| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.0 CrAdmitted-Finance | -2.16% | ₹25.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹25.2 CrAdmitted-Finance | -1.25% | ₹25.2 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Reject |
| 4 | Rejected-Technical 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | - | - | - | Rejected-Technical Reject |
| 5 | Rejected-Technical 0 | - | - | - | Rejected-Technical Reject |
Updated dates
Tender Value
₹25.6 Cr
EMD Value
₹51.1 L
Closing Date
16 Jan 2026, 12:00 pmClosed
ce lda
CE, LUCKNOW DEVELOPMENT AUTHORITY
Construction of 24 m wide connecting road from Green Corridor roundabout to existing 45 m master plan road and from 45 m road to Sultanpur road
2025_LDAUP_1103164_1
199/E-Nivida/ce/25
Open Tender
Civil Works
365 days
CE LDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹59,000
SECRETARY LDA
₹51.1 L
Yes
Parijaat Hall, 2nd Floor, LDA, Lucknow.
13 Feb 2026
1 Jan 2026
17 Jan 2026
1 Jan 2026
16 Jan 2026
1 Jan 2026
5 Jan 2026
EARTHWORKS IN EMBANKMENTS BY TRANSPORTED EARTH 1) Earthwork in embankment by power transported earth with a lead up to 18km including excavation, loading, unloading cartage, royalty. mechanical compaction (up to 98.5% OMC), dressing and all lifts complete a) in all types of Soil-Borrow Area
CHUTE DRAINCHUTE DRAIN Construction of Chute Drain including all as per technical specification As per Drawing or Directed by Engineer In charge including cost of material, labour, T&P, etc complete( CHUTE DRAIN) a) M-15 grade in Foundation of Drainage chutes (0.09 Cum/Lm)
Construction of Chute Drain including all as per technical specification As per Drawing or Directed by Engineer Incharge including cost of material, labour, T&P', etc complete b) M-20 grade in Drainage chutes (0.251 Cum/Lm)
clearing and grubbing road land including uprooting rank vegetation, grass, bushes shrubs, saplings and trees girth up to 300mm,removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned ,up to a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness
providing, laying ,spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site ,laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density .
Plant Mix Method Construction of granular sub-base by providing close graded Material,mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom
providing and laying dense graded bituminous macadam with higher capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
providing and laying bituminous concrete with higher capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4% of mixed and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
construction of footpath/ separator by providing a 150mm compacted granular sub base as per clause 401 and 25mm thick cement concrete grade M15, over laid with precast concrete tiles in cement mortar 1:3 including provision of all drainage arrangements but excluding kerb channel
providing and erecting "W" metal beam crash barrier comprising of 3mm thick corrugated sheet metal beam rail 70cm above road/ ground level, fixed on ISMC series channel vertical post, 150X75X5 mm spaced 2 m center to center, 1.8 m high, 1.1 m below ground/ road level, all steel part and fitments to be galvanized by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150X75X5 mm 330 mm long complete as per clause 811
Construction of K.C. Drain with 1:2:4 C.C including 100 mm thick base concrete of 1:4:8 cement fine sand & 40 mm nominal size O.BB. and also including earth work in excavation in proper slop & Camber Including all labour, T & P etc. required for proper completion of work
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete
Wall painting with plastic emulsion paint of approved brand and no-manufacture to give an even shade: two or more coats on new work (Ist quality (Royal, Silk) Asian / Berger
Supply & Fixing of M S Delineator made of Mild steel with pure polyester powder coating with the minimum thickness of powder coating of not less than 40 micron for protection against corrosion. The surface should be concealed so that there should not be any exposed surface without powder coating. Alternatively, these metal guide poles can be concealed with thermoplastic body. The posts shall have an ellipsoidal or circular design with the height of the pole shall be 800 to 900 mm above the ground with about 200 to 300 mm base which can be anchored onto the ground. Mild steel Guide Poles shall conform to Type XI sheeting specifications as per IRC:67 up to date and ASTM D4956 which would ensure to obtain clear visibility of the road alignment during night time. The Retro reflective sheeting shall be tested for A certificate of having the sheeting tested for coefficient of retro reflection, daytime color and luminance, shrinkage, flexibility, liner removal, adhesion, impact resistance, specular gloss and fungus resistance, 3 years outdoor weathering and its having passed these tests shall be obtained from International/Government Laboratory / Institute by the manufacturer of the sheeting and in case the certificate is obtained from international condition, it should also be obtained from Indian condition within 3 years of launching of product by the manufacture in abroad. Alternatively, a certificate conforming to ASTM Specification (D4956-09) on artificial accelerated weathering requirements from a reputed laboratory in India can be accepted provisionally. In such a situation, the Employer / Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years outdoor weathering of the sheeting as per IRC 67 up to date & Proof of the same Report shall be uploaded with quoting tender. The rate shall include all materials, labour, T&P, transportation, installation and incidentals all complete as per direction of the Engineer-in-Charge.
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 grms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 upto date The finished surface to be level, uniform and free from streaks and holes. Material shall be tree from all skins, dirt and foreign objects and shall comply with requirements as per Table 800-9 of (MORTH SPECIFICATION) Thermoplastic Material when tested in accordance with ASTM D36/BS-3262-(Part 1) daylight Luminance shall be AASHTO M 249 for white 450-65% min. and for yellow 45% min. Drying time not more than 15 minutes, skin resistance not less than 45 as per BS-6044, material shall show no cracks on application to concrete blocks at Low Temperature. softening point 102.50C ± 9.50C as per ASTM D36 and yellowness index for white thermoplastic paint not more than 0.12 as per AASHTO M 249. Container of the thermoplastic material shall be clearly and indelibly marked with Name, Trade mark or other means of identification of manufacturer, Batch No., Date of manufacturer, Color, Maximum application temperature and maximum safe heating temperature. Glass beads shall meet the gradation requirement as per Table 800-10 of MORTH SPECIFICATION. The Glass beads shall have a minimum Reflective Index of 1.5 and 70% Roundness. The Pavement Temperature shall not be less than 100C during application of Hot thermoplastic paint. The Contractor shall furnish to the Engineer a copy of certified test reports from the manufacturer of the thermoplastic material/glass beads showing results of all test specified in MORTH SPECIFICATION and shall certify that the material meet all requirement of specification.
Providing and laying of hot applied thermoplastic compound 5 mm 2 thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 5 mm is exclusive of surface applied glass beads as per IRC:35 up to date. The finished surface to be level, uniform and free from streaks and holes. Free from streaks and holes and shall comply with requirements as per Table 800-9 of (MORTH SPECIFICATION) Thermoplastic Material when tested in accordance with ASTM D36/BS-3262-(Part 1) daylight Luminance shall be AASHTO M 249 for white 450-65% min and for yellow 45% min. Drying time not more than 15 minutes, skin resistance not less than 45 as per BS-6044, material shall show no cracks on application to concrete blocks at Low Temperature, softening point 102.50C ± 9.50C as per ASTM D36 and yellowness index for white thermoplastic paint not more than 0.12 as per AASHTO M 249. Container of the thermoplastic material shall be clearly and indelibly marked with Name, Trade mark or other means of identification of manufacturer, Batch No., Date of manufacturer, Color, Maximum application temperature and maximum safe heating temperature. Glass beads shall meet the gradation requirement as per Table 800-10 of MORTH SPECIFICATION. The Glass beads shall have a minimum Reflective Index of 1.5 and 70% Roundeess. The Pavement Temperature shall not be less than 100C during application of Hot thermoplastic paint. The Contractor shall furnish to the Engineer a copy of certified test reports from the manufacturer of the thermoplastic material/glass beads showing results of all test specified in MORTH SPECIFICATION and shall certify that the material meet all requirement of specification.
Supply and fixing of raised pavement marker with Made of Plastic body of RPM/ Road Stud shall be moulded from ASA (Acrylic Styrene Acrylonitrite) or HIPS (High-Impact Polystyrene) or Acrylonitrile Butadien Styrene (ABS) or Any other suitable material approved by the Engineer. The Marker shall support a load of 13,635 kg tested in accordance with ASTM D4280. The Reflective panels shall consist of number of lenses contatning single or dual prismatic cubes capable of providing total internal reflection of the light entring the lens face. Lenses shall be moulded of methyl methecrylate conforming to ASTM D788 or equivalent. The slop or retro-reflecting surface shall preferably be 35+/-5 degree to base and the area of each retro -reflecting surface shall not be less than 13.00 sq.cm. marker height shall not be less than 10 mm and shall not exceed 20 mm & Width shall not exceed 130 mm. The base of the marker shall be flat within 1.3 mm all road studs shall be legibly marked with the name, trade or other means of identification of the manufacture. epoxy installations, excess adhesive around the edge of the marker, excess adhesive on the pavement and adhesive on the exposed surfaces of the markers shall be immediately removed. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. In addition a two year warranty for satisfactory infield performance of the finished road marker shall also be given by the contractor who carries out the work of fixing of reflective road markers. In case the markers are displaced, damaged, get worn out or lose their reflectivity compared to stipulated standards, the contractor would be required to replace all such markers within 15 days of the intimation from the Engineer, at his own cost. The rate shall include all materials, labour, T&P, transportation, installation and incidentals all complete as per direction of the Engineer-in-Charge.
Flexible Median Marker (FMM) should be used for improving median visibility during dark hours. Use of Median Marker provides safety against collision happening with medians during night time or severe weather. Flexible Median Markers shall be provided with fluorescent yellow colour retro-reflective sheeting Type XI as per IRC:67 upto date. Flexible Median Marker shall be of tough, high impact resistant, injection-molded, thermoplastic body with property of flexibility to provide high durability 'and U shape structure having rebound / bounce back property. the sheeting shall be of Type XI conforming to IRC:67 upto date and it should be on both the faces whereby providing maximum reflectivity at longer distances with adequate durability. The logo of the manufacturer shall be embossed on either side of the body during the injection molding process. FMM shall be fixed by a combination of epoxy adhesive and grouting/drilling on concrete medians or properly constructed solid medians. Height: The marker height shall be a minimum of 180 mm. width 120 mm & Body Thickness: 6.5 mm. the shanks shall not be less than 20 mm and depth shall not be less than 30 rnm Reflective Area: Shall not be less than 90 cm square. Proof of the same Report shall be uploaded which quoting tender. The body of FMM shall bounce back to its original position of after 750 number of hits using pendulum of 1.8 kg conforming 40 ASTM D256 adhesion between the body and outer casing body of FMM shall with stand 50 kg f Tensile loads conforming to ASTM D638 method. The rate shall include all materials, labour, T&P, transportation, installation and incidentals all complete as per direction of the Engineer-in-Charge.
Supply & fixing of Acrylic Reflector Traffic Delineator System (AFT) Complete
providing and fixing of retro-reflectorised cautionary, mandatoryand Informatory sign as per IRC 67-2012 made of high intensity grade sheeting type-IV vide clause 801 3. fixed over aluminium sheeting 1.5mm thick supported on a mild steel angle iron post 75mmx75mmx8mm firmly fixed to the ground by means of property designed foundation with M15 grade cement concrete 45cmx45cmx60cm, 60cm below ground level as per approved drawing The Retro reflective sheeting shall be tested for a certificate of having the sheeting tested for coefficient of retroreflection, day time colour and luminance, shrinkage, flexibility, liner removal adhesion impact resistance, specular gloss and fungus resistance, 3 years out door weathering and its having passed these tests shall be obtained from International/ Government Laboratory/ institute by the manufacturer of the sheeting and in case the certificate is obtained from international condition, it should also be obtained from Indian condition within 3 years of launching of product by the manufacture in abroad. Alternatively, a certificate conforming to ASTM Specification (D4956-09)on artificial accelerated weathering requirements from a reputed laboratory in India can be accepted provisionally. In such a situation, the Employer/Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years out door weathering of the sheeting as per IRC67:2012 Legends, letters, numerais and border set should be as per MoRTH specification No-801.3.7 Proof of the same in form of government report shall be uploaded while quoting tender vii) 90 cm high octagon
providing and fixing of retro-reflectorised cautionary, mandatoryand Informatory sign as per IRC 67-2012 made of high intensity grade sheeting type-IV vide clause 801 3. fixed over aluminium sheeting 1.5mm thick supported on a mild steel angle iron post 75mmx75mmx8mm firmly fixed to the ground by means of property designed foundation with M15 grade cement concrete 45cmx45cmx60cm, 60cm below ground level as per approved drawing The Retro reflective sheeting shall be tested for a certificate of having the sheeting tested for coefficient of retroreflection, day time colour and luminance, shrinkage, flexibility, liner removal adhesion impact resistance, specular gloss and fungus resistance, 3 years out door weathering and its having passed these tests shall be obtained from International/ Government Laboratory/ institute by the manufacturer of the sheeting and in case the certificate is obtained from international condition, it should also be obtained from Indian condition within 3 years of launching of product by the manufacture in abroad. Alternatively, a certificate conforming to ASTM Specification (D4956-09)on artificial accelerated weathering requirements from a reputed laboratory in India can be accepted provisionally. In such a situation, the Employer/Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years out door weathering of the sheeting as per IRC67:2012 Legends, letters, numerais and border set should be as per MoRTH specification No-801.3.7 Proof of the same in form of government report shall be uploaded while quoting tender (ix) 50X60 cm Double faced single chevron
providing and fixing of retro-reflectorised cautionary, mandatoryand Informatory sign as per IRC 67-2012 made of high intensity grade sheeting type-IV vide clause 801 3. fixed over aluminium sheeting 1.5mm thick supported on a mild steel angle iron post 75mmx75mmx8mm firmly fixed to the ground by means of property designed foundation with M15 grade cement concrete 45cmx45cmx60cm, 60cm below ground level as per approved drawing The Retro reflective sheeting shall be tested for a certificate of having the sheeting tested for coefficient of retroreflection, day time colour and luminance, shrinkage, flexibility, liner removal adhesion impact resistance, specular gloss and fungus resistance, 3 years out door weathering and its having passed these tests shall be obtained from International/ Government Laboratory/ institute by the manufacturer of the sheeting and in case the certificate is obtained from international condition, it should also be obtained from Indian condition within 3 years of launching of product by the manufacture in abroad. Alternatively, a certificate conforming to ASTM Specification (D4956-09)on artificial accelerated weathering requirements from a reputed laboratory in India can be accepted provisionally. In such a situation, the Employer/Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years out door weathering of the sheeting as per IRC67:2012 Legends, letters, numerais and border set should be as per MoRTH specification No-801.3.7 Proof of the same in form of government report shall be uploaded while quoting tender (xi) 30X90 cm (Left/Right) Object Hazard
providing and fixing of retro-reflectorised cautionary, mandatoryand Informatory sign as per IRC 67-2012 made of high intensity grade sheeting type-IV vide clause 801 3. fixed over aluminium sheeting 1.5mm thick supported on a mild steel angle iron post 75mmx75mmx8mm firmly fixed to the ground by means of property designed foundation with M15 grade cement concrete 45cmx45cmx60cm, 60cm below ground level as per approved drawing The Retro reflective sheeting shall be tested for a certificate of having the sheeting tested for coefficient of retroreflection, day time colour and luminance, shrinkage, flexibility, liner removal adhesion impact resistance, specular gloss and fungus resistance, 3 years out door weathering and its having passed these tests shall be obtained from International/ Government Laboratory/ institute by the manufacturer of the sheeting and in case the certificate is obtained from international condition, it should also be obtained from Indian condition within 3 years of launching of product by the manufacture in abroad. Alternatively, a certificate conforming to ASTM Specification (D4956-09)on artificial accelerated weathering requirements from a reputed laboratory in India can be accepted provisionally. In such a situation, the Employer/Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years out door weathering of the sheeting as per IRC67:2012 Legends, letters, numerais and border set should be as per MoRTH specification No-801.3.7 Proof of the same in form of government report shall be uploaded while quoting tender (iii)60 cm Circular with definition plate (20cm X 60cm)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.79 MB
BOQ_2034304.xls
BOQ • 0.30 MB
vol-3.pdf
Tender Documents • 1.95 MB
vol-2.pdf
Tender Documents • 1.23 MB
vol-1.pdf
Tender Documents • 2.32 MB
Download all tender documents and submit your bid