The Project Director , DRDA,Dindigul
The Project Director , DRDA,Dindigul
Upgradation/Strengthening of 2nos Rural Roads in Palani Block of Dindigul District under Mudhalvarin Grama Salaigal Membattu Thittam MGSMT 25percentage 2022-23 TN05-136
2023_RDTN_346420_1
DIPR NO.3578/Tender / 2023 dated. 13.07.2023
Open Tender
Civil Works
Item Wise
180 days
DINDIUGL DISTRICT
Upgradation/Strengthening of 2nos Rural Roads in Palani Block of Dindigul District under Mudhalvarin Grama Salaigal Membattu Thittam MGSMT 25percentage 2022-23 TN05-136
5 documents required · 5 mandatory
₹0
₹1.5 L
DRDA,DINDIGUL
5 Sept 2023
19 Jul 2023
27 Jul 2023
19 Jul 2023
27 Jul 2023
19 Jul 2023
21 Jul 2023
Amount
Name of the work : 1.Strengthening of the Road from Kombaipatty Periyaduraiyan koil to Panjupatty Medu Road Km 0/0-1/810 H/O Kanakkanpatty (R198) Estimate amount : Rs.63.55 Lakhs
A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking the existing worn out BT surface hard gneiss, granite,quartz metal 50mm to 100mm thick and repacking the metal to bring the existing surface to camber including leveling and sectioning as indicated by the departmental officer including labour charges for picking tools and equipments employed and all other incidental charges etc., complete as per standard
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. Side berms
Construction of Retaining wall for Ch 720m
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying for cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.
Construction of Retaining wall for Ch 1250m (for 10m)
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying for cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.
Providing Wearing coat at Ch 70m
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Providing Wearing coat at Ch 140m
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Providing Wearing coat at Ch 400m
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Providing Wearing coat at Ch 600m
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Providing Wearing coat at Ch 750m
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Supply of Km stone
Supply of Hm stone
Suppy and fixing of Sing board (60 cm Equilateral triangle cautionary signboard )
Road White marking
Provision for Name board charges
DPR+Soil invst charges (0.50%)
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Name of the work : 2.Strengthening of the Road from Valcot road to Periyadurayan kovil link road (Near Ramraj Thottam) Km 0/0-1/0 H/O Kanakkanpatty (R259) Estimate amount : Rs.72.65 Lakhs
A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking the existing worn out BT surface hard gneiss, granite,quartz metal 50mm to 100mm thick and repacking the metal to bring the existing surface to camber including leveling and sectioning as indicated by the departmental officer including labour charges for picking tools and equipments employed and all other incidental charges etc., complete as per standard
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. Side berms
Construction of Single apn of 1.50m RCC slab culvert at ch 10m
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying for plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Providing and laying Reinforced cement concrete 1:1.5:3 using 20mm ISS HBG metal in superstructure as per drawings and MORD technical specification clauses 800,1250.4 & 1205.5 Design mix M25 for Bed block &Deck slab
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Below sill
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Above sill
Supply and fabrication of S-415 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover, blocks and all other incidental charges etc complete, as per standard specification for culvert.for Bed block & Deck slab
Providing and fixing PVC EXPANSION JOINT in between Deck slabs over abutment and pier as shown in the Drawing including cost and conveyance of expansion Joints including Shalimar pad and joint sealant etc., Complete 1 joint.
Providing and fixing Kraft paper full width of deck slab and including cost and conveyance to work site, labour for fixing the same in corect position and all other incidental charges etc.,complete as per standard specifications.
Providing and fixing 100 mm Dia PVC Seepage pipes of required lengths for abutment and retaining walls including cost and conveyance of all materials to work site. Cost and labour for semispherical back fill arrangements with 100 mm size broken granite chips at the periphery and labour charges for fixing etc complete to drain the backfill as per standard specification.
Construction of Retaining wall for Ch 900m (880m to 943m)
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying for cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.
Construction of Single Span of 6m RCC Slab Culvert at Ch 550m
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS AND WINGS.
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications for FOUNDATION
Cement Concrete 1:3:6 using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTINGS OF ABUTMENT AND WINGS BELOW SILL LEVEL & ABOVE SILL LEVEL
Reinforced Cement Concrete 1:1.5:3 using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete for DIRT WALL CUM BED BLOCK OVER ABUTMENTS
Reinforced Cement Concrete 1:1.5:3 using 20mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DECK SLAB.
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for Below sill level
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for super structutre
Supply and Fabrication of Fe-415 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete, Fe-415 grade
Providing and fixing PVC EXPANSION JOINT in between Deck slabs over abutment and pier as shown in the Drawing including cost and conveyance of expansion Joints including Shalimar pad and joint sealant etc., Complete
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite, labour for fixing the same in correct position and other incidental charges etc., complete
Providing and fixing seepage pipes of 100mm PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to worksite, cost and labour for 900 mm dia. semi-spherical backfill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc., complete to drain the backfill.
Filling behind Abutments and wings with gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete..
Supply of Km stone
Supply of Hm stone
Suppy and fixing of Sign board
Road White marking
Provision for Name board charges
DPR Prepartion charges
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
KS Construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .