Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-AOC | L1 | Accepted-AOC Qualified | |
| 2 | L2₹15.9 L+₹14,942.12 (0.95%)Rejected-Finance LAXMANPUR CHOWK VIKASNAGAR DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | L2 | Rejected-Finance not qualified | |
| 3 | L3₹16.7 L+₹1.0 L (6.47%)Rejected-Finance | L3 | Rejected-Finance not qualified |
Tender Value
₹15.8 L
EMD Value
₹47,500
Closing Date
14 Mar 2023, 12:00 pmClosed
SE EDC Srinagar Garhwal
SE EDC Srinagar Garhwal
Construction work of 11KV line on turnkey basis for Kandarsyun pumping peyjal scheme under EDD Pauri in Deposit head
2023_UPCL4_55612_1
Tender no.39/EDC(s)/2022-23
Open Tender
Electrical Works
Turn-key
180 days
work
Construction work of 11KV line on turnkey basis for Kandarsyun pumping peyjal scheme under EDD Pauri in Deposit head
3 documents required · 3 mandatory
₹1,180
Yes
EE ETD Srinagar Garhwal
₹47,500
Yes
27 Jul 2023
2 Mar 2023
15 Mar 2023
2 Mar 2023
14 Mar 2023
2 Mar 2023
Amount
ST Pole bottom portion hot dip
ACSR Rabbit Conductor
11 KV Polymer Pin Insuator with Pin
11 KV Polymer Disc Insulator (B&S) type
11 KV Disc fitting 45 KN
Stay Set GI 16x1800mm
Stay wire GI 7/3.15mm 7/10SWG
Earthing Rod MS 20x2500mm
MS Channel 100x50mm
MS Angle 65x65x6mm
MS Angle 75x75x6 mm
Gi wire 5mm 6 SWG
GI wire 5mm 10 SWG
Earth wire GI 7/1.6mm 16 SWG
Cable AL 3x70 sqmm XLPE 11KV
11 KV Cable jointing kit 3x70 sqmm Indoor type
11KV pilfer resistance metering cubical
11 KV Cable jointing kit 3x70 sqmm Outdoor type
Electronic static TVM 11KV RS-232 Port
11KV Gang operating 400A GO Switch
PP clamp SP-23 with N&B
E/W clamp ST Pole SP-23 with N&B
Stay Clamp SP-23 with N&B
Earth clamp for ST Pole SP-23 with N&B
Bracing Clamp for ST Pole SP-23 upper side with N&B
Bracing Clamp for ST Pole SP-23 lower side with N&B
N&B off size
Labour
Excavation of earth for pole of size 0.90x0.60x1/6 of pole length for erection of ople in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil.
Erection of following pole in proper level and alignment along with fixing of all accessories X-bracing & clamp as per Respo construction manual.
ST Pole SP-23 Single Pole
ST Pole SP-23 Double Pole
Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 Block including cost of cement, sand and stone ballast & back filling of soil and boulders inpit and ramming and proper alignment and leveling.
Fabrication of MS channel angle iron after cutting in required size with drilling of hole upto good finish for top channel bracing and special type bracket etc as per Respo shedule and local approve drawing.
Excavation of earth for stay pit of size 0.60x0.60x1.20 mtr. In all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil.
Fixing, tightning and nuzzling of stay (11KV) with pole and stay rod on required tension.
Grouting of stay in size 0.60x0.60x0.30 mtr. In CC ratio 1:4:8 (1 cement:4 graded stone 20mm nominal size:8 coarse sand) block including cost of cementand stone ballast back filling of soil and boulders in pit and ramming and proper alignment and leveling.
Earthing of supports with MS earth rod of 2.5 meter long by hammering of M.S Road to proper depth and connecting the earth electrod with thhe help of GI wire
Laying, spreading & sagging of 11 KV line complete with binding & jumpering (ACSR Conductor)
Mounting and fixing of fuse set on double pole structure including making of complete connection work
Mounting and fixing of TPMO on double pole structure including making of complete connection work
Construction of PRMC Plinth with size 1x1.5x1.1 meter above ground level and 0.6mtr. Below ground level including the cost of material such as cement, brick, sand etc and wire mesh fencing with material
Installation of 11 KV metering cubical in the metering room with grouting and making all connection
Jointing and fixing of cable jointing Kit indoor & outdoor
T-off connection complete 11 KV
garg enterprises
S R CONSTRUCTION COMPANY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .