| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.8 LAdmitted-Finance | ₹97.8 L | L1 | Admitted-Finance |
| 2 | L2₹97.8 LAdmitted-Finance | ₹97.8 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MOSTAFIZUR RAHMAN L1 | ROFIQUE AHMED L2 |
|---|---|---|---|---|---|
| 1.00 | Medium Jungles: Clearing medium jungles and trees up to 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed.(When 30% to 60 % of the area is overed by shrubs, trees etc.) | 4,302 | sqm | 17.31 ₹74,467.62 | 17.31 ₹74,467.62 |
| 2.00 | Filling of geotubes (25m long and 10m circumference) with sand of volume 176 cum by using mud pump not below the fill height of 1.60 m as per drawing and technical specification, binding the tube with 9mm nyion rope to jati bamboo pegs of length 2m placed 5m c/c along both sides of the tube and at both ends to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250 M, pumping slurry using mud pump from a distance upto 250m, etc. including setting up of the tube laying platform, complete as directed. | 74 | nos | 39,784.7 ₹29.4 L | 39,784.7 ₹29.4 L |
| 3.00 | Earth work in embankment by tractor trailer carriage by Mechanical means with locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all
debries, breaking clods up to 4cm cube, dressing as per design section and compaction with three wheel static roller of 80-100 KN capacity in layers not exceeding 30 cm in thickness and core cutter soil test at every layer and every 500m distance, etc. complete as directed.
For initial Lead up to 1.00 Km for all lifts.
For beyond initial 1 Km & up to 10.00 Km & for all lifts.
Total Lead=2 Km | 20,059 | cum | 301.04 ₹60.4 L | 301.04 ₹60.4 L |
| 4.00 | Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely includingdressing earth pegging with Jati bamboo split, watering till the grass grows for a lead up to 90 m and all lifts, etc. complete as directed. | 18,900 | sqm | 30.18 ₹5.7 L | 30.18 ₹5.7 L |
| 5.00 | Construction of whole bamboo single palisading with matured Bhaluka bamboo posts 7.5 cm to 10 cm dia.,
15 cm clear apart 1.50 m to 1.80 m above ground and 1.00 m to 1.20 m below ground with Bhaluka bamboo
inclined struts placed at 1.5 m a part tied with three rows of horizontal half Jati bamboo kamies etc. complete as directed. (Using Bhaluka Bamboo at the rate of 10.14 nos./Rm & Jati Bamboo at the rate of 2.40 nos./Rm) | 140 | Rm | 879 ₹1.2 L | 879.19 ₹1.2 L |
| 6.00 | Labour charge for filling of empty cement bags to attain minimum filled up volume of 0.028 Cum with filled up size of 0.7 m × 0.40 m × 0.10 m, laying and
pitching of the earth filled cement bags including excavation and borrowing earth, breaking clods, filling in bags and supplying and stitching the mouth
with jute sutli, etc. complete as directed.
(Cement bags will be supplied by the department free of cost) .For borrowing earth from a distance beyond 30 m. &
up to 60 m. | 1,800 | nos | 18.42 ₹33,156 | 18.42 ₹33,156 |
Tender Value
₹97.8 L
EMD Value
₹2.0 L
Closing Date
13 Jan 2026, 2:00 pmClosed
Chief Engineer, Water Resources Department, Assam
O/O Chief Engineer Water Resources Department, Basistha, Guwahati 29
Restoration of B/Dyke from Kharmuza to Nichinpur at Kaljani area ( In Between Ch.10.20 Km to 12.00 Km ) from flood damages of river Brahmaputra.
2026_DoWR_49833_1
GOALPARA/2025-26/PDNA/WORK/II
Open Tender
Civil Works
180 days
Goalpara
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹2.0 L
Yes
17 Mar 2026
1 Jan 2026
13 Jan 2026
1 Jan 2026
13 Jan 2026
6 Jan 2026
Medium Jungles: Clearing medium jungles and trees up to 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed.(When 30% to 60 % of the area is overed by shrubs, trees etc.)
Filling of geotubes (25m long and 10m circumference) with sand of volume 176 cum by using mud pump not below the fill height of 1.60 m as per drawing and technical specification, binding the tube with 9mm nyion rope to jati bamboo pegs of length 2m placed 5m c/c along both sides of the tube and at both ends to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250 M, pumping slurry using mud pump from a distance upto 250m, etc. including setting up of the tube laying platform, complete as directed.
Earth work in embankment by tractor trailer carriage by Mechanical means with locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4cm cube, dressing as per design section and compaction with three wheel static roller of 80-100 KN capacity in layers not exceeding 30 cm in thickness and core cutter soil test at every layer and every 500m distance, etc. complete as directed. For initial Lead up to 1.00 Km for all lifts. For beyond initial 1 Km & up to 10.00 Km & for all lifts. Total Lead=2 Km
Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely includingdressing earth pegging with Jati bamboo split, watering till the grass grows for a lead up to 90 m and all lifts, etc. complete as directed.
Construction of whole bamboo single palisading with matured Bhaluka bamboo posts 7.5 cm to 10 cm dia., 15 cm clear apart 1.50 m to 1.80 m above ground and 1.00 m to 1.20 m below ground with Bhaluka bamboo inclined struts placed at 1.5 m a part tied with three rows of horizontal half Jati bamboo kamies etc. complete as directed. (Using Bhaluka Bamboo at the rate of 10.14 nos./Rm & Jati Bamboo at the rate of 2.40 nos./Rm)
Labour charge for filling of empty cement bags to attain minimum filled up volume of 0.028 Cum with filled up size of 0.7 m × 0.40 m × 0.10 m, laying and pitching of the earth filled cement bags including excavation and borrowing earth, breaking clods, filling in bags and supplying and stitching the mouth with jute sutli, etc. complete as directed. (Cement bags will be supplied by the department free of cost) .For borrowing earth from a distance beyond 30 m. & up to 60 m.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
kaljani_bid.pdf
Tender Documents • 0.56 MB
BOQ_79208.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid