Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.7 Cr+₹4.6 L (2.84%)Admitted-Finance OPP BANK OF BARODA LOKHAND BAZAR BHAVNAGAR GUJARAT 364002 INDIA | BHAVNAGAR | GUJARAT | 364002 | L2 | Admitted-Finance | |
| 3 | L3₹1.7 Cr+₹6.0 L (3.72%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.7 Cr+₹9.0 L (5.57%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Patel Brijesh Kanaiyalal L1 | Bakul Construction Co L2 | VINUBHAI NARANBHAI MAKWANA L3 | JK INFRASTRUCTURE L4 |
|---|---|---|---|---|---|---|---|
| 1.00PART-A CIVIL WORK EARTH WORK | |||||||
| 1.01Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lif upto 1.5 m, as directed by Engineer-in- Charge: | |||||||
| 1.02 | All kinds of soil | 250 | sqm | 400 ₹1,00,000 | 135 ₹33,750 | 90 ₹22,500 Lowest | 310 ₹77,500 |
| 1.03Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | |||||||
| 1.04 | All kinds of soil | 20 | cum | 500 ₹10,000 | 150 ₹3,000 Lowest | 180 ₹3,600 | 300 ₹6,000 |
| 1.05Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m: | |||||||
| 1.06All kinds of soil | |||||||
| 1.07 | Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 15 | metre | 450 ₹6,750 | 365 ₹5,475 | 351 ₹5,265 Lowest | 425 ₹6,375 |
| 1.08 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 32 | cum | 500 ₹16,000 Lowest | 1,860 ₹59,520 | 1,800 ₹57,600 | 1,800 ₹57,600 |
| 1.09 | Pruning, trimming, shaping of trees /shrubs (ht 15 feet and above) i/c removal of cut materials upto 50mt. stacking of serviceable material and disposal of unserviceable material.
Lead, as per direction of officer in charge. T&P
shall be arranged by the contractor | 35 | per tree | 500 ₹17,500 | 100 ₹3,500 | 90 ₹3,150 Lowest | 360 ₹12,600 |
Tender Value
₹1.8 Cr
EMD Value
₹3.7 L
Closing Date
31 Aug 2026, 3:00 pmClosed
THE DIRECTOR CSIR-CSMCRI, BHAVNAGAR
G B MARG, Bhavnagar
Comprehensive external - internal repairs and renovation works of Scientist Apartments (One block of total 8 Nos) and external repairs, painting, waterproofing and termite treatment of Scientist Apartments (2 blocks having total 32 SQs) in Hill drive
2026_CSIR_288682_1
NIT 05/2026-27
Open Tender
Civil Works
Works
300 days
At Hill Drive Colony of CSIR-CSMCRI
Please refer Tender documents.
12 documents required · 12 mandatory
₹1,500
THE DIRECTOR CSIR-CSMCRI
₹3.7 L
7 Sept 2026
24 Aug 2026
1 Sept 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART-A CIVIL WORK EARTH WORK | |||||
| 1.01 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lif upto 1.5 m, as directed by Engineer-in- Charge: | - | - | - | - |
| 1.02 | All kinds of soil | 250 | sqm | 129.85 | ₹32,462.5 |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | - | - | - | - |
| 1.04 | All kinds of soil | 20 | cum | 177.5 | ₹3,550 |
| 1.05 | Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m: | - | - | - | - |
| 1.06 | All kinds of soil | - | - | - | - |
| 1.07 | Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 15 | metre | 352.15 | ₹5,282.25 |
| 1.08 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 32 | cum | 2,123.75 | ₹67,960 |
| 1.09 | Pruning, trimming, shaping of trees /shrubs (ht 15 feet and above) i/c removal of cut materials upto 50mt. stacking of serviceable material and disposal of unserviceable material.
Lead, as per direction of officer in charge. T&P
shall be arranged by the contractor | 35 | per tree | 91.45 | ₹3,200.75 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.11 MB
TenderbookNIT052627CSPS.pdf
Tender Documents • 2.60 MB
Annexure1to5CSPS.pdf
Other Document • 1.45 MB
BOQ_336882.xls
BOQ • 0.42 MB
corrigendum1052627.pdf
PDF • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .