| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹47.6 LAdmitted-Finance | -0.50% | ₹47.6 L | L1 | Admitted-Finance |
| 2 | L2₹47.8 LAdmitted-Finance | +0.00% | ₹47.8 L | L2 | Admitted-Finance |
| 3 | L3₹49.2 LAdmitted-Finance NEW DELHI | NEW DELHI | DELHI | 110001 | +2.97% | ₹49.2 L | L3 | Admitted-Finance |
| 4 | L4₹50.1 LAdmitted-Finance | +4.75% | ₹50.1 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical HARIDWAR UTTARAKHAND 249407 INDIA UDYAM UK 06 0003350 | HARIDWAR | UTTARAKHAND | 249407 | - | - | - | Rejected-Technical As per tender committee recommnadtions |
Tender Value
Refer Docs
Closing Date
3 Feb 2026, 2:00 pmClosed
AGM WCS
ADM4
Day to Day Operation of Water works Activities in BHEL-Township, Haridwar
2026_BHEL_57294_1
BHEL/HEEP/WCS/25-26/202503431 Dt. 21.01.2026
Open Tender
Civil Works
365 days
BHEL
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
30 Mar 2026
21 Jan 2026
3 Feb 2026
21 Jan 2026
3 Feb 2026
21 Jan 2026
DAY TO DAY RESOLUTION OF COMPLAINTS PERTAINING TO SEWER CHOCKAGE FOR SEWER LINES UPTO 200MM DIA WHICH INCLUDES CLEANING THE SEWER LINE AND/OR MANHOLES IN ALL DEPTHS AND COMPLETE REMOVAL OF ALL THE OBSTRUCTIONS/BLOCKAGE ACCUMULATED SUCH AS SILT, SAND, DEBRIS AND ALL OTHER WASTES ETC. BY MEANS OF BLOCKAGE REMOVAL MACHINE/TOOLS ATTACHED WITH/WITHOUT SEWER CLEANING ROD ETC. AND DISPOSING THE SAME IN THE NEARBY LOW LEVEL AREAS OR AS PER DIRECTION OF ENGINEER-I/C. SCOPE ALSO INCLUDES, BUT NOT LIMITED TO, OPENING THE MANHOLE COVER, REMOVING ALL THE BLOCKAGE SUCH AS SILT, SAND, DEBRIS, ALL OTHER WASTES ETC., LIFTING, DISPOSING THE SAME IN THE NEARBY LOW LEVEL AREAS INCLUDING ALL LABOUR, TOOLS, REPOSITIONING THE MANHOLE COVER AFTER FINISHING THE JOB ETC. INCLUDING SUPPLY OF SAND AND/OR COARSE AGGREGATES BY THE CONTRACTOR FOR SATISFACTORY COMPLETION OF WORK AS PER DIRECTION OF ENGINEER-I/C THIS WORK ALSO INCLUDES RESOLUTION OF DAY TO DAY SEWER LINE LEAKAGE /REPAIR / CLEANING/ SURVEILLANCE RELATED COMPLAINTS OR JOB ASSIGNED BY ENGINEER I/C. THE JOB IS TO BE CARRIED OUT IN GENERAL SHIFT OF 8 HOURS? DURATION (I.E. 8AM TO 5PM) INCLUDING 1-HOUR LUNCH BREAK THROUGH 3 SEMISKILLED SEWER-MEN IN THE ABOVE SHIFT. WATER JET SEWER CLEANING MACHINE, RODDING MACHINE, CEMENT ETC. FOR THE JOB, AS PER REQUIREMENT, WILL BE ISSUED BY BHEL FREE OF COST.
DAY TO DAY RESOLUTION OF COMPLAINTS PERTAINING TO SEWER CHOCKAGE FOR SEWER LINES EXCEEDING 200MM DIA WHICH INCLUDES CLEANING THE SEWER LINE AND/OR MANHOLES IN ALL DEPTHS AND COMPLETE REMOVAL OF ALL THE OBSTRUCTIONS/BLOCKAGE ACCUMULATED SUCH AS SILT, SAND, DEBRIS AND ALL OTHER WASTES ETC. BY MEANS OF BLOCKAGE REMOVAL MACHINE/TOOLS ATTACHED WITH/WITHOUT SEWER CLEANING ROD ETC. AND DISPOSING THE SAME IN THE NEARBY LOW LEVEL AREAS OR AS PER DIRECTION OF ENGINEER-I/C. SCOPE ALSO INCLUDES, BUT NOT LIMITED TO, OPENING THE MANHOLE COVER, REMOVING ALL THE BLOCKAGE SUCH AS SILT, SAND, DEBRIS, ALL OTHER WASTES ETC., LIFTING, DISPOSING THE SAME IN THE NEARBY LOW LEVEL AREAS INCLUDING ALL LABOUR, TOOLS, REPOSITIONING THE MANHOLE COVER AFTER FINISHING THE JOB ETC. INCLUDING SUPPLY OF SAND AND/OR COARSE AGGREGATES BY THE CONTRACTOR FOR SATISFACTORY COMPLETION OF WORK AS PER DIRECTION OF ENGINEER-I/C THIS WORK ALSO INCLUDES RESOLUTION OF DAY TO DAY SEWER LINE LEAKAGE /REPAIR / CLEANING/ SURVEILLANCE RELATED COMPLAINTS OR JOB ASSIGNED BY ENGINEER I/C. THE JOB IS TO BE CARRIED OUT IN GENERAL SHIFT OF 8 HOURS DURATION (I.E. 8AM TO 5PM) INCLUDING 1-HOUR LUNCH BREAK THROUGH 3 SKILLED SEWER-MEN IN THE ABOVE SHIFT. WATER JET SEWER CLEANING MACHINE, RODDING MACHINE, CEMENT ETC. FOR THE JOB, AS PER REQUIREMENT, WILL BE ISSUED BY BHEL FREE OF COST.
PROVIDING DAY TO DAY ASSISTANCE IN STORE & MATERIAL HANDLING ACTIVIES, MAINTAINING OF DAILY COMPLAINTS RECORDS, RECORD KEEPING, FILE HANDLING ETC. THE JOB IS TO BE CARRIED OUT IN GENERAL SHIFT OF 8 HOURS DURATION (I.E. 8AM TO 5PM) INCLUDING 1-HOUR LUNCH BREAK
DAY TO DAY RESOLUTION OF WATER LINE COMPLAINTS INCLUDING REPAIR OF BURST IN GI/DI/CI PIPE LINE (BOTH S&S AND FLANGED) UPTO 150MM DIA IN TOWNSHIP AREA INCLUDING NECESSARY EXCAVATION, DEWATERING AND CARTAGE OF REQUIRED MATERIALS SUCH AS PIPES, SPECIALS PIG-LEAD AND FIRE WOOD ETC. SCOPE ALSO INCLUDES, BUT NOT LIMITED TO, DAY TO DAY WATER LINE LEAKAGE /DAMAGE / SURVEILLANCE RELATED COMPLAINTS OR JOB ASSIGNED BY ENGINEER I/C. WITH/WITHOUT CUTTING, THREADING, JOINTING AND REPLACEMENT OF DAMAGED PIPE, LEAD CAULKING, TESTING (LEAK PROOFING) AND REFILLING THE EXCAVATED EARTH AS PER DIRECTION OF THE ENGINEER I/C INCLUDING SUPPLY OF ALL LABOUR AND T&P ETC. REQUIRED FOR PROPER COMPLETION OF THE JOB. NORMALLY, THE JOB IS TO BE CARRIED OUT IN GENERAL SHIFT OF 8 HOURS? DURATION (I.E. 8AM TO 5PM) INCLUDING 1-HOUR LUNCH BREAK THROUGH 2 ASSISTANT-PLUMBER/FITTER IN THE SHIFT FOR WORKING IN BHEL TOWNSHIP AREA NOTWITHSTANDING ANY URGENCY AS ASSIGNED BY ENGINEER I/C. (ANY SPECIAL TOOLS, PIPE FITTINGS, PIG-LEAD SPAN-YARN, NUTS BOLTS, ADHESIVE, RUBBER GASKET ETC. WILL BE SUPPLIED FROM BHEL STORES FREE OF COST)
DAY TO DAY RESOLUTION OF WATER LINE COMPLAINTS INCLUDING REPAIR OF BURST IN GI/DI/C. I PIPE LINE (BOTH S&S AND FLANGED) EXCEEDING 150MM DIA IN TOWNSHIP AREA INCLUDING NECESSARY EXCAVATION, DEWATERING AND CARTAGE OF REQUIRED MATERIALS SUCH AS PIPES, SPECIALS PIG-LEAD AND FIRE WOOD ETC. SCOPE ALSO INCLUDES, BUT NOT LIMITED TO, DAY TO DAY WATER LINE LEAKAGE /DAMAGE / SURVEILLANCE RELATED COMPLAINTS OR JOB ASSIGNED BY ENGINEER I/C. WITH/WITHOUT CUTTING, THREADING, JOINTING AND REPLACEMENT OF DAMAGED PIPE, LEAD CAULKING, TESTING (LEAK PROOFING) AND REFILLING THE EXCAVATED EARTH AS PER DIRECTION OF THE ENGINEER I/C INCLUDING SUPPLY OF ALL LABOUR AND T&P ETC. REQUIRED FOR PROPER COMPLETION OF THE JOB. NORMALLY, THE JOB IS TO BE CARRIED OUT IN GENERAL SHIFT OF 8 HOURS? DURATION (I.E. 8AM TO 5PM) INCLUDING 1-HOUR LUNCH BREAK THROUGH 2 PLUMBER/FITTER IN THE SHIFT FOR WORKING IN BHEL TOWNSHIP AREA NOTWITHSTANDING ANY URGENCY AS ASSIGNED BY ENGINEER I/C. (ANY SPECIAL TOOLS, PIPE FITTINGS, PIG-LEAD SPAN-YARN, NUTS BOLTS, ADHESIVE, RUBBER GASKET ETC. WILL BE SUPPLIED FROM BHEL STORES FREE OF COST)
DAILY OPERATION OF 13 NO. TUBEWELLS & DOZING MACHINES THROUGH TIMED OPERATION OF PUMP-MOTOR SET, ROUND THE CLOCK MONITORING OF ALL TUBEWELLS & ASSOCIATED ELECTRIC PANELS, MAIN SWITCHES & WATER METER ALONG WITH MAINTAINING LOG-BOOKS FOR ALL TUBEWELL AND WATER METER WITH HISTORY SHEET OF BREAKDOWN ETC. AS PER DIRECTION OF ENGINEER-IN-CHARGE THE JOB IS TO BE CARRIED OUT 24X7 IN THREE SHIFTS OF 8 HOURS? DURATION NORMALLY THROUGH 3 PUMP-ASSISTANTS IN A DAY FOR OPERATING THE TUBEWELLS IN TOWNSHIP AREA I.E. 1 PUMP-ASSISTANT EACH SHIFT
DAILY OPERATION OF 2 NO. SEWAGE PUMPING HOUSES THROUGH TIMED OPERATION OF SEWAGE PUMP-MOTOR SET, ROUND THE CLOCK MONITORING OF ALL SEWAGE PUMP-MOTORS & ASSOCIATED ELECTRIC PANELS, MAIN SWITCHES, REFLUX VALES ETC. IN ALL RESPECTS ALONG WITH MAINTAINING LOG-BOOKS FOR ALL PUMP-MOTOR SETS WITH HISTORY SHEET OF BREAKDOWN ETC. AS PER DIRECTION OF ENGINEER-IN-CHARGE THE JOB IS TO BE CARRIED OUT 24X7 IN THREE SHIFTS OF 8 HOURS? DURATION NORMALLY THROUGH 3 PUMP ASSISTANTS IN A DAY FOR OPERATING THE SEWAGE PUMP HOUSES IN TOWNSHIP AREA I.E. 1 PUMP-ASSISTANT EACH SHIFT
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tendernotice_2.pdf
PDF • 35.08 MB
BOQ_61921.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid