Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹7.3 LAWARDED | AWARDED |
Tender Value
₹9 L
EMD Value
₹22,500
Closing Date
15 Apr 2025, 9:30 pmClosed
Karnataka Neeravari Nigam Limited
Arranging Power Supply to 42.50 HP Water Supply Installation in the name of Shri Assistant Executive Engineer KNNL Saundatti site At Near Jogalbhavi at Saundatti, in O & M HESCOM Urban Section of Saundatti Sub Division.
KNNL/2023-24/EL/WORK_INDENT840/CALL-2
KNNL/2023-24/EL/WORK_INDENT840/CALL-2
Open
Electrical
Electronic Documents, First(One Cover)
KNNL Division MLBC Div No 2 Navilutheertha
₹500
₹22,500
2 Apr 2025
2 Apr 2025
9 Apr 2025
Arranging Power Supply to 42.50 HP Water Supply Installation in the name of Shri Assistant Executive Engineer KNNL Saundatti site At Near Jogalbhavi at Saundatti, in O & M HESCOM Urban Section
PART-A For EXTENSION OF HT 11KV LINE MATERIALS, supplying and fixing RCC Poles for 9Mtr Long. 145kg WL , , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engine...
PART-A Erection of HT 11KV LINE MATERIALS: PSC Poles for 8 Mtr. Long, 140kg WL , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-A Erection of HT 11KV LINE MATERIALS: 2 No's of fish plate, bolts, nuts and washers-MS( Using for Studd oly) , including Materials & Labour cost ,Complete with all lead & lifts as per direction ...
PART-A Erection of HT 11KV LINE MATERIALS: 11kV Horizontal cross arms with H.T.Single top support, clamp, bolts, RCC Pole , including Materials & Labour cost ,Complete with all lead & lifts as per d...
PART-A Erection of HT 11KV LINE MATERIALS: 11KV, 5KN composite / Polymeric Pin Insulator (24mm dia FP rod) , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engi...
PART-A Erection of HT 11KV LINE MATERIALS: 11KV 45KN Polymeric Insulator / Silcon rubber composite insulator , including Materials & Labour cost ,Complete with all lead & lifts as per direction of En...
PART-A Erection of HT 11KV LINE MATERIALS: Guy set with No.15KV strain insulator & Concreting materials as per Drwg No. BESCOM/GM/CP/7/Dt; 24.10.07 , including Materials & Labour cost ,Complete with a...
PART-A Erection of HT 11KV LINE MATERIALS: Rabbit ACSR Conductor with @1.5% Sag , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-A Erection of HT 11KV LINE MATERIALS: Guy concreting with Boulders, Mud & Sand as per Drawing No BESCOM/GM/CP/7 Dt : 24.10.2007 (with out Cement ) , including Materials & Labour cost ,Complete wi...
PART-A Erection of HT 11KV LINE MATERIALS: Spiral Earth Electrode , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-B Double pole distribution TRANSFORMER Structure MATERIALS: DP Transformer structure using RCC Pole- 9 Mtr Long, 145 Kg WL , including Materials & Labour cost ,Complete with all lead & lifts as ...
PART-B Double pole distribution TRANSFORMER Structure MATERIALS: 11kV/433V, 63kVA, 3 Phase, 50 Cys Distribution Transformer BEE-5 Star Rated with Oil , including Materials & Labour cost ,Complete with...
PART-B Double pole distribution TRANSFORMER Structure MATERIALS: 11kV,5KN, composite / Polymeric pin insulator (24mm dia FP rod) , including Materials & Labour cost ,Complete with all lead & lifts as...
PART-B Double pole distribution TRANSFORMER Structure MATERIALS: 11kV,45KN, Polymer insulator / silicon rubber composite insulator, including Materials & Labour cost ,Complete with all lead & lifts a...
PART-B Double pole distribution TRANSFORMER Structure MATERIALS: Earthing materials pipe type for grounding with accessories as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 , including Materials...
PART-B Double pole distribution TRANSFORMER Structure MATERIALS: Anticlimbing device (12 mtr GI Barbed Wire)
PART-B Double pole distribution TRANSFORMER Structure MATERIALS: CAUTION /DANGER BOARD , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-B Double pole distribution TRANSFORMER Structure MATERIALS: GI Wire 8 SWG , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-B Double pole distribution TRANSFORMER Structure MATERIALS: Guy Wire 7/10 SWG , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-B Double pole distribution TRANSFORMER Structure MATERIALS: 11kV Lightning Arester, Metal Oxide 9kV, 5kA Polymetic Type with ground disconnector , including Materials & Labour cost ,Complete with...
PART-b (i) SWITCH GEAR MATERIALS : a) LT Protection Kit for 63 kVA , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-b (i) SWITCH GEAR MATERIALS : b) LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT , including Materials & Labour cost ,Complete with all lead & lifts as p...
PART-b (i) SWITCH GEAR MATERIALS : c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) , including Materials & Labour cost ,Complete with all lead & lifts as pe...
PART-b (i) SWITCH GEAR MATERIALS : d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in ...
PART-b (i) SWITCH GEAR MATERIALS : 11kV Solid Core Type HG Fuse Unit , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-b (i) SWITCH GEAR MATERIALS : 11kV, 200Amps, Single Break GOS , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-C erection of LT LINE MATERIALS : PSC Poles for 11 Mtr. Long, 365 kg WL , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-C erection of LT LINE MATERIALS : Base concreting CC 1:4:8 For11/9.5/9/8 Mtr pole (500X650X150 MM), including Materials & Labour cost ,Complete with all lead & lifts as per direction of Enginee...
PART-C erection of LT LINE MATERIALS : Pole concreting CC 1:2:4 (without coping) for 11 mtr PSCC POLE (650X500X2000), including Materials & Labour cost ,Complete with all lead & lifts as per directi...
PART-C erection of LT LINE MATERIALS : L.T. 4-Pin "X" arm with pole clamp, bolts, nuts and washers 8 Mtr RCC Pole, including Materials & Labour cost ,Complete with all lead & lifts as per direction ...
PART-C erection of LT LINE MATERIALS : L.T. 4-Pin "X" arm with pole clamp, bolts, nuts and washers without braces-MS (for 8 Mtr PSC/PCC Pole), including Materials & Labour cost ,Complete with all lea...
PART-C erection of LT LINE MATERIALS : 1.1KV Ceramic Pin Insulator With GI pin, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-C erection of LT LINE MATERIALS : No. 8KV Strain Insulator, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-C erection of LT LINE MATERIALS : Guy set with No.8KV strain insulator & Concreting materials as per Drwg No. BESCOM/GM/CP/7/Dt; 24.10.07, including Materials & Labour cost ,Complete with all le...
PART-C erection of LT LINE MATERIALS : Weasel ACSR Conductor With @ 1.5% sag, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
PART-C erection of LT LINE MATERIALS : Guy concreting in marshy area (providing cement concret 1;2:4 for anchor rod in marshy/black cotton soil 600*600450 mm), including Materials & Labour cost ,Comp...
PART-C erection of LT LINE MATERIALS : Spiral Earth Electrode, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
Special locality Allowance @ 20% on labour charges
Contingencies @ 2% on Total material & labour (1+2)
ESCOM Establishment cost @ 20% on Total Labour charges as applicable
Goverment electrical inspectorate charges as per actuals.
Supervision charges shall be collected at 10% on all items from 1 to 4
Security deposit
Supervisor charges as applicable
Transformer inspection test bench + GST
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .