| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.0 LAccepted-AOC AT JHINITISASAN PO JHINITISASAN PS BALIPATNA DIST KHORDHA PIN 752100 | JHINITISASAN | KHORDHA | ODISHA | 752100 | ₹14.0 L | 1 | Accepted-AOC Lottery |
| 2 | 3₹14.0 LRejected-Finance | ₹14.0 L | 3 | Rejected-Finance Lottery |
| 3 | 3₹14.0 LRejected-Finance AT ALISHISHASAN PO DARADA PS BALIPATNA DIST KHURDA | KHORDHA | ODISHA | 751001 | ₹14.0 L | 3 | Rejected-Finance Lottery |
| 4 | 4₹14.0 LRejected-Finance | ₹14.0 L | 4 | Rejected-Finance Lottery |
| 5 | 4₹14.0 LRejected-Finance | ₹14.0 L | 4 | Rejected-Finance Lottery |
Tender Value
₹14.0 L
EMD Value
₹13,981
Closing Date
11 Jun 2026, 5:00 pmClosed
BLOCK DEVELOPMENT OFFICER BALIPATNA
BALIPATNA
CONST OF ADDITIONAL CLASSROOM AT GOVT UPS MUKUNDADASPUR
2026_PRBLP_128280_1
1/BPS/2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
MUKUNDADASPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹13,981
Yes
18 Aug 2026
25 May 2026
12 Jun 2026
25 May 2026
11 Jun 2026
4 Jun 2026
25 May 2026 - 8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in hard soil within initial lead and lift as per direction of the Engineer-in-charge | 60.21 | 100cum | 1 | ₹60.15 |
| 2 | Sand filling in foundation and plinth including cost of all material, labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charge. | 45.22 | cum | 595.54 | ₹26,930.32 |
| 3 | Providing & laying plain cement concrete (1:3:6) using 4cm size metal etc. complete including all labour, materials & royality etc. complete as per direction of EIC. | 12.33 | cum | 6,295.89 | ₹77,628.32 |
| 4 | Brick work with Fly Ash bricks 25cm x 12cm x 9cm size having crushing strength not less than 35 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and plinth etc complete. | 11.1 | cum | 5,614.89 | ₹62,325.28 |
| 5 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.Column & Base footing | 11.06 | cum | 6,733.27 | ₹74,469.97 |
| 6 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.Column s\s | 4.74 | cum | 15,996.18 | ₹75,821.89 |
| 7 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.Plinth beam | 5.53 | cum | 7,603.61 | ₹42,047.96 |
| 8 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.lintel band | 1.35 | cum | 14,396.68 | ₹19,435.52 |
| 9 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.Chajja | 0.79 | cum | 19,257.17 | ₹15,213.16 |
| 10 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja etc including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.Roof beam | 5.53 | cum | 15,996.18 | ₹88,458.88 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_592139.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_592139.xls
BOQ • 0.25 MB
DTCN.pdf
Tender Documents • 1.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].