Loading…
Loading…
Tender Value
₹28.8 L
EMD Value
₹29,000
Closing Date
25 Aug 2026, 6:00 pmDue tomorrow
Executive Engineer, Petlad Irrigation Division Petlad
Construction new box type V.R.B. at ch. 585 m on Parallel drain Tarapur Rinza road near village Kanawada.
332868
05 of 2026-2027
Open
Miscellaneous Works
Turn-key
Anand
13 documents required · 10 mandatory · 3 optional
₹1,500
Executive Engineer Petlad Irrigation Division Petlad
₹29,000
11 Aug 2026
11 Aug 2026
11 Aug 2026
25 Aug 2026
11 Aug 2026
Bill Of Quantities
Memorandum showing items of works to be carried out
NAME OF Construction new Box Type V.R.B. at Ch.585 m on Parallel drain Tarapur Rinza
WORK : road near village Kanawada
Quantit Estimated rate
SR. estimat accoarding to
Item of work Rs. in Rs. in Unit
No. ed but estimated
may be figs. words quantities
ITEM NO :- 1 Excavation for foundation in all
sorts of soil including yellow sandy gravelly soils
,soft & hard murrum etc. in dry condition Rs. One
including depositing the excavated stuff in Hundred
1 337.00 uniform layers in banks or as and where directed 107.80 Seven & CM
etc. complete for lead upto 500 m and all lift.(BY Eighty Paise
MACHINERY) Including dewatering. Only
ITEM NO :- 2(A) Providing & Laying in position
"DESIGN MIX" cement concrete using cement
sand and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator, Rs. Four
curing as directed with all lead & lift etc complete Thousand
2 68.00 without dewatering and excluding the cost of 4190.00 One CM
steel reinforcement. (A) For Footing of column / Hundred
Abutment / Pier / Bottom slab of barrel / Plinth Ninety Only
course / Coping/Approach slab etc. (a) Concrete
grade M-15 and MSA-20 mm
ITEM NO :- 2(B) Providing & Laying in position
"DESIGN MIX" cement concrete using cement
sand and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator, Rs. Four
curing as directed with all lead & lift etc complete Thousand
3 74.00 without dewatering and excluding the cost of 4651.00 Six Hundred CM
steel reinforcement. (A) For Footing of column / Fifty One
Abutment / Pier / Bottom slab of barrel / Plinth Only
course / Coping/Approach slab etc (e) Concrete
grade M-25 and MSA-20 mm
ITEM NO :- 2(C) Providing & Laying in position
"DESIGN MIX" cement concrete using cement
sand and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator, Rs. Four
curing as directed with all lead & lift etc complete Thousand
without dewatering and excluding the cost of Three
steel reinforcement. (B) For Pier and Hundred
Abutments / Wing wall / Head wall / Return Forty Four
wal/Dowel wall etc. (e)Concrete grade M-15 and Only
ITEM NO :- 2(D) Providing & Laying in position
"DESIGN MIX" cement concrete using cement
sand and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator, Rs. Five
curing as directed with all lead & lift etc complete Thousand
5 79.00 without dewatering and excluding the cost of 5642.00 Six Hundred CM
steel reinforcement. (E) For Column / Beam / Forty Two
Solid Slab of Road Bridge / Barrel / Cutoff wall Only
etc. (q) Concrete grade M-25 and MSA-20 mm
ITEM NO :- 2(E) Providing & Laying in position
"DESIGN MIX" cement concrete using cement
sand and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary formwork, Rs. Five
centering, scaffolding, compaction by vibrator, Thousand
curing as directed with all lead & lift etc complete Four
6 16.00 without dewatering and excluding the cost of 5481.00 CM
steel reinforcement. (D) For Kerb / Wearing Eighty One
coat.(n) Concrete grade M-25 and MSA -10 to Only
ITEM NO :- 2(F) Providing & Laying in position
"DESIGN MIX" cement concrete using cement
sand and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator, Rs. Eight
curing as directed with all lead & lift etc complete Thousand
7 2.00 without dewatering and excluding the cost of 8023.00 CM
steel reinforcement. (F) For Perapet wall of Road Three Only
Bridge / Structure (t)Concrete grade M-25 and
MSA -10 to 20 mm
ITEM NO :- 3Providing & Placing in position
reinforcement bars including cutting, bending,
welding joints where necessary, hooking etc.
8 138.22 complete as per drawing for all lead and lifts.TMT 7194.00 CM
ITEM NO :- 4 Providing and fixing 110 mm Rs. Three
diameter P.V.C.Pipe (6 kgf / sqcm) Water spout Hundred
9 4.00 with necessary iron gratting as per design 369.20 Sixty Nine & CM
ITEM NO :- 5 Providing and laying in position
mm dia (6 kgf/sqcm) P.V.C. Pipe for weep holes Rs. Two
with non corroding jali in abutments, wing walls, Hundred
10 18.00 retaining walls etc. complete.
262.50 Sixty Two & RMT
ITEM NO :- 6 Providing & Laying in position
"NOMINAL MIX" cement concrete using cement,
sand and crushed aggregate by mass and
machine mix for C.C./R.C.C work incl. necessary Rs. Three
formworks centering, scaffolding, compaction by Thousand
vibrator, curing as directed with all lead & lift etc Three
11 85.00 complete Without Dewatering and excluding cost 3346.00 RMT
of steel reinforcement.(A) For Foundation concrete Forty Six
/ General purpose. (a) C. C. Nominal Mix, M-10 Only
ITEM NO :- 7 Providing temporary all weather
and fair weather drain diversion suitable for drain Rs. Two
water during the construction period of the Thousand
12 20.00 structure including all safty measures including 2012.89 Twelve & CM
red lamps/ signals at night for traffic etc. comp. Eighty Nine
Item No : - 8 Back filling the foundation trenches
around the structures etc with selected excavated
stuff including watering, ramming, compacting Rs. Thirty
13 56.00 etc. complete. (By Machinery) 36.90 Six & Ninety RMT
Item No :-9 Providing drone videography on the
occaion of function or for before/on going/after
completion of construction work including
dubbing , titeling etc. complete including cost of Rs. Four
14 1.00 cassette/CD ) 4000.00 Thousand CM
Rs. Twenty Eight Lacs Eighty Thousand Six Hundred Sixty one and Twenty Eight Paise Only
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender RS
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for
which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement
Consumption / 16 / CDate: 11/05/2017asstated in S.O.R. there fore in R.C.C. items where there is a change as per actual mix design the
cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the
Signeture of Contractor Deputy Executive Engineer
Drain Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 05 of 2026-27 online.pdf
1 Front Page.pdf
2 Notice Inviting online Tender.pdf
3.SBD-Documen .pdf
4 Item Technical Specification-.pdf
5. except item wise specification.pdf
9.1. Cemenr Consumption.pdf
9.2. BOQ.pdf
9.3. PE.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].