| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC LID EW SECTION AREEKODE | KANNUR | KERALA | 670002 | L1 | Accepted-AOC accepted | |
| 2 | L2₹1.6 L+₹8,956.82 (6.00%)Rejected-AOC | L2 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | MUHAMMEDSALIH P T L2 | SHIHABUDHEEN L1 |
|---|---|---|---|---|---|
| 1.00DWSS | |||||
| 1.00 | OD525166/2025-2026:Supplying and fixing of open well type centrifugal pump set with all fittings, suction
and delivery pipe,panel
board volt meter,ammeter,indicator lamp,non return valve, etc. complete | 1.5 | HP (Horse power) | 13,350 ₹20,025 | 12,709.2 ₹19,063.8 Lowest |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 15 | hour | 350 ₹5,250 | 328.95 ₹4,934.25 Lowest |
| 1.00 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 30.33 | sqm | 309 ₹9,372.9 | 294.1 ₹8,920.94 Lowest |
| 1.00 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 1.52 | cum | 9,845 ₹14,934.87 | 9,374.5 ₹14,221.12 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 152.63 | kilogram | 120 ₹18,315.36 | 107 ₹16,331.2 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 50 | kg | 179 ₹8,950 | 169.8 ₹8,490 Lowest |
| 1.01 | 51.18.12.6:Providing and fixing G.I. pipes complete with G.I. fittings (Cost of fittings to be paid separately) <br> External work - 50 mm nominal dia | 100 | metre | 678 ₹67,800 | 644.95 ₹64,495 Lowest |
| 1.01 | 50.18.7.3.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 25 mm dia 10Kgf/ cm2- Internal work- Exposed on wall | 45 | metre | 300 ₹13,500 | 283 ₹12,735 Lowest |
Tender Value
₹1.6 L
EMD Value
₹3,918
Closing Date
18 Mar 2026, 3:00 pmClosed
REENA.V
Office of the Assistant Engineer,LID EW SECTION KARAKURUSSI GP
ET-6-Annual Plan-Karakurussi gp 2025/26,Project No.321/25-26-Maintance of drinking water schemes in various wards of panchayat CFC 2022-23-General Civil Work
2026_LSGD_845898_6
05/25-26/AE/LSGD/KKSY
Open Tender
Civil Works - Others
Item Rate
300 days
Karakurussi gp
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹3,918
Yes
25 May 2026
10 Mar 2026
21 Mar 2026
10 Mar 2026
18 Mar 2026
10 Mar 2026
OD525166/2025-2026:Supplying and fixing of open well type centrifugal pump set with all fittings, suction and delivery pipe,panel board volt meter,ammeter,indicator lamp,non return valve, etc. complete
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
51.18.12.6:Providing and fixing G.I. pipes complete with G.I. fittings (Cost of fittings to be paid separately) <br> External work - 50 mm nominal dia
50.18.7.3.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 25 mm dia 10Kgf/ cm2- Internal work- Exposed on wall
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1429046.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_1429046.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.88 MB
viewnit.pdf
Tender Documents • 0.03 MB
datecorrigendumpdfnew.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .