| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.9 LAccepted-AOC | ₹17.9 L Quoted ₹13.9 L | 1 | Accepted-AOC L1 Bidder for Package-I |
| 2 | 2₹10.7 L+₹2.9 L (20.7%)Accepted-AOC PLOT NO 3 FIRST FLOOR SARHAUL OPP HIPA SECTOR 18 GURUGRAM 122001 HARYANA | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹10.7 L+₹2.9 L (20.7%) Quoted ₹16.8 L | 2 | Accepted-AOC L1 Bidder for Package-III |
| 3 | 3₹18.5 L+₹6.5 L (46.7%)Accepted-AOC CF 394 SECTOR I SALT LAKE CITY KOLKATA NORTH 24 PARGANAS WEST BENGAL 700064 | 24 PARAGANAS NORTH | WEST BENGAL | 700064 | ₹18.5 L+₹6.5 L (46.7%) Quoted ₹20.4 L | 3 | Accepted-AOC L1 Bidder for Package-II |
| 4 | 4₹23.8 L+₹9.9 L (71.3%)Rejected-AOC | ₹23.8 L+₹9.9 L (71.3%) | 4 | Rejected-AOC NOT L1 BIDDER |
| 5 | 5₹29.3 L+₹15.4 L (110.9%)Rejected-AOC 7 SRISTIDHAR DUTTA LANE HATIBAGAN HATIBAGAN KOLKATA WEST BENGAL 700006 | KOLKATA | WEST BENGAL | 700006 | ₹29.3 L+₹15.4 L (110.9%) | 5 | Rejected-AOC NOT L1 BIDDER |
Tender Value
₹48.4 L
EMD Value
₹48,365
Closing Date
16 Feb 2023, 2:00 pmClosed
GM HIGHWAY
General Manager HW RITES Ltd, Highway Division 4th Floor, RITES BHAWAN, Plot No. 1 Sector 29, Gurgaon, Haryana 122001
Geotechnical Investigation and Material Investigation for Preparation of DPR for Roads, Elevated Roads and Flyovers in Guwahati and Silchar Package I, II and III
2023_RITES_144482_1
RITES/HW/GUWAHATI/ GEOTECH/2023
Limited
Consultancy
Item Rate
60 days
Guwahati and Silchar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
Yes
RITES LTD
₹48,365
Yes
6 Feb 2024
7 Feb 2023
17 Feb 2023
7 Feb 2023
16 Feb 2023
8 Feb 2023
Amount
Mobilization & Demobilization of hydraulic rotary drilling machines, platforms for drilling offshore boreholes, equipments, samples, tools and plants along with & accessories, materials, labour, supervisor etc. including shifting of equipments & accessories from one location to other both in land as well as in water i) The agency shall also engage a boat/launch for movement of the supervisors and technical officers to the offshore platform. (ii) Sufficient lighting arrangement shall also to be made for boring works to be conducted during evening hours. (iii) Digital photography during boring works and during in-situ testing are included.
Geo-technical Investigations for Bridges/Flyovers/ ROBs etc. including testing
Boring in all types of soil including sampling and testing
Boring in all types of rock including sampling and testing
Pit investigation & testing along the existing road alignment
Excavation of Pit (approx. 1.0m x 1.0m up to sub-grade level at identified locations conducting along the existing alignment recording pavement composition details, Conducting Field Dry Density test of Existing Subgrade, Field Moisture Content, collection of sub-grade soil samples and laboratory tests (Unsoaked & Soaked CBR at Three Energy Levels), Modified Proctor Test)
Investigation and Testing for Road Construction Materials
Carry out all laboratory tests on soil/ flyash samples as per Technical Specifications Clause-B.
Carry out all laboratory tests on granular material/ GSB samples as per Technical Specifications Clause-B.
Conducting all laboratory tests on Stone Aggregate samples as per Technical Specifications Clause-B.
Conducting all laboratory tests on Sand samples as per Technical Specifications Clause-B.
Conducting all laboratory tests on water samples as per Technical Specifications Clause-B.
Description of Work / Item(s)
Amount
Mobilization & Demobilization of hydraulic rotary drilling machines, platforms for drilling offshore boreholes, equipments, samples, tools and plants along with & accessories, materials, labour, supervisor etc. including shifting of equipments & accessories from one location to other both in land as well as in water i) The agency shall also engage a boat/launch for movement of the supervisors and technical officers to the offshore platform. (ii) Sufficient lighting arrangement shall also to be made for boring works to be conducted during evening hours. (iii) Digital photography during boring works and during in-situ testing are included.
Geo-technical Investigations for Bridges/Flyovers/ ROBs etc. including testing
Boring in all types of soil including sampling and testing
Boring in all types of rock including sampling and testing
Pit investigation & testing along the existing road alignment
Excavation of Pit (approx. 1.0m x 1.0m up to sub-grade level at identified locations conducting along the existing alignment recording pavement composition details, Conducting Field Dry Density test of Existing Subgrade, Field Moisture Content, collection of sub-grade soil samples and laboratory tests (Unsoaked & Soaked CBR at Three Energy Levels), Modified Proctor Test)
Investigation and Testing for Road Construction Materials
Carry out all laboratory tests on soil/ flyash samples as per Technical Specifications Clause-B.
Carry out all laboratory tests on granular material/ GSB samples as per Technical Specifications Clause-B.
Conducting all laboratory tests on Stone Aggregate samples as per Technical Specifications Clause-B.
Conducting all laboratory tests on Sand samples as per Technical Specifications Clause-B.
Conducting all laboratory tests on water samples as per Technical Specifications Clause-B.
Description of Work / Item(s)
Amount
Mobilization & Demobilization of hydraulic rotary drilling machines, platforms for drilling offshore boreholes, equipments, samples, tools and plants along with & accessories, materials, labour, supervisor etc. including shifting of equipments & accessories from one location to other both in land as well as in water i) The agency shall also engage a boat/launch for movement of the supervisors and technical officers to the offshore platform. (ii) Sufficient lighting arrangement shall also to be made for boring works to be conducted during evening hours. (iii) Digital photography during boring works and during in-situ testing are included.
Geo-technical Investigations for Bridges/Flyovers/ ROBs etc. including testing
Boring in all types of soil including sampling and testing
Boring in all types of rock including sampling and testing
Pit investigation & testing along the existing road alignment
Excavation of Pit (approx. 1.0m x 1.0m up to sub-grade level at identified locations conducting along the existing alignment recording pavement composition details, Conducting Field Dry Density test of Existing Subgrade, Field Moisture Content, collection of sub-grade soil samples and laboratory tests (Unsoaked & Soaked CBR at Three Energy Levels), Modified Proctor Test)
Investigation and Testing for Road Construction Materials
Carry out all laboratory tests on soil/ flyash samples as per Technical Specifications Clause-B.
Carry out all laboratory tests on granular material/ GSB samples as per Technical Specifications Clause-B.
Conducting all laboratory tests on Stone Aggregate samples as per Technical Specifications Clause-B.
Conducting all laboratory tests on Sand samples as per Technical Specifications Clause-B.
Conducting all laboratory tests on water samples as per Technical Specifications Clause-B.
XPLORER Consultancy Services Pvt Ltd
FARGO CONSULTANTS PVT. LTD.
Avante Engineers
Constell Consultants Pvt. Ltd.
FARGO CONSULTANTS PVT. LTD.
Avante Engineers
Constell Consultants Pvt. Ltd.
XPLORER Consultancy Services Pvt Ltd
XPLORER Consultancy Services Pvt Ltd
Avante Engineers
FARGO CONSULTANTS PVT. LTD.
Constell Consultants Pvt. Ltd.
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .