Loading…
Loading…
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
10 Jul 2026, 3:00 pm2d left
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
Construction of RCC drain from Badaun Sugar Mill to Shiv Swayamvar Banquet Hall via Studio 11 in Ward-07 Bareilly Nagar.
2026_DOLBU_1166172_1
175/CE/CD/NNB/26-27 (1 To 7) Sr No 6 Tender List 7 Date-02.07.2026
Open Tender
Civil Works
180 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Bareillye-tender.com
₹3.4 L
4 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches. excluding royalty.( S.I. No.251) | 3,008 | CUM | 195 | ₹5,86,560 |
| 1.02 | Sand filling in plinth including supply of necessary quality of sand from a distance not exceeding 8 km. (5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc. rquired Rar proper completion of the work. (Rate is including Royality) | 150.4 | CUM | 760 | ₹1,14,304 |
| 1.03 | Cement concrete with 4 cm (1.5") gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P ete. required for proper completion of the work. | 150.4 | CUM | 7,000 | ₹10,52,800 |
| 1.04 | R.C.C In Sub Structure: Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana Ordinary Portland Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing. carriage for all leads; but excluding the cost of centering. shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | 225.6 | CUM | 7,611.57 | ₹17,17,170.19 |
| 1.05 | R.C.C In Sub Structure: Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana Ordinary Portland Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing. carriage for all leads; but excluding the cost of centering. shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | 442.84 | CUM | 7,382.86 | ₹32,69,425.72 |
| 1.06 | FORM WORK: Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. | 282 | SQM | 293.62 | ₹82,800.84 |
| 1.07 | Columns, Pillars, Piers, Abutments, Posts and Struts | 5,720.6 | SQM | 719.76 | ₹41,17,459.06 |
| 1.08 | Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504 | 655.91 | QTL | 8,870 | ₹58,17,921.7 |
| 1.09 | PVC Pipe 63mm for Weep hole | 282 | RM | 80 | ₹22,560 |
| 1.1 | Supply and laying of empty cement bags filled with local earth sand and carriage up to site of work including stiching loading and unloading stacking and also including supply of all material labour T&P required for proper completion of the work etc.as per direction of Engineer In charge. | 500 | EACH | 18 | ₹9,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 28.29 MB
BOQ_2187381.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid