Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.2 CrAccepted-AOC JOYNAGAR MIDDLE ROAD JOYNAGAR AGARTALA WEST TRIPURA PIN 799001 | AGARTALA | WEST TRIPURA | TRIPURA | 799001 | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹31.5 Cr+₹35.3 L (1.13%)Rejected-AOC 14 1 L N BARI ROAD BANAMALIPUR AGARTALA WEST TRIPURA PIN 799001 | AGARTALA | WEST TRIPURA | TRIPURA | 799001 | L2 | Rejected-AOC 2nd lowest |
Tender Value
₹29.4 Cr
EMD Value
₹58.9 L
Closing Date
27 Mar 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer NH Division Agartala Tripura W
O o the Executive Engineer NH Division Agartala PWD NH Netaji Chowmuhani West Tripura
Strengthening and improvement of riding quality of road from Kukipara Golachipa to Barpathari Bazar L 10.20 Km under South Tripura District.
2026_CEPWD_71153_1
20/CE/PWD(NH)/2025-26
Open Tender
Civil Works - Roads
Percentage
730 days
Kukipara to Barpathar South Tripura
Please refer to the Tender document
9 documents required · 9 mandatory
₹20,000
₹58.9 L
O o the Executive Engineer NH Division Agartala
13 Oct 2026
3 Mar 2026
27 Mar 2026
3 Mar 2026
27 Mar 2026
3 Mar 2026
3 Mar 2026 - 13 Mar 2026
16 Mar 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sub Head - I | |||||
| 1.01 | SITE CLEARANCE | - | - | - | - |
| 1.02 | Clearing and Grubbing Road Land.
Clearing and grubbing road land including uprooting wild vegetation , grass, bushes, shrubs, saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRT&H Technical Specification clause 201.
(A)In area of light jungle | 2.55 | Hectare | 28,638.7 | ₹73,028.69 |
| 1.03 | Making 50 mm x 50 mm Furrows
Making 50 mm x 50 mm furrows, 25mm/ 50mm deep, 450 to the center line of the road and at one metreinterval in the existing thin bituminous wearing coarse including sweeping and disposal of excavated material within 1000 metres lead as per MoRT&H Technical Specification Clause 404.3.1.
(ii) 50 mm deep furrow cutting | 38,250 | Sqm | 11.6 | ₹4,43,700 |
| 2Sub Head - II | |||||
| 2.01 | EARTH WORK | - | - | - | - |
| 2.02 | Compacting Original ground
(i) Compacting orginal ground supporting Subgrade.
Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.2 for subgrade construction as per MoRT&H Technical Specification clauses of section 300. | 8,925 | Cum | 86.7 | ₹7,73,797.5 |
| 2.03 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead upto 1000 m as per MoRT&H Technical Specification clauses of section 300. | 4,527.05 | cum | 58.1 | ₹2,63,021.61 |
| 2.04 | Construction of Embankment with Material deposited from Roadway Cutting.
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300.2 and as per MoRT&H Technical Specification clauses of section 300. | 3,845.62 | cum | 142.5 | ₹5,48,001.42 |
| 2.05 | Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 5000 m as per MoRT&H Technical Specification clauses of section 300. | 1,288.43 | cum | 259.7 | ₹3,34,605.79 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.37 MB
DNIT.pdf
Tender Documents • 2.73 MB
BOQ_72401.xls
BOQ • 0.36 MB
PWDform7.pdf
Additional Documents • 1.72 MB
Corrigendum01.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .