| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.1 L+₹1.1 L (5.74%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN LOWEST BIDDER |
Tender Value
₹16.5 L
EMD Value
₹33,000
Closing Date
2 Mar 2022, 6:00 pmClosed
GE 881 EWS C/o 56 APO
GE 881 EWS C/o 56 APO
PROVN OF TOILET BLOCK WITH ALLIED INFRASTRUCTURE AT MANDI UNDER GE 881 EWS
2022_MES_499582_2
GE/PNH-63/2021-22
Open Tender
Civil Works
Lump-sum
180 days
GE 881 EWS C/o 56 APO
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE 881 EWS
₹33,000
Yes
8 Jun 2022
14 Feb 2022
4 Mar 2022
14 Feb 2022
2 Mar 2022
15 Feb 2022
Amount
Schedule 'A' Part-I (Building Work) JOB NO. 25RR/0794/2021-22 (Toilet block)
Total amount of Sch 'A' Part-I (Building work) brought forward from srl page No-21
Schedule 'A' Part-II (Internal Water Supply works) JOB NO. 25RR/0794/2021-22 (Toilet block)
Total amount of Sch 'A' Part-II (Internal Water Supply works) brought forward from srl page No-23
Schedule 'A' Part-III (Plumbing works) JOB NO. 25RR/0794/2021-22 (Toilet block)
Total amount of Sch 'A' Part-III (Plumbing works) brought forward from srl page No-24
Schedule 'A' Part-IV (Internal Electrification works) JOB NO. 25RR/0794/2021-22 (Toilet block)
Total amount of Sch 'A' Part-IV (Internal Electrification works) brought forward from srl page No-27
Schedule 'A'Part-V (Excavation and EarthWork) JOB NO. 25RR/0794/2021-22 (Toilet block)
Total amount of Sch 'A' Part-V (Excavation and EarthWork) brought forward from srl page No-28
Schedule 'A'Part-VI (Sewage Disposal Works) JOB NO. 25RR/0794/2021-22 (Toilet block)
Total amount of Sch 'A' Part-VI (Sewage Disposal Works) brought forward from srl page No-30
Schedule 'A'Part-VII (External water supply Works) JOB NO. 25RR/0794/2021-22 (Toilet block)
Total amount of Sch 'A' Part-VII (External water supply Works) brought forward from srl page No-31
Schedule 'A'Part-VIII (External Electric supply Works) JOB NO. 25RR/0794/2021-22 (Toilet block)
Total amount of Sch 'A' Part-VIII (External Electri supply Works) brought forward from srl page No-32
Schedule 'A'Part-IX (Path Works) JOB NO. 25RR/0794/2021-22 (Toilet block)
Total amount of Sch 'A' Part-IX (Path Works) brought forward from srl page No-33
Schedule 'A'Part-X (Area Drainage Works) JOB NO. 25RR/0794/2021-22 (Toilet block)
Total amount of Sch 'A' Part-X (Area Drainage Works) brought forward from srl page No-34
Schedule 'A'Part-XI (Protective Works) JOB NO. 25RR/0794/2021-22 (Toilet block)
Total amount of Sch 'A' Part-XI ( Protective Works) brought forward from srl page No-35
Schedule 'A'Part-XII (Heating Appliances Works) JOB NO. 25RR/0794/2021-22 (Toilet block)
Total amount of Sch 'A' Part-XII ( Heating Appliances Works) brought forward from srl page No-36
Schedule 'A'Part-XIII (Misc Items of Works) Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under Col. 5 siginifies this fact only. JOB NO. 25RR/0794/2021-22 (Toilet block)
S&F LED Lamp 10 watts (B-22 holder) suitable for batten holder PVC/polycarbonate type, complete all as specified. Make of LED lamp:- Havells cat part No LHlDERUEML8x010 or Equaivalent cat part of make as specified in P.S.
Construction of septic tank with cover slab of RCC M-25 (Design mix) for 25 users, built in brick work in cement mortar 1:4 (with top of slab at ground level) including necessary excavation and earth work in any type of soil, returning, filling and disposal of surplus soil as directed, RCC manhole cover with angle iron welded frame complete, vent shaft with cowl etc. complete all as specified.
Construction of soakage well 1.80 mtr dia and 3 mtr deep below inlet (depth) from inlet pipe to ground level 45 cm, including excavation and earth work in hard / dense of soil, PCC 1:4:8 type D-2 (using 40 mm graded crushed stone aggregates) in foundation, wall in honey combed brick work in CM 1:4, cover slabg of M-25 (Design mix), filling with brick bats, earth cushion on brick lining on top and inlet pipe 150mm dia, complete all as specified and as shown on drawings.
M&L for cutting the existing GI pipe line and inserting the TEE suitable for connecting GI line complete all as specified and directed.
M/S KEWAL KRISHAN SANJEEV KUMAR VAID
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .