Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-Finance | ₹1.0 L | L1 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | Ponnappn L1 |
|---|---|---|---|---|
| 1.00Newcut regulator | ||||
| 1.00 | OD10951/2025-2026:conveyance of the wooden shutters from storage shed at Irrigation subdivision office
to the regulator site including loading ,unloading, carefully stacking and all labour charges etc. complete. | 5.4 | cum | 314.69 ₹1,699.33 |
| 1.00 | OD10956/2025-2026:Fixing the wooden shutters carefully in the grooves of the regulator piers without any
damages to the shutters and grooves as per serially numbered in the shutters including all labour charges etc. complete(1m length and 0.37m height of shutter is considered as 1nos.). | 294 | 1 nos | 81.26 ₹23,890.44 |
| 1.00 | OD10953/2025-2026:Supplying and filling the puddle clay between wooden shutters for making the same
water tight including cost coveyance by both lorry and boat including all labour charges etc. complete. | 39.27 | cum | 608.29 ₹23,887.55 |
| 1.00 | OD10952/2025-2026:Removing the wooden shutters from the grooves of the regulators ,piers without any
damages to the shutters and care fully stacking including all labour charges etc.complete (1m length and 0.37m height of shutter is considered as 1nos.). | 294 | no | 29.81 ₹8,764.14 |
| 1.00 | OD10955/2025-2026:Conyeyance of wooden shutters from regulator site to the office store at
parappanangadi by lorry including loading, unloading care fully stacking and all labour charges etc.
complete. | 5.4 | cum | 314.69 ₹1,699.33 |
| 1.01 | OD10954/2025-2026:Removing puddle clay already filled in the gap between shutters of the regulators for
clearing the vent way including all labour charges etc. complete. | 39.27 | cum | 119.18 ₹4,680.20 |
| 2.00Poorapparamba lock | ||||
| 2.00 | OD10950/2025-2026:Engaging heavy man mazdoor for operating the shutter of the pooraparamba lock of old cut as per the direction of department officers at site | 20 | each | 1,199.36 ₹23,987.20 |
| 3.00Office compound | ||||
Tender Value
₹97,011
EMD Value
₹2,425
Closing Date
1 Nov 2025, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer O/o AEE Irrigation subdivision, Parappananagadi
GENERAL- Maintenance to Keeranellur New cut regulator and Pooraparamba lock of old cut in Parappanagadi Municipality-For the year 2025-26-General Civil Wor
2025_Irrig_810665_2
IRR/IA/TR/6197/2022_5_4_3/1
Open Tender
Civil Works - Others
300 days
New cut regulator, poorapparamba lock- Keeranellur
Please refer tender documents
10 documents required · 10 mandatory
₹555
₹2,425
Yes
6 Feb 2026
28 Oct 2025
3 Nov 2025
28 Oct 2025
1 Nov 2025
28 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1367056.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
NIT.pdf
Tender Documents • 0.03 MB
BOQ_1367056.xls
BOQ • 0.30 MB
SBD.pdf
Other Document • 1.63 MB
Download all tender documents and submit your bid