Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹10.2 L+₹26,897.28 (2.70%)Rejected-Finance | L2 | Rejected-Finance L2 bidder | |
| 3 | L3₹10.6 L+₹58,739.93 (5.89%)Rejected-Finance | L3 | Rejected-Finance L3 bidder |
| Sl No | Description | Qty | Unit | NAVIN KUMAR L2 | NAIMUDDIN ANSARI L3 | AMAR PRASAD L1 |
|---|---|---|---|---|---|---|
| 1.00Description of Work | ||||||
| 1.01 | Mulma cleaning /removal of debris from u/g gallaries and cleaning of belt roadways and staking /loading within 50m. ( Sl No.- 1 of GMSOR 2018 ) | 36.53 | Cum | 710 ₹25,936.3 | 732.8 ₹26,769.18 | 692.01 ₹25,279.13 Lowest |
| 2.00 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. d) in Coal (Sl No.- 2d of GMSOR 2018) | 8.38 | Cum | 1,790 ₹15,000.2 | 1,845.5 ₹15,465.29 | 1,742.86 ₹14,605.17 Lowest |
| 3.00 | Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone ( Sl No.- 2a of GMSOR 2018 ) | 4.82 | Cum | 6,305 ₹30,390.1 | 6,499.5 ₹31,327.59 | 6,137.9 ₹29,584.68 Lowest |
| 4.00 | MS Rod 10mm. (Existing market rate) | 951.39 | Kg | 70.5 ₹67,072.99 | 72.7 ₹69,166.05 | 68.62 ₹65,284.38 Lowest |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses,
plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth
level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 ( Sl No.- 13 of GMSOR 2018 ) | 58.47 | Cum | 10,997 ₹6,42,994.59 | 11,335.8 ₹6,62,804.23 | 10,705.2 ₹6,25,933.04 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl No.- 14 of GMSOR 2018 ) | 181.13 | Sqm | 424 ₹76,799.12 | 437.7 ₹79,280.6 | 413.37 ₹74,873.71 Lowest |
| 7.00 | 12 mm cement plaster mix 1:6 (1 cement : 6 Fine Sand ) ( Sl No.- 11 of GMSOR 2018) | 268.63 | Sqm | 400 ₹1,07,452 | 412.5 ₹1,10,809.88 | 389.55 ₹1,04,644.82 Lowest |
| 8.00 | Loading of materials into tub at surface. ( Sl No.- 8a of GMSOR 2018) | 95.16 | Cum | 273 ₹25,978.68 | 281.8 ₹26,816.09 | 266.11 ₹25,323.03 Lowest |
| 9.00 | Un-loading the materials at destination point in UG. ( Sl No.- 8b of GMSOR 2018) | 95.16 | Cum | 199 ₹18,936.84 | 205.1 ₹19,517.32 | 193.65 ₹18,427.73 Lowest |
Tender Value
Refer Docs
EMD Value
₹16,100
Closing Date
28 Oct 2025, 5:00 pmClosed
GM (Oprn.), Baikunthpur Area
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Construction of 05 Nos. new RCC Isolation Stopping in proposed 90LE depillaring Panel at West Block of Churcha Mine (RO).
2025_SECL_345781_1
SECL/BKP/GMO/25-26/CW/eT/14 Dated 17.10.2025
Open Tender
Civil Works - Others
Item Rate
180 days
West Block of Churcha Mine (RO)
Please refer Tender document
4 documents required · 4 mandatory
₹16,100
6 Dec 2025
17 Oct 2025
29 Oct 2025
18 Oct 2025
28 Oct 2025
18 Oct 2025
18 Oct 2025 - 21 Oct 2025
Amount
Description of Work
Mulma cleaning /removal of debris from u/g gallaries and cleaning of belt roadways and staking /loading within 50m. ( Sl No.- 1 of GMSOR 2018 )
Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. d) in Coal (Sl No.- 2d of GMSOR 2018)
Groove cutting in roof/ floor / side for Stopping & Manhole by using chisel & hammer. a) Hard Stone ( Sl No.- 2a of GMSOR 2018 )
MS Rod 10mm. (Existing market rate)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 ( Sl No.- 13 of GMSOR 2018 )
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. ( Sl No.- 14 of GMSOR 2018 )
12 mm cement plaster mix 1:6 (1 cement : 6 Fine Sand ) ( Sl No.- 11 of GMSOR 2018)
Loading of materials into tub at surface. ( Sl No.- 8a of GMSOR 2018)
Un-loading the materials at destination point in UG. ( Sl No.- 8b of GMSOR 2018)
Lead for transportation of materials for every 15 mtr or part by head load for 50 m. (01 Leads) ( Sl No.- 7 of GMSOR 2018)
Total impact of GST for the purpose of CTC
NAVIN KUMAR (BID ID -1191771)
NAIMUDDIN ANSARI (BID ID -1192989)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Tendernotice_2.pdf
PDF • 1.38 MB
Tendernotice_3.pdf
PDF • 0.73 MB
BOQ_358456.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .