Loading…
Loading…
Tender Value
₹75 L
EMD Value
₹1.4 L
Closing Date
29 Sept 2026, 6:00 pm
CWE Bareilly
HEADQUARTERS, COMMANDER WORKS ENGINEER, MILITARY ENGINEER SERVICES, STATION ROAD, BAREILLY CANTT, PIN 243001
CA NO.CWE BLY/ GE (E) /85 OF 2026-27MAINT AND REPAIR TO ROAD FURNITURE UNDER GE (EAST) BAREILLY
2026_MES_787208_1
8100/B/961/E8
Open Tender
Civil Works - Roads
Item Rate
270 days
Bareilly
As per NIT
6 documents required · 6 mandatory
₹1,000
GE (East) Bareilly
₹1.4 L
Yes
1 Sept 2026
1 Sept 2026
6 Oct 2026
1 Sept 2026
29 Sept 2026
22 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L to repair to potholes any depth, not exc 1sq m each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good by filling in screened & graded road metal, watering and well ramming (including supply of road metal) (including supply of raod metal) complete all as specified and directed. | 1 | 10 Sqm | -1 | - |
| 2 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area n exc 400 sqm but n. exc 50mm deep complete all as specified and directed. | 100 | 10 Sqm | -1 | - |
| 3 | M&L for preparing surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. and Applying evenly a priming/ tack coat with bituminous primer at 10 kg per 10 sq metre (Paving bitumen) complete all as specified and directed. | 120 | 10 Sqm | -1 | - |
| 4 | M&L for 100mm thick (compacted thickness) WBM with coarse aggregates of grading 1 (90 to 40mm size), spread, rolled and consolidated to gradient and camber required with 8 to 10 tonne power roller complete all as specified and directed. | 100 | 10 Sqm | -1 | - |
| 5 | M&L for Premix bituminous, macadam with binder content of 4% by weight of total mix using paving bitumen VG-30 grade, laid/rolled and compacted to required gradient and camber (consolidated thickness 75mm or less) complete all as specified and directed. Note :(i) Aggregates for Bituminous works shall confirm to clause No 20 B 2.5 of SSR 2009 Part- I (Specifications) with the following Constraints:- Aggregate passing 26.5 mm IS Sieve -100 % Aggregate passing13.20 mm IS Sieve -60% to 80% Aggregate passing 4.75 mm IS Sieve -20% to 30% Aggregate passing 2.36 mm IS Sieve -5% to 10% | 60 | Cum | -1 | - |
| 6 | M&L for preparing surfaces by brushing with wire brushes for removing caked mud from black top surface etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. and applying evenly a priming/ tack coat with bituminous primer at 5 kg per 10 sq metre using paving bitumen over Bitumin macadam portion complete all as specified and directed. | 1,000 | 10 Sqm | -1 | - |
| 7 | M&L for bituminous premix asphaltic semi dense concrete 30 mm consolidated thickness with 5.5% binder content of paving bitumen (VG-30 grade) by weight of total mix, rolled and compacted, mixed in mechanical hot mixed plant and premixed material, laid with mechanical paver finished including rolling to required camber and gradient complete with 8 to 10 tone power roller to required compaction complete all as specified and directed.
Note :(i) Design Mix for SDAC shall be carried out through an authorised testing lab and the cost of testing shall be included in quoted rate.
(ii) Aggregates for Bituminous works shall confirm to clause No 20 B 2.5 of SSR 2009 Part- I (Specifications) Note for item No. 5 & 7: Based on job mix formula, in case the binder content (i.e. Bitumen) is less than the content specified under these items then a minus adjustment @ Rs 40/- per kg of bitumen (less consumed) shall be applied on the quoted rate of contractor against these items, hence the quoted rate of contractor shall be reduced based on less content of bitumen required as per job mix formula. However, no price adjustment on plus side shall be made for increase of quantity of bitumen in case of required as per job mix formula. | 1,000 | 10 Sqm | -1 | - |
| 8 | Demolition of unreinforced cement concrete in ground floors and paving n.exc 15cm thickness (below or above ground level) complete all as specified and directed. | 78 | Cum | -1 | - |
| 9 | M&L for providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete all as specified and directed. | 6 | Cum | -1 | - |
| 10 | Removing and refixing of existing precast cement concrete kerb stone with alligenment and jointed in CM 1:4 including excavation of material complete all as specified as directed. | 80 | RM | -1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_882242.xls
BOQ • 0.24 MB
PS_85.pdf
Tender Documents • 1.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .