| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.7 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹16.0 L+₹24,230.07 (1.54%)Rejected-Finance 45 MOH ASDULLAPUR TEHSIL MILAK RAMPUR UTTAR PRADESH 243701 | 243701 | 2 | Rejected-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹16.2 L
EMD Value
₹32,310
Closing Date
21 Apr 2026, 5:00 pmClosed
Executive Officer
Nagar Palika Parishad Rampur
Construction of Hall and toilet on first floor in Moh chadarwala bagh ward no-18 Rampur
2026_DOLBU_1132144_16
3093/NPP/ET/RAMPUR/2026
Open Tender
Civil Works
Percentage
90 days
Rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
Eo
₹32,310
8 Jun 2026
1 Apr 2026
22 Apr 2026
1 Apr 2026
21 Apr 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per S.I. No. 251. | - | Cum | - | - |
| 2 | Cement concrete with 4cm gauge approved stone ballast, approved fine sand, cement in the proportion 8:4:1 including supply of all materials, labour and tools and plants etc. required for proper completion of the work. SI No. 281 | - | Cum | - | - |
| 3 | M-150 brick work in One part cement and Six part Fine sand in foundation and plinth including supply of all materials, labour & T&P required for proper completion of work as per SI.No. 303 | - | Cum | - | - |
| 4 | M-150 brick work in One part cement and Six part Fine sand in superstructure including supply of all materials, labour & T&P required for proper completion of work as per SI.No. 303 & 310. | - | Cum | - | - |
| 5 | 12 mm thick plaster with cement and approved course sand in proportion 1:4 over brick work minimum thickness not to be less than 1 cm including supply of all materials labour and T&P etc. required for proper completion of the work SI.NO. 584 | - | Sqm | - | - |
| 6 | Cement concrete with 4cm gague approved stone ballast coarse sand and cement in proporation of 4:2:1 but with 2cm gaguge stone gritt instead of 4cm gauge stone ballast inculding supply of all materials labour and T&P etc for proper completion of work.As par S.I No-279A Ch.-05 | - | Sqm | - | - |
| 7 | R.C.C raft foundation work in with cement approved coarse sand and 4Cm gauge approved stone grit in proporation of 1:1.5:3 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. | - | Cum | - | - |
| 8 | R.C.C lighter beam having spans upto 6M work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:2:4 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. | - | Cuum | - | - |
| 9 | R.C.C work in T-beam Slab Roof with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:1.5:3 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. | - | Cum | - | - |
| 10 | R.C.C work in Columns in 1:1.5:3 with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.39 MB
BOQ_2113082.xls
BOQ • 0.40 MB
16.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .