Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC | L1 | Accepted-AOC ACEEPTED BEING LOWEST TENDER | |
| 2 | L2₹6.8 L+₹47,720 (7.61%)Rejected-AOC | L2 | Rejected-AOC REJECTED BEING NOT LOWEST TENDER | |
| 3 | L3₹7.3 L+₹1.1 L (17.1%)Rejected-AOC | L3 | Rejected-AOC REJECTED BEING NOT LOWEST TENDER |
Tender Value
₹8.8 L
EMD Value
₹17,700
Closing Date
21 Oct 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE I RNDDEHRADUN
GE I RND DEHRADUN DEAL RESIDENTIAL COMPLEX RAIPUR ROAD DEHRADUN 248008
REPAIR/ MAINTENANCE OF CENTRAL /PACKAGE TYPE AC PLANTS, COMPONENTS AND CONNECTED MISC ITEMS IN DEAL UNDER GE (I) RND DEHRADUN
2020_MES_373560_1
GE(I)RND/9000/E8/20-21
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
DEHRADUN
Class E Category c (i) FOR UNENLISTED CONTRACTOR (i) Enlistment criteria may be seen in Para 1.4 of section of Part I of MES Manual on contracts-2007 (Reprint 2012) as available in all MES formations (ii) Copy of police verification /passport
6 documents required · 6 mandatory
₹500
GE I R N D DEHRADUN
₹17,700
Yes
7 Nov 2020
31 Aug 2020
23 Oct 2020
31 Aug 2020
21 Oct 2020
7 Sept 2020
31 Aug 2020 - 7 Sept 2020
60 days
Amount
Material and labour for Descaling of condenser unit by rubbing with nylon brush/ cleaning rod using hydrochloric acid pumped through electric driver descaling pump including dismantling and connecting all dismantled components in proper position after servicing/ overhauling/ greasing etc replacement of packing gasket 3mm thick, nuts, bolts with washer, testing of water line for leakage & repairing of pipe line to make it leak proof complete all as specified and directed by Engr-in-Chagre for the following AC plants :- Notes : (i) The de-scaling & cleaning of condenser (Heat Exchanger) of cooling tower shall be done by circulating concentrated de-scaling solution mixed with water of make as approved to the entire satisfaction of GE/Engineer-in-Charge complete all as specified in Sch ‘A’. (ii)The hydrochloric acid shall be used as a de-scaling solution mixed with water in a suitable proportion as approved by the GE/Engineer-in-Charge so as avoid damage to existing pipe lines.
2x15 TR TR capacity AC plant (installed at SATCOM Building DEAL.
2x27 TR capacity AC Plant (installed at PRC Building DEAL)
Servicing/ overhauling/ greasing of condensor coil, cooling coil and evaporator coil etc replacement of packing gasket, nuts, bolts with washer, testing of water line for leakage & repairing of pipe line to make it leak proof of capacity 3X11TR AC Plant (installed at Technical Area. DEAL) complete all as specified and directed by Engr-in-Chagre.
Openning and checking of Central/Package type AC plant at chiller Unit of chiller cutting welding with insulation and presure testing of copper tube fixing of new copper tube size 5/8" x3 meter long with expending and pressure testing 350 PSI stand 24 hours complete testing,all as specified and directed.
Dismantling the head from compressor fitted in system, and strip opening of compressor head of twin cylinder for Model AC 1070 : of Kirloskar make/SMC 6-65/8-65 model of ACCEL compressor completely for servicing /overhauling mechanically and electrically, and checking of various components with precision instruments to assess the requirements of repair/replacement, and making inventories for repairs required and re-fixing the serviceable parts in position after proper cleaning, oiling/greasing,etc ,and removing & replacement of defective / unserviceable parts with new parts, as required at site, and reassembling the compressors head ensuring perfectly leak proof after cleaning the oil sump, oil pump connecting rod, piston, liner etc and filling of compressor oil, before charging of refrigerant gas to required pressure and testing at site on full load to the entire satisfaction complete all as specified and directed for following :- ( included notes mentioned in here in after)
Notes: - (i) The replacement of defective / nonfunctional parts, and Refrigerant gas and compressor oil for top up shall be measured & paid for separately as “Supply only” under appropriate item of Sch ‘A’ and fixing/filling rate for new items are deemed to include under these items. (ii) The refregrent gas to be pumped down before dismantlling the compressure head for avoid the wastage of gas. (iii) The quoted rate shall be deemed to include replacement of small/ minor parts for prroper functioning of compressure .
M&L for cutting and grinding the crank-shaft (for 1070 : of Kirloskar make/SMC 6-65/8-65 model of ACCEL compressor) of 0.50/0.75 mm around as required to make it equivalent to manufacturer’s standard size and smoothening/ fine finishing,polishing of shaft to match with half section big end bearings, cleaning oil ports for proper lubrication complete all as specified and directed by Engr-in-Charge. Note : (i) The cost of taking out and re-fixing of the shaft / rod in position after necessary repairs is deemed to be included under the rates quoted by the contractor for respective Schedule `A' item. (ii) The rates for above items are deemed to include transportation to & fro of crank-shaft to workshop for necessary repairs.
Supply only following items / spare parts suitable for ACCEL make compressors of Model SMC 6-65 installed at SATCOM building at Tech area dismantled / fixed complete all as specified and directed .
(a). Main Bushing with detachable coller for repair .50/.75mm u.s.
(b). Connecting rod
(c). Bolt for Connecting rod
(d). Castle nut
(e). Split pin
(f). Guide pin
(g). Big end bearing (half section bearing) .05/.075 mm.
(h). set of aluminuam washer set
(j). Oil pump assembly.
(k). Shaft seal assembly.
(l). Piston with pin and rings set
(m). Cylinder liner for R-22. with suction valve
(n). Single frame unloader- 65 (bracket).
(o). Busing for piston pin.
(p). Discharge valve assembly (R-22)
(q). Gasket set complete for SMC 6-65.
(r). Set of neoperne ''O" ring set for SMC 6-65.
(s). Oil pressure regulator valve.
(t). Suction stop valve 'o' ring set"
(u). Discharge stop valve 'o' ring set
(v). Safety valve assembly
Supply only following items / spare parts suitable for Air Control and Chemical Engg. Co Ltd make compressors of Model SMC 8-65 installed at PRC Bldg dismantled / fixed under Sch ‘A’ here in above complete all as specified and directed .
(a). MainBushing with detachable coller for repair .50/.75mm u.s.
(b). Connecting rod
(c). Bolt for Connecting rod
(d). Castle nut
(e). Split pin
(f). Guide pin
(g). Big end bearing (half section bearing) 0.050/.0.75 MM U.S.
(h). Crank shaft SMC 8-65
(j). Oil pump assembly.
(k). Shaft seal assembly.
(l). Piston with pin and rings
(m). Cylinder liner for R-22. with suction valve
(n). Single frame unloader- 65 (bracket).
(o). Busing for piston pin.
(p). Discharge valve assembly (R-22)
(q). Gasket set complete for SMC 8-65.
(r). Set of neoperne ''O" ring set for SMC 8-65.
(s). Oil pressure regulator valve.
(t). Suction stop valve 'O' RING SET" with nylon washer
(u). Discharge stop valve 'O' RIG SET" with nylon washer
(v). Safety valve assembly
(w). V BELT B-68
(x). V BELT B-105
Carrying out leak detection in the system of AC plants including nitrogen pressure testing for 24 hours and repairing the leakage by gas welding / electric welding of refrigerant pipes, replacement of valve gland, gaskets etc. and then creating vacuum for 4 hours before charging refrigerant gas R-22/R-407 in the system and testing the complete plant for working pressure for 24 hours complete, all as specified and directed. Note : R-22/R-407 gas shall be measured and paid separately under Schedule ‘A’ Item.
(a). 2x15 TR TR capacity AC Plant (installed at SATCOM building )
(b). 2x27 TR capacity AC Plant (installed at PRC Building)
(c). 3x11 TR capacity AC Plant (installed at EMI/MC BldgTechnical area deal
Supply and fixing/testing in replacement of UNSV compressore 5.5 tr make denfoss/copland scroll compressore R-407 with pressure testing complete, all as specified and directed.
Supply and fixing/testing in replacement of UNSV V belt 'A' type as per existing for blower fan of packege type unit complete, all as specified and directed.
Supply of refrigerant gas monochloro difluoro methane (CHCLF2) R- 22 conforming to IS-5160 of 1983 , duly filled in factory sealed cylinder standard capacity for filling under Sch ‘A’ item No 3. and here in above complete, all as specified and directed.
Supply of lubricating oil anti freezing for refrigeration in factory sealed container of standard capacity for filling under Sch ‘A’ items No 3 complete,all as specified and directed. Make: Servo froze -68-10c of IOC.
Supply only R-407 refrigrant gas with testingn under Sch ‘A’ item 3 here in above complete, all as specified and directed.
Supply fixing and testing in replacement of UNSV pre filter with GI sheet frame of size 610mm x 610mm x 50mm deep suitable for Air handling units of air conditioning plants including efficiency 90% , down to 10-20microns, Initial Pressure drop- 2.5 mm WG, filter media shall be Synthetic Non Woven with Both Side HDPE Mesh, and testing complete complete, all as specified and directed.
Supply fixing and testing in replacement of UNSV Pre filter with GI sheet frame of size 1000mm x 1000mm x 10mm deep suitable for Pakage type units of air conditioning plants including efficiency 90% , down to 10-20microns, Initial Pressure drop- 2.5 mm WG, filter media shall be Synthetic Non Woven with Both Side HDPE Mesh, and t testing complete complete, all as specified and directed.
Supply fixing and testing in replacement of UNSV condencer safety valve of size ½”, for pressure 300 PSI with and Including ½”, mild steel socket duly welded on condenser ensuring perfectly leak proof joint with pressure testing complete all as specified and directed.
Supply fixing and testing in replacement of UNSV thermostatic expansion valve (R-22) suitable for 15/27 TR capacity of central AC plant complete, all as specified and directed.
Supply fixing and testing in replacement of UNSV water pressure gauge 100 mm dia of range 0 to 100 PSI for central AC plant complete all as specified & directed.
Supply fixing and testing in replacement of UNSV Gas pressure gauge 100 mm dia of range 0 to 300 PSI for central AC plant complete all as specified & directed.
Supply fixing and testing in replacement of UNSV liqud line filtter driers of suitable size for Package type AC plant 11TR complete all as specified & directed.
Supply fixing and testing in replacement of UNSV low pressure control switch type MP-1 with required cutting, flaring/chipping and gas welding ensuring perfectly leak proof joint with pressure testing complete, all as specified and directed
Supply fixing and testing in replacement of UNSV low pressure control switch type MP-5 with required cutting, flaring/chipping and gas welding ensuring perfectly leak proof joint with pressure testing complete, all as specified and directed
Supply fixing and testing in replacement of UNSV low pressure control switch type MP-15 with required cutting, flaring/chipping and gas welding ensuring perfectly leak proof joint with pressure testing complete, all as specified and directed
Supply fixing and testing in replacement of UNSV oil pressure control switch type MP-55 with required cutting, flaring/chipping and gas welding ensuring perfectly leak proof joint with pressure testing complete, all as specified and directed
Supply fixing and testing in replacement of UNSV PVC Fins of FPR cooling tower size 600mmx300mmx 150 mm complete, all as specified and directed
Supply, fixing and testing in replacement of UNSV pully 2 step 'V' groov B type of size 10" dia suitable of 2x27 TR at PRC Bldg AHU, and SATCOM Bldg AHU of any description complete,all as specified and directed.
Disconnecting and removing old existing non functional electric motor, of any description and in any position from existing platform for compressor/blowers/pumps/ cooling towers and dismantling and strip opening of the motor, for cleaning oiling/greasing and fixing of serviceable parts in position and removing the old existing burnt windings, cleaning the slots & rewinding of the electric motor with existing gauge super enameled copper wire, including insulating material such as illuminous paper, Letherized paper, cotton tape, glass sleeves insulating varnish etc for powering compressor /blowers /pumps / cooling towers and transportation to site & refixing on existing platform ,connecting with exising connections & testing on full load complete all as specified and directed for following capacity :- .
(a). 3.0 HP capacity, Three phase 50 Hz AC supply
(b). 5.0 HP capacity, Three phase 50 Hz AC supply
(c). 7.5 HP capacity, Three phase 50 Hz AC supply
Disconnecting and removing old existing non functional electric pump, of any description and in any position from existing platform for pumps and dismantling and opening of the pump, for cleaning oiling/greasing and fixing of bearing, imppler serviceable parts in position pumps and transportation to site & refixing on existing platform ,connecting with exising connections & testing on full load complete all as specified and directed for following capacity :- .
(a). 3.0 HP capacity, Three phase 50 Hz AC supply
(b). 5.0 HP capacity, Three phase 50 Hz AC supply
(c). 7.5 HP capacity, Three phase 50 Hz AC supply
M&L for AHU Room/duct cleaning with the help the of veccum cleaner by opening gill/defuser etc. and refixing testing complete all as specified and directed.
Supply fixing,connecting and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 16 Amps. Complete all as specified and directed .Make L&T or equievelent model of specified and directed.
Supply fixing and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 25 Amps. Complete all as specified and directed .Make L&T or equievelent model of specified and directed.
Supply fixing and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 32 Amps. Complete all as specified and directed . Cat part No SS90935- Type ML-10 of make L&T or equievelent model of specified and directed. ,
Supply fixing and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 50 Amps. Complete all as specified and directed .Make L&T or equievelent model of specified and directed. .
Supply fixing and testing in replacement of UNSV 3 pole Power contactor with 2NO + 2NC auxiliary contacts, coil voltage 220 volts, AC3 rating 70 Amps. Complete all as specified and directed .Make L&T or equievelent model of specified & directed
Supply fixing and testing in replacement of UNSV bimetal overload relays directly operated & directly mounted on ML type Power contactor for relay range of 06 to 18 Amps complete all as specified and directed. make L&T or equievelent model of specified and directed. .
Supply fixing and testing in replacement of UNSV bimetal overload relays directly operated & directly mounted on ML type Power contactor for relay range of 18 to 30 Amps complete all as specified and directed. make L&T or equievelent model of specified and directed.
Supply fixing and testing in replacement of UNSV bimetal overload relays directly operated & directly mounted on ML type Power contactor for relay range of 32 to 45 Amps complete all as specified and directed. make L&T or equievelent model of specified and directed.
Supply fixing and testing in replacement of UNSV digital type of size 96mm x 96mm, AC Volt meter 0- 500 Volts including wiring with 1.5 Sqmm PVC insulated stranded copper conductor cable complete all as specified and directed.
Supply fixing and testing in replacement of UNSV digital type of size 96mm x 96mm, AC Amp meter 0- 200 Amps with including 3 Nos C.T of Ratio 200/5 of class-1.0 including wiring with 1.5 Sqmm PVC insulated stranded copper conductor cable complete all as specified and directed.
Supply fixing and testing in replacement of UNSV insulated connectors 4 pole 100 amps rating including testing complete, all as specified and directed
Supply fixing and testing in replacement of UNSV insulated connectors 4 pole 63 amps rating including testing complete, all as specified and directed
Supply fixing and testing in replacement of UNSV Electronic timers 415 Volts, 50 Hz, AC supply, with delay period of 9-30-Seconds complete all as specified and directed f make L&T or equievelent model of specified make as approved by the GE
Supply fixing and testing in replacement of UNSV FN type switch 63 Amps capacity complete in the existing panel Complete connecting electrically all as specified and directed. Model : FN 63 TPN / FP of L&T or equivalent as specified
Supply fixing and testing in replacement of UNSV Connector push button ON/OFF complete in the existing panel Complete connecting electrically all as specified and directed
Supply fixing and testing in replacement of UNSV indicator light red/yellow /green complete in the existing panel Complete connecting electrically all as specified and directed
Supply, fixing, connecting and testing in replacement of UNSV thermostate heating/cooling of any description complete,all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV strip heater fins type, 3.0 KW, 230 volts, single phase, AC supply in any position complete, all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV MCCB Triple pole, 400 Amps 415 volts, 50 Hz having breaking capacity 35/36 KA , with adjustable thermal and fixed magnetic setting fixed in existing panel Complete all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV MCCB Triple pole, 200 Amps 415 volts, 50 Hz having breaking capacity 36 KA , with adjustable thermal and fixed magnetic setting fixed in existing panel Complete, all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV MCCB Triple pole, 100 Amps 415 volts, 50 Hz having breaking capacity 25 KA , with adjustable thermal and fixed magnetic setting fixed in existing panel Complete, all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV gas gage adopter for connecting of HP, LP and OP gagecomplete, all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV Globe valve bruss for control of liquid line complete, all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV solenoid valve for control of liquid line complete, all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV condenser fan motor for package type AC plant complete, all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV AC coolent pipe stick for fixing of pipe complete, all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV Nipple 3/4" size for draining of water for package type AC plant complete, all as specified and directed.
Supply, fixing, connecting and testing in replacement of UNSV PVC pipe 20 mm dia for draining of water for package type AC plant complete, all as specified and directed.
Pantech Instruments and Services
AIRCOM
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .