Loading…
Loading…
Tender ID
Tender Value
₹83.9 L
EMD Value
₹83,900
Closing Date
1 Apr 2026, 5:00 pmClosed
Deputy Commissioner, Gandhinagar Municipal Corporation (GMC), Gandhinagar
Supply and Laying of Ready-Mix Cementitious Material for Patch Work & Ready-Mix Grout Material under the jurisdiction of Gandhinagar Municipal Corporation (As and When Required on VariousRoads in Gandhinagar Municipal Area)- Annual Rates for Year 2025-26
289916
99/2025-26
Open
Civil - All
Works
Gandhinagar
3 documents required · 3 mandatory
₹2,832
Deputy Municipal commissioner Gandhinagar Municipal Corporation, Gandhinagar
₹83,900
25 Mar 2026
25 Mar 2026
25 Mar 2026
1 Apr 2026
25 Mar 2026
Name of Work:Supply and Laying of Ready-Mix Cemen ous Material for Patch Work & Ready-Mix Grout Material under the jurisdic on of Gandhinagar Municipal Corpora on
(As and When Required on Various Roads in Gandhinagar Municipal Area)- Annual Rates for Year 2025-26
Bill of Quantity
Rate (Including
Sr.No. Item Quantity Unit Amount
1% Labour Cess)
Supplying Cementitious Ready-Mix Patchwork Material for Asphalt/Concrete Road
Patch Work, including Government taxes and transportation up to 60 km lead,
1A with execution within three hours. Under the Jurisdiction of Gandhinagar 108286 K.G. 45
Municipal Corporation (As and When Required on Various Roads in Gandhinagar
Municipal Area) – Annual Rates for Year 2025-26
Providing Labour, Manpower, Machinery, and Safety Arrangements for laying and
compacting Ready-Mix Cementitious for Pothole Repair per KG.
Supplying of Cementitious Ready-Mix Slurry Material for damaged surface of
2A Asphalt/Concrete Road Repairing, including Government taxes and transportation 45078 K.G. 47
up to 60 km lead, with execution within three hours.
Rupee Eighty Three Lacs Eighty Nine Thousand Eight Hundred Forty Only
I/We am/are willing to carry out the work at……………………………… Above / Below ……………… percentage (should be written in figure and words)
*Estimated Amount *Estimated Amount
put to tender Rs.8389840.00
Deduct :…………% Below Add :………%Above
In Words …………………………………… In Words………………
(* Please strike out whichever is not applicable).
1 Contractor should quote rate in words & figure both.
2 The bidders should strictly note that rate will be fixed and firm. No escalation will be given during the maintenance period
3 The work should be carried out as per the terms and conditions laid down in the tender specification.
4 All replace material shall be return to department store by the contractor at his own cost.
5 Applicable GST Or Other Tax Shall be paid by Contractor As Applicable And It shall Be reimbarsed by Department On Submission of
6 The labour cess will be recovered as per prevailing rules i.e. 1% of Bill amount of tender as per Clause.
7 Testing of Materials shall be as per statement attached with specifications. The testing charges shall be paid by the Contractor.
8 All the Columns in Schedule should be filled in by ink and the total of the entries in the last columns should be struck by the contctor under
9 The Contctor shall exhibit a board with detailed specification and details of work as directed by the EngineerInCharge for which no ext
10 The contctor shall state even NIL percentage above / below if no deduction is offered.
11 Testing of Materials shall be as per statement attached with specifications. The testing charges shall be paid by the Contctor.
12 No advance payment on materials shall be made.
13 The labour cess will be recovered as per prevailing rules i.e. 1% of Bill amount of tender as per Clause78.
14 Above all the document should must be submitted online that will only valid no hand copy will entertained
15 Out of 100% testing 90% testing carried out in Govt. approved private LAB & 10% testing must be carried out in GERI.
16 To be continued on additional sheets, if found necessary.
17 Rate Excluding of GST. GST shall be paid extra.
18 For execution of work if any permission is required from any department, one liaison person shall be depute by contractor at his own cost.
19 This work is required to carried out in Developed Urban area & having lots of underground utilities like water supply lines, Gas lines,
20 During execution of work any accident if occurs on site to labour or public then it will be the fully responsibility of contractor only & GMC
21 Contractor is bound to follow all Govt labour existing laws & regulation and any changes in future.
GANDHINAGAR MUICIPAL
Contractor Signature CORPORATION,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Book Pot Hole Final.pdf
Schedule B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .