Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 LAccepted-Finance | ₹2.3 L | 1 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | SOUTHERN COMMUNICATIONS INFRASTRUCTURE PVT LTD L1 |
|---|---|---|---|---|
| 1.00Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. | ||||
| 1.01 | a) Thermo-Mechanically Treated bars. | 40 | Kg | 120 ₹4,800 |
| 2.00 | Providing and laying Reinforced Cement concrete with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size for Pole structural base / Pedestal size (230mmx450mmx1000 mm) each including cost of centering, shuttering . The concrete surface to be finished with 6mm plaster with Cement mortar 1:3 ( 1cement: 3 fine sand ) and painting the same with Water proofing cement paint. The rate includes necessary demolishing of Weathering tiles to required area of 0.15 Sq.m, disposing and Cleaning the same, Applying necessary Epoxy water Proofing coat on bottom and sides, insurance charges for labour and the agency is responsible for all precautionay measures to be maintained at site where the structural base / Pedestal for the pole is to be carried out at a height of upto 10.00 m from terrace excluding the pole height for safety of men working. ( The Reinforcement shall be paid in separate item) | 3 | Job | 5,000 ₹15,000 |
| 3.00 | Developing the column on the terrace by making holes of upto 20 mm dia by drilling a depth upto 200 mm including cleaning the surface by blowing air, injecting resin grout of Fisher FIS V 360S or equivalent and fixing 16 mm dia TMT bar dowels in position including all labour and Tools & Plants in work all complete as directed by Engineer-in-charge and Reinforcement bar shall be paid for separately. | 12 | Nos | 1,000 ₹12,000 |
| 4.00Supplying at site the galvanized Iron Pole materials consisting of angles, flats, pipes, bars bolts and nuts washers , Gusset plates, etc., including labour charges for cutting drilling holes, welding as required and galvanising of all sections upto 80 micron thickness as per the directions of Engineer-in-Charge. | ||||
| 4.01 | a) Pipes | 300 | Kg | 190 ₹57,000 |
| 4.02 | b) Angles, plates , flats etc. | 377 | Kg | 180 ₹67,860 |
| 5.00 | Erection of Pole structure on the terrace of the building, consisting of 3.00 Nos Poles of Different Dia upto a height of 9.00 M , including anchoring with stays etc complete including necessary sorting out of materials at site as per check list and tightening of bolts and nuts, washers etc. as per the requirement of Indian standard codes, torque checking etc. complete as directed by the Engineer- in- Charge. ( The rate includes necessary Tools and plants for hoisting,scaffolding,supporting men and materials,welding , insurance charges for labour and the agency is responsible for all precautionay measures to be maintained at site for safety of men working) | 1 | Job | 10,000 ₹10,000 |
| 6.00Painting of complete Pole structures steel works (Three numbers) and gantry with Epoxy Enamel paint in two or more coats over and including a base coat of Etch primer followed by Epoxy primer of Brand Berger or equivalent of approved make and even shade. | ||||
| 6.01 | a) 9.00 M Poles - Three Numbers are Individually erected and Each one Supported by Stay wires/ Angles | 1 | Job | 5,000 ₹5,000 |
Tender Value
Refer Docs
EMD Value
₹4,833
Closing Date
19 May 2026, 3:00 pmClosed
Executive Engineer C BSNL Civil Division Trichy
Executive Engineer Civil BSNL Civil Division Trichy
Supply and Erection of 3 Nos of 9.00 meter high Roof Top Poles structure including RCC Base, lightning conductor, Antistatic flooring to BTS room in Composite block Building at NITPY Tiruvettaikudi, Karaikal.
2026_BSNL_277301_1
NIT No.05/EE/BSNL/CD/TRY/2026-27
Open Tender
Civil Works
45 days
TRICHY
Please refer tender document
3 documents required · 3 mandatory
₹590
AO(Cash), O/O GM,BSNL,Thanjavur
₹4,833
23 May 2026
12 May 2026
23 May 2026
12 May 2026
19 May 2026
12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. | |||||
| 1.01 | a) Thermo-Mechanically Treated bars. | 40 | Kg | 119 | ₹4,760 |
| 2 | Providing and laying Reinforced Cement concrete with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size for Pole structural base / Pedestal size (230mmx450mmx1000 mm) each including cost of centering, shuttering . The concrete surface to be finished with 6mm plaster with Cement mortar 1:3 ( 1cement: 3 fine sand ) and painting the same with Water proofing cement paint. The rate includes necessary demolishing of Weathering tiles to required area of 0.15 Sq.m, disposing and Cleaning the same, Applying necessary Epoxy water Proofing coat on bottom and sides, insurance charges for labour and the agency is responsible for all precautionay measures to be maintained at site where the structural base / Pedestal for the pole is to be carried out at a height of upto 10.00 m from terrace excluding the pole height for safety of men working. ( The Reinforcement shall be paid in separate item) | 3 | Job | 6,196 | ₹18,588 |
| 3 | Developing the column on the terrace by making holes of upto 20 mm dia by drilling a depth upto 200 mm including cleaning the surface by blowing air, injecting resin grout of Fisher FIS V 360S or equivalent and fixing 16 mm dia TMT bar dowels in position including all labour and Tools & Plants in work all complete as directed by Engineer-in-charge and Reinforcement bar shall be paid for separately. | 12 | Nos | 944 | ₹11,328 |
| 4Supplying at site the galvanized Iron Pole materials consisting of angles, flats, pipes, bars bolts and nuts washers , Gusset plates, etc., including labour charges for cutting drilling holes, welding as required and galvanising of all sections upto 80 micron thickness as per the directions of Engineer-in-Charge. | |||||
| 4.01 | a) Pipes | 300 | Kg | 191 | ₹57,300 |
| 4.02 | b) Angles, plates , flats etc. | 377 | Kg | 177 | ₹66,729 |
| 5 | Erection of Pole structure on the terrace of the building, consisting of 3.00 Nos Poles of Different Dia upto a height of 9.00 M , including anchoring with stays etc complete including necessary sorting out of materials at site as per check list and tightening of bolts and nuts, washers etc. as per the requirement of Indian standard codes, torque checking etc. complete as directed by the Engineer- in- Charge. ( The rate includes necessary Tools and plants for hoisting,scaffolding,supporting men and materials,welding , insurance charges for labour and the agency is responsible for all precautionay measures to be maintained at site for safety of men working) | 1 | Job | 10,382 | ₹10,382 |
| 6Painting of complete Pole structures steel works (Three numbers) and gantry with Epoxy Enamel paint in two or more coats over and including a base coat of Etch primer followed by Epoxy primer of Brand Berger or equivalent of approved make and even shade. | |||||
| 6.01 | a) 9.00 M Poles - Three Numbers are Individually erected and Each one Supported by Stay wires/ Angles | 1 | Job | 8,192 | ₹8,192 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
Tendernotice_2.pdf
PDF • 0.21 MB
BOQ_323874.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid