Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical technically qualified |
| 2 | Accepted-Technical | Accepted-Technical technically qualified |
| 3 | Accepted-Technical | Accepted-Technical technically qualified |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
6 Jul 2026, 3:00 pmClosed
Usha Nandhini. C
CM-Finance (Purchase)
Maintenance and repairs of RCC drain near AMC junction - under CSR 26-27
2026_IREL_281016_1
IREL/Chavara/26-27/T.No.57
Open Tender
Civil Works
Item Rate
365 days
IREL(India)Limited, Chavara
As per clause 13 of the tender
2 documents required · 2 mandatory
₹0
₹20,000
20 Jul 2026
16 Jun 2026
7 Jul 2026
16 Jun 2026
6 Jul 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for clearing, shifting & replacing of existing RCC covering slab for drain including levelling the drain & RCC covering slabs at the correct levels and lines. Mechanical means such as excavators/cranes will be utilized for the installation. The scope of work also including all labour charges for handling all materials, loading and unloading etc complete as per standard specifications. | - | Each | 613 | - |
| 2 | Earth work excavation in hard soil for RCC drain in existing tar road and depositing on bank with initial lead up to 50M and lift up to 1.50M including breaking clods, watering, ramming, and sectioning of spoil bank etc complete. | - | Cu.M | 248.28 | - |
| 3 | PCC 1:5:10 using 40mm hard broken stone for base of RCC drain including cost and conveyance of all materials , hire charges for tools and plants, shuttering, labour charges for laying, mixing , watering, placing, curing etc complete as per standard specification excluding cost of cement | - | Cu.M | 5,000 | - |
| 4 | RCC 1:2:4 using 20mm hard broken stone for repair, raising of RCC drain wall, covering slab etc including cost and conveyance of all materials, all labour charges for laying ,mixing, placing, vibrating with mechanical vibrator, watering, curing etc, hire charges for tools & plants etc complete as per standard specification but excluding cost of cement and MS re inforcement | - | Cu.M | 6,900 | - |
| 5 | MS reinforcement bent, tied and placed in position for RCC wall & covering slab work including cost and conveyance of MS bars, binding wires, all labour charges, loading unloading charges hire charges for tools & plants etc complete as per standard. Specification. | - | Qtl | 10,000 | - |
| 6 | Supplying and stacking ISI mark best quality portland cement (OPC/PPC) approved make in paper bags including cost and conveyance of all materials, loading and unloading charges etc complete (Payment will be made only for actual quantity of cement consumed). | - | T | 9,056 | - |
| 7 | Sundry & Petty works - Skilled labour for cleaning drain . | - | Each | 1,000 | - |
| 8 | Sundry & Petty works -Man Mazdoor for cleaning drain. | - | Each | 1,000 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_327974.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .