| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.1 LAccepted-AOC | ₹65.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹66.6 LRejected-AOC | ₹66.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹68.9 LRejected-Finance | ₹68.9 L | L3 | Rejected-Finance L3 |
| 4 | L4₹70.1 LRejected-Finance | ₹70.1 L | L4 | Rejected-Finance L4 |
| 5 | L5₹75.5 LRejected-Finance | ₹75.5 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | GK INFOTECH L3 | B A Rahiman L2 | MANZOOR KUNHAMOO L8 | Abdul Rahiman L1 | MUHAMAD RASHID K L6 | ANANDAN T L5 | B.M ABDUL RAHIMAN L4 | ABDUL KHADER FAIZAL A M L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00A | |||||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 297.11 | cum | 250 ₹74,277.50 | 243.66 ₹72,393.82 | 289.34 ₹85,965.81 | 237.9 ₹70,682.47 | 256.21 ₹76,122.55 | 261.54 ₹77,706.15 | 251.87 ₹74,833.10 | 276.18 ₹82,055.84 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 52 | cum | 120 ₹6,240 | 88.74 ₹4,614.48 | 105.38 ₹5,479.76 | 86.64 ₹4,505.28 | 93.31 ₹4,852.12 | 95.25 ₹4,953 | 91.73 ₹4,769.96 | 100.58 ₹5,230.16 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 149.46 | cum | 250 ₹37,366 | 215.71 ₹32,240.88 | 256.16 ₹38,286.70 | 210.62 ₹31,480.11 | 226.83 ₹33,902.92 | 231.55 ₹34,608.39 | 222.98 ₹33,327.48 | 244.5 ₹36,543.95 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 49.83 | cum | 5,200 ₹2.6 L | 5,373.21 ₹2.7 L | 6,380.69 ₹3.2 L | 5,246.34 ₹2.6 L | 5,650.08 ₹2.8 L | 5,767.62 ₹2.9 L | 5,554.23 ₹2.8 L | 6,090.38 ₹3.0 L |
| 1.00 | OD24914/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using
cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge.Cement content considered in this item is 330kg/cum. Excess or less cement used as per design mix is payable or recoverable separately.Excess/less cement used as per design mix is not payable/recoverable separately.
All work upto plinth level | 84.26 | cum | 7,400 ₹6.2 L | 7,375.87 ₹6.2 L | 8,758.84 ₹7.4 L | 7,201.71 ₹6.1 L | 7,755.93 ₹6.5 L | 8,076.28 ₹6.8 L | 7,624.36 ₹6.4 L | 8,360.34 ₹7.0 L |
| 1.01 | OD24915/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using
cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge.Cement content considered in this item is 330Kg/ cum. Excess/less
cement used as per design mix is not payable/recoverable seperately. - All work above plinth level upto floor V level | 89.27 | cum | 8,300 ₹7.4 L | 8,753.9 ₹7.8 L | 10,395.25 ₹9.3 L | 8,547.21 ₹7.6 L | 9,204.97 ₹8.2 L | 8,269.5 ₹7.4 L | 9,048.81 ₹8.1 L | 9,922.3 ₹8.9 L |
| 1.01 | 4.2.5:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | 4.08 | cum | 8,150 ₹33,227.55 | 7,511.49 ₹30,624.34 | 8,919.89 ₹36,366.39 | 7,334.13 ₹29,901.25 | 7,898.54 ₹32,202.35 | 8,062.83 ₹32,872.16 | 7,764.54 ₹31,656.03 | 8,514.06 ₹34,711.82 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 8,254.2 | kilogram | 75 ₹6.2 L | 76.15 ₹6.3 L | 90.42 ₹7.5 L | 74.35 ₹6.1 L | 80.07 ₹6.6 L | 81.74 ₹6.7 L | 78.71 ₹6.5 L | 86.31 ₹7.1 L |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 12,216.39 | kg | 75 ₹9.2 L | 76.15 ₹9.3 L | 90.42 ₹11.0 L | 74.35 ₹9.1 L | 80.07 ₹9.8 L | 81.74 ₹10.0 L | 78.71 ₹9.6 L | 86.31 ₹10.5 L |
Tender Value
₹92.5 L
EMD Value
₹50,000
Closing Date
10 Nov 2025, 5:00 pmClosed
The Exe.Engineer,PWD Building Division,Kasaragod
Office of the Exe.Engineer,PWD Building Division,Kasaragod
Kasaragod Development Package 2024 25 Infrastructure Development to GHS Kundamkuzhy in Bedaduka GP General Civil Work
2025_PWD_818148_1
PWD/BLDG/TR/8481/2023_5_1_1/1
Open Tender
Civil Works - Buildings
365 days
Kasaragod
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
26 Feb 2026
1 Nov 2025
13 Nov 2025
1 Nov 2025
10 Nov 2025
1 Nov 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1371015.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.63 MB
BOQ_1371015.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid