EXECUTIVE ENGINEER
ENGINEERING SECTION ASSAM UNIVERSITY SILCHAR
Electrical Repairing and Shifting Of 500 KVA DTR From Behind Earth Science Department to New Proposed Location Near Boys Hostel-5 At Assam University Silchar.
2024_AUS_827538_1
Au/Engg/Maint/Elect-115/2024
Open Tender
Electrical Works
Works
45 days
ASSAM UNIVERSITY SILCHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Assam University Silchar
₹18,387
4 Oct 2024
24 Sept 2024
2 Oct 2024
24 Sept 2024
1 Oct 2024
24 Sept 2024
Amount
1C X120sqmm unarmored 1.1 KV grade Al cable
DTR cubical for 500 kVA DTRs comprising of requisite one no µP MCCB (1x800A) for incoming and three TM release MCCB (2X400A,1X250A) for outgoing , Static TVM , CT ,V-meter, A-meter, LED pilot lamp indicator complete with bus-bar etc.
GI earthing pipe 50mm dia 3m length ,3.15 mm thickness with perforated holes of 15 mm dia at 30 cm interval along the pipe
GI trip 25X3mm for DRT earthing
GI trip 50X6 mm for DRT neutral earthing
11 KV 400A GOAB switch cum horn type fuse set
Disc insulator (Poly) 70 KN (T&C)
Pin insulator poly 5 KN
LT pin insulator
LT Guy insulator
LT shackle insulator
GI 11 KV T Cross arm with angle size 50X50X6 mm
GI channel cross arm (100X50X6X2200)mm
GI channel cross arm (100X50X6X2800)mm
GI channel cross arm (100X50X6X3200)mm
LT angle cross arm (40X40X6X500)mm
11Kv 5KA LA (Line type Distribution class)
Transformer oil EHV grade insulating oil
H/W fitting for disc insulator T&C 70kN tension type
LT GI Shackle strap with bolts
DTR fencing as per REC standards specification complete with labour and materials.
Earth filling with river sand including watering leveling compacting grading etc including payment for forest royalty and other duties as per site condition and technical specification.
Grouting and muflerring of steel tubular pole as per specification and drawing with minimum planting depth of 2.15 mtr
Grouting and muflerring of 8.5 mtr pole as per specification and drawing with minimum planting depth of 1.5 mtr
Grouting of stay set with PCC and boulder
DTR fencing including all material complete with RCC footing beam ,brick wall etc as per specification Rates include all material and labour.
Transformer pad for 500 KVA distribution transformer complete
Supplying fitting and fixing of transformer bushing
Heat curing and tanking of transformer
Oil filter and filling after dehydration of transformer
Supplying fitting and fixing of transformer new gasket set complete
Cleaning, painting, varnishing of transformer tank both inside and outside
Testing ,inspection and commissioning of the 500 kV DTR including payment of statutory charges and handing over the DTR to the University for operation and maintenance complete as directed by the department
Supplying and erection of L.T. stay set complete (Galvanize with 19mm dia x1.8m long stay rod anchor plate of size 30cm x 30cm x 6.4 mm thimble stay clamps tube buckle (19mmx 60c 7/14 SWG dia G.I stay and strain insulation etc. in cement concrete 1:3:6:(1Cement:3Course sand: 6graded stone aggregate 40mm nominal size foundation including excavation and refilling etc. as required and as directed by the department.
Supplying and erection of H.T. stay set complete (Galvanize with 19mm dia x1.8m long stay rod anchor plate of size 30cm x 30cm x6.4 mm thimble stay clamps tube buckle (19mmx 60c 7/3.15 mm dia G.I stay and strain insulation etc. in cement concrete 1:3:6:(1Cement:3Course sand:6graded stone aggregate 40mm nominal size foundation including excavation and refilling etc. as required and as directed by the department.
Shifting of the 500 KVADTR from behind Earth Sc department to new location near Boys Hostel 05 Building at Assam University Silchar including following works:
Hire charge for 20 ton Hydra
Hiring of Man Power for preparing kaccha road and jungle cutting suitable of DTR shifting.
Disconnection of Electrical components and accessories
Reconnection of existing Electrical components and services
Lugs of required size and crimping complete as directed
SITC of 12 mtr HT MS pole complete with erection as directed by department.
SITC of 8.5 mtr HT MS pole complete with erection as directed by department.
Supplying and string up AAAC Racoon conductor in the existing P.S.C./ M.S/ Galvanized pole with binding etc. as required and as directed by the department. Directed by the department.
Any other SOR item based on APDCL SOR
PROTIMA TRADERS AND ELECTRICAL SHOP
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .