| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.9 LAccepted-AOC | L1 | Accepted-AOC pl.see summary | |
| 2 | L2₹1.7 Cr+₹86.6 L (105.7%)Rejected-Finance PB NO 04 KARUNAGAPALLY KOLLAM 690 518 | KARUNAGAPALLY | KOLLAM | KERALA | 690518 | L2 | Rejected-Finance pl. see summary | |
| 3 | L3₹2.0 Cr+₹1.2 Cr (145.7%)Rejected-Finance IX 526 527 HILL PALACE ROAD KARINGACHIRA IRUMPANAM P O TRIPUNITHURA ERNAKULAM KERALA 682309 | ERNAKULAM | KERALA | 682309 | L3 | Rejected-Finance pl.see summary | |
| 4 | Rejected-Technical | - | Rejected-Technical Pl see summary | |
| 5 | Rejected-Technical | - | Rejected-Technical Pl see summary |
Tender Value
₹99.9 L
EMD Value
₹50,000
Closing Date
12 Nov 2019, 6:00 pmClosed
Head Of Department (Commercial)
Travancore Titanium Products Limited Kochuveli Thiruvananthapuram
AMC for repairing/modifying MS structural of various plants in TTPL
2019_TTPL_311180_1
CD/CN/JL-147/AMC-Structural work/C/19-20
Open Tender
Civil Works - Others
Item Rate
365 days
Travancore Titanium Products
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
Yes
online
₹50,000
Yes
27 Feb 2020
21 Oct 2019
15 Nov 2019
22 Oct 2019
12 Nov 2019
28 Oct 2019
23 Oct 2019 - 8 Nov 2019
Structural repair/modifying Work
Labour charges for repairing/ modifying and replacing the damaged steel structurals such as column, beam, staircase,purlin, trusses, bracing, bracket, etc. of the building at various levels up to the height of 25.3m including charges for fabricating members to size, conveying it to the site, lifting and fitting in position either by welding or by bolting, painting with iron primer one coat and two over coats with rubber based paint after cleaning the surface thoroughly including the cost of welding rods, cutting gas, hire of tools and charges for scaffolding, conveyance etc and dumping debris to the dump yard etc.complete as per directions of enginner in charge
Labour charges for strengthening the corroded structurals such as columns ,beams, and other structural of buildings at various levels upto a maximum height of 25.3 m by continuous welding of two rows with MS plate of various thickness as directed by the officer incharge including charges for fabricating, conveying to the site, lifting and fixing in position, painting with one coat of iron primer and two over coat of rubber based paint after scrapping and cleaning the surface including charges for scaffolding ,hire of tools, cost of cutting gas, welding rod etc.complete as per direction of Engineer-in-charge
Labour charges for dismantling, removing and lowering damaged and corroded MS section from the plant & building at various levels up to a maximum height of 25m including charges for conveying and dumping the same in dump yard, hire of tools and cost of cutting gas etc. complete as per the direction of officer in charge
Labour charge for fabrication & erection of hand rails in various floors at different levels with MS angle 65 x65x 6mm at about 1.2 m c/c 25mm dia pipes for horizontals, toe board of MS Flat and painting one coat metal primer and two over coats with rubber based paint after scrapping and cleaning the surface including charges for scaffolding ,cost of cutting gas and welding rod, hire of tools etc. complete as per the direction of officer in charge.
Labour charges for fabricating and fixing 25mm dia MS pipe for horizontaling the damaged portion of the hand rails including cutting the damaged pipe ,removing,lowering ,conveying &dumping the same in the scrap dump yard ,painting the pipe with one coat iron primer and two over coats of rubber based paint after scrapping ,cleaning the surface thoroughly including charges for scaffolding , hire of tools ,cost of cutting gas and welding rod etc. complete as per direction of Engineer-in-charge
Labour charge for fabrication and erection of staircase steps ,platforms,walkways etc.with MS chequered plate or MS plate of any thickness/PVC grating including a)Dismanting, removing and lowering corroded and damaged plates wherever necessary and debris to the dump yard b)Cutting new plate to required size and shape fixing in position either by welding (full run) or by bolting and fixing the PVC grating properly in the MS frame work c) Painting one coat metal primer and two over coats with rubber based paint after scrapping and cleaning the surface including cost of cutting gas ,welding rod, hire of toots and charges for scaffolding etc.complete as per the direction of officer in charge
Labour charges for cutting & removing corroded portion of members of tubular trusses on the roofs wherever necessary, conveying and dumping the MS corrored pipe and MS structurals to the scrapyard, charges for fabrication of new members of 40mm dia or nearest available size and required length and fixing in position by welding or bolting, painting the same with iron primer one coat and two over coats with rubber based paint after scrapping and cleaning the surface thoroughly including charges for cutting gas, scaffolding etc. complete.
Labour charges for fabricating and fixing the tubular purlin on the roofs with 50mm dia or nearest available size of MS pipe by welding or by bolting after dismantling the corroded purlin without causing any damage to remaining structurals including charges for lowering, conveying and dumping the dismantled purlins to the yard and painting the new purlin with iron primer one coat and two over coats with rubber based paint after scrapping and cleaning the surface thoroughly, charges for welding necessary cleats, MS plate on the roof trusses and flats at the end of the purlin, cost of cutting gas ,welding rod, hire of tools and charges for scaffolding etc. complete as per the direction of officer in charge.
Labour charges for dismantling & removing the AC roofing sheet including ridges, hips, valleys and gutters etc., and stacking the material for structural repair work without causing any damage and refixing the same or new sheets after repairing works including cost of all labours ,hire of tools, charges for scaffloding etc. complete as per the direction of officer in charge.
Labour charges for dismantling the wooden floor for repairing the steel structurals including charges for refixing the same after completion of the repair work. Cost of all labours, hire of tools, charges for scaffolding, all other connected works etc. complete as per the direction of officer in charge.
Labour charges for dismantling & removing the ridges( in pair) barge board/ apron sheet etc. over the roof of plant/ building without causing any damage and refixing the same or any ridges after repairing work including cost of all labour, hire of tools, charges for scaffolding etc. complete as per the direction of officer in charge.
HIND ERECTORS
S.K.BOILERS PVT LTD.,
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .