Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1 for P2₹13.6 LAccepted-AOC | L1 for P2 | Accepted-AOC Evaluated L1 bidder | |
| 2 | L1 for P1₹17.0 LAccepted-AOC | L1 for P1 | Accepted-AOC Evaluated L1 bidder | |
| 3 | No L1₹2.0 LRejected-Finance | No L1 | Rejected-Finance Not evaluated L1 bidder for any package | |
| 4 | No L1₹3.1 LRejected-Finance | No L1 | Rejected-Finance Not evaluated L1 bidder for any package | |
| 5 | No L1₹3.2 LRejected-Finance | No L1 | Rejected-Finance Not evaluated L1 bidder for any package |
Tender Value
Refer Docs
EMD Value
₹39,000
Closing Date
14 Feb 2023, 4:30 pmClosed
Group SM(E), PnC div, Ratle HEP, Shalimar
Group SM(E), PnC div, Ratle HEP, Shalimar
Hiring of Running and Maintenance Services of various packages from PAFs/Locals of Ratle HE Project
2023_RHPCL_142513_2
RH/RATLE/PnC/C-023/2023
Open Tender
Facility Management Services
Item Rate
365 days
Shalimar, Dist-Kishtwar, UT of JnK
As per tender document
6 documents required · 6 mandatory
₹590
Yes
Ratle Hydroelectric Power Corporation Limited
₹39,000
Yes
11 Jul 2024
7 Feb 2023
16 Feb 2023
7 Feb 2023
14 Feb 2023
7 Feb 2023
Amount
Contractor's Profit and Overhead Charges, as required for execution of the entire scope of work of Package 1.
Contractor's Profit and Overhead Charges, as required for execution of the entire scope of work of Package 2.
MS Farooq Ahmad Sheikh
ASIF IQBAL BUTT
DHEERAJ SINGH
RAVI KUMAR SHAN
Rajinder Kumar Wazir
Ajit Singh Parihar
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .