Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-AOC | ₹19.3 L | L1 | Accepted-AOC being L1 accepted |
| 2 | L2₹20.1 LRejected-AOC | ₹20.1 L | L2 | Rejected-AOC being L2 rejected |
| Sl No | Description | Qty | Unit | K.S Ansar L2 | Panmana Labour Contract Co-operative Society L1 |
|---|---|---|---|---|---|
| 1.00Appendix-A-Surface clearing and Providing Grill for resting shed | |||||
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 537 | sqm | 130 ₹69,810 | 127 ₹68,199 |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 100 | sqm | 80 ₹8,000 | 71 ₹7,100 |
| 1.00 | 9.48.2:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to openings/ wooden frames with rawl plugs screws etc | 1,080 | kg | 240 ₹2.6 L | 234 ₹2.5 L |
| 1.00 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 36 | sqm | 250 ₹9,000 | 238 ₹8,568 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,633 | kilogram | 105 ₹1.7 L | 106 ₹1.7 L |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 93.2 | sqm | 380 ₹35,416 | 365 ₹34,018 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 16.33 | cum | 10,400 ₹1.7 L | 9,942 ₹1.6 L |
| 2.00Appendix-B-GSB Laying and band concrete around interlock | |||||
| 2.00 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil. | 53.7 | cum | 2,600 ₹1.4 L | 2,354 ₹1.3 L |
Tender Value
₹20.3 L
EMD Value
₹50,000
Closing Date
1 Nov 2025, 1:00 pmClosed
Executive Engineer
Office of the Executive Engineer Harbour Engineering Division Kollam
GENERAL-Expansion and Major additions to Coastal Infrastructure- -Providing Interlock around Ice Plant and waiting Shed at Neendakara Fishing harbour-General Civil Work
2025_HED_814465_1
HED/CEHED/TR/114/2025
Open Tender
Civil Works - Others
120 days
Neendakara Fishing harbour
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹50,000
Yes
17 Feb 2026
24 Oct 2025
3 Nov 2025
24 Oct 2025
1 Nov 2025
24 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1362448.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
viewsbd.pdf
Tender Documents • 2.34 MB
BOQ_1362448.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid