| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.4 LAccepted-AOC | ₹31.4 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹32.2 L+₹73,086.55 (2.32%)Rejected-Finance | ₹32.2 L+₹73,086.55 (2.32%) | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹33.9 L+₹2.4 L (7.64%)Rejected-Finance NEAR CIVIL HOSPITAL WARD NO 07 VPO CHOWARI DISTT CHAMBA HP 176302 | CHOWARI | CHAMBA | HP | 176302 | ₹33.9 L+₹2.4 L (7.64%) | L3 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | m/S Varun Gupta L3 | M/s ASS Construction Co L1 | S R CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth, for foundation, etc, or for foundation, etc, for shafts, wells, cesspits, manholes, pier holes, etc, n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in any type of soil complete all as specified and directed. | 65.45 | Cum | 355 ₹23,234.75 | 100 ₹6,545 Lowest | 300 ₹19,635 |
| 2.00 | M&L for PCC 1:4:8(nominal mix) type D-2 (using 40 mm graded crushed stone aggregate), as in foundation filling and mass concrete, complete all as specified and directed. | 11.2 | Cum | 4,255 ₹47,656 | 8,000 ₹89,600 | 4,000 ₹44,800 Lowest |
| 3.00 | Use and waste of formwork to sides of concrete foundation,footing,bases of columns,rafts and rafts beams ,sides and soffits (if any) of foundation and plinth beams and similar work ,vertical or to batter for fair finished surfaces of concrete complete all as specified and directed. | 57.12 | Sqm | 355 ₹20,277.6 | 300 ₹17,136 Lowest | 450 ₹25,704 |
| 4.00 | Use and waste of formwork to sides of pillars, posts, struts, columns etc for fair finished surface of concrete,complete all as specified and directed. | 36 | Sqm | 655 ₹23,580 | 300 ₹10,800 Lowest | 650 ₹23,400 |
| 5.00 | Use and waste of formwork to sides and soffits of floor or roof beams, beam haunchings, girders, bressummers, lintels, cantilevers, shelves including supports, overhangs, etc, also splays between floors and beams flat for rough finished surfaces of concrete, complete all as specified and directed. | 32.88 | Sqm | 655 ₹21,536.4 | 300 ₹9,864 Lowest | 650 ₹21,372 |
| 6.00 | Use and waste of formwork to soffits of flat and fair faces of suspended slabs such as roof slabs, floor slabs, landings and similar work, not exceeding 200mm thick (Horizontal or sloping) complete all as specified and directed. | 64.5 | Sqm | 655 ₹42,247.5 | 300 ₹19,350 Lowest | 700 ₹45,150 |
| 7.00 | M&L for RCC M-25 (using 20mm graded stone aggretate) design mix for Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc,complete all as specified and directed. | 13.79 | Cum | 8,500 ₹1,17,215 | 9,000 ₹1,24,110 | 8,000 ₹1,10,320 Lowest |
| 8.00 | M&L for RCC M-25 (using 20mm graded stone aggretate) design mix in columns ,pillars,piers,post and struts ,all as specified and directed complete all as specified and directed. | 4.6 | Cum | 9,250 ₹42,550 | 9,000 ₹41,400 | 8,500 ₹39,100 Lowest |
| 9.00 | M&L for RCC M-25 design mix (using 20mm graded stone aggregate) as in beams, cantilevers, bressumn- ers, lintels over 1.5m span all as sppcified complete all as specified and directed. | 4.9 | Cum | 9,250 ₹45,325 | 9,000 ₹44,100 | 8,500 ₹41,650 Lowest |
| 10.00 | M&L for RCC M-25 design mix (using 20mm graded stone aggregate) as in slabs supported on walls , beams, and columns in floors, roofs landings, balconies, canopies, deck slabs and in shelves and the like complete all as specified and directed. | 8.5 | Cum | 9,250 ₹78,625 | 9,000 ₹76,500 | 8,500 ₹72,250 Lowest |
Tender Value
Refer Docs
EMD Value
₹69,000
Closing Date
17 Jul 2026, 6:00 pmClosed
Aayush Kumar Singh
Holta camp palampur
PROVN OF RW AND SRW WORKS UNDER GE PALAMPUR
2026_MES_773479_1
GEP-37/2026-27
Open Tender
Civil Works
Item Rate
270 days
Palampur Mil Stn
As per tender documents
8 documents required · 8 mandatory
₹500
GE Palampur
₹69,000
11 Sept 2026
19 Jun 2026
24 Jul 2026
19 Jun 2026
17 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth, for foundation, etc, or for foundation, etc, for shafts, wells, cesspits, manholes, pier holes, etc, n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in any type of soil complete all as specified and directed. | - | Cum | - | - |
| 2 | M&L for PCC 1:4:8(nominal mix) type D-2 (using 40 mm graded crushed stone aggregate), as in foundation filling and mass concrete, complete all as specified and directed. | - | Cum | - | - |
| 3 | Use and waste of formwork to sides of concrete foundation,footing,bases of columns,rafts and rafts beams ,sides and soffits (if any) of foundation and plinth beams and similar work ,vertical or to batter for fair finished surfaces of concrete complete all as specified and directed. | 57.12 | Sqm | - | - |
| 4 | Use and waste of formwork to sides of pillars, posts, struts, columns etc for fair finished surface of concrete,complete all as specified and directed. | 36 | Sqm | - | - |
| 5 | Use and waste of formwork to sides and soffits of floor or roof beams, beam haunchings, girders, bressummers, lintels, cantilevers, shelves including supports, overhangs, etc, also splays between floors and beams flat for rough finished surfaces of concrete, complete all as specified and directed. | 32.88 | Sqm | - | - |
| 6 | Use and waste of formwork to soffits of flat and fair faces of suspended slabs such as roof slabs, floor slabs, landings and similar work, not exceeding 200mm thick (Horizontal or sloping) complete all as specified and directed. | 64.5 | Sqm | - | - |
| 7 | M&L for RCC M-25 (using 20mm graded stone aggretate) design mix for Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc,complete all as specified and directed. | 13.79 | Cum | - | - |
| 8 | M&L for RCC M-25 (using 20mm graded stone aggretate) design mix in columns ,pillars,piers,post and struts ,all as specified and directed complete all as specified and directed. | 4.6 | Cum | - | - |
| 9 | M&L for RCC M-25 design mix (using 20mm graded stone aggregate) as in beams, cantilevers, bressumn- ers, lintels over 1.5m span all as sppcified complete all as specified and directed. | 4.9 | Cum | - | - |
| 10 | M&L for RCC M-25 design mix (using 20mm graded stone aggregate) as in slabs supported on walls , beams, and columns in floors, roofs landings, balconies, canopies, deck slabs and in shelves and the like complete all as specified and directed. | 8.5 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_866074.xls
BOQ • 0.58 MB
td.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .