Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr Quoted ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 Cr+₹33,155.80 (0.23%)Rejected-AOC | ₹1.5 Cr+₹33,155.80 (0.23%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.5 Cr+₹65,442.01 (0.44%)Rejected-AOC | ₹1.5 Cr+₹65,442.01 (0.44%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.5 Cr+₹2.9 L (2.00%)Rejected-AOC | ₹1.5 Cr+₹2.9 L (2.00%) | L4 | Rejected-AOC L4 |
| 5 | L5₹1.5 Cr+₹5.2 L (3.50%)Rejected-AOC | ₹1.5 Cr+₹5.2 L (3.50%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | DAVIS ANTO P L1 | Vijaykumar P L5 | N J THOMAS L6 | Ceeyech Construction Private Limited L2 | ELIAS SUNNY L4 | PYNADATH VARGHESE STEPHEN L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00detailed estimate | |||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 715.63 | cum | 310 ₹2,21,845.92 | 323.7 ₹2,31,650.08 | 350 ₹2,50,471.2 | 313.46 ₹2,24,322.01 | 300 ₹2,14,689.6 Lowest | 314.14 ₹2,24,808.64 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 42.12 | cum | 6,947 ₹2,92,593.75 | 7,139.6 ₹3,00,705.67 | 6,950 ₹2,92,720.1 | 6,912.72 ₹2,91,149.94 Lowest | 7,200 ₹3,03,249.6 | 6,927 ₹2,91,751.39 |
| 1.00 | OD123338/2025-2026:
Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20 cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 7.34 | cum | 5,976 ₹43,857.86 | 6,148 ₹45,120.17 | 6,900 ₹50,639.1 | 5,952.66 ₹43,686.57 Lowest | 6,400 ₹46,969.6 | 5,965.63 ₹43,781.76 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 548.4 | cum | 275 ₹1,50,811.1 | 286.6 ₹1,57,172.59 | 650 ₹3,56,462.6 | 277.51 ₹1,52,187.59 | 250 ₹1,37,101 Lowest | 278.12 ₹1,52,522.12 |
| 1.00 | OD14684/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering ,shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve work ability without impairing strength and durability as per direction of Engineer - in - charge. Note: Cement content considered in this item is @ 330kg@cum. Cement content obtained as per mix design shall be no additional payment for the excess cement used as per designed mix separately as per circular number CE/BL/GL/2015,Dtd:30.08.2017 of CE,BLDS, All work upto plinth level | 170.28 | cum | 9,530 ₹16,22,806.52 | 9,800.6 ₹16,68,885.37 | 11,500 ₹19,58,266 | 9,489.17 ₹16,15,853.82 Lowest | 10,000 ₹17,02,840 | 9,509.86 ₹16,19,377 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 15,325.56 | kilogram | 97 ₹14,86,579.32 Lowest | 101.1 ₹15,49,414.12 | 99.8 ₹15,29,490.89 | 97.97 ₹15,01,445.11 | 98 ₹15,01,904.88 | 98.19 ₹15,04,816.74 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 159.44 | sqm | 337 ₹53,731.95 | 347.5 ₹55,406.1 | 350 ₹55,804.7 | 336.5 ₹53,652.23 Lowest | 350 ₹55,804.7 | 337.23 ₹53,768.63 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 978.72 | sqm | 671 ₹6,56,719.11 | 686.5 ₹6,71,889.22 | 550 ₹5,38,294.35 Lowest | 664.77 ₹6,50,621.7 | 700 ₹6,85,101.9 | 666.22 ₹6,52,040.84 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 509.07 | sqm | 880 ₹4,47,986 | 907.6 ₹4,62,036.47 | 620 ₹3,15,626.5 Lowest | 878.85 ₹4,47,400.56 | 850 ₹4,32,713.75 | 880.77 ₹4,48,377.99 |
Tender Value
₹1.7 Cr
EMD Value
₹50,000
Closing Date
30 Sept 2025, 11:30 amClosed
Superintending Engineer
O/O Superintending Engineer,PWD Buildings Thrissur
Construction of Eriyad Grama Panchayath building-
2025_PWD_799214_1
PWD/BLDG/TR/6841/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
540 days
Eriyad
Please refer Tender documents.
12 documents required · 12 mandatory
₹6,508
Yes
₹50,000
Yes
4 Nov 2025
20 Sept 2025
3 Oct 2025
20 Sept 2025
30 Sept 2025
20 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .