equipment, machineries,
accessories, major and minor spares, consumables including chemicals, greases,
lubricants, all cleaning agents, packing, rubber sheet, laboratory reagents, all
hardware, required quantity of white wash, oil paint color, all types of epoxy paint,
material required for housekeeping and cleaning etc. are to be brought by the
contractor. The quality of all consumable and spare etc. i.e. technical requirements as
per manufacture recommendation shall remain unchanged.
2.2.14. A technical expert of the contractor shall visit the plant on every fortnight and will
suggest if required, to improve the efficiency and working of the plant. The visit must
be recorded in document and outcome of the visit/minutes of meeting should be got
signed by Engineer In-charge of works without which the visit shall not be considered.
2.2.15. In case, there is no inflow to the plant after completion of construction for a period of
one month and/ or more, payment during first fifteen days of O & M stage will be made
without any deduction. Payment for next fifteen days of the first month shall be
made at rate of 50% of O & M price quoted by him. Contractor shall also be paid for
days of the second month at rate of 50% of O & M price quoted by him. Thereafter,
payment towards security watchmen and minimum power requirement will only be
made (i.e. after 45 days of completion of construction). ULB shall intimate Contractor
by written notice in such event during initial fifteen days of O & M period.
3. DUTY OF CARE BY THE OPERATOR AND PERFORMANCE STANDARDS
3.1. Duty of Care
3.1.1. The Contractor shall manage, operate and maintain the Facilities in accordance
with Good Operating Practices and in accordance with the O & M Standard so
that the Facilities are capable of meeting the outputs and specifications set out in the
3.1.2. The Contractor shall take full responsibility for the care of the Facility from the
date of start of O&M period, till the end of the O & M Period.
3.1.3. If any loss or damage happens to the Facility, during the O & M Period due to any
breach by the Contractor of any of his obligations under these Conditions including any
wilful misconduct, negligence and non-conformity with Good Operating Practices
then the Contractor shall, at his own cost, rectify such loss or damage so that the
Facility conforms in every respect with the provisions of these Conditions.
3.1.4. The Employer shall be liable only in case of any damage caused due to any Employer‟s
4. OBLIGATIONS AND RESPONSIBILITIES OF THE EMPLOYER
The Employer shall employ the Contractor to provide the O & M Services and shall:
4.1.1. following the issue of Certificate of Successful commissioning and trial run, handover
the custody of the Facilities to the Contractor for its intended use during the O &
4.1.2. Pay the Contractor all sums required to be paid in accordance with the terms of
these Conditions. Notwithstanding anything else herein contained the Employer may
set off any sums owed by the Contractor under the Contract for money owed to
the Contractor by the Employer under these Conditions or as a debt due from the
5. REPRESENTATIONS AND WARRANTIES OF THE CONTRACTOR
The Contractor hereby represents for the benefit of the Employer as follows:
5.1. Performance of O & M Services
5.1.1. that the Contractor has the required skills and capability to perform, and shall
diligently perform, the O & M Services in a high quality, timely and professional
manner utilizing sound engineering principles and project management
procedures in accordance with Good Industry Practices;
5.1.2. that the Contractor shall perform his obligations hereunder in accordance with the
requirements of these Conditions and shall meet the Performance Guarantee; and
5.1.3. That it shall not use any spare parts or material that are not new and which shall
be of a quality that is in accordance with Good Industry Practices.
5.2. Knowledge of Adverse Information
5.2.1. As of the Commencement Date, Contractor is not aware of any facts, conditions or
events which would affect the ability of Contractor to provide the O & M Services
in accordance with these Conditions.
5.2.2. Contractor has familiarized himself with the nature and extent of the O & M
Services required to be provided under these Conditions and with all other
requirements under Applicable Law
5.3. Organization, Standing and Qualification
Contractor is validly existing and in good standing under Applicable Law and has
all necessary power and authority to carry on its business as presently conducted
and to perform its obligations under these Conditions. Contractor is, or will be prior to
the date on which the O & M Services are to be commenced duly qualified or licensed
to provide these services.
5.4. Due Authorization
5.4.1. Each of the execution, delivery and performance by the Contractor of all contracts
entered into pursuant to these Conditions shall be duly authorized by all necessary
action on the part of Contractor.
5.4.2. Neither the execution and delivery by Contractor of the O&M Contract, nor the
consummation by Contractor of any of the transactions contemplated hereby, requires
the consent or approval of, the giving of notice to, the registration with, the recording
or filing of any document with, or the taking of any other action in respect of, any
Governmental authority or agency, except:
a) Such as have been duly obtained, given, registered, recorded, filed or taken and are in
full force and effect or are not yet required; and
b) Filings and recordings expressly required pursuant to the O & M part of contract.
Contractor holds, or will obtain, any and all licenses, permits and approvals on a timely
basis. Contractor has no reason to believe that any of those not yet required will not be
readily obtainable or done in the ordinary course of business upon due application
5.5. Litigation
In the aggregate, there are no pending or, to the knowledge of Contractor, threatened
actions, investigations or proceedings before any court, Governmental authority or
arbitrator, which would have material adverse effect on the ability of Contractor to
perform its obligations under these Conditions
6.1. General Conditions
6.1.1. Without limiting the Contractor’s obligations, responsibilities and liabilities under
these Conditions, the Contractor shall be required to provide and maintain in full force
and effect, at his expense the insurance coverage’s specified in Schedule [3]
throughout for the O&M Period. Any deductibles on the insurance shall be to the
account of the Contractor.
6.1.2. Maintenance of insurance shall not relieve the obligation of the Contractor to remedy
or repair any damage to the Facility in case such damage is caused due to the fraud,
negligence, wilful misconduct or breach of any obligations of the Contractor under
these Conditions (including failure to perform the O & M Services in accordance
with Good Operating Practices) at the Contractors cost promptly and regardless of the
extent of settlement of claims by the underwriters or the time taken for settlement of
claims. Any amounts not insured or not recovered from the insurers shall be borne
by the Contractor to the extent any such liability or damage is caused due any breach
of any obligations of these Conditions (including failure of the Contractor to perform
the O & M Services in accordance with the Good Operating Practices) by the
Contractor or any wilful misconduct, negligence on the part of the Contractor.
6.1.3. The terms of the Insurance shall be approved by the Employer.
6.1.4. The Contractor within the 14 days from work order shall submit to the Employer
evidence that the insurances required under Schedule [3] of these Conditions has been
obtained as approved by the Employer.
6.1.5. The Contractor shall not make any alteration to the terms of any insurance without the
prior approval of the Employer. If the Contractor fails to effect and keep in force
any of the insurance it is required to effect and maintain under these Conditions, or
fails to provide satisfactory evidence and copies of policies in accordance with this
Sub Clause, the Employer may effect insurance for the relevant coverage and pay
the premiums due and may claim the same from the Contractor. The insurances:
a) shall be in the name of the Employer and the Employer shall be the sole loss payee,
b) shall be extended to cover liability for all loss and damage to the Employer‟s property
arising out of the Contractor‟s performance of his obligations or failure to do so under
these Conditions and any fraud, gross negligence or wilful misconduct on his part, and.
6.1.6. If the Contractor fails to effect and keep in force insurance which is required to be
maintained under these Conditions, and the Employer neither approves the omission
nor effects insurance for the coverage relevant to this default, any moneys which
would have been recoverable pursuant to such insurance shall be paid by the
6.1.7. The insurance shall cover all the electrical items, mechanical items,
Instrumentation & automation items, all civil works, Storage structures etc. The
insurance for the work of transmission main is optional. Since the responsibility of
safety of all work lies with contractor, contractor may prefer to take the insurance
of optional item also if deemed fit.
7. INDEMNIFICATION
7.1. Loss or Damage to Facilities
The Contractor shall at its own expense make good any physical loss or
damage to the Facilities occasioned by it in the course of the performance of its
obligations under these Conditions if and to the extent such loss or damage is caused
by the negligence, wilful default or breach of statutory duty or failure to follow Good
Industry Practices by the Contractor
7.2. Other Loss or Damage
7.2.1. Except as otherwise stated in this Clause 7.2 or covered by Clause 7.3, the Contractor
shall indemnify, defend and hold harmless the Employer against any and all liabilities,
losses, damages and claims of whatever kind and nature, including all related costs
and expenses incurred in connection therewith, in respect of personal injury to or
death of third parties or any employee of the Employer or the in respect of loss of or
damage to any third party property or property belonging to employee of the
a) any breach by the Contractor of its obligations hereunder and
b) any negligence, wilful default or breach of statutory duty on the part of Contractor
7.2.2. Except as otherwise stated in this Clause 7.2 or covered by Clause 7.3, the Employer
shall indemnify, defend and hold harmless the Contractor for all claims and losses
of whatever kind and nature, including all related costs and expenses incurred in
connection therewith, in respect of personal injury to or death of third parties or
of any person employed by the Contractor in respect of loss of or damage to any
third party property or property belonging to any person employed by the
Contractor to the extent that the same arises out of any Employer‟s Risk
7.3. Accidents or Injury to Workmen
7.3.1. The Contractor shall indemnify, defend and hold harmless the Employer or any
Employer‟s Personnel against any and all claims for loss, damage and expense of
whatever kind and nature (including all related costs and expenses) in respect of
the death of or injury to any person employed by the Contractor in connection with
the performance of the O&M Services and obligations hereunder except to the
extent that such death or injury is caused by an Employer‟s Risk.
7.3.2. Neither Party shall be liable to the other Party for loss of use of the Facilities, loss of profit,
loss of any contract or for any indirect or consequential loss or damage which may be
suffered by the other Party in connection with the Contract, other than under Sub-Clause[13]
and this Clause [7].
7.3.3. The total liability of the Contractor to the Employer, under or in connection with these
Conditions other than as provided in Clause 7.3.2 & 14 shall not exceed the sum of
the O & M Price and the Delay Damages payable under the these Conditions.
7.3.4. This Sub-Clause shall not limit liability of the Contractor in case of fraud wilful default,
gross negligence and liabilities arising due to breach of Applicable Law and the
liability under any other Clause of these Conditions that might impose a greater
liability on the Contractor
8.1. General Provisions
8.1.1. The Employer may check the operation of the Facilities or designate an
organization of his choice to carry out inspections regularly. The Employer or the
organization appointed by him shall check that the Contractor is performing the tasks
for which he is responsible with due diligence. The Contractor shall at his cost provide
all the assistance the Employer requires to complete these inspections
8.1.2. Before any inspection, the Employer shall give prior notice to the Contractor,
indicating the name(s) of the person(s) empowered to carry out such inspection in
the name of the Employer
8.2. Measurement and Analysis
8.2.1. The Employer has the right to perform any analysis or inspection he deems necessary.
Before any inspection, the Employer shall give a prior written notice to the Contractor.
8.2.2. The sewage quantity, for any such test, analysis or inspection shall be measured by
flow- meters installed at the Facility, which are acceptable to the Employer, provided
they are maintained and calibrated as per requirements of this contract.
8.2.3. Other parameters like Pressure temperature and speed shall be measured by certified
calibrated meters provided by the contractor and, which are acceptable to the
8.2.4. The flow meters shall be inspected and certified upon their availability by the
Employer and the Contractor. Thereafter, the said meters shall be tested and their
accuracy verified once in every six (6) months by the Contractor. After each
inspection, the flow-meters shall both be sealed in the presence of representatives of
the Employer and the Contractor in a manner that is adequate to prevent the
tampering of said meters by any person.
8.2.5. The Contractor shall be responsible for the security and protection of flow-meters at
the designated point. If there is any malfunctioning of the meters, it should be
repaired at the Contractor’s cost, as per manufacturer’s technical recommendations.
8.3. Plant Complex Visits
8.3.1. At the end of each month, or at the initiative of the Employer, a visit shall be organized
so that both parties can check the condition of the installations at the facilities.
8.3.2. A report shall be drawn up to record the opinions of both Parties. The Employer
reserves the right to call in equipment manufacturers or specialized technicians for
8.3.3. These visits shall provide an opportunity for examining maintenance programs
and operating procedures and improvements requiring additional investments.
8.3.4. Any test, visit, analysis or inspection and any approval thereof shall not in any way
alter/modify or dilute the responsibility of the Contractor to fulfil his obligations
under these Conditions.
9. RECORDS AND REPORTS
9.1. Operating Records and Data- The Contractor shall:
9.1.1. Prepare and maintain, on a current basis and in accordance with generally accepted
Indian accounting principles, proper, accurate and complete books and records and
accounts of all transactions related to the Facilities including a log book at the site
which shall contain inter alia the following details
a) Reading from the different meters, indicators and recorders (including but not limited
to consumption of energy, volume of water conveyed, operating times of the different
items of equipment etc which may be updated on a daily basis); and
b) Report of visits by persons other than those of the Employer and the Contractor to the
9.1.2. Establish and maintain a weekly and monthly reporting system to provide storage and
ready retrieval of operating data relating to the Facilities, including such information
necessary to verify calculations made pursuant to these Conditions or the O & M part
of contract and provide the same to the Employer on a monthly basis
9.1.3. Provide to the Employer or such persons notified by it access to the Facilities and
to data in relation to the Facilities, at all times.
9.1.4. At the Employer’s request, at the end of every month, make a copy of the system
performance data for that month as recorded by the instrument and control system
9.1.5. / DVDs and printed document there from and deliver the same to the Employer
9.1.6. Provide support to the Employer to meet the data requirements of all competent
authorities and under Applicable Law
9.2.1. The Contractor shall submit the reports mentioned in Schedule [2] at times indicated
in the said Schedule.
9.2.2. The Contractor shall also provide the Employer with such reports as are required
by the Employer and shall comply with all reporting requirements prescribed under these
Conditions and the O & M part of contract. In addition the Contractor shall submit
the following information to the Employer.
9.2.3. Upon obtaining knowledge thereof, shall submit prompt written notice of:
a) Any litigation or material claims, disputes or actions, threatened or filed, concerning the
Facilities or the services to be performed hereunder;
b) Any refusal or threatened refusal to grant, renew or extend or any action pending or
threatened that might affect the granting, renewal or extension of any clearance,
permit or license;
c) Notwithstanding the aforementioned materiality, all penalties or notices of violation
issued by any authority under Applicable Law;
9.2.4. The Contractor shall promptly submit to the Employer any material information
concerning new or significant aspects of the operations of the Facilities, any
material complaint about the Facilities from any person or entity with a bonafide
complaint who complains directly to the Contractor and, upon Employer‟s request,
shall promptly submit any other information concerning the Facilities or the services
performed by the Contractor.
9.2.5. The Employer may from time to time specify any changes to be made to any of the
format of any report or plan required hereunder.
9.2.6. If the Contractor is required by any Applicable Law to produce any projection, report
or any other document relating to the provision of the O & M Services of the
Facilities or the Employer requests a report regarding other information relating to the
Facilities, the Contractor shall prepare a draft of such document at the request of the
Employer, as soon as practicable and in any event within any time limit prescribed by
Applicable Law.
9.2.7. If the Contractor is required by any Applicable Law to produce any projection, report
or any other document, it shall prepare such report diligently and submit the same to
the Employer as soon as possible thereafter. Wherever practicable, such reports shall
be submitted to the Employer for review seven days before the same is issued. The
Contractor shall take into account any comments or revisions proposed by the
Employer thereon.
9.3. Procurement
9.3.1. The Contractor is responsible for the procurement of all goods and services necessary
to ensure compliance with its obligations under these Conditions.
9.3.2. The Contractor shall procure and keep in readiness spare parts required for
urgent repairs, materials, supplies and other consumable items, and maintains an
adequate inventory thereof Facilities.
9.3.3. The Contractor shall submit a report for every fiscal quarter to the Employer reflecting
the status of the inventory for spare parts, materials and other consumable items.
9.3.4. The Contractor shall procure the Chlorine Gas Tonners. Necessary arrangement for
procurement of Chlorine Gas in tonners / cylinders shall be made by the contractor. No
extra charges shall be paid for hiring / Purchasing the tonners / Cylinders. The
contractor shall ensure adequate storage of these materials, so that operations of
the facilities do not affect for want of these materials.
10.1.1. The Contractor‟s request(s) for payment shall be made to Employer in writing,
accompanied by invoice(s) along with presence sheet of personnel of particular month
duly certified by our Engineer on site, claims etc. as appreciate.
10.1.2. Payment shall be made by Employer as per prevailing procedure subsequent to
the submission of such invoice(s) / claim(s) by the Contractor.
10.1.3. Employer will deduct from the amount payable to the contractor any amount paid by
Employer on behalf of the contractor of Gujarat Electricity board (GEB) electricity
charges including penalty for non conformance of desired Power factor or any other
dues and liquidated damages as per clause and, as per tender terms and condition, Any
telephone bills charged by telephone department towards contractor’s usage, the
payment of telephone bill will be made by contractor
10.1.4. Contractor will provide Security Guards services for all assets in plant STP
premises for 24 hours of a day and 365 days of the year for the whole contractor
11. Additional Conditions:
a) The analysis for the Plant Performance Evaluation for Commissioning Certificate,
Defect Liability Phase and Operation & Maintenance, should be carried out at the
Third Party Reputed Laboratory as per the Engg-In- Charge Approval. Note-
i) The above stated analysis requirement are in addition to the routine analysis for
commissioning or regular course of operation as per the tender document and can be
done at plant scale.
ii) The Charges for the Third Party Laboratory Testing to be borne by Kheda
Nagarpalika /Client (Respective Nagarpalika/Authority).
iii) The frequency of Sampling for
Completion/ Commissioning – Three (3) Composite Samples for a day, for
Three(3) Consecutive Days (72 Hours)
Operation & Maintenance - Four (4) Nos. of Composite Sample for a day (Weekly
b) The statutory Charges from Gujarat Pollution Control Board (GPCB) or Central
Pollution Control Board (CPCB) or any other Authority for any Compliance should be
paid by the Contractor on behalf of Client and would be reimbursed by client at actual.
c) Any Penalty imposed by GPCB/CPCB/ or any other Authority for Non-
compliance of Effluent Quality Standard shall be recovered from Contractor at two
times of the Penalty.
12. FORCE MAJEURE
In this Clause, „Force Majeure‟ shall mean an event or circumstance, which materially and
adversely affects the ability of the affected Party to perform its obligations.
a) which is beyond a Party‟s control,
b) which such Party could not reasonably have provided against before entering into the
O & M part of Contract;
c) which, having arisen, such Party could not reasonably have avoided or overcome, and
d) which is not attributable to the other Party
Force Majeure may include, but is not limited to, exceptional events or circumstances
of the kind listed below, so long as conditions (a) to (d) above are satisfied:
a) war, hostilities (whether war be declared or not), invasion, act of foreign enemies)
b) rebellion, terrorism, revolution, insurrection, military or usurped power, or civil war,
c) riot, commotion, disorder, strike or lockout by persons other than the
Contractor‟s Personnel and other employees of the Contractor;
d) As result of war, explosive materials, harmful radiation or contamination by
radio- activity, except as may be attributable to the Contractor‟s use of such
munitions, explosives, radiation or radio- activity, and
e) Natural catastrophes such as earthquake, hurricane, typhoon or volcanic activity.
Heavy rainfall, cyclone, strike and lockout.
12.1. Notice of Force Majeure
12.1.1. If a Party is or will be prevented from performing any of its obligations under
these Conditions by Force Majeure, then it shall give notice to the other Party of the
event or circumstances constituting Force Majeure and shall specify the obligations,
the performance of which is or will be prevented. The notice shall be given within
7 days after the Party became aware, or should have become aware, of the relevant
event or circumstance constituting Force Majeure.
12.1.2. The Party shall, having given notice, be excused performance of such obligations
for so long as such Force Majeure prevents it from performing them.
12.1.3. Notwithstanding any other provision of this Clause, Force Majeure shall not apply
to obligations of either Party to make payments to the other Party under the
12.2. Duty to Minimize Delay
12.2.1. Each Party shall at all times use all reasonable endeavors to minimize any delay
in the performance of the Contract as a result of Force Majeure.
12.2.2. A Party shall give notice to the other Party when it ceases to be affected by the
12.2.3. Notwithstanding anything else herein contained the Employer may terminate the O
& M part of contract if the Force Majeure event continues for more than a period of
13. TERMINATION:
Termination shall mean the termination of the O&M part of Contract by the Employer or
the Contractor in accordance with Clause 13.1 or 13.2 respectively.
13.1. Termination by Employer
The Employer may terminate the O & M part of Contract by notice on:
a) the dissolution or insolvency of the Contractor, pursuant to an order of a court
or the bankruptcy of the Contractor; or;
b) if 45 days having passed since the Contractor is in material breach of his
obligations under these Conditions, or
c) if the Contractor ceases to carry on its business; or
d) abandonment;
e) the subsisting Force Majeure event as provided in Clause 12.2.3 above.
13.2. Payments upon Termination
13.2.1. Upon termination or as soon as practicable thereafter an account shall be taken of the
net amount owing from the Employer to the Contractor or from the Contractor to the
Employer (as the case may be). The Employer shall forthwith pay to the Contractor (if
the balance is due to the Contractor) all moneys due to the Contractor. If the account
shows a balance due to the Employer from the Contractor, the Contractor shall
forthwith pay any such balance to the Employer;
13.2.2. As part of the calculation made pursuant to clause 13.1 of the amounts due to the
Contractor on Termination, the following amount shall be taken into account.
a) The portion of the O & M Price outstanding and payable by the Employer for the
period prior to the Termination;
b) Any Delay Damages or indemnities for which the Contractor would be liable
under these Conditions upto the date of Termination;
c) Any other amounts due to the Employer under these Conditions by the
Employer including return of any amount of the O & M Price paid in advance by the
Employer to the Contractor under Clause [10].
13.3. In case of a Termination by the Employer in accordance with Clause 13.1 the Employer
may recover other than the amounts due to him under Clause 13.2.2 any costs
incurred by him in finding any replacement contractor
13.4. Successor to the Contractor Upon Termination:
13.4.1. The Contractor shall use all endeavors to facilitate the appointment and
commencement of duties of any person to be appointed by the Employer to operate
and maintain the facilities (the “Successor Contractor”) so as not to disrupt the
normal Operation & Maintenance of the Facilities and shall provide full access to
the Facilities and to all relevant information, data and records relating thereto by the
Successor Contractor and its representatives and accede to all reasonable requests
made by such persons in connection with preparing for taking over the Operation &
Maintenance of the Facilities;
13.4.2. Promptly after Termination, the Contractor, shall deliver to (and shall, with effect from
Termination, hold on trust for and to the order of) the Employer or (if so required
by the Employer by written notice) to the Successor Contractor all property in its
possession or under its control owned by the Employer or leased or licensed to the
13.4.3. The Contractor shall transfer to the Successor Contractor, as from the date of
Termination, its rights as the Contractor under all contracts entered into by it in the
performance of its obligations under these Conditions or relating to the Operation &
Maintenance of its obligations under these Conditions or relating to the Operation &
Maintenance of the Facilities. Pending such transfer, the Contractor shall hold its rights
and interests there under for the account and to the order of the Successor
13.4.4. The Employer shall be reimbursed any cost and expenses incurred by the
Employer due to default of the Contractor in discharging its obligations under this
13.4.5. The Contractor shall, upon Termination of the O & M part of Contract, co-operate with
the Employer and the Successor Contractor and comply with all reasonable requests
thereof, including the execution of documents etc.
13.4.6. Upon Termination of the O & M part of Contract on expiry of the terms of the O &
M part of Contract, the Parties agree that:-
13.4.7. The Contractor will use reasonable efforts to ensure a transition to the next Contractor
that will avoid operating difficulties for the Facilities.
13.4.8. For a six (6) month period after Termination or six (6) months prior to the expiration
of the O&M part of Contract, the Contractor shall, at his expense, provide sufficient
assistance to the Employer in the hiring and training of replacement personnel for
those Facilities.
13.5. Notwithstanding anything else herein contained the Employer shall be entitled to
terminate the O & M part of Contract, at any time at the Employer‟s convenience, by
giving notice of such termination to the Contractor. The termination shall take effect
28 days after issuance of the notice of termination.
13.5.1. On the expiry of the O & M part of Contract or Termination of the O & M part of
Contract, all the installations, works and equipment placed under the Contractor‟s
responsibility shall be handed over to the Employer, at no cost, in good working order,
except for normal wear and tear. The Employer may perform any inspections, tests or
expert appraisals he shall consider necessary with a view to checking that the property
is in good working order. The Contractor shall also hand over any unutilized spares,
consumables etc. purchased for the Facilities.
13.5.2. At the end of O & M Period, the Contractor shall be entitled to receive an O & M
Completion Certificate within thirty (30) days
13.5.3. The delivery of such O & M Completion Certificate will relieve the Contractor from his
responsibility as regard to the operation & maintenance of the Facilities and confirm
that the Contractor has fulfilled all of his obligations under these Conditions.
14. CONFIDENTIALITY AND INTELLECTUAL PROPERTY RIGHTS
14.1. Confidential Information - Subject to Clause [14.2], the Contractor shall at all times
during the O & M Period and for a period of two years after that:
14.1.1. use all efforts to keep all information regarding the terms and conditions
and any data or information acquired under or pursuant to these Conditions confidential
and accordingly shall not disclose the same to any other person; and
14.1.2. not use any document or other information (whether technical or commercial)
obtained by them it by virtue of these Conditions or the Contract concerning the
Employer‟s undertaking for any purpose other than performance of the its obligations
under these Conditions;
14.1.3. Provided that the provisions of this Clause 14.1 shall not apply to information, which
at the time of disclosure was in the public domain other than by breach at the
14.2. Disclosure of Confidential Information - The Contractor shall not be entitled to
disclose the terms and conditions of these Conditions and any data or information
acquired by it under or pursuant to these Conditions without the prior written
consent of the Employer unless such disclosure is made in good faith:
14.2.1. to any outside consultants engaged by or on behalf of the Contractor and acting in that
capacity, having made them aware of the requirements of this Clause [14].
14.2.2. to the lenders, any security trustee, any bank or other financial institution and its
advisers from which the Contractor is seeking or obtaining finance, having made them
aware of the requirements of this Clause [14].
14.2.3. to the extent required by Applicable Law;
14.2.4. to any insurer under a policy of insurance; or
14.2.5. to the Contractor‟s Personnel having made them aware of the requirements of this
14.3. Information - The Contractor shall:
14.3.1. make available to the Employer without charge such materials, documents and
data of any nature (except any materials documents and data protected by legal
privilege or which is subject to any duty of confidentiality to any third party) acquired
or brought into existence in any manner whatsoever by it as the Employer may request
for the purposes of exercising its rights or carrying out its duties in respect of the
Facilities or exercising its rights under or performing its obligations under these
14.3.2. make available to the Employer other such materials and documents and data
acquired or brought into existence by third parties as the Employer may request for
the purposes referred to in sub-paragraph (i) above
14.4. Third Party Intellectual Property - The Contractor shall:
14.4.1. procure that any intellectual property owned or developed by third parties and
utilized by the Contractor in connection with the performance of its obligations under
these Conditions is licensed to the Contractor for the purposes of the Operation &
Maintenance or repair of the Facilities and otherwise for the purposes of the Facility;
14.4.2. Ensure that the Contractor shall have the right to sub- license that intellectual
property to the Employer and any Successor Contractor for use in connection with the
operation, maintenance and repair of the Facilities. These licenses should survive
termination under these Conditions. The Contractor shall grant all such sub-
licenses. If any fee is payable to the licensor in consideration of any such sub-
license, the Contractor shall pay such amount during the O & M Period and each such
license shall be irrevocable
14.4.3. Indemnify and hold harmless the Employer against any action, claims, damages, losses
caused to the Employer by the owner of the Intellectual Property due to the allegedly
unauthorized or improper use of this intellectual property by the Contractor for
the fulfilment of his obligations under these Conditions.
14.5. Successor Contractor
If the licenses and sub-licenses of intellectual property granted under this Clause
respectively shall survive termination of the O & M part of contract in accordance with
the terms of this Clause, the Employer shall be permitted to grant sub-licenses of
intellectual property licensed to it there under to any Successor Contractor of the
Facilities for use only in connection with the operation, maintenance and repair of the
Facilities provided that such Successor Contractor concludes an agreement with the
Contractor or, as the case may be, the licensor of any such intellectual property on
terms which it may reasonably require any payment in connection with those sub-
licenses. Where intellectual property has been sub-licensed to the Employer under
this Clause and such sub-license is not subject to revocation by the Contractor there
under, the Contractor shall take such actions as the Employer may request in
connection with the grant of licenses to any Successor Contractor for the purposes
15. ARBITRATION AND DISPUTE RESOLUTION
15.1. SETTLEMENTS OF DISPUTES:
15.1.1. If any dispute of any kind whatsoever may arise between the Employer and the
Contractor in connection with or arising out of the Contract, including without
prejudice to the generality of the foregoing any question regarding its existence
validity or termination, or the execution of the works whether during the progress of
the work or before or after the termination, abandonment or breach of the contract,
the either parties shall have to raise/ refer their disputes/ differences / claims in
writing to the other party, within a period of 30 days on occurrence of such events, to
resolve any such dispute or difference.
15.1.2. The contractor shall have to refer their disputes to the concerned KHEDA Nagarpalika
Engineer. After receipt of the dispute from the contractor under this clause, the KHEDA
Nagarpalika Engineer In-charge of works shall have to submit their report to the Chief
officer within a period of 90 (Ninety) days. The Chief officer shall offer an
opportunity to the contractor to be heard and to furnish evidence in support of their
disputes within 30 (Thirty) days after the receipt of the disputes duly compiled by
KHEDA Nagarpalika Engineer. After hearing the contractor regarding their disputes
along with their documentary support and the concern KHEDA Nagarpalika Engineer
in charge of the work, the Chief officer shall give decision within a period of
(One Hundred Twenty) days or the contractor is dissatisfied with the decision within
120 (One Hundred Twenty) days after the contractor has been heard. If The Chief
officer does not give decision within 120 (One Hundred Twenty) days or the contractor
is dissatisfied with the decision of the Chief Officer, the contractor shall within
(thirty) days after receiving the instruction or decision, appeal to the regional
commissioner of Municipalities (RCM) ahmedabad Zone. After hearing both the
parties the RCM, KHEDA Nagarpalika will give reasonable decision within 180 (One
Hundred Eighty) days from the date of receipt of appeal by the contractor. The
decision of the RCM, KHEDA Nagarpalika shall be final and binding on both the parties.
If the RCM, KHEDA Nagarpalika does not give decision within 180 (One Hundred
Eighty) days after the date of appeal by the contractor, the contractor will have right to
refer the dispute to arbitration tribunal as per provision of clause “Arbitration”.
15.2. ARBITRATION:
15.2.1. Subject to Clause (A) mentioned above and in the event of any dispute or
difference arising out of or in any way relating to all concerning these contracts or the
construction or effect of these contracts shall on the initiative of either party to the
contract be referred to “The Arbitration Tribunal Constituted Under The Provision Of
Gujarat Public Work Contract Dispute Arbitration Tribunal Act, 1992”.
15.2.2. The arbitration shall be conducted in accordance with the provisions of the
“Gujarat Public Work Contract Dispute Arbitration Tribunal Act, 1992” or statutory
modifications there on. The Arbitration shall be held at such place and time as the
Tribunal may determine.
15.2.3. The decision of the tribunal shall be final and binding upon both the parties. The
expenses of the arbitration shall be paid as may be determined by the Tribunal.
15.2.4. Performance of the contractor under the contract shall if reasonably be possible,
continue during the arbitration proceedings and payments due to the contractors by
the owner shall not be withheld, unless they are the subject matter of the
arbitration proceedings.
15.2.5. The dispute is deemed to have arisen on the date, on which RCM, Kheda Nagarpalika
shall not give his decision as mentioned above in Clause (A) or in the case of intimation
of any decision, the Contractor intimates in writing that he has finally refused to accept
the offer made by the Employer.
15.2.6. Where any dispute arises between the parties to the work contract either party
shall irrespective of whether such works contract provides for any arbitration or not,
refer, within one year from the date that RCM Office, Kheda Nagarpalika has not
given the decision as per Clause (A) such dispute in writing to the Tribunal for
arbitration in such form and accompanied by such documents or other evidence any
by such fees, as may be prescribed.
15.2.7. Legal jurisdiction: All question relating to this Tender shall be governed by the law of
India and shall be subject to jurisdiction of court at kheda, Gujarat.
16. GOVERNING LAW AND JURISDICTION
These Conditions and the O & M Part of Contract shall be governed in accordance with
The Contractor agrees that any legal action or proceedings arising out of these Conditions
may be brought in the courts or tribunals at Kheda in India and irrevocably submits
themselves to the jurisdiction of such courts or tribunals. The Employer may, however, in its
absolute discretion commence any legal action or proceedings arising out of these
Conditions in any other court, tribunal or other appropriate forum, and the Contractor
hereby consents to such jurisdiction.
17. MATERIAL, TOOLS AND TEST EQUIPMENTS:
All materials required for the O&M of the project shall be new and of best quality and
suitable for the purpose intended. These shall be got approved from the Engineer in charge
17.1. Electricity Supply:
Contractor shall keep good liaison with Power Supply Company for power supply in case of
electric power failure (break down/shut down) it shall be the responsibility of the agency to
inform all the concerns as well as to contact concern authorities to restore the power supply.
The vehicle kept at site by the contractor shall be provided for this purpose along with
operation and maintenance staff in case of requirement as per direction of Engineer in
charge or his representative. All charges are under in KHED Anagarpalika scope.
17.2. Work Order Book
A bound half sheet size work order book shall be provided by the contractor and handed
over to the owner for maintaining at the work site. This shall be a permanent record. The
contractor or his Resident engineer shall sign against instructions & orders recorded by the
Engineer in charge or his representative for the maintenance work. He may take out a copy
thereof if necessary. He shall take prompt action as per the instruction/orders of the owner
and necessary compliance shall be recorded against each instruction/order
17.3. Electrical Installations
All electrical work shall be carried out as per the provisions of Indian Electricity Act, Indian
Electricity Rules, Instructions and requirement of authority/ authorities i.e. Electrical
Inspector and Gujarat Urja Vitran Nigam Limited or as mentioned in the Tender document.
17.4. Accident on the works
The contractor shall be fully responsible for any accident that may occur to the labour on his
work on duty and report the same to the Engineer in charge and concerned Govt. labour
department authority and shall pay all necessary compensation as per rules. Contractor
shall also be fully responsible for any loss to any individual or public property occurred due
to him or his workers negligence under the scope of this contract.
17.5. Use of site
The contractor shall not unreasonably encroach the site with materials and equipment.
The contractor shall not use land for any private purpose.
17.6. Compliance
The contractor shall be bound by all ordinance acts, codes, rules, regulations and orders of
which in any way affects conduct of works, or workmen engaged for the work. The
contractor shall be responsible for any violation of any govt. rules & regulations. It shall
be the responsibility of the contractor against any claim or liability arising from violation
17.7. Accommodation for Staff
Contractor shall provide necessary accommodation to their labours & engineers at his own
17.8. Transportation
Contractor shall have to make his own arrangements for conveyance of his staff at his cost.
No facility will be provided by the owner.
Contractor shall provide medical facility to his staff at his cost.
18. CONTRACTOR’S STAFF & THEIR CONDUCT ETC.:
18.1. Nationality & Address
All employees shall be Indian Nationality and it shall be contractor’s responsibility to give
temporary and permanent address: Convicted or penalized person shall not be employed.
18.2. Salary to Employees
Contractor shall strictly follow labour laws and shall also ensure regular monthly salary
payment to his staff. The owner will not take any liability of any of his employees appointed
for operation and maintenance under this contract. Contractor shall submit monthly
certificate for full payment to his staff on or before 10th of every month. Owner reserves the
right to conform the contents of the certificate from contractor’s employee for their last pay.
The owner will not be responsible for any delayed payment/ compensation/ overtime or
any other claims by employees of contractor during the tender period and even after the
18.3. Identification Dress Code with Badge/ Identity Card
Contractor shall have to provide special dress code with identification badge with name
plate strip to be displayed on front pocket to each staff as approved by Engineer in
charge along with Identity Card etc.
18.4. Holidays and Leave
Holidays and leaves shall be given to staff as per relevant labour rules. During holidays/
causal leave/earned leaves etc. and contractor shall arrange for the substitute. The owner
shall not make any separate payment of overtime for these substitutes provided by the
contractor during above periods.
All employees of the contractor shall follow the instruction of Engineer in charge. If any
employee misbehaves with Engineer in charge he/she shall be immediately removed from
duty and substitute for that shall be employed by the contractor. If contractor fails to do so,
non-refundable penalty of Rs.200/- (Rupees Two hundred only) per day per such case will
be levied, this amount shall be recovered from the bill or any due amount of agency.
The plant is one of its own kinds. Visitors are expected to visit this plant. It is expected that
all staff and Engineers be present and follow the directives of Engineer in charge.
CLERK - DRAINAGE
DEPARTMENT KHEDA
Operation and Maintenance Services
The Contractor shall be required to perform the following services under these Conditions:
1) The Contractor shall be responsible for corrective and preventive maintenance of
civil, hydraulic, mechanical, and electrical and instrumentation equipment as well
as miscellaneous equipment.
2) The Contractor shall be responsible for carrying out regular servicing and lubrication
of rotary machines, complying with maintenance instructions as defined in the
Operation and Maintenance Manual and ensuring that electromechanical equipment
and motors operate correctly at all times.
3) The Contractor shall ensure that all measurement systems are calibrated, within the
valid period of certification and operate correctly at all times.
4) The Contractor is responsible for the maintenance of the internal plant roads,
landscaped areas inside the Employer plant fences.
5) The Contractor shall be responsible for maintenance of civil structures including
primary and secondary treatment, pump houses, plant pipelines, administration
buildings, chlorine building, sludge dewatering building, garages, etc.
6) The Contractor will operate and maintain in a state of continuous operational
readiness all plant and systems to meet the flow requirements. It shall remain the
Contractor’s responsibility to ensure that plant systems are at all times able to
operate to the designed capacity of plant.
7) Provided here are certain standard services that KHEDA Nagarpalika could require.
However KHEDA Nagarpalika may wish to review this and make changes depending
on the exact nature of services they require from the Contractor.
8) The Contractor shall be entitled to appoint a representative who shall together with
Employer’s Representative on the last day of each month or if such day is not a
working day on the following day, jointly carry out a reading of water meters
and jointly certify the record of such readings.
9) For the duration of the O & M period, the Contractor will be responsible for the
supply and control of lubricants, spare parts and consumable materials including
Electrical Power, necessary for the continuous operation of the works.
10) The Contractor will manage the consumables and utilities services to ensure their
most economic consumption and to minimize wastage.
11) The quantities of all the unutilized spare parts and consumable materials will be fully
handed- over to the Employer at the end of the O&M period.
12) The stores inventory, the issuing and recording of spare parts will be the
responsibility of the Contractor.
13) The Contractor is also responsible for providing spare parts and material required for
the operation and maintenance during the operation period, and shall bear the
cost for the same, including the cost of storing and safeguarding.
14) The Contractor will make all necessary arrangements to ensure the continuous
supply of spare parts and material for the works; and the rate of advance supply of
these materials shall be in such quantities and amounts as would ensure
uninterrupted operation.
15) All the furniture and administrative office equipment etc. required shall be furnished
by the Contractor. Costs of operating administrative office and supplies shall be borne
by the Contractor.
16) The Contractor shall take out subscriptions for standard telephone lines / wireless
sets etc. Running cost for the telephone / wireless sets will be borne by the
Contractor. The Key maintenance staff should have mobile phones in operating
conditions for better coordination of the maintenance activities.
17) Cost of operation and maintenance and housekeeping of housing complexes including
domestic water supply and drainage, roads, gardens, electrical installations, etc.
will be borne by the contractor.
18) The Contractor will provide staff personnel for the full term of O & M as per schedule
of establishment given in Volume - IV, Price Bid.
19) Contractor has to do painting to all Civil Structures including pipeline, channels,
etc. with the same quality of paint used while construction of the structures or as
directed by Employer at a regular interval of every two years.
20) All Aeration Blowers working hrs shall be recorded in PLC/SCADA system, Report of
the same shall be attached by Contractor along with monthly bill of O&M.
1) MONTHLY REPORT
The monthly report shall include but not be limited to:
Volume of Sewage treated
Inlet and outlet sewage characteristics and any other data required by the Engineer in Charge
All the problem areas in the facility,
O & M works carried out during the month.
Monthly materials consumption statement
2) ANNUAL REPORT
The Contractor shall provide the Employer by March 31 of the current year (n) with an
annual report for the preceding year (n- 1). This report shall include:
*A statement of works carried out during the preceding year n- 1 in connection with the
contractor‟s obligations under these conditions.
NOTE: The Employer may consider if it requires these reports or requires reports and
provide for the same. This will need to be looked at in the light of reporting requirements in
these Conditions. The Employer will also need to determine what information is required in
Insurance against Injury to Persons and Damage to Property:
1) The Contractor shall insure against each liability for any loss, damage, death or bodily
injury which may occur to any physical property (mechanical, electrical, automation work,
all civil works, Storage etc. excluding pipe line) or to any person which may arise out of the
Contractors performance of his obligations under these Conditions during the O & M
2) This insurance shall be for a limit of per occurrence of not less than the amount of Rs.
30 lakh (per person), with no limit on the number of occurrences. (as per govt. guidelines)
3) Insurance for Contractors Personnel
4) The Contractor shall effect and maintain insurance against liability for arising from injury,
sickness, disease or death of any person employed by the Contractor or any other of the
Contractors Personnel.
5) The Employer shall also be indemnified under the policy of insurance, except that this
insurance may exclude losses and claims to the extent that they arise from any act or neglect
of the Employer or of the Employers Personnel.
6) Contractor shall have to take insurance for Electrical, Mechanical and instrumentation
equipment under this package and whereas the insurance of another component like sump,
pipeline will be optional. This General Insurance for the work will be in the name of KHEDA
Nagarpalika. The depreciated value is to be considered for the purpose of insurance for
respective year. The insurance for skilled, semi- skilled and unskilled labour is compulsory.
The same should be taken by agency as per labour act laws in force.
SPECIAL TERMS AND CONDITIONS
SPECIAL CONDITIONS OF CONTRACT FOR
OPERATION & MAINTENANCE
TECHNICAL CONDITIONS
1) The operation and maintenance of all the works included in this tender as per details
given should be carried out by contractor at his own cost.
2) All electric bills for operating all plant and equipment installed in this contract will be
paid by the contractor.
3) All the required electrical goods / fixtures like bulb, tube light, chock, starter, fuse, wire
etc. required for operation and maintenance shall be procured by contractor at his
own cost and lighting arrangement should be kept in good condition.
4) Any type of valve or part of the valve not working properly after repairing and requires
replacement, as per opinion of Engineer in Charge or his representative, then required
valve will be replaced by the Contractor.
5) During the period of contract, a person other than responsible representative of
contractor or persons employed by him should not enter into the premises of the STP
site. Every care should be taken by contractor to prevent such type of unauthorized
entry or interruption in the premises or surrounding the property STP.
6) At any time during the visit of Engineer in charge or his representative if it is observed
that the operation and maintenance is not carried out properly, Sewage treatment is
stopped and contractor is responsible for it recovery will be made at double rate of
contract for that particular day or contract will be terminated.
7) All the works executed under this project & covered in the scope of this tender will be
deemed to have handed over to contractor from the date of successful commissioning of
the facility. Proper operation and maintenance of the same works/ components shall be
carried out by contractor and at the time of completion of contract period or
termination of contract, contractor should have to give possession of all the work and
components back to KHEDA Nagarpalika in good condition. Before handing over the
possession to ULB in-consultation with Engineer In charge, account of contract will not
be finalized and deposit will not be refunded to contractor. For all type of legal
activities and expenditure for the same, contractor will be fully responsible.
8) During the period of contract for any type of dispute, decision of Client, will be
final and binding to both the parties.
9) Prescribed registers as maintained by agency during the period of operation and
maintenance period shall be submitted to the KHEDA Municipality.
10) Proper care is to be taken by contractor to keep neat and clean. Every component
of head work sites and maintenance of all the components shall be done by contractor.
11) Servicing of all the piping & valves cleaning of all civil works and maintenance
shall be carried out regularly by contractor and entered into the concerned registers.
12) History sheet shall be maintained by contractor for replacement of material in pipeline,
or valves, spare parts of Electro-mechanical equipment.
13) All the works included in the scope of work shall be oil painted once during
contract period at the cost of contractor.
14) All the gardens and plants situated at STP site shall be supplied water and maintained
properly by contractor. No any extra payment will be made on account of this work.
15) Telephone/ wireless message shall be received and entered in the register and message
should be conveyed to concern party for action. If any interruption in the system of
any important message should convey immediately to concerned Engineer in charge.
16) All the information regarding labors, staff, vehicles etc. is incorporated in this
tender for preparation of estimate. As per list staff having proper qualification/labours
and vehicles shall be deployed by contractor. If due to negligence of contractor for
providing sufficient staff and vehicles sewage is not supplied properly remaining
labors/staff and vehicles will be deployed by Kheda Nagarpalika at the risk and cost of
contractor and recovery for such expenditure will be made from the bill of contractor.
17) The contractor has to make all the arrangements required for the proper
operation, maintenance and safety of all the works included in this contract at his own
cost during the whole contract period.
18) Any damage / breakage found from mischievous element found in the system, the
contractor should lodge police case immediately under intimation to concern
19) Material consumption register in prescribed format should be maintained by the
contractor. During the visit of Engineer- in- charge if required it should be produced.
20) The Contractor will be required to pay following bills.
a) Outstanding pending electricity bill payments are in scope of Kheda Nagarpalika.
b) Telephone bills will have to be paid by the Contractor. No reimbursement shall be
c) Electric /Battery operated flow meters have to be maintained by Contractor In case
failure of batteries, same shall have to be replaced by contractor at his own cost.
21) All miscellaneous items, for example, vehicles, tools, testing equipment, cleaning or
green keeping equipment, security and safety equipment, electrical fixtures, etc shall be
provided by the Contractor at his expense.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Doc.pdf
Gujarati Condition.pdf
PIL 225_0001.pdf
Download all tender documents and submit your bid