Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹64.6 LAdmitted-Finance AT SRIRAM NAGAR PO STATION ROAD PS TALABANIA DIST PURI PIN 752002 | PURI | ODISHA | 752002 | -22.60% | ₹64.6 L | L1 | Admitted-Finance |
| 2 | L2₹66.6 LAdmitted-Finance | -20.25% | ₹66.6 L | L2 | Admitted-Finance |
| 3 | L3₹68.6 LAdmitted-Finance | -17.90% | ₹68.6 L | L3 | Admitted-Finance |
Tender Value
₹83.5 L
EMD Value
₹83,520
Closing Date
7 Apr 2026, 5:00 pmClosed
EXECUTIVE OFFICER, PURI MUNICIPALITY
VIP ROAD
CIVIL
2026_ORULB_127453_3
PM 08/2025-26
Open Tender
Civil Works - Others
180 days
PURI MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹83,520
Yes
21 May 2026
20 Mar 2026
8 Apr 2026
20 Mar 2026
7 Apr 2026
20 Mar 2026
20 Mar 2026 - 26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earth work in excavation of foundation in oridinary soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge | ||||||
| 2Sand Filling foundation and plinth with sand well watered and rammed including all cost, carriage, royality, taxes and all labour, T & P etc. all complete as per the direction of Engineer-in- charge. | ||||||
| 3Cement concrete (1:3:6) using 40mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. | ||||||
| 4Fly ash Brick masonry in cement mortar (1:6) in F&P with all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in- charge. | ||||||
| 5Fly ash Brick masonry in cement mortar (1:6) in Superstructure with all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in- charge. | ||||||
| 6Providing R.C.C. M20grade with 20mm and down graded CBHG chips including hoisting and laying with all cost carriage royality taxes and all labour involved for the completion of item of work as per direction of Engineer-in- charge. GROUND FLOOR Column Base | ||||||
| 7Column & Beam | ||||||
| 8Plinth Band | ||||||
| 9Stair | ||||||
| 101st Floor Column & Beam | ||||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
Tendernotice_2.pdf
PDF • 0.54 MB
BOQ_585744.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid