Loading…
Loading…
Tender Value
₹5.6 L
EMD Value
₹5,620
Closing Date
25 Jun 2026, 5:00 pm
Executive officer
Vyasanagar municipality jajpur road
Construction of shed at Mahima Gosain Ashram in ward No- 26
2026_ORULB_131451_69
03/VNM/2026-27
Open Tender
Civil Works - Roads
90 days
vyasanagar municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹5,620
Yes
8 Jun 2026
8 Jun 2026
29 Jun 2026
8 Jun 2026
25 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in all kinds of soil up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site with all leads and lifts, T&P labour required for the work etc. complete as directed by the Engineer-In Charge | 2.3 | cum | 299.58 | ₹689.03 | 1 |
| 2 | Supplying and filling in foundation and plinth with sand including watering, ramming including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per direction of Engineer-In-Charge. | 0.51 | cum | 995 | ₹507.45 | 2 |
| 3 | Supplying all materials, labour, T&P and providing cement concrete(1:3:6) with 4cm size crusher broken black hard granite metal including watering, curing, conveyance of all materials to work site, payment of royalty taxes,contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge. | 0.51 | cum | 6,422.15 | ₹3,275.3 | 3 |
| 4 | Rigid and smooth centring, shuttering for RCC works including false work and dismantling them after casting including cost of materials complete.Column Base | 13.44 | sqm | 295.16 | ₹3,966.95 | 4 |
| 5 | Supplying all labour, materials ,T&P and providing Reinforced Cement concrete (1:1½:3) with crusher broken hard granite chips on 12mm size RCC works including cost of conveyance & royalty ,sundries , watering ,curing &lifting &laying concrete at a height of 5mtr. Maximum,contractor profit & labour cess complete etc all complete (Excluding cost of reinforcement & centering & shuttering) | 2.35 | cum | 8,656.84 | ₹20,343.57 | 5 |
| 6 | Supplying all materials, labour, T&P and providing M.S. reinforcement for Reinforced cement concrete work including cutting, bending, binding and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes ,contractor profit & labour cess etc all complete as per specification and direction of the Engineer-in-charge.(Ref AR-2006,Item RCC work Sl No.09,P-52) | 0.94 | Qntl | 8,330.99 | ₹7,831.13 | 6 |
| 7 | brick work (1:6) in cenet motrar (1:6) | 7.5 | Nos | 5,576 | ₹41,820 | 7 |
| 8 | Supplying all material labour T& P and Fixing vertified tiles dados 12mm thick ………… | 90 | sqm | 1,315.92 | ₹1,18,432.8 | 8 |
| 9 | 12mm thick cement plaster complete in all respect | 135 | sqm | 193.31 | ₹26,096.85 | 9 |
| 10 | providing two coat of weather coats with any approved shaded in cluding all respect | 135 | sqm | 193.31 | ₹26,096.85 | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.96 MB
Tendernotice_2.pdf
PDF • 1.48 MB
BOQ_595328.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid