| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-Finance AT UPPER KULI JHARIA P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | ₹1.4 L | L1 | Accepted-Finance BEING L1 |
| 2 | L2₹1.4 LRejected-Finance H NO 47 GANDHI NAGAR DHANSAR NEAR BHATIA BUILDING SHIV MANDIR DHANBAD DHANBAD 826001 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826001 | ₹1.4 L | L2 | Rejected-Finance NOT BEING L1 |
| 3 | L3₹1.4 LRejected-Finance DHANBAD JHARKHAND 828111 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | ₹1.4 L | L3 | Rejected-Finance NOT BEING L1 |
| Sl No | Description | Qty | Unit | SHRI DURGA AUTOMOBILES L2 | Q-TECH SALES AND SERVICE L3 | S K AUTOMOBILE L1 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01 | Jobs to be done:
(A) JOBS TO BE DONE :-
SL.
NO. DESCRIPTION QNTY.
1- Gear Box Assly Complete Dismantling/Overhauling, Fitting. 1 No.
2- Gear Box Counter Shaft Welding, Repairing by Suitable Electrodes. 1 No.
3- Gear Box Chapa Welding & Repairing. 1 No.
4- Operator Cabin Door Complete Removing & Lock Cutting, Changing, Fitting & Door Setting. 2 Nos.
5- Front Side Air Steel Main Pipe Removing Broken Pipe Welding, Repairing, Fitting, Air Leakage Problem Rectifying. 1 Set.
6- Dismantling and Fitting of Complete Clutch Plate, Pressure Plate and Flywheel Assly. 1 Set.
7- Dismantling & Fitting Complete Engine Assly with Engine Mounting with Bolt & Bracket. 1 Set.
8- Dismantling & Fitting of Complete Hydraulic Pipe Lines, Air Pipe Lines 7 Diesel Pipe Lines. 1 No.
9- Radiator Hose Pipe & Clamp, Radiator Grill, Engine Bonnat Cover. 1 No.
10- Pump Coupling Assly. Complete Dismantling & Fitting. 1 No.
11- Pump Coupling Spiland Shaft Teeth Cutting, Welding, Fitting. 1 No.
12- Pump Coupling, U.J. Cross Kit & Yoke Flange Removing & Changing, Fitting. 2 Sets.
13- Engine Timing Plate Housing Removing & Gasket with Seal Changing, Fitting. 1 No.
14- Engine Tappet Cover Removing & Gasket Changing, Fitting. 1 No.
15- Engine Tappet Complete Adjusting, Setting. 1 Set.
(B) MATERIALS REQUIRES ITEMS :-
SL.
NO. DESCRIPTION QNTY.
1- Clutch Pressure Plate Assly. 1 No.
2- Clutch Release Bearing Assly. 1 No.
3- Clutch Release Bearing Hub. 1 No.
4- Clutch Plate Assly. 1 No.
5- Clutch Flywheel Assly. 1 No.
6- Gear Box Packing Kit. 1 Set.
7- Gear Box Roller Bearing. 4 Nos.
8- Gear Box Frok Rod. 4 Nos.
9- Gear Box T.H. Cover with Oil Seal. 1 Set.
10- Gear Box Back Gear Pinion Assly. 1 No.
11- Gear Box Shim. 1 Set.
12- Gear Box Housing Bolt. 6 Nos.
13- Gear Box 2nd/2 No. Gear Pinion. 1 No.
14- Gear Box 3rd/3 No. Gear Pinion. 1 No.
15- Gear Box Top Gear Pinion. 1 No.
16- Gear Box Main Gear Pinion 1st/1 No. 1 No.
17- Gear Box Oil Seal. 1 Pc.
18- Gear Box Goli Spring. 1 Set.
19- Operator Cabin Door Lock with Handle. 2 Sets.
20- Pump Coupling Teeth with Sleave. 1 Set.
21- Pump Coupling U.J. Cross Kit. 2 Sets.
22- Pump Coupling Yoke Assly. 1 No.
23- Pump Coupling Bolt, Nut, Washer. 6 Nos.
24- Engine Timing Plate Seal & Gasket. 1 Set.
25- Engine Timing Plate Gear Pinion. 1 No.
26- Engine Tappet Cover Gasket. 1 No.
27- Engine Tappet Rocker Liver. 2 Sets.
28- Engine Tappet Cover Bolt. 2 Nos.
Repairing work should be completed with all required materials and manpower. | 1 | Nos | 1,41,850 ₹1.4 L | 1,43,600 ₹1.4 L | 1,39,793 ₹1.4 L |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹1.4 L
EMD Value
₹1,747
Closing Date
7 May 2026, 11:00 amClosed
GENERAL MANAGER EXCAVATION KUSUNDA AREA
OFFICE OF THE GM KUSUNDA AREA VI
Repairing of Shakti Crane JH10CW 2049 work like complete gear assly, clutch system assly, overhauling, repairing, Engine timing housing dismantling and seal with gasket, pinion requires replacement fitting as well as requires pump coupling, UJ cross
2026_BCCL_358705_1
BCCL/KA-VI/EXC/E-TEN/26-27/05
Open Tender
Excavation Department Work
8 days
DOCP KUSAUNDA AREA VI
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,747
Yes
19 May 2026
24 Apr 2026
8 May 2026
24 Apr 2026
7 May 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Item Description/ Heading | ||||||
| 1.01 | Jobs to be done:
(A) JOBS TO BE DONE :-
SL.
NO. DESCRIPTION QNTY.
1- Gear Box Assly Complete Dismantling/Overhauling, Fitting. 1 No.
2- Gear Box Counter Shaft Welding, Repairing by Suitable Electrodes. 1 No.
3- Gear Box Chapa Welding & Repairing. 1 No.
4- Operator Cabin Door Complete Removing & Lock Cutting, Changing, Fitting & Door Setting. 2 Nos.
5- Front Side Air Steel Main Pipe Removing Broken Pipe Welding, Repairing, Fitting, Air Leakage Problem Rectifying. 1 Set.
6- Dismantling and Fitting of Complete Clutch Plate, Pressure Plate and Flywheel Assly. 1 Set.
7- Dismantling & Fitting Complete Engine Assly with Engine Mounting with Bolt & Bracket. 1 Set.
8- Dismantling & Fitting of Complete Hydraulic Pipe Lines, Air Pipe Lines 7 Diesel Pipe Lines. 1 No.
9- Radiator Hose Pipe & Clamp, Radiator Grill, Engine Bonnat Cover. 1 No.
10- Pump Coupling Assly. Complete Dismantling & Fitting. 1 No.
11- Pump Coupling Spiland Shaft Teeth Cutting, Welding, Fitting. 1 No.
12- Pump Coupling, U.J. Cross Kit & Yoke Flange Removing & Changing, Fitting. 2 Sets.
13- Engine Timing Plate Housing Removing & Gasket with Seal Changing, Fitting. 1 No.
14- Engine Tappet Cover Removing & Gasket Changing, Fitting. 1 No.
15- Engine Tappet Complete Adjusting, Setting. 1 Set.
(B) MATERIALS REQUIRES ITEMS :-
SL.
NO. DESCRIPTION QNTY.
1- Clutch Pressure Plate Assly. 1 No.
2- Clutch Release Bearing Assly. 1 No.
3- Clutch Release Bearing Hub. 1 No.
4- Clutch Plate Assly. 1 No.
5- Clutch Flywheel Assly. 1 No.
6- Gear Box Packing Kit. 1 Set.
7- Gear Box Roller Bearing. 4 Nos.
8- Gear Box Frok Rod. 4 Nos.
9- Gear Box T.H. Cover with Oil Seal. 1 Set.
10- Gear Box Back Gear Pinion Assly. 1 No.
11- Gear Box Shim. 1 Set.
12- Gear Box Housing Bolt. 6 Nos.
13- Gear Box 2nd/2 No. Gear Pinion. 1 No.
14- Gear Box 3rd/3 No. Gear Pinion. 1 No.
15- Gear Box Top Gear Pinion. 1 No.
16- Gear Box Main Gear Pinion 1st/1 No. 1 No.
17- Gear Box Oil Seal. 1 Pc.
18- Gear Box Goli Spring. 1 Set.
19- Operator Cabin Door Lock with Handle. 2 Sets.
20- Pump Coupling Teeth with Sleave. 1 Set.
21- Pump Coupling U.J. Cross Kit. 2 Sets.
22- Pump Coupling Yoke Assly. 1 No.
23- Pump Coupling Bolt, Nut, Washer. 6 Nos.
24- Engine Timing Plate Seal & Gasket. 1 Set.
25- Engine Timing Plate Gear Pinion. 1 No.
26- Engine Tappet Cover Gasket. 1 No.
27- Engine Tappet Rocker Liver. 2 Sets.
28- Engine Tappet Cover Bolt. 2 Nos.
Repairing work should be completed with all required materials and manpower. | - | Nos | - | - | BI01010001010000000000000515BI0100001113 |
| 7Total impact of GST for the purpose of CTC | ||||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_371577.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_371577.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid