Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | +2.54% | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹12.7 L (7.38%)Admitted-Finance | +10.11% | ₹1.8 Cr+₹12.7 L (7.38%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 Cr+₹44.2 L (25.7%)Admitted-Finance | +28.88% | ₹2.2 Cr+₹44.2 L (25.7%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹46.1 L (26.8%)Admitted-Finance | +30.00% | ₹2.2 Cr+₹46.1 L (26.8%) | L4 | Admitted-Finance |
| 5 | L5₹2.3 Cr+₹59.6 L (34.7%)Admitted-Finance | +38.10% | ₹2.3 Cr+₹59.6 L (34.7%) | L5 | Admitted-Finance |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
8 Jul 2026, 6:00 pmClosed
Executive Engineer KDA, Kota
KDA, Kota
Construction of Protection wall, drain and Development of Park near Manshapuran Balaji Mandir, Bapu Basti, Ward No. 49, Kota
2026_UITKo_570979_1
08/2026-27 (31)
Open Tender
Civil Works
Percentage
300 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
online sso
₹3.4 L
Yes
20 Jul 2026
29 Jun 2026
9 Jul 2026
29 Jun 2026
8 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | - | Sqm | 5 | - |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge.
1: 3: 6 or richer mix. | 43.2 | Cum | 637 | ₹27,518.4 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 1,055 | Cum | 175 | ₹1,84,625 |
| 4 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 1 | Cum | 178 | ₹177.82 |
| 5 | Add extra for foundation/trenches/drains for every additional lift of 1.5 Mtr. or part thereof in
All kinds of soil | 300 | Cum | 34 | ₹10,200 |
| 6 | Add extra rate for quantities of works, executed :
In or under foul position , including pumping out water as required | 205 | Cum | 43.75 | ₹8,968.75 |
| 7 | Random rubble dry stone Kharanja under floor. | 288.88 | Cum | 932 | ₹2,69,236.16 |
| 8 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.
M10 grade Nominal Mix
1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 230.4 | Cum | 3,847 | ₹8,86,348.8 |
| 9 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | - | Sqm | 157 | - |
| 10 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :
Walls (any thickness) including attached pilasters, buttresses plinth and string course. | 3,120 | Sqm | 289 | ₹9,01,680 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
Condition_31.pdf
Tender Documents • 0.39 MB
BOQ_1015908.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .