| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance 1ST FLOOR SIDHARTH TOWER BALTI KHARKHANA BYELNE S J ROAD ATHGAON GUWAHATI KAMRUP ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | ₹1.9 L | L1 | Accepted-Finance Financial Bid Qualified |
| 2 | L2₹1.9 LAccepted-Finance | ₹1.9 L | L2 | Accepted-Finance Financial Bid Qualified |
| 3 | L3₹1.9 LAccepted-Finance | ₹1.9 L | L3 | Accepted-Finance Financial Bid Qualified |
| 4 | L4₹1.9 LAccepted-Finance | ₹1.9 L | L4 | Accepted-Finance Financial Bid Qualified |
| 5 | L5₹2.0 LAccepted-Finance | ₹2.0 L | L5 | Accepted-Finance Financial Bid Qualified |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
9 Feb 2021, 12:00 pmClosed
E.E., E.T.D., Bareilly
Hydle Colony, Rampur Garden, Bareilly
REPLACEMENT OF VARIOUS EQUIPMENT TO ATTEND THE EMERGENCY BREKDOWN AT VARIOUS SUB STATIONS DURING THE PERIOD OF ONE YEAR UNDER ETD BAREILLY
2021_UPTCL_550419_1
E-Tender No. 11 ETD / (B) / 2020-21
Open Tender
Electrical Works
365 days
Bareilly
Please Refer In tender Documents
2 documents required · 2 mandatory
₹590
Yes
Ac No 0043002100037996, IFSC PUNB0004300
₹2,000
Yes
11 Feb 2021
1 Feb 2021
9 Feb 2021
1 Feb 2021
9 Feb 2021
1 Feb 2021
Amount
Replacement of various 220KV, 132KV and 33KV equipments under ETD, Bareilly along with other associated Works during the Period of 1 Year with all due care of Safety & Precautions, with all Cost of Men, Misc. Consumables, T&Ps etc. required for Satisfactory Completion of the Work as per Technical Specifications & Direction of the Supervising Engineer:
Replacement of defective/damaged 33KV VCB Installed at 220KV S/S C.B. Ganj, 132KV S/S Baeilly Town, 132KV Bareilly-II (Balipur), 132KV S/S Faridpur &132KV S/S Richha.
Dismantling of 33KV Damaged/Defective VCB Including shifting of dismantled VCB from switch yard to storage place/store room.
Modification of 33KV VCB foundation as per site requirement/as per manufacturing drawing or as per direction of supervising Engineer and shifting of earthing & both side jumper.
Erection of new 33KV VCB in proper alignment and cable Termination of circuit breaker as per logic for tripping /closing / spring charging / indication / supervision ckt with proper ferruling and checking out of breaker operation from Local / remote, including earthing and connection of both side jumpers and works related to complete the erection work. All required T&P, skilled labours, crane/Hydra etc. shall be arranged by the contractor at his own cost.
Replacement of 220KV CT/CVT/PT/LA with all cost of required T&P, skilled labours, crane / hydra etc. shall be arranged by the contractor at his own cost as per details below:-
Dismantling of 220 KV CT/CVT/PT after opening of its both side Jumpers, earthing, cable terminations etc. including shifting of dismantled material from site to store.
Erection of new 220 KV CT/CVT/PT/ including shifting of new 220KV CT/CVT/PT from store to site. The works also includes Jumpering from both side, earthing and cable termination.
Dismantling of 220 KV LA after opening of its Jumpers, earthing including shifting of dismantled material from site to store.
Erection of new 220 KV LA including shifting of new 220 KV LA from store to site. The works also includes Jumpering from both side, earthling and cable termination,
Dismantling of 220 KV PI including shifting of dismantled PIs from site to store.
Erection of 220 KV PI including shifting of new PIs from store to site.
Replacement of 132KV CT/PT/LA with all cost of required T&P, skilled labours, crane /hydra etc. shall be arranged by the contractor at his own cost as per details below:-
Dismantling of 132 KV CT/PT after opening of its both side Jumpers earthing cable terminations etc. including shifting of dismantled material from site to store.
Erection of new 132 KV CT/PT including shifting of new 132KV CT/PT from store to site. The works also includes Jumpering from both side, earthing and cable termination,
Dismantling of 132 KV LA after opening of its both side Jumpers earthing cable terminations etc. including shifting of dismantled material from site to store.
Erection of new 132 KV LA including shifting of new 132KV LA from store to site. The works also includes Jumpering from both side, earthing and cable termination,
Dismantling of control panels / line protection panel / Transformer control and relay Panel by opening of all the associated control cable termination and earthing & trip. Shifting of dismantled panel to store. The work also includes erection of required Panels, earthing of panel and all the associated cable terminations and shifting of new control panel from store to site and other associated work.
LOVEE ELECTRICALS
EMC Associates
LASHANI ENTERPRISES
M/s S.S. Refregeration
JBS ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf