Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
14 Jul 2021, 6:55 pmClosed
Executive Engineer Mech. Irrig. DIv. Baramulla
Mech. Irrig. DIv. Baramulla
Repairs to 40 HP, 04-pole, 03-phase squirrel cage induction motor at lift irrigation scheme Trikolbal New
2021_IFC_129967_3
eNIT 18 of 2021-22
Open Tender
Repair and Maintenance Works
Item Rate
3 days
Pattan
Please refer Tender documents.
5 documents required · 5 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. DIv. Baramulla
Exempted
Mech. Irrig. DIv. Baramulla
19 Jul 2021
8 Jul 2021
15 Jul 2021
8 Jul 2021
14 Jul 2021
8 Jul 2021
12 Jul 2021
Amount
Dismantling of motor from the respective base frame by opening of foundation bolts. The job includes dragging of 40-HP, 3-Phase Induction motor to loading site and shifting it to the workshop and unload it there. The job includes the shifting of motor back to site in a private vehicle after successful completion of whole job and testing on full load.
Dismantling of motor at workshop by way of disassembling the stator rotor assembly and assessing the damages. The job also includes extraction of damaged windings from the slots of stator.
Complete rewinding of stator coils of 03 phase induction motor with suitable gauge copper wire of standard quality after removal of burnt out windings , cleaning of slots etc insulation class-F, varnishing, tapping, including heat treatment etc. (Note: The unserviceable scrap copper generated shall be property of the firm and is taken into account for estimation of rates.)
Providing and fitting of copper connection leads out of single core PVC insulated copper wire of suitable amperage (06 leads) including their brazing and thimbling of terminals.
Reassembling of the stator rotor assembly carefully without causing any damage to the windings. The job includes refitting of motor at site to ensure proper alignment with pump.
NEW S M ENTERPRISES
M/s SAJID ENGINEERING WORKS
Asif Engineering Works
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .