Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.1 LAccepted-AOC | 1 | Accepted-AOC Select from Lotery | |
| 2 | 1₹11.1 LRejected-AOC AT WARD 10 PO BIRAMITRAPUR DIST SUNDARGARH ODISHA | BIRAMITRAPUR | SUNDARGARH | ODISHA | 1 | Rejected-AOC Not Select | |
| 3 | 1₹11.1 LRejected-AOC | 1 | Rejected-AOC Not Select | |
| 4 | 1₹11.1 LRejected-AOC | 1 | Rejected-AOC Not Select | |
| 5 | 1₹11.1 LRejected-AOC | 1 | Rejected-AOC Not Select |
Tender Value
₹11.1 L
EMD Value
₹11,062
Closing Date
15 Jun 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
Construction of Boundry Wall from pwd road towards Ramabtar sunari house back side pandey daffai, w.n-1
2026_ORULB_130676_33
EO/BRMP/02/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
BIRMITRAPUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹11,062
Yes
22 Oct 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with initial lead and lift including rough dressing and leveling the bed and depositing the soil away as directed by E.I.C . | 105.82 | cum | 282.88 | ₹29,934.36 |
| 2 | Sand filling with filling sand inside F and P including watering and ramming, cost of material, labour, conveyance all taxes T and P etc. complete. | 13.36 | cum | 738.69 | ₹9,868.9 |
| 3 | Metal concrete (1:4:8) using 40mm size CBG metal with all cost of material, labour, conveyance, royalty, taxes T and P etc. complete. | 13.36 | cum | 5,822.49 | ₹77,788.47 |
| 4 | Brick work with Fly Ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Foundation and Plinth including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. | 21.2 | cum | 5,582.36 | ₹1,18,346.03 |
| 5 | Brick work with Fly Ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Foundation and Plinth including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. | 53.51 | cum | 5,615.36 | ₹3,00,477.91 |
| 6 | R.C.C. M-25 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P etc excluding centering shuttering & cost of reinforcement complete. | 16.2 | cum | 6,543.63 | ₹1,06,006.81 |
| 7 | Supplying , fitting and placing uncoated HYSD bar reinforcement complete as per drawing and techincal specification including cost of steel binding wire and labour required for bending, binding etc. | 14.58 | Qtl | 8,597.28 | ₹1,25,348.34 |
| 8 | Rigid smooth centering and shuttering to C.C. work including false work and dismantling them after casting complete in Ground Floor. (column base & Pb etc.) | 92.8 | Sqm | 249.82 | ₹23,183.3 |
| 9 | Rigid smooth centering and shuttering to C.C. work including false work and dismantling them after casting complete in Ground Floor.( Column) | 69 | Sqm | 1,219.7 | ₹84,159.3 |
| 10 | 16mm thick C.P. in C.M.(1:6) over brick masonary to the rough surface including watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. | 483 | Sqm | 277.18 | ₹1,33,877.94 |
stage.html
html • 0.10 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_594347.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .