| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC | ₹24.1 L Quoted ₹23.4 L | L1 | Accepted-AOC accepted |
| 2 | L2₹23.6 LRejected-Finance | ₹23.6 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | PALANIANDI GOPAL L1 | V P V CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of 60000 Lit Capacity RCC Oht at Melamanjampatti Kallarai Street in Vengaikurichi Panchayat Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B For Column Foundation For G.L. Brace Beam (3.68-2.90 =0.78) | 58.68 | cu.m | 263 ₹15,432.84 | 300 ₹17,604 |
| 2.00 | Second depth 2.00 m - Below For Column Foundation | 10.21 | cu.m | 408.16 ₹4,167.31 | 410 ₹4,186.10 |
| 3.00 | Sand filling for foundation with clear M.Sand including cost of sand watering, ramming and consolidation etc complete. For Column Foundation | 4.59 | cu.m | 2,173.75 ₹9,977.51 | 2,173.75 ₹9,977.51 |
| 4.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete. For Column Foundation, For GL Brace Beam Foundation (3.68-0.30=3.38) | 4.98 | cu.m | 5,592 ₹27,848.16 | 5,592 ₹27,848.16 |
| 5.00 | Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers. | 48.34 | cu.m | 45.85 ₹2,216.39 | 60 ₹2,900.40 |
| 6.00 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for item 1.5m below ground level | 9.28 | cu.m | 9,324 ₹86,526.72 | 9,324 ₹86,526.72 |
| 7.00 | For items 0 to 1.50m below GL | 2.53 | cu.m | 9,324 ₹23,589.72 | 9,324 ₹23,589.72 |
| 8.00 | For items 0m to 1m above GL | 0.49 | cu.m | 9,465.36 ₹4,638.03 | 9,465.36 ₹4,638.03 |
| 9.00 | 1.00m to 4.50m above GL | 3.51 | cu.m | 9,465.36 ₹33,223.41 | 9,465.36 ₹33,223.41 |
| 10.00 | 4.50 m to 7.32 m above GL | 3.17 | cu.m | 9,743.25 ₹30,886.10 | 9,743.25 ₹30,886.10 |
Tender Value
₹24.1 L
EMD Value
₹24,100
Closing Date
27 Feb 2026, 3:00 pmClosed
BDO VP
Panchayat Union Manapparai
Construction of 60000 Lit Capacity RCC Oht at Melamanjampatti Kallarai Street in Vengaikurichi Panchayat Manapparai Block in Tiruchirappalli District under PERIURBAN PANCHAYATS 2022-23 TO 2025-26
2026_RDTN_666841_1
B3/0531/2026 ven dt 20.02.2026
Open Tender
Civil Works - Water Works
90 days
Manapparai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹24,100
3 Mar 2026
26 Feb 2026
27 Feb 2026
26 Feb 2026
27 Feb 2026
26 Feb 2026
Construction of 60000 Lit Capacity RCC Oht at Melamanjampatti Kallarai Street in Vengaikurichi Panchayat Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B For Column Foundation For G.L. Brace Beam (3.68-2.90 =0.78)
Second depth 2.00 m - Below For Column Foundation
Sand filling for foundation with clear M.Sand including cost of sand watering, ramming and consolidation etc complete. For Column Foundation
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete. For Column Foundation, For GL Brace Beam Foundation (3.68-0.30=3.38)
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for item 1.5m below ground level
For items 0 to 1.50m below GL
For items 0m to 1m above GL
1.00m to 4.50m above GL
4.50 m to 7.32 m above GL
7.32 m to 10.98 m above GL
10.98 m to 14.64 m above GL
14.64 m to 18.30 m above GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. PLANE SURFACES Below G.L.
PLANE SURFACES ABOVE G.L. to 3.30m
PLANE SURFACES ABOVE 3.31m - 4.30 m
PLANE SURFACES 5.30m . to 6.30
PLANE SURFACES 6.31m . to 7.30m
PLANE SURFACES 8.31m . to 9.30m
PLANE SURFACES 9.31m - 10.30
PLANE SURFACES 11.31m to 12.30m
Curved Surface 0 to 3.30m
Curved Surface - 3.30m to 4.30m ht.
Square column Below Ground Level 3.30m
Square column 3.31 to 4.30 m
Square column 4.31 to 5.30 m
Square column 5.31 to 6.30 m
Square column 6.31 to 7.30 m
Square column 7.31 to 8.30 m
Square column 8.31 to 9.30 m
Square column 9.31 to 10.30 m
Square column 10.31 to 11.30 m
Square column 11.31 to 12.30 m
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
Exterior Emulsion Paint two coats with approved exterior emulsion paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete.
Providing PVCI ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl etc., complete.,
Providing manhole cover of size 0.60 m X 0.60 m in CI Manhole Cover MS angle fixed along edges and as directed by TWAD Board officers.
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 4Scm consisting of two Nos. of ve~ical post of 10cm x lScm and step slab of 25mm x 25mm etc., complete.
Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm centre to centre welded, jointed etc., providing with suitable side supports, clamps, and locking arrangements provided with one coat of red oxide paint for providing access to roof top of OHT of suitable inclined length, including bottom anchorage and transportation etc., complete.,
65mm Ø GI pipes for over flow & 1xl rain water harvesting pipe
65mm Ø GI pipes for over flow & 1xl
50mm Ø GI pipes for scour pipe 1xl
65mm Ø GI pipe for delivery 1x1 pipe
90mm Ø PVC Threaded coupler
65 mm Ø PVC threaded coupler
65mm Ø GI Tee
65mm Ø GI 90 Bend
65mm Ø GI coupler
65mm Ø GI union
65mm Ø GI Elbow
65x50mm Ø GI Reducer
75mmx 63mm PVC Reducer
75mm PVC Threaded coupler
75x90 PVC Reducer
65mm Ø GM Gate valve
50mm Ø GM gate valve
64 mm PVC Pipe 6 ksc
63 mm PVC Elbow
63 mm PVC Tee
PVC Adhesive Solution (100gm)
Earthwork Excavation in all Soil for excavated earth including all Charges etc 63 mm PVC Pipe
PVC Laying of excavated earth including all Charges etc 63 mm PVC Pipe
Refilling of excavated earth including all charges etc., 63 mm PVC Pipe
Provision for Water Meter
Provision for Cholirnation Charges
Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.46 MB