Executive Engineer Mech Gandhinagar
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar.
343991
Tender Notice No.12 of 2026-27
Open
Electrical
Works
Gandhinagar
17 documents required · 16 mandatory · 1 optional
₹2,832
Gujarat Maritime Board NON PLD, Gandhinagar.
₹81,000
16 Sept 2026
16 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
Name of work: Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar.
Amount put to Tender: - Rs.
Office of the Executive Engineer (Mech)
Gujarat Maritime Board
Sector10 A, Opp. Air Force Station
Gandhinagar - 382
Email: [email protected]
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Name of work: Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar.
Chapter Name Page No.
- Title Page 00 to
01 Notice Inviting Tender 02 to
02 General Information 05 to
03 Eligibility (PQ) criteria for bidders 07 to
04 Instruction to bidders 09 to
05 PQ FORM LIST- I TO VI & Ref. Letters 15 to
06 Tender Form for Electrical Work 24 to
07 Scope of work 78 to
08 Special conditions during installation of lifts 81 to
09 Insurance & Inspection 83 to
10 Special Conditions 85 to
11 General Conditions 86 to
12 Commercial Conditions 87 to
13 Approved Make List 88 to
14 Recovery amount statement 89 to
15 Lift shaft layout 90 to
14 Price bid 91 to
Please read as:-
(1) GUJARAT MARITIME BOARD instead of GUJARAT STATE.
(2) Vice Chairman and Chief Executive Officer, GMB instead of Governor of Gujarat.
(3) EXECUTIVE ENGINEER (MECH.) instead of EXECUTIVE ENGINEER.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
NOTICE INVITING TENDER (NIT)
On behalf of the Chairman-Gujarat Maritime Board, The Executive Engineer (Mech.)
Office of the PIU Gujarat Maritime Board, GMB Office Complex, Sec-10A Gandhinagar from reputed
agencies having sound background and experience in such type of similar work.
Department Name : Gujarat Maritime Board
Superintending Engineer (Mech.),
Circle : 5th Floor, Sagar Bhavan, Sector 10A, CHH Road
Gandhinagar -382010.
Division (For Inviting Tender : Executive Engineer (Mech.),
only) Gujarat Maritime Board, PIU-Gandhinagar.
Division (For issue of A.L. & Executive Engineer (Mech.),
W.O. and work execution) :
Gujarat Maritime Board, PIU- Jamnagar
IFB No. : Tender Notice No.12 of 2026-27
Location : At GMB Office complex, Jamnagar.
Upgrade 3 Nos. Elevators at GMB Complex,
Estimated Contract Value : Rs.
Period of Completion : 8 (eight) Month
Bidding Type : Open
Bid Call (Nos.) : 01 (One)
Tender Currency Type : Single
Tender Currency Settings : Indian Rupee (INR)
Joint Venture : Not Applicable
Rs.2832.00 by D.D.(Non-refundable)inclusive of
Bid Document Fee :
Gujarat Maritime Board NON PLD Account.
Bid Document Fee Payable To :
Payable at Gandhinagar.
Minimum of Rs.81000/- (incl. GST) in form of FDR
of any scheduled/ nationalized bank With
Bid Security / EMD (INR) :
minimum 06 months validity.
(D.D. will not be valid for EMD)
Bid Security / EMD in favour The Executive Engineer (Mech.), Gujarat Maritime
: Board, Gandhinagar Payable at Gandhinagar
Bid Document Downloading
Bid Document Downloading
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Last Date & Time for Receipt
(Submission) of Bids
Bid Validity Period : 120 days after opening of price bid
The Bidder has to submit the following required
documents in electronic format only through
online scanning and send the same documents in
a sealed envelope through RPAD/Speed Post only
from date 01/10/2026 to 09/10/2026, up to office
18.10 hr at the Office of the Executive Engineer
(M), SAGAR BHAVAN, Gujarat Maritime Board, 5th
floor Mech. wing, Opp. Air Force Station, Sector
Submission of Documents etc. : 10A, Gandhinagar-382010 mentioning the name
of work on the sealed envelope.
The details of documents are as mentioned in
relevant chapter-3 "Eligibility criteria(PQ) for
Note: - No condition will be acceptable in letter of
Bidders shall submit their bid/offer in electronic
format on website, after digitally signing the same.
Bid offer, which are not digitally signed will not be
Remarks : accepted.
No price-bid offer in physical form will be accepted
and any such offer, if received by GMB will be
outright rejected.
Contact Information :
Email: [email protected]
Dt: 12/10/2026 from 12.00 Hrs. Onwards…
Online bid Opening Date :
In the office The Executive Engineer (Mech.) PIU
GMB-Gandhinagar
Officer Inviting Bids only : The Executive Engineer (Mech.),
Gujarat Maritime Board, Gandhinagar.
Officer as E.I.C. (For issue of A.L. & : The Executive Engineer (Mech.),
W.O. and work execution) Gujarat Maritime Board, PIU- Jamnagar.
Bid Opening Authority : The Superintending Engineer (Mech.)
GMB Complex, Sector 10A, CHH Road
Gandhinagar -382010
Address : The Superintending Engineer (Mech.)
GMB Complex, Sector 10A, CHH Road
Gandhinagar -382010
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
General Terms and Conditions:-
(1) Bidders can download the tender document free of cost from the website.
(2) Bidders have to submit Price bid in Electronic form only on n-procure website till the Last
Date & time for submission.
(3) Offers in physical form will not be accepted in any case.
(4) Free vendor training camp will be organized every Saturday between 4.00 to 5.00 P.M. at
(n) code solutions-A Division of GNFC Ltd. Bidders are requisite take benefit of the same.
(5) Government of Gujarat & Governor Shall be Rear as GUJARAT MARITIME BOARD &Vice
Chairman and Chief Executive Officer-GMB, respectively.
Bidders who wish to participate in online tenders will have to procure / should have legally
valid Digital Certificate as per Information Technology Act-2000 using it they can sign their
electronic bids. Bidders can procure the same from any of license certifying Authority of India
or can contract (n) code solutions- A division GNFC Ltd, who are licensed Certifying Authority
by Govt. of India.
All bids should be digitally signed, for details regarding digital signature certificate related
training involved the below mentioned address should be contacted:
(n) Code Solutions
A division of GNFC
301, GNFC Info tower, Bodakdev,
Ahmedabad – 380 054 (India)
E-mail: [email protected], Web-site: www.nprocure.com
Toll Free: 1800-233-1010(Ext. 321)
Other Terms & Conditions as per detailed tender documents.
Signature of Executive Engineer (Mech.)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
GENERAL INFORMATION
The Gujarat Maritime Board (GMB) was set up on 4thApril 1982 under Gujarat Maritime Board Act,
1981 (Gujarat Act No. 30) in order to develop, administer, operate and regulate the state’s port
sector. In 1998/99 GMB constructed the building of its Head Office as a cornerstone for controlling
and coordinating various port activities.
On behalf of the Gujarat Maritime Board, the Executive Engineer (Mech.), GMB, PIU Gandhinagar
invites tenders from reputed agencies having sound background and experience in Electrical work
for “Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar.
2.2 Site Information
The contractor has to carry out the said work at GMB complex Jamnagar. Contractor is strongly
advised to visit the site and acquainted himself with the site condition its surrounding etc. in view
of performing the scope of tender.
GMB is in a plan to Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar.
2.3 Definitions:
In the contract as hereinafter defined, the following words and expressions shall have the meaning
hereby assigned to them except where the context otherwise requires.
⮚ The Expression “Board” means Gujarat Maritime Board constituted under the Gujarat
Maritime Board Act
⮚ The expression “Work” where used in this document shall, unless there be something in the
subject or contest repugnant to such construction, be constructed to mean the work or the
work contracted and to be executed under or in virtue of the contract, whether temporary or
permanent and whether originally or altered, substituted or additional. It shall include all extra
or excess works and variations and be subject to all commissions ordered in accordance with
these conditions.
⮚ “Site” means the land, jetty, dry-dock and/or other places on, stacking area, under, in or
through which works are to be executed or carried out and services to be rendered any other
lands or places provided by Gujarat Maritime Board for the purpose of the contract together
with such other places that may be specifically designated in the contract as forming part of
⮚ “Contract “means the notice inviting tenders, general conditions of contract, terms and
conditions of contract, specifications, price bid, tender and contract agreement made at the
time of awarding the work and also the mutual agreement made jointly during contract period.
⮚ "Contract Price" means the sum named in the tender subject to such additions thereto or
deductions there from during negotiation as may be under the provisions hereinafter
⮚ “Contract Period” means total time limit allowed for this work from the date of issue of work
order by the Executive Engineer (Mech.), GMB, PIU Jamnagar for this tendered work.
⮚ “Bidder”/” Contractor”/”Agency” shall mean the person or persons, firm, company or
corporation who’s tender has been accepted by the GMB and includes Bidder’s/ Contractor’s
personal representative, successors and permitted assignees or joint Bidders who shall be
deemed to be bound jointly and separately.
⮚ “Requirement” means total quantity or numbers of system required as per tender
requirement and accordingly order has placed by the Executive Engineer (Mech.), GMB, PIU
Jamnagar or his authorized representative. The requirement may be increased or decreased as
mentioned in the tender document which approved by the Competent authority.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
⮚ “Engineer-in-charge” (EIC) shall mean the Executive Engineer (Mech.), GMB PIU Jamnagar or
his authorized representative i.e. the Deputy Executive Engineer (Elect.), - Jamnagar Port, who
shall exercise only such authority on behalf of the Executive Engineer (Mech.) as may have been
delegated to him from time to time by the Executive Engineer (Mech.) and powers delegated
to him by the Government/GMB Rules.
⮚ “Approved” means approval given in writing including verbal approval for which subsequent
written confirmation is given and “approval” means approval in writing including as aforesaid.
⮚ “Competent authority” Officer or officers of the Gujarat Maritime Board competent to
exercise the powers conferred upon him/them by the GMB/Government.
⮚ “Drawings” means the drawings referred to in the specifications and attached with the
agreement and any modifications of such drawings approved in writing by the classification
society / EIC or such other drawings as may, from time to time be furnished or approved in
writing by the EIC.
2.4 Abbreviations:
GMB / Board - Gujarat Maritime Board.
EIC - Engineer-In-Charge.
BOQ - Bill of Quantities.
BIS - Bureau of Indian Standard.
SE (Mech) - Superintending Engineer (Mechanical)
XEN - Executive Engineer (Mech.),
DEE (Elect) - Deputy Executive Engineer (Elect)
GoI - Government of India
GoG - Government of Gujarat
IRS - Indian Register of Shipping
NIT - Notice Inviting Tender
Signature of Executive Engineer (Mech.)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
ELIGIBILITY (PQ) CRITERIA FOR BIDDER
3.1 MINIMUM QUALIFICATION CRITERIA AND EVALUATION PROCEDURE :
PQ cum technical bid will be evaluated on the basis of documents submitted as per NIT and
following main criteria as per details provided by the bidders in requisite Performa i.e. Annexures,
along with prescribed application form given in this bid, without which tender/application will not
be considered for evaluation and opening of price bid. Bidders who fulfil the minimum criteria will
be qualified for opening of price bid.
The Bidder has to submit the following required documents in electronic format only through
online scanning and send the same documents in a sealed envelope through RPAD/Speed Post only
from date 01/10/2026 to 09/10/2026, up to office 18.10 hr.at the Office of the Executive Engineer
(M), SAGAR BHAVAN, Gujarat Maritime Board, 5th floor Mech. wing, Opp: Air Force Station, Sector
10A, Gandhinagar-382010 mentioning the name of work on the sealed envelope.
Main criteria of evaluation are as following:
A. General Criteria:
1. Letter of Application
2. Tender fee of Rs. 2832.00 (Non-refundable). Pay in favour of "Gujarat Maritime Board
NON PLD Account." Payable at Gandhinagar.
3. Earnest Money Deposit of Rs. 81,000.00 in form of FDR of any scheduled/ nationalized
bank With minimum 06 months validity.( (DD will not allowed) in favour of "The
Executive Engineer (Mech.), Gujarat Maritime Board, Gandhinagar." Payable at
4. Photocopy of PAN Card.
5. Valid GST Registration Certificate.
6. A valid Certificate of Authorization, duly issued by the Chief Electrical Inspector of the
concerned Government Department, authorizing the agency for the manufacturing of
the specified make of lifts as mentioned in Chapter No. 13 and for the maintenance of
7. Valid ISO 9001:2001 certificate of the Lift OEM.
8. Valid Electrical Contractor License duly issued by concerned Government deptt.
9. Bidder must provide the self-declaration certificate regarding attending emergency
breakdown time and regular breakdown time. (referenced letter is attached)
10. Bidder must provide the self-declaration certificate of the passenger lift offered by them
shall be designed, manufactured, supplied, installed, tested and commissioned in
accordance with the latest applicable provisions of the Bureau of Indian Standards (BIS)
and all relevant Indian Standards, including IS 17900 (all applicable parts).
11. Bidder must provide the self-declaration certificate of availability of spare parts-
whether manufactured in-house OR procured from approved vendors for minimum
years.( Lift Works)(Ref letter is attached)
12. PQ Forms – I to VI.
B. Financial Criteria:
1. Annual Turnover of any one of the last 05 financial years i.e. from 2021-22 to 2025-
26 shall be more than ₹. 6852113.00. ( CA certified shall be upload/submit)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
2. Solvency Certificate: Bank Solvency of Rs. 13.71 Lakh or above from any
Nationalized/Schedule bank for tendering purpose, issued on or after 1st January
C. Experience Criteria:
Experience of having successfully completed of similar* work of following amount
during last five financial years i.e. from 01-04-2021 to till the due date of bid.
One similar completed work costing not less than of Rs. 27,40,845.00.
*Similar work means: experience of successfully completion of "SITC of Lift/Elevators"
Bidder should have Minimum experience of Installation of Similar type of Lift Work.
(Work completion certificate and the copy of relevant lift usages license for that
shall be upload/submit)
Signature of Executive Engineer (Mech.)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
INSTRUCTION TO BIDDER
On behalf of the Gujarat Maritime Board, the Executive Engineer (Mech.), PIU, GMB-Gandhinagar invites
tenders from reputed agencies having sound background and experience in "Upgrade 3 Nos. Elevators
at GMB Complex, Jamnagar."
4.1 BID SUBMISSION :
a) The bid should be uploaded (submitted) through the official web site www.nprocure.com“As
b) The physical documents shall be submitted through RPAD/Speed Post only “As per NIT”.
Beyond the last date physical submission will not be accepted/ considered in any case and it
will be returned back to the bidder. The envelope must be super-scribed with name of work.
GMB is not responsible for the tender process, if on the cover name of tender work is not
c) The Board does not assume any responsibility for the supporting tender documents being torn/
damaged during the postal transit. It is the responsibility of the Bidder to see that the
supporting tender documents reach this office before due date as fixed and notified in the
tender notice for the purpose of receipt of the tender.
4.2 TENDER FEE (NON-REFUNDABLE):
Tender Document can be download from GMB website www.nprocure.com and the tenderer have
to pay tender fee in form of Demand Draft (DD) “As per NIT". Scanned copy of the same must be
uploaded online as well as physical submission as per NIT.
Tender without Tender fees, will be rejected outright.
4.3 EARNEST MONEY DEPOSIT (EMD) :
a) The Bidder shall submit Earnest Money “As per NIT” in form of Fixed Deposit Receipt (FDR)
with the tender, failing which the tender will not be considered.
b) The Earnest Money shall be submitted in the form of FDR of any scheduled/ nationalized bank
as “Mentioned in NIT”. Cheque/D.D. will not be accepted towards the Earnest Money Deposit.
c) The Earnest Money deposited by the unsuccessful Bidders will be refunded after the finalization
of tender. E.M.D. shall not bear any interest.
d) The Earnest Money deposited by the successful Bidder will be refunded on receipt of Security
Deposit and Performance Security.
e) If any party backs out after GMB has accepted his bid, it will be considered default and in such
case, necessary action against bidder will be taken by GMB such as
i. Forfeiting of EMD
ii. Black listing the agency for three years, etc.
4.4 SECURITY DEPOSIT (SD) :
The successful Bidder has to furnish a Security Deposit (SD) by FDR with the Gujarat Maritime
a) The successful Bidder will be required to furnish a Security Deposit (SD) of sum of “10% of the
Contract value + Applicable GST”, in the form of Fixed Deposit Receipt (FDR) with the Gujarat
Maritime Board having validity of 24 months in favour of The Executive Engineer (M), GMB
b) If the security deposit is not furnished within 15 days on issuing acceptance letter or such
extended period as may be permitted by the Executive Engineer (Mech.), GMB, PIU Jamnagar in
writing, the Earnest Money deposit is liable to be forfeited and the tender will be considered as
cancelled. The board shall take penal action up to black listing the agency for period of 03 years.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
c) In the event of the Bidder, after the issue of the Acceptance Letter (AL) by the GMB, fails/refuse
to execute the agreement as hereinafter provided, the Bidder shall be deemed to have
abandoned the contract and such an act shall amount to be construed as wilful breach of
contract. In such case the Board shall have full right to claim damages incurred in addition to
the forfeiture of earnest money deposit.
d) The GMB may at their option forfeit the Security deposit, if the TPI fails to affect perform the
services or observe the conditions of contract. The Board will also be at liberty to deduct any
sum that may be due to the GMB from the Security Deposit or from any sums of money due or
that may become due under any other contract from the bidder. This is without prejudice to the
rights of the Board under the terms of the contract.
e) The said Security deposit shall not in any way be construed as a limitation of the Contractor’s
responsibility or liability pertaining to his obligations and/or guarantees under the contract
and shall be without prejudice and in addition to any other remedies available to the Board in
terms of the contract and/or the laws of the land.
f) The security deposit will be released only on satisfactory completion of scope of work
(including Defective liability period (DLP)) as required and as counterploted in the contract.
4.5 TIME SCHEDULE:
The time allowed for the Completion of the work “Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar."
is considered as 8 (eight) Month from the date of start/commencement.
4.6 RIGHT OF THE BOARD TO ACCEPT OR REJECT THE TENDER:
a) The Board does not bind itself to accept the lowest tender and reserves the right to reject any
or all tenders received without assigning any reason, whatsoever.
b) Tenders in which any of the particulars and prescribed information is inadequate or incomplete
in any respect and/or the prescribed conditions are not fulfilled are liable to be rejected.
c) The Gujarat Maritime Board reserves the right to drop the entire tendering process without
assigning any reasons thereof.
d) The Gujarat Maritime Board reserves the right to reject any bidder on the basis of past
experience OR previous history of bidder under any contract of GMB.
4.7 PRE CUM TECHNICAL QUALIFICATION:
The bidder’s qualification shall be decided on the basis of information submitted in the prescribed
Annexures & qualification criteria mentioned in this tender document as mentioned in Chapter-03
i.e. experience, financial position, etc. as well as other documents mentioned and hence all bidders
are requested to fill the information strictly correct in prescribed Performa only with full
knowledge and supporting documents otherwise they will be disqualified for the work.
The information for financial data and project costs by the bidder should be submitted in Indian
The competent authority of the Gujarat Maritime Board shall evaluate the pre-qualification
4.8 BID OPENING :
a) The On-line tender for Pre-Qualification cum Technical bid shall be opened “As per NIT”.
b) The Technical bid shall be opened online of those Bidders who are pre-qualified. The date and
time of opening of the Technical Bid will be notified to the qualified Bidders in advance of
c) During the process of Bid evaluation GMB may call the bidders for discussion /clarification and
also can ask for requisite support documents.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
d) The Price bid shall be opened online for those Bidders who are pre-qualified and technically
e) Tenders submitted by Bidders shall remain valid for acceptance for a period of 120 days from
the date of opening of the price bid. The Bidder will not be allowed during the declared period
of validity to revoke or cancel his tender or to vary any term thereof.
f) If any Bidder withdraws his tender before the date of validity as declared, the earnest money
deposited by the Bidder, shall be outright forfeited. There shall be considered as breach of
contract and action against bidder shall be taken according to norms.
g) The work will be awarded to the lowest techno-commercial offer after approval obtained from
the competent authority.
h) Only the authorized representatives of the bidders will be allowed to be present during bid
4.9 COLLECTION OF DATA - BIDDER'S RESPONSIBILITY:
The Bidder shall visit the site and acquaint himself fully with the site and local conditions and no
claims whatsoever will be entertained on the plea of ignorance of difficulties for execution of the
Before submitting the tender, the Bidder shall be deemed to have clearly understood and satisfied
himself regarding the work and services, all conditions liable to be encountered during the
execution thereof and that prices, rates and/or compensation quoted in the offer are adequate and
all-inclusive with respect to all factors, circumstances and conditions likely to be incidental, both
direct and indirect, to the work and services
Contractor is strongly advised to visit the site and acquainted himself with the site condition its
surrounding etc. in view of performing the “Scope of Work”.
In general, Collection of DATA is Bidders responsibility.
4.10 ADDENDA / CORRIGENDA:
The Executive Engineer (Mech.), GMB, PIU Gandhinagar shall have the right to revise or to amend
the contract documents prior to the date of receipt and opening of the tender aforesaid such
revision or amendments or extensions, if any, shall be communicated to all concerned in the form
of a letter or by notice in the press, as may be considered necessary.
Addenda/Corrigenda to the tender documents may be published by the Executive Engineer
(Mech.), GMB, PIU Gandhinagar prior to the date of opening of the tenders, to clarify or reflect
modifications in the contract terms and conditions. Any Addendum/ Corrigendum will become part
of Tender document.
4.11 AMBIGUITY:
In case of there be any ambiguity or doubt as to the meaning of any of the tender clauses/conditions
or, if any further information is required, the matter should immediately be referred to The
Executive Engineer (Mech.), Gujarat Maritime Board, PIU Gandhinagar in writing, whose
interpretation shall be final and binding to the contractor.
4.12 TERMINATION
Gujarat Maritime Board shall be entitled to terminate this contract at no cost due to:
a) In the event bidder is adjudicated or found bankrupt of insolvent or any order is made or
resolution passed for the winding up, liquidation of dissolution of bidder firm.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
b) This CONTRACT shall be deemed to have been automatically terminated on the completion of
guarantee/defect liability period.
c) If, GMB considers that the performance of the contractor is unsatisfactory or, not up to the
expected standard, the GMB shall notify the contractor in writing and specify in detail the cause
of such dissatisfaction. The GMB shall have right to terminate this CONTRACT by giving 30 days’
notice in writing to the contractor, if, contractor fails to comply with the requisitions contained
in the said written notice issued by the GMB.
d) If, contractor abandons this Contract or if he fails to perform or observe any of the obligations
OR its part to be performed and observed hereunder and refuses to take steps to remedy the
same within 7 (seven) days of written notice from GMB Or for any other reason by giving
days written notice, stating the reasons for termination.
e) Termination of this Contract shall be without prejudice to any rights or remedies accrued to
either Party prior to such termination.
f) No further payment shall become due to the contractor in respect of any period after
termination of this Contract with the exception only on any payment previously accrued and
due for payment to contactor for satisfactory service under the terms of this Contract.
4.13 PERMITS, LAWS AND REGULATIONS
The Contractor shall carry out the work bound by all applicable laws of Indian Electricity Act &
Gujarat Maritime Board (GMB) and hereby undertakes to comply and to ensure compliance with all
laws, ordinances, rules, regulations, bye-laws, decrees and orders whether of GMB/GOG/GOI or
other authority for Obtaining Permits etc.
Contractor shall be responsible for obtaining and maintaining all licenses, permits, clearances,
certifications and authorizations necessary for the performance of his obligation under this
Contract at his own cost.
4.14 SAFETY& INSURANCE
The Contractor shall at his own expense arrange for all the safety provisions normally called for by
the nature of on-shore electrical asset repairing work and as ordered by the competent
Authority/EIC OR his authorized Representative in respect of all personnel directly or indirectly
employed for this contract.
The contractor shall be responsible to arrange insurance of all labourers, skilled and unskilled,
workers, supervisors, etc. employed by him for this work, as per labour regulation of the State at
his own cost & there will be no liability comes on GMB in case of any accident/loss of life or goods
during this entire contract.
The Contractor shall be responsible for the safety of their Labours, Supervisor, own
equipment/material during this Contract. The Contractor shall also take such additional
precautions as may be indicated from time to time by the EIC or his authorized Representative with
a view to prevent any losses like theft, fire hazards, act of god, etc.
Without limiting his obligation and responsibilities under various clauses & conditions in this
contract, the contractor must insure “Workman Compensation Policy with Medical Extension” for
all labourers, skilled and unskilled, workers, supervisors, etc. deployed for said work. The cost of
tender includes all medical compensation that is to be extended to the workers employed by the
contractor in case of any sort of medical requirement that may arise to the workers and GMB would
not be liable for the same.
Any accident/death of person/theft occurs during execution of this work, the GMB has no liability
for the same. It will be solely contractor’s responsibility.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
4.15 LAWS GOVERNING THE CONTRACT
This Contract shall be subjected to the laws and regulation governed by the GMB & Government of
Gujarat that may be in force during the Contractual period.
4.16 JURISDICTION:
The award of contract is subject to the Jamnagar PIU (Gujarat State) jurisdiction.
4.17 SIGNING THE CONTRACT:
The successful Bidder shall be required to execute an Agreement on stamp paper of the required
value within 15 days from the date of issue of the notice of Letter of Intent with submission of
Security Deposit as per above stated clause. In the event of failure on the part of the successful
Bidder to execute the agreement within the above stipulated period, or the period agreed by the
GMB, the Earnest Money deposited by him will be forfeited and apart from that the GMB being in
such circumstances entitled to treat the successful Bidder as in breach of contract and proceed
4.18 INSTRUCTIONS TO BIDDERS TO FORM PART OF THE AGREEMENT :
All these instructions, conditions, special conditions, if any, Technical specifications contained in
the tender document and any correspondence related to this Contract shall form part of the
1) Letter of Application shall be submitted in proper format. Incomplete offers shall be rejected.
2) The bidder shall satisfy himself with regard to the nature of work to be carried out, its scope, the
conditions of the contract, etc. included in the bid document.
3) The cost associated with the preparation and submission of bid shall be borne by the bidder and
GMB shall in no case be responsible or liable for such costs.
4) The language for submission of bid should be in English.
5) The enclosed schedules should be filled in completely and all questions should be answered. If
any particular query is not relevant, it should be stated as "NOT APPLICABLE".
6) Financial Data, Projects Costs, value of work etc. should be given in Indian rupees only.
7) For any clarification, for site visit and information regarding relevant data will be available at
office of The Executive Engineer (Mech.), PIU, Gujarat Maritime Board, Jamnagar.
8) If a proprietary firm makes the application, it shall be signed by the proprietor above his full
name and the full name of his firm with its current address.
9) If the application is made by a firm in partnership, it shall be signed by all the partners of the
firm, above their full names and current addresses or by a partner holding the power of attorney
of the firm by signing of the application in which case a certified copy of the power of attorney
shall accompany the application A certified copy of the partnership dead, current address of the
firm and the full names, and current of all the partners of the firm shall also accompany the
10) If limited company or a limited corporation makes the application, a duly authorized person
holding the power of attorney for signing the application in which case a certified copy of the
power of attorney shall accompany the application shall sign it. Such limited company or
Corporation will be required to furnish satisfactory evidence of its existence before the contract
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
11) Information furnished must be sufficient to show that the applicant is a capable in all respects
to successfully complete the envisaged contract works strictly on the basis of the applicant,
having already carried out satisfactorily works of similar size, nature and complexity.
12) While submitting the schedules, duly filled in, the applicant shall enclose the latest copies of
brochures and technical documentation giving more information about the firm and all the
13) The Gujarat Maritime Board reserves the right to reject any or all bids without assigning any
reasons and the Gujarat Maritime Board decision shall be final and binding.
14) No costs incurred by bidder in making this offer like providing clarification or attending
discussions, conferences or site visits will be reimbursed by the Gujarat Maritime Board.
15) Bidder shall enclose list of similar nature of jobs under taken during last five years. Copies of
certificates/documents in support shall be attached.
16) Details of the litigation, if any, during last three years shall be furnished.
17) During the tenure of profession, details of awards, if any and such additional information shall
18) The PQ cum Technical Bid should contain all other documents except the price bid, like
specifications, general conditions, etc. and Bidder’s letter regarding deviations to the general
terms & conditions, if any. It should be very clearly understood that the PQ & Technical Bid
should be restricted to only "Technical Matters” and the tender quoted price must not be
discussed in the PQ cum Technical Bid. Conditions in "PQ cum Technical Bid" should be specific
so as to evaluate them correctly and to arrive at the correct financial effect.
19) The bidders will understand clearly that the rates quoted are for complete works and include all
costs due to POL, labour, plants & equipment’s, transportation, supervision of GMB officials
including lodging & boarding, various other services like water, power, materials and all matters
and things necessary for satisfactory completion of the work and no claim for additional
payment beyond the offered/accepted rates will be entertained and the bidder will not be entitle
subsequently to make any claim on the ground of misrepresentations or on the ground that he
was supplied with wrong information given by any person (whether the person is the employee
of GMB or not). Any failure on the part of Bidder to obtain all necessary and correct information
for the purposes of filling his Bid and prices / rates therein shall not relieve him from any risks
or liabilities arising out of consequence upon the submission of the Bid.
20) The price bid should contain only rate and amount of the work. Any condition in the price bid
shall be liable for rejection of offer of that bidder.
21) No contract will be awarded except to the qualified and responsible bidders capable of
performing the classes of work contemplate.
22) No Bid shall be deemed fit for consideration unless, it is completed in all respect.
23) No conditional tender will be accepted.
24) No change or supplementary information (unless & until asked by GMB) in respect of the offer
shall be accepted after its submission. The bidder shall not make any alteration in the bid
25) The successful bidder shall have to enter in to an agreement with the Gujarat Maritime Board in
the prescribed format. The cost of stamp papers etc. for the agreement shall be borne by the
26) All document submitted will be the property of GMB and GMB reserves the right to use these
documents without any prejudice.
Signature of Executive Engineer (Mech.)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
P.Q. Forms List
QUALIFICATION DATA SHEET TO BE FILLED UP BY THE BIDDER.
The qualification questionnaire contains the following forms:
P.Q. FORM-I : Letter of Application
P.Q. FORM -II : Document Fees & EMD Details
P.Q. FORM III : General Details
P.Q. FORM–IV : Details of Turn Over
P.Q. FORM -V : Details of experience
P.Q. FORM -VI : History of Litigation
Executive Engineer (Mech.),
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
LETTER OF APPLICATION
The Executive Engineer (Mech.),
5th Floor, Mechanical Division,
Gujarat Maritime Board Office Complex
Sagar Bhavan, Sec-10 A "CHH" Road
Having examined the Bid documents including scope of works and time frame of the aforesaid
work, I/we hereby submit all necessary information and relevant documents as desired.
The application is made by us on behalf of M/s. (Bidder) duly authorized to submit the offer.
The necessary evidence admissible in law in respects of authority assigned to us on behalf of
the firms for applying and for completion of the contract document is attached herewith.
It is certified that the information furnished in this document is correct & authentic.
I/We confirm that we have not been barred & blacklisted by any Government organization OR
Major Port Trust OR Minor Port Board in India for any such works in last Three Years.
I/We shall make available to the GMB any additional information it may find necessary or
require for this tender purpose.
I/We promise that we will abide by all rules & regulation as laid down by G.M.B. time to time
for execution of any contract as may arise during this contract period
I/We have examined and have no reservation to these tender documents with any addendum
I/We undersigned accept that GMB reserves the rights to reject any or all tender for this work
without assigning any reason.
Signature of the applicant
(Name in bracket)
Encl: As per NIT
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Document Fees & EMD Details
Document Fees Detail
D.D./Banker’s cheque No.& date
Bank Name & Address
Bank Name & Address
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
GENERAL INFORMATION
All individual firms applying for pre-qualification must complete the information in these
1. Name of firm:
2. Head office address:
3. Local office address (if any):
4. Telephone: Contact:
5. Facsimile: E-Mail & Website:
6. Place of incorporation / registration: Year of incorporation / registration:
9. Main lines of business:
10. Details of office set up with Key staff
name, designation, & other detail
11. Other information ( if any)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
P.Q. FORM –IV Turn over
All individual firms applying for pre-qualification must complete the information in these
forms. (In Rs. Lacks)
Particular Year Value
Note: Copy of Chartered Accountant certified shall be attached online with the Tender &
Should be submitted in physical.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Bidders should provide information showing their experience for similar works as mentioned in the
Experience of successfully completed works during last 05 financial years i.e. from 01-04-2021 to last date of
online submission of bid for the proposed work as per relevant clause of PQ bid shall be taken in to
A. Experience in Contracts of works completed:
Sr. Name Owner Address Contact Value of Detail Order Successfully
No of / with phone person name contract (copy Completion
work Client / Fax No. & Mobile no. Attached) Certificate of
1. The above information should be filled in the table and supporting documents in soft
copies should be submitted inclusive of work Completion certificate and the copy of
relevant lift usages licence for that in e-tender.
2. If Bidder will submit Government experience work then they should submit Form-3A
for that particular work duly signed by the authority for that.
3. If bidder will submit Non-Government work experience cert OR Subletting work
experience cert then they have to furnish following certificates.
- Copy of main work order and entire work completion certificate.
- Copy of the sub-let work order issued by the concerned civil agency for the lift
- Self-attested copy of letter of permission/approval given by the main employer for
subletting the work.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
History of Black Listing and Barring / Litigation
Non judicial Stamp paper of Rs.300/- or Above
Name of work: Upgrade 3 nos of Elevators at GMB complex Jamnagar
We here by undertakes and confirms that our agency M/s.__________________(Bidder)________________ have
been neither black listed nor banned for tender participation or execution of the works by any Govt./PSU
Authority in last 03 (three) year.
Yours faithfully,
(Name of Authorized signatory)
Note: - (The stamp paper must be purchased on a date after the tender is published.)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
REFERENCED LETTER OF DECLARATION
Must be submitted by the OEM’s (among the approved makes) letter pad with
authorized signatory for availability of Lift parts
The Executive Engineer (Mech.),
5th Floor, Mechanical Division,
Gujarat Maritime Board Office Complex
Sagar Bhavan, Sec-10 A "CHH" Road
Name of work: Upgrade 3 nos of Elevators at GMB complex Jamnagar
We M/s ……………………………………………………………….. who are Original Equipment
Manufacturers (OEM) of ………………………………. (product range/name), do hereby Confirm that
the products proposed are in production and service / spare support shall be available for next
15 years and the products being proposed are latest product and no obsolete products. All
genuine spare parts-whether manufactured in-house or procured from approved vendors shall
be available for next 15 years.
Further, Necessary Training / Technical Support for the above project/work shall be provided
by us to M/s Gujarat Maritime Board, Jamnagar, if required.
Signature of the applicant
(Name in bracket)
Scan copy of above must be uploaded on tender portal.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
REFERENCED LETTER OF DECLARATION
Must be submitted by the OEM’s (among the approved makes) letter pad with
authorized signatory for attending the complaint
The Executive Engineer (Mech.),
5th Floor, Mechanical Division,
Gujarat Maritime Board Office Complex
Sagar Bhavan, Sec-10 A "CHH" Road
Name of work: Upgrade 3 nos of Elevators at GMB complex Jamnagar
We M/s ……………………………………………………………….. who are Original Equipment
Manufacturers (OEM) of ………………………………. (product range/name), do hereby Confirm and
undertake that in order to ensure passenger safety and reliable lift operation, we fully
understand and shall comply with/provide following requirements in the event of any
breakdown, or any failures.
1. Emergency entrapment cases (Affecting the passenger safety)
Immediate response and necessary technical assistance must be provided upon receipt of
breakdown complaint, with an authorised technician reaching the site within 30 minutes.
2. Regular breakdowns:
1. Attendance shall be provided within two hours of registration of the complaint during
working hours. For complaints received during non-working hours, attendance shall be
provided during the next available shift, unless the breakdown presents an immediate safety
risk, in which case prompt attendance shall be ensured.
Furthermore, as and when required, all necessary training and technical support pertaining to
the above-mentioned project/work shall be provided by us to M/s. Gujarat Maritime Board,
Jamnagar, to ensure proper operation, maintenance, and effective handling of the installed
system/equipment.
2. Qualified and authorised service personals shall be provided to attend the breakdown and
restore lift to normal and safe operation at the earliest.
3. All necessary trouble shooting, repairs, testing, replacement of any defective components in
accordance with the OEM's prescribed standards and safety requirements.
Signature of the applicant
(Name in bracket)
Scan copy of above must be uploaded on tender portal.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Gujarat Maritime Board
Government of Gujarat
Division:_ “Mechanical Division – PIU Jamnagar
ELECTRICAL WORK
Upgrade 3 nos of Elevators at GMB complex Jamnagar
Name of work :-
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Tender Booklet contains 55 Pages
C Instructions to tenderers
Form of tender for electrical work (induplicate) with schedule of
E General Conditions
F Data Sheet for E-tendering
G General Condition of contract for electrical works
J Specification for electric works
K List of approved Electrical Products
(i) Amount put to tender Rs.
(ii) Tender fee Rs. As per NIT & Tender
(iii) Earnest Money Rs……………………….. Documents
(iv) Security Deposit Rs…………………… Performance Bond Rs….………....
Last Date of Receipt of Tenders by R.P.A.D. Dt. ____/____/_________
Downloading of tender documents From date ____/____/________
Start End Date Up to date ____/____/________ Till _____ : _____ hrs.
Divisional Account/D.A.O.
Executive Engineer (Mech.)
(Only in case of Tender above Ten lakhs)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
2. Estimated Cost … Rs. ………………………………………….………
3. Earnest Money 1% Rs. …………………………………………………
4. Validity period of tender offered …
(90/120*) days from the stipulated date of
receiving tenderTender
if tenders are invited off
Documentsshall be allowed
line and no modification
after handing over the to postal authorities.
In case of on line tenders, the validity period
shall be counted from the date of opening on
line tenders, in case of single cover system
tenders and from the date of opening
technical bid in case of two cover system
5. Security Deposit -
(i) In the form of small
Savings or Narmada Bonds or FDR of schedule
(of minimum one year time limit) 2.5% Rs. ……………………………………………….
(ii) To be deducted from bills (Security Deposit) 2.5% Rs. ……………………………………………….
(Deduction at rate of 5% from each Running
As per NIT &Tender Documents
Bill shall be made till stipulated maximum
amount is recovered).
(iii) Performance bond of schedule Bank 5% Rs. ……………………………………………….
(In case of tender estimating Rs. 30 lacs or
6. Time limit … As per NIT & Tender Documents
* Strike out whichever is not applicable
* Vide R & GD G. R. No. TNC – 1088 – 1B/1 (13) / C dated 4-5-1993 & revised vide G.R. No. TNC-1088/IB/18(13)-
C, dated 31-8-94. & TNC-10-2013-3-(Part-1)-C, dated 19/11/2013& TNC -10-2013-3 (Part 2)-C dated 20-11-13
Deposit furnished in the form of interest bearing document as per Item .4 (i) can further be extended for
renewal if so desired and communicated by the Contractor in writing before one month from the date expiry date.
Similarly Security Deposit deducted as the Item No.4 (ii) can also be converted into interest bearing fixed term
securities of schedule and Nationalised Bank. If so desired and communicated by the contractor in writing. The
security Deposit will be released against Bank Guarantee as provided in Clause 3.8 of General Condition of
Should this tender be accepted, I/We hereby agree to abide by and fulfil all the terms and Provisions of
the conditions of the contract annexed here to so far as applicable and in default thereof to forfeit and pay to
Government in office the sums of money mentioned in the said conditions.
(Receipt No. ___________ dated _______________ from the Government Treasury or Sub-Treasury at _____________ in
respect of sum Rs.* _________________________________ is forwarded herewith representing the earnest money + (a) the
full of value of which is to be absolutely forfeited to Government should I/We not deposit the full amount of
security deposit specified in the above memorandum in accordance with Clause-I of the said conditions, otherwise
the said sum of above Rs. ______________________________shall be refunded).
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
*Digital signature of contractor
**Signature of the contractor
(Witness)*** (At the time of execution of contract document)
*Digital signature of contractor before submission of tender.
**Signature of contractor at the time of execution of contract document.
***Signature of witness to Contractor’s signature at the time of execution of Contract document
The above tender is hereby accepted by me on behalf of the Government of Gujarat
Signature of the Executive Engineer (Mech.),
Note: The normal rate of Security Deposit is 5 percent for works upto Rs. 30 lacs and further 5 % as performance
bond for works above Rs. 30 lacs. Out of 5 % of Security Deposit 50 % is Payable at the time of acceptance of tender
and the balance by deduction from progress bills.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Instructions to Tenderers
1. Tenders, sealed and marked on the outside for “Will be received by undersigned
Up to the day of 20 In the form of “Tender for Electrical Works” here to annexed
2. The tendered shall state precisely in his tender the type and description of the materials, plant and
stores he proposes to use for the work. If he proposes to use materials, plant or stores of other than
Indian manufacture he must clearly state this in his tender, together with the name, manufacturer
and of the country of origin of the same.
3. The office with whom cash deposits are to be made, or to whom securities are to be endorsed
accordance with clause 3 of General Condition of Contract for Electrical Works, is the Ex
4. The work must be carried out in accordance with the General Condition of Contract for Electrical
Works and the general specification for electrical works in Government building.
5. Plans may be seen, in the office of the Executive Engr._____________________________________________
6. The Governor of Gujarat does no undertake to accept the lowest or any tender.
Executive Engineer (Mech.).
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Form of Tender for Electrical Works
1. I/We do hereby tender to execute the whole of the work Described in the accompanying tender for the several
sums, and in the case of measured works, at the several rates, set forth in the tender hereto attached and signed
by me/us and should this tender be accepted. I/We further undertake to complete the work within the time
stated below reckoned form the date of acceptance of tender, namely.
2. I/We do agree and bind myself/ourselves to abide by and fulfil the general conditions of contract and the
Special Conditions of Contract annexed to the Specification or in default thereof to pay to the purchaser, as
reasonable compensation for such breach of such conditions, the sums of money mentioned in the said
3. I/We further agree to make good at my/our own expense all defect in the installation which appear within
twelve months from the date bringing the installation into beneficial use when such defects are due to defective
workmanship or material executed or supplied by me/us.
4. I/We hereby declare that my/our near relative are not working in this Division or in its sub-division as an
Executive Engineer (Mech.), Deputy Executive Engineer, Additional Assistant Engineer, Overseer, Divisional
Accountant, Store Keeper, Manager of Atithi/Vishram Gruha and in the circle as a Superintending Engineer in
additional for Panchayat Works not working nor having posting as Chairman of P.W. Committee or as
incumbent in Jilla Panchayat at today.
The above tender is hereby accepted by me for and on behalf of the Governor of Gujarat.
Executive Engineer (Mech.),
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Form of Tender for Electrical Works
1. I/We do hereby tender to execute the whole of the work Described in the accompanying tender for the several
sums, and in the case of measured works, at the several rates, set forth in the tender hereto attached and signed
by me/us and should this tender be accepted. I/We further undertake to complete the work within the time
stated below reckoned form the date of acceptance of tender, namely.
2. I/We do agree and bind myself/ourselves to abide by and fulfil the general conditions of contract and the
Special Conditions of Contract annexed to the Specification or in default thereof to pay to the purchaser, as
reasonable compensation for such breach of such conditions, the sums of money mentioned in the said
3. I/We further agree to make good at my/our own expense all defect in the installation which appear within
twelve months from the date bringing the installation into beneficial use when such defects are due to defective
workmanship or material executed or supplied by me/us.
4. I/We hereby declare that my/our near relative are not working in this Division or in its sub-division as an
Executive Engineer (Mech.), Deputy Executive Engineer, Additional Assistant Engineer, Overseer, Divisional
Accountant, Store Keeper, Manager of Atithi/Vishram Gruha and in the circle as a Superintending Engineer in
additional for Panchayat Works not working nor having posting as Chairman of P.W. Committee or as
incumbent in Jilla Panchayat at today.
The above tender is hereby accepted by me for and on behalf of the Governor of Gujarat.
Executive Engineer (Mech.),
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
GENERAL CONDITIONS
1. The work of the Electrical Installation shall be carried out as per I.S Specifications I.S. 732-Code Part I, II & III
- 1982-82 of practice of Electrical wiring and fitting in building.
For Hospitals I.S. 7732 of
For Educational Installation I.S. 108941-1984
For Aluminium Conductor I.S. 398-1984 Part III
2. The fitting should be fixed with mild steed hooks to be supplied and erected and duly grouted in the cement
concrete by the contractor wherever possible the decision of the EIC in respect of the feasibility of providing
such hooks in the cement concrete, shall be final and binding on the contractors.
3. The work shall have to be completed within the prescribed time limit unless the extension in the time limit
at the instance and the request of the 'contractors is granted by the authorities in which case, the application
for the extension in time limit have to be made by the contractors by registered post before the date of expire
of the schedule time limit under the agreement.
4. The amount of Rs. 1-00 for each empty wooden box of ceiling fan and 0-50 paise for each empty wooden box
of Table fan issued to the contractors for* the work as per Schedule B of the work shall be recovered from the
5. Materials required for the work shall be supplied to the contractor as per rates mentioned in the Schedule 'A'
attached herewith and the cost of materials will be recovered form their bills.
6. The tender documents required shall have to be filled in either in ink or by ball pen.
7. In addition to the above the tender will also be liable to be rejected outright if
(i) Any of the pages of the tender is/are removed or replaced.
(ii) In the case of "item rate" tender, the rates are not entered in ink, in figures and words and the total of each
item and grand total are not struck by the tender or in ink in the last column of schedule 'B' under his
item and grand total are not struck by the tender or in ink in the last column of schedule 'B' under his
(iii) All corrections, additions or pasted slips are not initialled by the tenderer,
(iv) Any erasure is made by him in the tender AND
(v) The tenderer in the case of a firm, each partner or the person holding the power of attorney thereof does
not sign or the signature is/are not attested by witness on page 8 of the tender in the space provided for
8. A certificate of registration as approved contractor should be attached with the tender.
9. In respect of tenders from the co-operative society a solvency certificate of an amount equal to 20% of the
amount of the work put to tender plus cost of work in hand will have to be produced along with the tender or
a certificate, regarding the borrowing capacity of the society issued by the legal Assistant, Directorate of
Cottage Industries will have to be produced along with the tender.
10. The several documents forming the contract are the essential parts of the contract and requirement occurring
in one is as binding as though occurring in all, they are intended to be mutually explanatory and
complementary and to describe and provide for a complete work.
11. In the event of any discrepancy the several documents forming the contract or in any one document the
following order of procedure should apply:
(a) Dimension and quantities:
(ii) Schedule 'B' of the tender form
(iii) Specification
On drawing figures, dimensions unless obvious in contract will be followed in preference to sealed dimension.
(b) Description:
(i) Schedule 'B' of the tender form
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
(iii) Specifications
In case of defective description or an ambiguity, the Executive Engineer (Mech.) in charge should issue
further instructions directing in what manner the work is to be carried out is being understood that the last
modern practice is to be followed. The contractor should forthwith comply with such instruction.
12. The contractor should take no advantage of any apparent error, omission in drawings or a specifications and
the Executive Engineer (Mech.) in charge should be permitted to make fulfil the intent of the plans and
specifications.
13. Controlled materials (Essentially certificate)
(i) As regards "Controlled materials, the R. & B. Dept. will help to arrange for the permits as far as possible
and hold the contractor in securing the same. All incidental charges in procuring these materials shall be
borne by the permit as far as possible by the contractor himself. Though the R. &, B. Dept. will help to
arrange for the permit as far as possible and help the contractor in obtaining the materials, it shall not
accept any responsibility for any delay or loss or account of delay caused to the contractor while obtaining
(ii) The contractor shall submit the monthly returns in the prescribed forms at to the receipts and actual use
of the controlled materials during the month to the EIC of every calendar month.
(iii) The contractor shall submit the Executive Engineer (Mech.) or his representatives to inspect the stock of
the controlled materials by him at any time whenever the Executive Engineer (Mech.) or his
representatives so desire.
14. The tender shall remain open for a period of 90/120* days. The validity period shall be counted from the
stipulated date of receiving tenders if tenders are invited off-line.
In case of online tenders the validity period shall be counted from the stipulated date of opening online
tenders in case of single cover system tenders and from date of opening technical bid in case of two cover
system tenders. (R & B.D. G.R. No. TNC-10-2013(2)-C dated 10-5-2013)
If any tenderer withdraws or makes any modifications or additions in the terms and conditions of this tender
not acceptable to the Government (Public Works Department) as above then the Government shall without
prejudice to any right remedy be at liberty to forfeit in full the said earnest money absolutely.
15. The contractor shall employ only such labourers who shall produce a valid certificate of having been
vaccinated against small pox within a period of last three years.
16. The contractor shall provide drinking water facilities to the workers, labourers to comply with the provisions,
the engineer in charge shall give notice facility to the workers, Labourers within a period of ten days from the
date of the notice in writing, the Engineer in charge shall there upon make the arrangement for the drinking
water at the cost of the contractor.
17. The contractor shall provide the amenity of shade and shelter to the workers, labourers and their children on
Govt. work as soon as the work starts" If the contractor fails to provide shade and shelter than the Govt. Shall
provide the same at the cost of the contractor.
(Govt. Resolution PWD No. TNC-2172 (i) 76-C Dt.4-7-1973)
18. Challan for earnest money @ 1% of the estimated cost must accompany the tender. Tenderer may pay earnest
money up to Rs. 50,000 in cash or on the form of Crossed demand Draft or in case of tenderer is member of
only IEEMA DEPOSIT AT CALL receipts of Nationalized of scheduled Bank drawn in favour if Executive
Engineer (Mech.), Divisional Officer concerned. However in respect of the works estimated to cost above Rs.
50 lacs, the amount of earnest money in excess of Rs. 50,000 Can be offered by the contractor, at his choice,
in the form of Bank Guarantee of the Scheduled Bank only. The Bank Guarantee in such cases will be furnished
in the following form. In such cases also, the amount of first Rs. 50,000 will paid in the form of cash or crossed
demand drafts or fixed deposit receipts or deposit at call receipts worth the validity period of not less than
the 6 Months of the nationalized or Scheduled Banks.
The Contractors, who have secured exemption Certificate for payment of earnest money by depositing Lump
Sum earnest money Deposit need not pay earnest money, but produce the certified copy of the exemption
certificate along with the tender.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with the terms
and conditions of tender for the work of and where as We, Bank agree to give
the tenderer a guarantee for the Earnest Money.
1. Therefore, we hereby affirm As per
we &Tender Documents
are guarantors on behalf of the Tenderer up to total rupees
in words) Rs. (in figures) and we
undertake to pay to Executive Engineer (Mech.)s Division
Department of Government of Gujarat the (name of Govt. previous notice of
judicial or to be specified) up to his first written demand, without demur, without delay and without the
necessity of a previous notice of judicial or administrative procedures and without the necessity to prove
to the Bank the defects or shortcomings or debits of the contractor any sum within the limit of Rs.
2. We further agree that the Guarantee herein contained, shall remain in full force and effects during the
period that would be taken for the acceptance of tender.
However, unless a demand of claim under this Guarantee is made on us in writing on or before the
(Date to be specified-will not be less than 180 days from the date of opening the
tender) we shall be discharged from all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during currency except with the previous consent of the
Executive Engineer (Mech.) Division in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitutions of the Tenderer or of the
Date: Signature & Seal of Guarantor
* Strike out whichever is not applicable
19. Wires of I.S.I. mark will be allowed to be used on the work.
20. The rates should be written both in words and figures inclusive of all taxes and duties.
21. The percentage additions in total amount tendered of any items is not allowed however if overall reduction
21. The percentage additions in total amount tendered of any items is not allowed however if overall reduction
in percentage is offered the same should be stated in the prescribed clause added at the end of, schedule ‘B’
in words and figures. If no reduction is to be made the gap should be filled in by the word 'NIL'.
Note : As per Govt. Resol. No. CDN/1269/PAC/51-C.dt. 15/4/1978
22. Safeguards :
(a) That the percentages and the tender amount by each contractor shall actually be shown to the other
contractors who may be present at the time of opening the tenders.
(b) That a tender with any erasures and/or over writing in percentage (both in word and in figures) shall be
rejected outright.
(c) That insertions and or correction in the percentage quoted (both in words and in figures) resulting into
increase in the value of the work shall be liable to be rejected outright unless it is authenticated by the
officer opening the tender at the time of opening tender as well as the contractors they may be present at
the time of opening tender and.
(d) That any other correction or insertions shall be authenticated by the officer opening the tender and the
intending bidders who may be present.
23. Any error in quantity or amount in Schedule 'B' showing items of works to be carried out shall be adjusted in
accordance with the following rules:
(a) In the event of a discrepancy between description in words and figures quoted by a tenderer in the rates
column, the description in words shall prevail.
(b) In the event of an error occurring in the amount column of the Schedule 'B' showing item of works, as a
result of wrong multiplication of the unit rate and quantity, the unit rate shall be regarded as firm and
multiplication shall be amended on the basis of the rate.
(c) All errors in totalling in the amount column, and in carrying forward totals shall be corrected.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
(d) Any rounding off of amounts against items of in totals shall be ignored. The tendered sum so altered shall
for the purpose of tendered be substituted for the sum original tendered and considered for acceptance.
24. Battens shall be teakwood for acceptable quality and shall be varnished before fixing in position.
25. Wooden-cup board should be polished on both the sides.
26. Whenever Government materials are issued, the contractor shall be responsible for the safe custody and
proper use of the materials.
27. Loose electric fitting connection should be done at the time of handing over possession of building to the
concerned civil or administrative department and accordingly after taking over possession of these
connection concerned Civil/Administrative department is responsible for fittings.
28. (i) Late tenders (i.e. tender received after the specified time of opening) Delayed tender (i.e. tenders received
before the time of opening but after the due date time or receipt of tenders)'and post tender offers shall not
be opened and considered at all.
29. (ii) The tenders received (by registered post after the time of date specified in the tender notice) shall not be
received by the concerned office from the postman, for which date and time may be recorded on the cover of
the tender as to when tender was refused by the Divisional Accountant or the Divisional Head or any other
person in charge.
30. GST where recoverable / payable shall be deducted from bills for payment according to rules Prevailing at
the time of payment.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Pages 7 & 8 are for E-tendering of Electrical Tender Form only
DATA SHEET FOR Electrical E-TENDERING
(A) Details of Tender Item :
Sr. Tender EMD in Period of
Name of Work fee Security of
No. Value in (Rs. _______) Completion
1 ------ As per NIT & Tender Documents ------
(B) Eligibility : Registered in ________ Class or above / Pre-qualification.
(C) Schedule of E-Tendering is fixed as under:
(i) Site Visit (If any)
From Date : __/__/____
Downloading of tender
(ii) Upto Date : __/__/____ Till __:__ hrs.
documents Start & End Date
(iii) Online submission of bid Upto Date : __/__/____ Till __:__ hrs.
(iv) Submission of EMD & Tender fee SubmissionAsinper NIT &Tender
electronic Documents
format only through online by
and other documents scanning and then the same should be sent in original to
Superintending Engineer ___________________________
Cicle_____________________ at the time of Tender Opening or sent
the same through R.P.A.D. So as to reach Executive Engineer
7 days from last date of Opening.
(v) Online Opening of Bid
90/120 Days counted from the date of opening of online
(vi) Bid Validity period
● Bidders can download the tender documents free of cost from the website. www.gmb.nprocure.com
● Bidders have to submit bid in Electronic format only on above mentioned website till the Date & time
● Offers in physical form will not be accepted in any case.
Bidders who wish to participate in online tenders will have to procure/ should have legally valid Digital
Certificate (Class-III) as per Information Technology Act-2000 using which they can sign electronic bids. Bidders
can procure the same from any of the license certifying Authority of India or can contract (n) code solution - a
division of GNFC Ltd., who are licensed Certifying Authority by Govt. of India.
(D) (i) Bid Inviting Authority Executive Engineer (Mech.), GMB, PIU Gandhinagar
(ii) Bid Opening Authority Executive Engineer (Mech.), GMB, PIU Gandhinagar
Percentage premium or rebate in words and figures at
(E) Mode of Quoting Rate
the end of Schedule B
The list of certifying agencies are as mentioned under :
Sr. No. Name of Certifying Agency Website Address
1. (n) Code solution (G.N.F.C.) www.gnvfc.com.
2. Safecrypt www.safescrypt.com.
3 TCS www.tcs.-ca.tcs.co.in
4. MTNL www.mtnltrustline.com
As a result of E-tendering the information / Instructions on Pages 4 to 6 following may be read as modified
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
General Conditions from Page 4 to 6 are substituted for E-tendering as below :
7. In addition to the above the bid will liable to be rejected if :-
(i) The bidder proposes any alteration in the work specified or in the time allowed for carrying out the work
or any condition in the covering letter.
(ii) The bidder or the person authorized to sign on behalf of the bidder does not digitally sign the bid offer.
8. A Certificate of registration as approved contractor should be incorporated in electronically transmitted bid.
14. The tender for the work shall remain open for a period of 90 /120 days counted from the last
date of online submission of bid.
20. The rates should be expressed both in words and figures inclusive of all taxes and duties.
21. The bid will also be liable.
(i) The bidder proposes any alteration the work specified or in the time allowed for carrying out the work or
any condition or correction made in any code or mode of Schedule-B or Specifications.
(ii) The bidder or the person authorized to sign on behalf of the bidder does not digitally sign the bid offer.
31. (i) The Bids shall be offered in Electronic format only on online website www.gmb.procure.com/
www.gmbports.in till the date and time shown on Page 2 supra.
31. (ii) Payment of Tender Fee and Earnest Money Deposit : "Demand Draft for E.M.D. & Tender fee shall be
submitted in electronic format only through online (by scanning) while uploading the bid. This submission
shall mean that E.M.D. & tender fee are received for purpose of opening the bid. Accordingly offer of those
shall be opened whose E.M.D. & tender Fee is received electronically. However for the purpose of
realization of D.D. bidder shall send the D.D. in original to Superintending Engineer _____________________
Circle _______________________ at the time of tender opening or send the same through R.P.A.D. So as to reach
As per NIT &Tender Documents
Executive Engineer (Mech.) ______________________ Division _____________________ within 7 days from the last
date of opening. Penetrative action for not submitting D.D. in original to E.E. by bidder shall be initiated.
D.D. for Exemption Certificate is not necessary. However Exemption Certificate shall have to be submitted
electronically through online. If the contractor does not remit the tender fee & the earnest money within
the specified time his registration will be held in abeyance for one year & his tendering code will be
cancelled for one year.
Any documents in supporting of tender bid shall be submitted in electronic format only through online
(by scanning etc.) & hard copy will not be accepted separately." (R&B Circular No. પરચ-૧૦૨૦૦૮-પ-સ,
dated 18-1-2008 & R.&B.D.G.R. No. Parach-102008-5-C (Part file) dated 27-11-08)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
GENERAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS IN THE BUILDING AND
COMMUNICATION DEPARTMENT
GENERAL CONDITIONS OF CONTRACT
1. Definitions of terms:
In construing the general conditions and the annexed specification the following words shall have the
meaning here assigned to them unless there is something in the his successors and assigns.
The "GOVERNOR OF GUJARAT" shall include his successors and assigns.
The "ENGINEER" shall mean the Executive Engineer (Mech.), , for the time being attached to the Public works
Department of the Gujarat State or such other officer as may be appointed by the Executive Engineer (Mech.), to
supervise the work on behalf of the Governor of Gujarat.
The "CONTRACTOR" shall mean the Tenderer whose tender, shall be accepted by the Governor of Gujarat and
shall include the tenderer's legal personal representatives of successors and assigns.
"PLANT" shall mean and include any machine any machine fixed of movable, use for the generation or
transmission of power of actuated by power.
"WORK" or "WORKS" shall mean the whole the plant and material to be provided and work to be done
executed of carried out by the contractor under the contract.
The "CONTRACT" shall mean all the documents by which the agreement by the contractor to be provided to
execute of carry out the plant work or works shall be constituted or in or by which the terms of such agreement or
any of them are contained or set forth specially as per these General conditions, any special conditions attached to
or issued with these conditions. The specification, the Drawing, the invitation for Tenders (if any) of any other
letter. notice or document upon or with reference to which the Tender is made and the Schedule of prices (if any)
furnished by the contractor with these his Tenders.
The "SPECIFICATION" shall mean the specification annexed to these General conditions and the Schedule
thereto (if any).
The "SITE" shall mean the whole of the premises, buildings and grounds in or upon which the Plant works or
works is or are to be provided, executed, erected, done or carried out.
The "DRAWINGS" shall mean the drawings issued with the specification which will ordinarily be identified
by being signed by the Engineer and any further drawings submitted by the contractor with his tender and duly
signed by him and accepted or approved by the Engineer and all other drawings supplied or furnished by the
contractor or by the Engineer in accordance with these General conditions.
The "SPECIAL CONDITIONS" shall mean the special conditions of contractor (if any) attached to general
The "SCHEDULE" shall mean the schedule or schedule attached to the specification.
2. Contractor to inform himself fully :
The contractor shall be deemed to have carefully examined the invitation for Tender (if any) the general and
any special conditions, the specification and Drawings and the Schedule of price(in any). In case off discordance
or want of agreement between or amongst the several things herein described as the grounds or data of the
contract then these conditions shall have precedence of and be held to be more correct and binding and in like
manner detailed drawings shall be held to be more correct. and binding then general drawings and in like manner
drawing made to a large scale, or for special instruction, shall be held to be ore correct and binding than drawing
made to a smaller scale, or for general instruction and figured dimensions shall be held to be more correct than
dimensions by scale but subject nevertheless in case of doubt or dispute as to any of the matters aforesaid to the
determination and decision of Engineer as hereafter is more particularly mentioned and provided always that
nothing herein contained shall limit the powers of the Engineer herein after mentioned.
3. Security Deposit:
3.1 Security Deposit is required to be furnished by the contractor as guarantee money for performance of the
contract and observance of Contract Conditions.
3.2 The person/ persons whose tender is accepted (hereinafter called the “Contractor” which expression shall,
unless excluded by, or repugnant to the context include his Legal heirs, executors, administrators and
assignees shall pay the total amount of Security Deposit:
assignees shall pay the total amount of Security Deposit:
(a) In respect of the tender up to Rs. Thirty lacs, equal to 5 (Five) percent of the estimated cost of the work
(b) In respect of the work above thirty lacs, equal to 10 (Ten) percent of the estimated cost of the work put
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
3.3 In respect of the tenders up to Rs.30 lacs the contractor shall pay Five percent of Security deposit in two parts
Part-I : 2.5 percent in the from of Narmada Bond of Sardar Sarovar Narmada Nigam Ltd. or in any form of
National Small saving (N.S.S.) Schemes F.D.R. ofDocuments
any Schedule Bank to be paid within 10 days from the date
of receipt of Acceptance letter of his offer.
Part-II : 2.5 percent in the form of cash/ Security Deposit to be deducted from Running Bills that become
payable to the contractor from time to time.
3.4 In respect of the tenders above Rs. Thirty lacs the contractor shall pay first five percent of Security deposit as
specified in part 3.3 above and for the remaining five percent, the contractor shall have to give Performance
Bond to be produced within 10 days from the date of receipt of acceptance letter of is offer.
3.5 The work-order to commence to work shall be issued only after the security deposit as per Para 3.3 and 3.4 is
paid/ furnished by the tenderer. If the tenderer fail to produce the security deposit as above the earnest money
paid by him shall be forfeited and his registration shall be held in abeyance for three years from the date of
3.6 All compensation, liquidated damages or other sums or money payable by the contractor to Government
under the terms of this contract shall be deducted from or recouped by the realization of a sufficient part of
his security deposit, or from the interest arising there from or performance bond or from any sums which may
due or may become due by Government to the Contractor on any account whatsoever and whether in respect
of this contract, any other contract, or otherwise. In the event of his security deposit being reduced by reason
of any such deduction or recoupment as aforesaid, the contractor shall within ten days thereafter, make good
in cash or in Government securities transferred as aforesaid any sum or sums required to make good the
shortfall in the amount of the security deposit.
3.7 The portion of security deposit deducted at 2.5 percent from running bills as security deposit can be converted
in to interest bearing securities or F.D.R. of Schedule Bank in the Name of Executive Engineer (Mech.) provided
that the recovery of full amount of 2.5% is made and that the contractor has expressly desired this in writing.
3.8 The full amount of Security Deposit deducted in cash from running bills will be released proportionally as
indicated in table below on production of Bank Guarantee of schedule Bank provided the contractor produces
Bank Guarantee for the period of six months beyond the stipulated period of completion of work. Further if
the time limit of contract is extended the period of Bank Guarantee shall have to be extended for six months
beyond the proposed extension of time limit and the contractor shall have to furnish the undertaking for this
alongwith the application for extension in time limit.
Table of Proportionate release of Security Deposit:
As per Tender Documents Against production of
Sr. Monetary Progress Portion of Security Deposit to be released
Bank guarantee of
Equal to the amount retained from Running
Equal to the amount to
1. 25% of Tender cost Bills or 0.625% of the estimated cost of
work, whichever is less.
Equal to the amount retained from Running
Equal to the amount to
2. 50% of Tender cost Bills or 1. 25% of the estimated cost of work,
whichever is less.
Equal to the amount retained from Running
Equal to the amount to
3. 75% of Tender cost Bills or 1.88% of the estimated cost of work,
whichever is less.
3.9 It will have to be ensured that the ten percent amount of security deposit in any form as permissible above is
kept available with the employer till the actual date of completion of work.
3.10 Fifty percentage of the Security Deposit along with performance bond shall become refundable within
fifteen days after the final completion certificate issued a per Clause-25. All dues under this contract or other
contract. or otherwise, shall be recoverd from the aforesaid amount of fifty percentage of the said security
deposite and the balance shall be refunded within fifteen days after the final certificate is issued as per clause-
25. The remaining fifty percentage of the security deposit shall be refunded after expiry of the Defect Liability
period as per clause-33 after deducting there form the amount of expenses, is any Government under this
contract.(See Performance bond below) (Modified as per R & B Circular No. TNC-10-2013-3-(Part 1)-C
dated 19-11-2013 and GR. No. TNC-10-2013-3-(Part-2)-C dated 20-11-2013)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
PERFORMANCE BOND
(The date of this bond must not be prior to the date of the instrument in connection with which it is given).
Principal (Contractor)
Sum of bond (express in words and figures)
Contract No. and date of contract
KNOW ALL MEN BY THESE PRESENTS, THAT WE, THE PRINCIPALS AND SURETY above named are held and firmly
bound up to the______________________ hereinafter called the Employer in the amount stated for payment of which sum, well
and truly to be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly
by these presents subject to the provisions of which the aforesaid Contractor on demand and without demand on a claim
being made by the Employer.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the principals have entered in to a contract with the
Employer numbered and dates as shown above and hereto attached for the execution of work ______________
NOWTHEREFORE, if the Principal shall well and truly perform and fulfil all the undertakings, covenants, terms,
conditions and agreements of said contact during the original terms of the said Contract and any extensions thereof that
may be granted by the Employer with or without notice to the surety and during the life or any guarantee required under
the contract and shall also well and truly perform and fulfil all the Undertakings, covenants, terms, conditions and
agreements of any all duty and unduly authorized modifications of said Contract that may hereafter be made, notice of
which modifications to the surety being hereby waived or shall pay over, make good and reimburse to the Employer all
loss and damages which the employer may sustain by reason of failure or default on the part of said Principal so to do.
We _____________________________________ further agree that the guarantee herein Contained shall remain in full force and
effect during the period that would be taken for the validity of the said Contract, and that it shall continue to be
enforceable till all the dues of the employer under or by virtue of the Contract have been fully paid and its claims satisfied
or discharged or till the Employer certifies that the terms and conditions of the Contract have been fully and properly
carried out by the said Contractor and accordingly discharges the guarantee. Unless a demand or claim under this
guarantee is made on us in writing on or before the ____________________ we shall be discharged from all liability under this
guarantee thereafter.
IN WITNESS WHERE OF, the above bounded parties have execute this instrument under their several seals on the date
indicated above the name and corporate seal of each corporate partly being hereto affixed and these presents duly signed
by its undersigned representatives, pursuant to authority of its governing body.
In the presence of witness individual
by ______________________________ affix Corporate Seal
Attested Corporate surety
Business address
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
For and on behalf of the Employer
4. Mistake in contractor's Drawings
The Contractor shall submit such drawings as may be required and shall be responsible for any
discrepancies,errors omissions in any drawings other particulars supplied by him notwithstanding that such
drawings orparticulars may been approved by Engineer.
5. Patent Rights etc.
The contractor shall fully indemnify the Governor of Gujarat against all actions, suits claims demands, costs,
charges expenses arising from or incurred by reason of any infringement or alleged infringement, of any letters
patent, design, trademark or name copyright or other protected rights in respect of any machine, plant,work
materials thing or system or method of using fixing working or arrangement used or fixed or supplied by
contractor but this indemnity shall not extend or apply to any action suit claim, demand cost charges or expenses
arising from or incurred by reason of the use of the work or any part thereof otherwise then in the manner of for
a purpose contemplated by the contract all royalties and other similar payments which may have to paid for the
use of any machine, plants, work, material thing system or method as aforesaid (whether payable in one sum or
by installment or otherwise) shall be covered by the contract price and payable by the contractor.
In the event of any claim or demand being made or action or suit brought against the Governor of Gujarat in
respect of any such matter or matters as all negotiations for the settlement of such claim or demand and such
action aforesaid the contractor shall be duly notified, thereof, and he shall conduct or suit also be conducted by
him subject if and so far as Governor of Gujarat shall think proper under the Supervision & Control of Governor of
Gujarat through the officer duly authorized on his behalf.
6. Excess over Tender quantities, Extra items & Variations in Specifications, Drawings etc.
6.1 The Engineer-in-charge shall have power to make any late rations additions in or to the original specifications
drawings design instructions that may appear to him to be necessary of advisable during the progress of the
work and contractor shall be bound to carry out the work in accordance with any instructions in this
connection which may be given to him in writing signed by the Engineer-in-charge and such alternation shall
not invalidate the contract and additional work which the contractor may be directed to do in the manner
above specified as part of the work shall be carried out by the contractor on the manner above specified as
part of the work shall be carried out by the contractor in the same conditions in all respect on which he agreed
to do the work and at the same rate as are specified in tender for the main work.
6.2 Except that when the quantity of any item exceeds the quantity as in the tender by more than 10% the
contractor will be paid for the quantity in excess of 10% at the rate entered in the S.O.R. of the year during
which the excess in quantity is first executed or tender rate whichever is less.
6.3 If the additional or altered work includes any class of work for which no rate is specified in these contract,
then such class of work shall be carried out.
(i) At the rate derived from the item within the contractor which is comparable to the one involving
additional altered class of work where there are more than one comparable items, the item of the
contract which in nearest in comparison with regard to class or classes of the work involved shall be
selected and the decision of the superintending Engineer as to the nearest comparable item shall be final
and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall be carried out at the
rate angered in the Schedule of Rates of the Division for the year in which, the tender was received,
increased or decreased by the percentage by which the tender received increased or decreased by the
percentage by which the tender amount is more or less as compared or decreased by the percentage by
which the tender amount is more or less as compared to the amount arrived at the rates in the "Schedule
of Rates" Divisions in the year in which the tender was received. If the Schedule of rates calculated
considering such items which were included in the "Schedule of Rates of the Division for the year and or
materials consumed on such item the rate to be charged would be the basic rate taken into account for
fixing the rate in S.O.R. referred to above instead of the rate.
(iii) If it is not possible to arrive at the rate form(i) and (ii) above, such class of work shall be carried out at
the rate decided by the competent authorities on the basis of detailed rate analysis after hearing the
contractor before as committee of two superintending Engineers stationed at the same place or the
6.4 If the additional or altered work, for which no rate is entered in the "Schedule or Rates" of the Division is
ordered to be carried out before the rate is agreed upon, then the contractor shall within seven days of the
date of receipt by him of the order to carry out the work, inform the Engineer-in-charge does not agree to this
rates, he shall by notice in writing be at liberty to cancel his order to carry out such class of work and arrange
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
to carry it out in such manner as he may consider fit advisable, provided always that if the contractor shall
commence work or incurred any expenditure in regard thereof before the rates shall have been determined
as lastly herein before mentioned, then in such cases he shall only be entitled to be paid in respect of the work
carried out or expenditure incurred by him prior to the date of the determination of the rate as aforesaid
according to such rate or rates as shall be fixed by the Engineer-in-charge. In the event of the dispute the
decision the Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs, drawings and specifications
recommended by the contractor and accepted by the competent authority, the alternation above referred to
shall be within the scope of such designs drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion that the increase in the cost
occasioned by alternations bears to the cost of the original contract work and the certificate of the Engineer-
in-charge as to such proportion shall final and conclusive.
7. Work man ship and materials :
The works shall be carried out in all respects with workmanship and materials of the best and most
substantial and approved qualities to the entire satisfaction of the Engineer who may reject any plant, apparatus
of material or workmen ship which slab in his opinion be of defective quality any such rejection to be final and
conclusive. The contractor shall at his own expenses provide all material labour, haulage, power, tools, tackles and
apparatus necessary to execute and complete the works and plant in the manner aforesaid.
8. Use of work pending completion :
The Governor of Gujarat shall be at liberty at any time to put into beneficial use the whole or any part of the
work he may desire to use pending the formal completion and taking over of the same.
9. Subletting of contract :
The contractor shall not without the consent in writing of the Governor of Gujarat under the hand of the
Engineer assign or sublet the contract nor make any sub contract with an person or persons for the execution of
any portions of the work other than for raw materials, or for any part of the work of which the manufacturers are
named on his contract.
10. Protection and liability for a accidents, Theft and Damage :
The contractor shall at all items until the commencement of the period maintenance as provided in clause
property and sufficiently cover up and protect all materials delivered on site from damage or injury by exposure
to the weather and shall take every proper precaution against accident, damage or injury on the same from any
cause. The contractor shall be and remain answerable and liable for all accident and damage thereto which until
the commencement of the period of maintenance as provided for under clause 16 may arise or be occasioned by
the acts or omissions of the contractor or his workmen, agents, servants or sub-contractors and all loses
and damages arising from such accidents damage or injuries and aforesaid shall be made good in the most
complete and substantial manner by and at sole cost of the contractor and to the satisfaction of the Engineer.
Provided that should the Engineer certify, that the work has been completed but that owning to
circumstances over which the contractor has no control the work cannot be taken over the contractor shall not be
held liable for any loss of or damage to the work occasioned by such delay in taking over and occurring more than
one month after date of completion of the work as certified by the Engineer.
Until the work shall be or deemed to be taken over as hereafter provided the contractor shall also indemnify to
Governor of Gujarat from and against all claims and demands, suits proceedings, cost and expenses in respect in
respect of or in connection with any injury to person or damage to property by whomsoever sustained or by
defective design work for thefts of any property of the Governor of Gujarat or of other committed by any employees
of his own or his subcontractors and shall be liable for the costs of replacing any property stolen.
11. Insurance :
Subject as hereinafter provided the contractor shall at his own expense insure and at all times prior to the
commencement of the period of maintenance keep insured against destruction or damage by fire or earthquake
storm and tempest such plant and materials ordered for the work as may for the time being be upon the site for
the full value of such plant and materials.
12. Materials brought on the site :
All materials tools and tackle brought to and delivered upon the site for the purpose of the work shall from
the time of their being so brought vest in and be the property of the Governor of Gujarat but may be used for the
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
purpose of the work but for that purpose only and not on any account be removed or taken away by the contractor
or any other person without the express permission in writing of the Engineer but the contractor shall
nevertheless (subject as hereinafter provided) be solely liable and responsible for any loss or destruction thereof
or damage unless resulting from causes beyond the contractor's control not being causes insurance against
destruction or damage from which is provided for in clause 11.. The Governor of Gujarat shall have a lien on such
materials, tools and tackle for any sum which may to any time prior to the completion of the works be due or owing
to him the contractor under in respect of or by reason of the contract and shall be at liberty to sell and dispose of
any of such materials, tools and tackle remaining after the completion of the works in such manner as he shall
think fit, and to apply the proceeds in or towards the satisfaction of such sum or sums so due or owing as aforesaid
but subject to such lien and power of sale and disposal such surplus materials, tools and tackle shall being to the
contractor and may be removed and disposed of by him as he shall think fit after the lien is withdrawn by the
Engineer-in-charge.
If the contractor shall at any time fail in the opinion of the Engineer to proceed with the work with due
diligence and expedition or shall refuse, neglect or omit to comply with any orders given to him in writing by the
Engineer- in-accordance with the provisions of the conditions or shall commit any other breach of the
provision of the contract, the Engineer shall be at liberty to give notice in writing to the contractor to make good
the failure neglect. omission or breach complained of and should be contractor shall fail to comply with any such
notice within such period as may be prescribed in such period as may be prescribed in such notice then and in
such case the Governor of Gujarat shall be at liberty to employ workmen other than those of the contractor to
perform and execute the work in respect of which the failure neglect or omission referred to in such notice shall
have been committed or occurred. If the Governor of Gujarat shall think fit, it shall be lawful for him to enter into
a new contract with any other persons, or person, for the execution of such part of the work as may not have been
executed and in that event the Governor of Gujarat shall without incurring any liability to the contractor be entitled
to use all or any of the materials, tools, tackle or there things which may then be on site for the purpose of
completing the work or any part thereof and to provide any additional materials, tools, or tackle required for the
purpose and the cost of executing any such work and providing any such materials shall be paid by the contractor
to the Governor of Gujarat on demand.
Subject to and after satisfaction of the lien of the Governor of Gujarat for any sum due to him by the Contractor
for any expenses cost or charges incurred in the completion of the work, all materials , tools, tackle or other thing
remaining on the site and unsold after such completion shall forthwith hereafter be removed by the contractor.
14. Replacement of Defective work or material :
If during the progress of the work the Engineer shall notify in writing to the contractor that in his opinion the
Contactor has executed any unsound or imperfect work, or has supplied any materials inferior in quality to those
stipulated for by the contractor, the contractor shall at his own expense, within ten days of his receiving the notice
proceed with due expedition to remove or after and reconstruct or replace the work or as the case may be supplied
fresh materials up tothe standard of the specification. In place of the work or materials complained of by the notice
(as the case may be) and in case the contractor shall fail to do so the Governor of Gujarat may after expiration of
ten days from giving of such notice give a further notice in writing stating that the Governor of Gujarat intention
so to do forthwith at the cost of the contractor remove the work or materials complained of and perform all such
work or (as the case may be) supply all such materials in place of those complained of as may be necessary or
proper in order to comply with the contractor and the cost as certified by the Engineer of any such removed and
performance of work or supply of materials shall be paid by the contractor to the Governor of Gujarat on demand
provided always that nothing in this clause shall be deeded to derive the Government Gujarat or effect any other
rights or remedies under the contract or otherwise which he may have in respect of such defects of deficiencies.
No payment which have been made on account of materials delivered or work executed shall be looked on as
acceptance of such or any work or materials.
15. Cutting away & making good :
The tender is include all necessary cutting and making good for the purpose of the contract of the wood work,
walk, floors etc. of the site. The contractor win be held responsible for and will have to make good at his own
expanse to the satisfaction of the Engineer, any damages to or disfigurement of the site which may have been
caused the acts or omissions of himself or his servants or agents in connection with the carrying out the contract.
16. Maintenance :
The Contractor shall make good at his own expense all defects "due to faulty design material, or workmanship
on the part of the contractor which may during a period of 12 calendar months form the date of which the work is
certified by the Engineer to have been brought into beneficial use or if no such certificate is given from the date of
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
the final payment for the work under clause 20 (which period is hereinafter called the "the period of maintenance")
develop under proper use in the work or any part thereof by replacing plant materials or work or otherwise as a
may be necessary. Any such making good by the contractor shall in no case relieve him from his liability to make
good any further defect in these work made good of replace which made develop during the reminder of such
period of twelve months, if any such defects are clearly caused by the fault of the contractor and are liable to
recurrence the contractor shall make such alterations as are required to prevent any recurrence of such defects. If
any defects or alterations which contractor shall become liable make good or make under this clause be not made
good or made good or make the same (as the case may be) at the risk and expense of the Contractor, but without
prejudice to any other right or remedies which the Governor of Gujarat may have against the Contractor in respect
of his default in making good or making the same as aforesaid/and the cost of any such making good or making
shall be paid by the contractor to the Government of Gujarat on demand.
17. Contractor's Representative & workmen :
The contractor shall employ at least one competent representative, whose name or names shall have
previously been communicated in writing to the Engineer by the contractor to superintend the carrying out the
works. The said representative of if more than one shall be employed then, one of such representative shall always
be present on the site during working hours and any written orders or instruction which the Engineer or his
duly authorized representative, whose name shall have been previously communicated in writing to the
contractor, may give to the said representative of contractor shall be deemed to have been given to the contractor.
The Engineer shall be at liberty to object to any representative or person employed by the Contractor in
execution of or otherwise about the work who in the Engineers opinion, shall misconduct himself or be
incompetent or negligent and the contractor shall remove every person so objected to forthwith upon receipt from
the Engineer of notice in writing requiring him to do so.
17.A Minimum age of persons employed and employment of donkeys or other animals :
(i) The contractor shall not employ any person who is under the age 15 years.
(ii) The contractor shall not employ donkeys or other animals with breaching of string or thin rope. The
breaching must be attest three inches side and should be tape (Nawar).
(iii) No animal suffering from sores, lameness or emaciation or which is immature shall be employed on the
(iv) If contractor does not accept the proceeding condition No. (i), (ii), & (iii) his tender shall not be accepted
and his name shall be removed from the list contractors.
(v) The Engineer shall remove form the work any person or animal found working which does not satisfy
these conditions and to responsibility shall be accepted by the Governor of Gujarat for any delay caused
in the completion of the work by such removal.
17.B One percent of work done and payable in bills be recovered as contribution towards building and other
construction workers welfare cess the certificate of deduction of welfare cess shall be issued to the contractor
18. Submission of Samples :
The contractor shall not without written sanction of the Engineer use for the execution of the work any
materials plant or stores of any type of description other than those specified in his tender. He shall if required to
do so or at his options, deposit samples, at the Office of the Engineer for approval and the Engineer shall within
days or the receipt of the samples, express in writing contract to his approval or otherwise of the samples
deposited and all materials, plant and stores used in the execution of the work, must be in every away
equal to the deposited samples. All the deposited samples will be returned to the contractor within one month of
the work being taken over.
19. Deduction from contract Price :
The amount or all cost of work, expenses; or other sums which under the contract shall be payable by the
contractor to the Governor of Gujarat from any moneys due or becoming due by him to the contractor under
contract, without-prejudice to the Governor of Gujarat right to recover the same by the ordinary process of law.
20. Terms of Payments :
Subject to any deduction which the Governor of Gujarat may be authorized to make under the contract, the
contractor shall be entitled upon the certificate of the Engineer to the effect hereinafter stated payments of R.A.
Bills shall be made to contractor as per items, in measurable units executed according to the specifications.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
It at any time the contractor shall be prevented for any period of not less than 30 days from causes within the
control of the Governor of Gujarat either first, from delivering on the site any plant or materials ready in India for
delivery or secondly from proceeding with the erection at any plant or materials which he had already delivered
on the site, the Governor of Gujarat shall bear the cost of storage and protection, including insurance in accordance
the clause ii, of the plant and materials during such period in the first of such of contractor shall be entitled to
payment of 80% of the value certified as aforesaid of the plant or materials delivery of which shall have been so
prevented within one month from the date on which as certified by the Engineer such plant or materials are so
ready as aforesaid provided that all portions thereof have been suitably and sufficiently marked as being property
of the Governor of Gujarat and are delivered into the custody of some person approved by the Engineer who has
granted a receipt thereof.
Instalments shall be due and payable by the Governor of Gujarat within one month from the date of each certificate
of the Engineer.
21. Certificate of Engineer :
Every application to the Engineer for a certificate must be accompanied by a detailed claim in duplicate
setting forth (in the order of the Schedule of price if any) particulars of the Plant or materials delivered and work
executed to the date of the claim, and the certificate as to the plant and work mentioned in the claim as is in the
opinion the Engineer in accordance with the contract shall be issued within 14 days of the application. No
application for a certificate shall be made within 14 days previous applications.
22. Certificate not to affect rights of the Governor of Gujarat of contractor :
The Engineer may be any certificate make any correction or modification in any certificate previously issued
by him any payment shall be regulated and adjusted accordingly, No certificate of the Engineer shall nor shall any
payments on accounts by the Governor of Gujarat the Contractor, nor extension of time for the execution of the
work by contractor which may be granted by or behalf of the Governor of Gujarat affect or prejudice any of the
lights, of the Governor of Gujarat against the contractor under or relieve him any of his obligations for or in respect
of the due performance of the contract, or be interpreted as approval of work done or of materials supplied.
23. Suspension of work :
The Governor of Gujarat shall any to the contractor all proper expenses arising from suspensions of the work
by order in writing of the Engineer or any other officer on behalf of the Governor of Gujarat unless such suspension
is due of some default on the part of the contractor or any subcontractor under him.
24. Damages for delay in completion :
(i) If the Contractor fails to complete the work under contract by the stipulated date, he shall pay
liquidated damages of Rs.0.1 percentage of the contract value per day from the date of delaying the
said work up to the date of completion and banding over to the Government.
(ii) However also if the contractor fails to complete and part of the work Proportionate to by the time in
relation to the value of such part, he shall pay Liquidated damages per day from the date of delaying
the said part of the work up to the date of completion or the said designated part at the rates shown
in the said schedule of the contract value of such part for such failure till the said designated part is
(iii) The agree gate maximum of liquidated damages payable under this clause shall not exceed Rs.
percentage of contract value per day and shall be subject to the maximum amount of ten percent of
the estimated amount put to tender.
(iv) Delays requiring payment of ten percent liquidated damages of the contract values for performance
shall be sufficient cause for termination of contract and for forfeiture of security deposit. (including
amount of performance bond in forfeiture of works estimated to cost more than Rs. 15 lacs, for
performance) and registration of the contractor shall also be kept in abeyance of three years form
the date as fixed in all such cases.
24.A If the contract shall desire an extension of the time for completion of work on the ground of his having
been unavoidably hindered in it execution or on any other ground he shall apply in writing to the EIC before the
expiration of the period stipulated in the tender or before expiration of 30 days from the date on which he was
hindered as aforesaid on with the cause for making for extension occurred whichever is earlier and the EIC may if
in his opinion. There are reasonable and bona fide grounds for granting. And extensiongrant such extensions as
the thinks necessary or proper. The decision of the EIC in his matter shall be final.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
No applications for extension of time for completion of work shall be considered unless it is received by registered
post in the office of the Executive Engineer (Mech.) or left at his office and obtained receipt there of duly signed by
the Executive Engineer (Mech.) or his nominee authorized in this respect.
The date of receipt of application by the Executive Engineer (Mech.), shall be considered as the date of application
for the purpose of counting the period as mentioned above.
24.B "If the contractor or his workmen or servants shall break, deface injure or destroy and part of the building
or the work in question in/or which they may be working or any building road fence, enclosure or glass-land or
cultivated round contingence to the premises on which the work or any part there is being executed or if any
damage shall be done to the work from any cause whatever before completion of the work or before the
completion of the maintenance period whichever is later or any damages occurred caused due to normal flood or
rain or if any imperfection become apparent in it within three months from the grant of a certificate of completion,
final or otherwise by the Engineer-in-charge, the contractor shall make good the same at his own expenses or in
default, the Engineer-in-charge may cause the same to be good by other contractor and deduct expenses (of which
thecertificate of the Engineer-in-charge shall be final) from any sums that may then be due or may thereafter
become due to the contractor or from his security deposit or the proceeds of sale thereof a sufficient portion
24.C Force Major Clause :
Neither party shall be liable to the other for any loss or damage occasioned by or arising out of acts of God
such as Unprecedented flood, Volcanic eruption, earthquake or other convulsion of nature and other acts such as
but not restricted to general strike invasion, the acts of foreign countries, hostilities, or war like operations before
or after declaration of war, rebellion military or usurped power which prevent performance of the contract and
which could not have been foreseen of avoided by a prudent person.
Note: Unprecedented flood means *here flood crossing the Hi Flood Level of the past-year (s) which is on the
available record. (Modified Vide R&BD.G.R. No. TNC-1096-IB-143-(16)-C dated 11-1-99)
25. Time of taking over :
The work shall for the purpose of all the provisions of these conditions be deemed to have been completed
and taken over by the GMB when the Engineer, shall have certified in writing that it has been completed in
accordance with the contract conditions and such certificate shall not be unreasonable withheld nor shall the
Engineer delay its issue on account of commissions of defects which in his opinion do not affect the efficient use of
work but such issue shall be without prejudice to the contractor's liability to make good any such omission and
defects with the greatest possible expedition.
26. Death or Bankruptcy :
The if the contractor shall die or become insolvent or bankrupt or have a receiving order made against him
or compound with or make on proposal carrying on his business under inspection or for the benefit of his creditors
or commit and act of insolvency or bankruptcy, or being a corporation bordered to be wound up or have a received
of its business appointed the Governor of Gujarat shall be entitled forthwith by notice in writing to the contractor
his legal representative to determine the contract and the Governor of Gujarat may in that event complete the
contract in such time and manner and by such person as he shall think fit.
27. Disputes to be referred to Gujarat Public Works Disputes Arbitration Tribunal :
The disputes relating to this contract in so far as they fall within the jurisdiction of Gujarat public works
Disputes arbitration tribunal shall be referred to the said tribunal of Gujarat State.
However the reference to Arbitration Tribunal under this clause will not stay fulfilment of obligations of the
contractor or rights of the Engineer-in-charge under this contracts, unless otherwise ordered to the contrary by
the said Tribunal as Interim Relief measure.
(The following clause is to deemed included in this conditions only when Plant or Machinery is included
in the contract.)
28. Contract Drawings :
The contractor shall submit to the Engineer for his approval on or before the dates stipulated for the purpose
in the specification copies of all the drawings of the general arrangements of the plant as set out there in and of
such detail drawings as may be reasonably necessary.
Within Fourteen days from the receipt, by him of such copies the Engineer shall signify his approval or
otherwise of the same and if he does not do so he shall be doomed to have approved thereof. Within Fourteen days
from the notification by the Engineer to the contractor of his approval such copies, or in the absence of such
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
notification within-thirty days from the receipt of such copies, the copies in ink on tracing cloth, or Ferro Gallic
prints mounted on cloth, of ail drawings as approved shall be supplied to the engineer by the contractor respective
and shall there upon the signed by the contractor and become there property of the Governor of Gujarat.
Such signed copies of the drawing shall not be departed from in any way whatsoever except with the written
permission of the Engineer, during the execution of the works of the signed copies shall be always kept available
for reference on the site.
In the event of the Contractor desiring to keep in his own possession a signed copy of the drawings as
approved he shall supply three copies instead of two and in this case the Engineer shall sign the third copy and I
return the same to the Contractor.
29. Manner of Execution, Quality of materials etc. :
The plant shall be manufacture, constructed, provided, put in position and maintain in-the best and most
substantial and workmen like manner and materials of the best and approved qualities having regard to the
respective uses.
30. Test on site :
In all cases where the special conditions are provided for tests on the site where there of plant materials on
workmanship the Governor of Gujarat except where otherwise specifically stipulated shall provide free of charge
such labour materials fuel stores, apparatus and instruments as may be requisitioned from time to time efficiently
to carry out such tests in accordance with the condition.
Where electrical energy is required for tests on site and supply is available on the site form an existing
installation such electrical energy shall be supplied to the contractor by the Govt. free of charge at the pressure
and frequency of the ordinary supply is available the electrical energy necessary for such tests shall be provided
by the contractor.
31. Delivery of plants & materials :
No. plant materials shall be tendered for delivery until and intimation is writing shall have been given to the
contractor by the Engineer that Governor of Gujarat is ready to take delivery.
32. Tests on completion :
On the completion of the works on the site is accordance with the contract the contractor shall give the
Engineer notice in writing of such completion. The Engineer shall after receipt of such notice by notice in writing
under his hand for date and an hour on that date for the making of the test on site if any such are provided for the
The contractor shall carry out such tests upon the date and at the hour so fixed and if the Engineer or his
authorized representative shall attend on that date at that hours such test shall be carried out in the presence the
Engineer or such representative.
If any portion of the plant fails under the tests to satisfy the contract conditions similar tests according to the
contract of the portion so failing shall if required by the Engineer or by the Contractor be repeated within a time
to be fixed by the Engineer and the provisions of this clause shall apply to such repeat 20 test as if they were the
original tests and the contractor shall pay to the Governor of Gujarat all reasonable expenses to which he may be
put by such test.
If the test or any repeated tests so required as aforesaid be not made by the contractor on the date fixed as
aforesaid or the same by the Engineer may proceed to make such test himself at the contractor's risk and expense.
If in any test under this clause the plant tested shall fail to satisfy the contract conditions the Governor of
Gujarat shall as from the date stipulated by the contract for completion nevertheless have the right of using such
plant until the same shall satisfy such conditions and such Use shall be at the contractor's risk. In the event of the
question whether the works have been completed in accordance with the contract or any question regarding such
completion being submitted to Arbitration as any portion of the plant the Engineer may certify to be capable of
being use on condition of paying to the contractor a sum calculated (according the period of the use) at the rate of
5 present per annum upon the amount withheld or deducted in respect of such plant.
33. Rejection of Defective Work :
If the works, or any portion thereof shall not the opinion of the Engineer on the stipulated tests (if any) being
made is accordance with the contract satisfy the contract conditions within three months after the date of
completion the engineer may give notice in writing to the contractor setting for the particular of the defects of
particulars in respect of which the works in his opinion fail to comply with the contract conditions and requiring
the contract to make good, after or replace the same within such time to be specified in the notice as the engineer
may consider reasonable and the contractor shall make good, after or replace the same as required by such notice
and such as to make it employ with the requirements of the contract condition within the time so specified. Should
be he fail to do so within that the Governor of Gujarat may make good after of replace the same as so required any
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
the cost of such making alteration good or replacement (less) in case of any replacement any such, which would
have become due to the contractor under the contract in respect of the works replaced and which shall not have
been paid to him shall be paid by the contractor to the Governor of Gujarat demand or should the Governor of
Gujarat not make good after of replace any defective works in respect of which notice as aforesaid shall be given
within six weeks from the date of the given of such notice the contractor shall repay the Governor of Gujarat all
sums (in any) paid by him to the contractor in respect of such works. Nothing contained in this clause shall
prejudice or affect the rights of the Governor of Gujarat under the contractor whether in the way of enforcement
of penalties of otherwise in respect of any delay in the completion of this work.
34. Use of plant of works pending making good :
If at expiration of the time specified for making good, altering or replacing the plant of works in any notice
given by the engineer to the contractor under the last proceeding clause the contractor shall not have duly made
good. altered or replaced the same in accordance with the contractor the Governor of Gujarat shall be at liberty if
he thinks fit to make use of the same for such time as shall be reasonably sufficient according to the circumstances
enable him, to make good after or replace the same (whichever he may see fit to do) provided that in respect of
the period of such user, the Govt. of Gujarat shall not be entitled to any damages under clause 24 of these conditions
land in the case of complete replacement the contract shall be entitled to be paid reasonable sum for same.
35. Workmen's compensation in case of injury :
The contractor shall be responsible for any compensation and shall pay to his workmen compensation
payable for injuries under the workmen's compensation Act 1923 (VIII of 1923) hereinafter called the said Act. If
such compensation is paid by Government as principal under sub-section. (1) of section 12 of the said Act, on
behalf of the contractor. It shall be recoverable by Government from the contractor under sub section (2) of the
said section such compensation shall be recovered in the manner laid down in clause 3 and 19 of the condition of
36. The Apprentices :
The contractors shall afford or procure as the case may be every facility to Indian apprentices for practical
training in the factory.
Owned managed controlled or patronized by them so as to enable the Indian apprentices to acquire full
knowledge of the technique and work of their trade industry calling or profession.
37. Set off Clause :
Any sums of money due to the contract (including the security deposit returnable to the contractor under this
contract shall be appropriated by the Government and shall be set off against any claim of the Government for the
payment of such of a money arising out of or under any other contract made by the contract with the Government.
When no such amount for purpose of the recovery form the contract against any claim of the Government is
available such a recovery shall be made from the contractor as arrears of land revenues.
38. Appointment of Local Labourers :
The contractor should as far as possible obtain the requirement of labourers skilled and unskilled from the
nearest employment exchanges so as to utilize the local employment potential. If there are no local employment
exchange or such exchanges are not able to provide the required labourers locally. Suitable local labours should
be utilized to the maximum extent possible.
39. Fair wages :
If a contractor fails to pay within 7 (seven) days to the labours(s) worker(s) the minimum wages prescribed
by the Government under the minimum wages Act.1949 as in force from time to time the Executive Engineer
(Mech.) or the officer of an equal rank shall be at liberty to deduct the amount payable to the labourer(s) workers
form his (contractor's) bill or deposit(s) payable by the contract after making due inquiries and shall not be
entitled to any payment or compensation on account of any loss that he (contractor) may have to incur of the
action as aforesaid. Before the action as aforesaid is enforced notice in writing to the contractor shall be issued
by the Executive Engineer (Mech.) or the officer of the equal rank to pay the wages as per minimum wages Act
enforce at the relevant time. If the contractor does not act as aforesaid within seven days then the action
contemplated as above shall be taken against him.
40. License for contract labour :
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Before starting the work, the contractor will have to obtain the licence from the District Assistant Labour
Commissioner under the Contract Labour (Regulation and Abolition) Act, 1970 and contract Labour (Regulation
and Abolition) Gujarat Rules 1972 after paying necessary fees and deposit on the basis of the number of labourers
to be employed on the work and will have to supply two true copies of the said licence to the Deputy Executive
Engineer before the work is started.
41. Deduction of GST from bills:
The following tax deduction shall be made from each bill payable to the contractor (1) 1% of the value of
amount payable towards SGST. (2) 1% of the value of amount payable towards CGST. TDS certificate for taxes
deducted will be issued to the contractor (F.D.G.R. No GST/1017/1097/GST Cell dated 15-09-2018)
Signature of contractor/s
Schedule showing (approximately) the materials to be supplied from the Public works Store for work
Contracted to be executed and the rates at which they are to be charged for
Particulars Approximate Rate at which the materials will be Place of delivery
quantity charged to the contractor
unit Rate in Rupees.
Unit Rate in Rupees
This Clause has been Deleted
Note: 1. The person or firms submitting the tender should see that the rates in the above schedule are filled up
by the Engineer-in-charge before the issue of the form prior to the submission of the tender.
Note: 2. Store to be supplied to contractors for a work free of cost should be mentioned in Schedule 'A' in
addition to schedule 'B' and the specification attached to the contract agreement form.
Executive Engineer (Mech.)
Signature of contractor/s
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Memorandum showing items of works to be carried out :
(For works Estimated below Rs. 5 lakhs)
Quantities Estimated Rates Total amount
Quantities Estimated Rates Total amount
Items estimated but according to
Item of work Unit
No. may be more In figures estimated
or less Rs. Ps. quantities
-------- As per Separate Chapter of this Tender Document ---------
I/ We am/are willing to carry out the work at…………………………………% above/below
Percent (should be written in figure and words) of the estimated rates mentioned above. Amount of my/our tender
works out as under.
Estimated Amount put to tender: Rs. ________________ Estimated Amount put to tender: Rs. ________________
* (Please strike out whichever is not applicable).
Note 1 - All work shall be carried out as per Public Works Department Handbook and other
Specifications of Division or as directed.
Note 2 - All the columns is Schedule should be filled in ink and the total of the entries in the last
Column should be struck be the contractor under his signature.
Note 3 -Rates quoted include clearance of site (prior commencement of work and at its close) in
all respects and hold good for work under all conditions, site, moisture, weather etc.
Note 4 - To be continued on additional sheets, if found necessary.
Executive Engineer (Mech.)
Signature of contractor/s
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Memorandum showing items of works to be carried out :
(For works Estimated above Rs. 5 lakhs)
Quantities Tendered Rates Total amount
Quantities Tendered Rates Total amount
Items estimated but according to
Item of work Unit
No. may be more In figures estimated
or less Rs. Ps. quantities
-------- As per Separate Chapter of this Tender Document ---------
(A) Total Tendered amount Rs…………………………………
(B) Rebate on above tendered amount (if any)……% (in figure) Rs…..……………………………..
(C) Net tendered amount (A - B) Rs…………………………………..
Note 1 - All work shall be carried out as per Public Works Department Handbook and other
specifications of Division or as directed.
Note 2 - Rates quoted include clearance of site (prior commencement of work and at its close) in
all respects and hold good for work under all conditions, site, moisture, weather etc.
Executive Engineer (Mech.)
Signature of contractor/s
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
SPECIFICATIONS FOR ELECTRICAL WORKS IN GOVERNMENT BUILDINGSUBJECT TO THE
GENERAL CONDITION OF CONTRACT IN FORCE (1986)
1. Wirings Rule :
The installation generally shall be carried out in conformity with relevant Indian standard. Specification and
code of practices prevalent, Indian Electricity Rules, 1956 and Indian Electricity Act. 1910 as amended from
2. Definition :
The definition of terms shall be in accordance with Indian standard code of Practice for Electrical wiring
installation IS-732-1982 except for the definition of point in case of internal Electrical Installation. For
definition of point wiring and measurement of Electrical works IS-5908-1970 shall be referred to.
3. Voltage and Frequency of supply :
All current consuming devices shall be suitable for frequency of 50C/s and systems of voltage meant for
unless otherwise specified.
4. Layout of wiring and its description :
(i) The wiring shall be carried out as per schedule "Power" wiring must be in screwed conduit and shall be
kept separate and distinct from lighting wiring. All wiring must be done on the distribution system with
main and branch distribution boards at convenient centers and without isolated fuses. All conductors shall
be run as far as possible along the walls and ceiling as to be easily accessible and capable of being
thoroughly inspected. The balancing ofcircuits will be arranged beforehand by the Executive Engineer
(ii) Within one month of the taking over the installation, the contractor shall supply to the Executive Engineer
(Mech.), a complete set of wiring diagrams of the same on drawings to be supplied when available by the
Executive Engineer (Mech.) and to the satisfaction of the Executive Engineer (Mech.), D’cell. Dept. and
these wiring plans shall be "Drawings" within the meaning of the term as used in the General conditions
5. Conductors :
All conductors unless otherwise specified shall not be less than 1.5 sq. mm. for point wiring and 2.5 sq. mm
for mains conductors for power and lighting circuits shall be of adequate size to carry the designed circuit
load without exceeding the permissible thermal limits for the installation, and such sizes will be stipulated in
specifications and or drawings.
6.1 All cables shall conform to relevant Indian Standards.
6.2 Conductors of all cables except the flexible cable shall be of aluminum. The smallest aluminum conductor
for the final circuit shall have nominal cross sectional area of not less than 1.5 sq. mm. The minimum size of
the aluminum conductors for power wiring shall be 4 sq. mm.
6.3.1 Conductors of flexible cables shall be of copper the minimum cross sectional area of such a cables shall be
14.0193 mm. the Flexible cable shall have uniform and adequate insulation.
6.3.2 Unless the flexible cables and conductors are protected by armor or though rubber of PVC Sheath, theses
shallnot be used in workshops and other places where they are liable to mechanical damage.
6.3.3 Core flexible cables shall be used for connecting single phase Appliances for phase, natural & earth
7. Fall of Potential :
The Cross sectional area of all conductors inside buildings shall be so proportioned to their lengths that the
drop in voltage between main fuses and the farthest point or any lamp shall not exceed three percent of the
voltage of the consumer's with all the consuming devices in use.
7.1 If the Cable Size is increased to avoid the voltage drop in circuit current rating of the cable shall be more than
that for which circuit is designed. In each circuit or sub circuit or sub circuit every cable shall have current
rating not less than that of the fuse which protects the circuit or sub circuits respectively for current higher
than the full load current.
8. Ratings of lamps and fans socket outlets : Points and exhaust fans
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
8.1 Incandescent lamps installed in residential and non-residential buildings shall be rated at 60 watts &
watts respectively.
8.2 Table fans and ceiling fans shall be rated at 60 watts, exhaust fan shall be rated according to their capacity
8.3 5Amp. Socket outlet points and 15Amp. Socket outlet points shall be rated at 100watts and 1000 watts
respectively for the purpose of load assessment unless actual values of the load are, know or specified.
9.1 Before the installation is commissioned following tests shall be carried out.
(1) Insulation Resistance Test.
(2) Polarity Tests of Switches
(3) Earth continuity tests
(4) Earth electrodes Resistance test.
9.2.1.1 The insulation Resistance shall be measured between earth and the whole system of conductors or any
section thereof with all fuses in place and all switches closed, and except in earthed concentric wiring all
lamps in position or both poles of installation otherwise electrically connected together. A direct current
pressure of not less than twice the working pressure provided that it need not exceed. 500 volts for medium
voltage circuits where the supply is derived from three wire D.C or a ploy phase A.C. system, the neutral
pole of which is connected to earth either direct or through added resistance, the working pressure shall be
deemed to be that which is maintained between the phase conductor and the neutral.
9.2.1.2 The insulation resistance shall also be measured between all conductors to one pole or phase conductor of
the supply and all the conductors connected to the neutral or to the order pole or phase conductors of the
supply with all lamps in position and switches in "OFF" position and its value shall be not less than in that
specified in sub-clause 9.2.1.3.
9.2.1.3 The insulation resistance in Mega-ohms measured as above shall not be less than 50 mega ohms divided by
the number if outlet or when PVC insulated cables are used for wiring 12.5 mega ohms divided by number
9.2.1.4 Where a whole installation is being tested a lower value than that given by the formula subject to a minimum
of 1 mega ohm is acceptable.
9.2.1.5 A preliminary and similar test may be made before lamps, etc., are installed and in this event the insulation
resistance to earth should be not less than 100 mega ohms divided by the number of outlet or when PVC
insulated cables are used for wiring 25 mega ohms divided by number of outlets.
9.2.1.6 The term "Outlet" includes every switch except that a switch combined with a socket outlet appliance or
lighting, fitting is regarded as one outlet.
9.2.1.7 Control rheostat heating and power appliance and electric sign may, if required, be dis-connected from the
circuit during the test, but in that event the insulation resistance between the case or frame work, and all
live parts of each rheostat, appliance and sign, shall be not less than that specified in the relevant Indian
Standard Specification or where there is no such specification shall be not less than half a mega ohm.
9.2.2 Polarity Test :
9.2.2.1 In a two wire installation a test shall be made to verify that all switches in every circuits have been fitted in
the same conductor throughout & such conductor shall be labelled or marked for connection to the phase
conductor or to the non-earthed conductor of the supply.
9.2.2.2 In a three wire or a four wire installation a test shall be made to verify that every non-linked single pole
switch is fitted in a conductor which is labeled or marked for connection to one of the phase conductor of
9.2.2.3 The installation shall be connected to the supply for testing. The terminate of all switches shall be tested by
a testlamp one lead of which is connected to the earth. Glowing of test lamp to its full brilliance when the
switch is in on position irrespective of appliance in position or not shall indicate that the switch is connected
to the right polarity.
9.2.3 Earth Continuity Test :
The earth continuity conductor including metal conduits and metallic envelops of cables in all cases shall be
tested for electric continuity and the electrical resistance of the same along with the earthing lead but
excluding any added resistance or earth leakage circuit breaker measured form the connection with the
earth electrode to any point in the earth continuity conductor in the completed installation shall not exceed
9.2.3.1 Earth Electrode Resistance Test :
Earth electrode Resistance test may be carried out by magger Earth Testers containing a direct reading
ohmmeter, a hand driven generator and auxiliary electrodes.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
9.3 On completion of an electric installation (addition and alteration) a certificate shall be furnished by the
contractor countersigned by the certified Supervisor under whose direction supervision the
installation was carried out. This certificate shall be in the prescribed form as given in Appendix-B in
addition to the test certificate required by Local Electrical Supply Authorities.
10. Joint and looping back :
Unless with the sanction of Executive Engineer (Mech.), s all joints in conductor shall be means of approved
mechanical connectors in suitable and approved junction boxes but looping back system shall be preferable.in
wiring unless otherwise specified phase and live conduct shall be looped at the switch box where a neutral
conductor can be looped from light, fan or socked in non-residential buildings neutral and earth continuity
wire shall be brought to each of 'the switch boards should be of adequate size to accommodate at least one
number of 5 Amps, socket outlet and control switch in future.
Main Switchgears, Switch Board and their location :
11.1 All main switches (other hart loss of iron clad pattern) carrying current of 10 Amp. and above shall be
twitted for back connections and shall be suitably protected.
11.2 AH switches and circuit breakers shall be constructed in accordance with the I.S. 4237-1967. General
requirement for switchgear and control gear for voltage not exceeding 1000 volts and other relevant I.S.
provided also that spring shall be either of phosphor bronze or if steel shall be copper or Nickel plated and
that handle shall the so fastened that they do not tend to unscrew or become boss.
11.3 All main switches shall be either of metal cad enclosed pattern of any insulated enclosed pattern which shall
be fixed at close proximity to the point of entry of supply.
11.4 Switch boards shall not be erected above gas, stoves, sinks or within 2.5 m of any washing unit in the
washing rooms of laundries or in the bath rooms, lavatories, toilets or kitchens.
11.5 Switch boards, if unavoidably fixed in places likely to be exposed to weather, to drip or to abnormal noise
temperature the outlet casing shall be weather proof and shall be provided with glands or bushing of
adopted to receive screwed" conduit according to the manner in which cables are run PVC and double
flanged bushes shall be fitted in the holes of the switches for entry and exit of wires.
11.6 A Switch board not be installed so that its bottom is within 1.25 m above the floor unless the front of the
switch board completely enclosed by a door or the switch board is located in a position to which only
authorized persons have access.
11.7 Switch boards shall be recessed in the wall if so specified in the schedule of work or in the special
specification. The front shall be fitted with hinged panel of other suitable material such as Bakelite in wood
frame with locking arrangement, the outer surface of door being flush with the walls. Ample room shall be
provided at the back for connections and at the front between the switchgear mountings and the door.
11.8 Equipment’s which are on the front of a switch board shall be so arranged that inadvertently personal
contact with live parts is unlikely during the manipulation of switchgears. changing of fuses or like
11.9 No holes other than the holes by means of which the panel is fixed shall be drilled closer than 1.3 cms from
any edge of the panel.
11.10 The various live parts, unless they are effectively screened by substantial barriers of non-hydroscopic,
inflammable insulating material, shall be so spaced that space shall not be maintained between such parts
11.11 The arrangement of gear shall be such that they shall be readily accessible and their connections to all
instruments and apparatus shall also be traceable.
11.12 In every case in which switches and fuses are fitted on the same pole, these fuses shall be so arranged that
the fuses are not alive when their respective switches are in the off position.
11.13 No fuses other than fuses in instrument circuit shall be fixed on the back of or behind a switch board panel
11.14 All the metal switchgears and switch boards shall be painted, prior to erection with one coat of antirust
primer, After erection they shall be painted with two coats of approved enamel or aluminum paint as
required on all sides wherever accessible.
11.15 All switch boards connected to medium voltage and above shall be provided with "Danger Notice Plate"
conforming to relevant Indian Standards.
12. Control at Point of Commencement of Supply :
12.1 There shall be a linked man switchgear with fuse on each live conductor of the supply mains at the point of
entry. The wiring throughout the installation shall be such that there is no break in the natural wire except
in the form of the linked switchgear the neutral shall also be distinctly marked. In this connections Rule
32(2) of the Indian Electricity Rules, 1966 (See Appendix-A_ shall also be referred.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
12.2 The main switchgear shall be situated as near as practicable to be termination of services line and shall be
easily accessible without the use of any external aid.
12.3 On the main switchgear, where the conductor of a two wire system or an earthlyneutral conductor of a multi
wire system or a conductor which is to be connected thereto, an indication of a permanent nature shall be
provided to identify earthly neutral conductor. In this connection Rule 32(1) of Indian Electricity Rules,
1956 (see appendix 'A') shall be referred.
13. Switch Board & Distribution Boards :
Metal clad switch gear shall preferably be mounted on any of the following types of Board.
13.1 Hinged type Metal Board :
There shall consist of a box made of sheet metal not less than 2 mm thick and shall be provided with a
hinged cover to enable the board to swing open for examination of the wiring at the back. The joints shall
be welded. A teak wood board, thoroughly protected both inside and outside with good insulating varnish
conforming to IS : 347-1952 specification for varnish shellac for General purpose and of not less than
mm thickness shall be provided at the back for attachment of incoming and outgoing cables. There shall be
a clear distance of not less than 2.9 cm between the teak wood board and the cover, the distance being
increased for larger boards in order that on closing of the cover, the insulation of the cables in not subjected
to damage and no shoat length of cables is subjected to excessive twisting or bending in any case.
The board shall be security fixed to the wall by means of rag bolts, plugs or wooden Gutties and shall be
provided with a locking arrangement and an earthing stud. All wires passing through the metal board shall
be bunched. Alternatively, hinged type metal boards shall be made of sheet covering mounted on channel
or angle iron frame.
Note : Such type of boards are particularly suitable for small switch-boards for mounting metal-clad switchgear
connected to supply at low voltages.
13.2 Fixed type Metal Boards :
These shall consist of an angle or Channel of iron frame fixed on the wall or on floor and supported on the
wall at the top if necessary. There shall be a clear distance of one meter in front of the switch board. If there
are attachments of base connections at the back of the switch board Rules 51(1)c) of Indian Electricity Rules,
1956 shall apply
NOTE : Such type of boards are particularly suitable for large switchboard for mounting large
number of switchgears or higher capacity metal clad switchgears of both.
13.3 Teak wood Boards :
For small installation connected to a single phase 230 volts supply teak wood boards may be caused as main
boards or sub-boards. These shall be of seasoned teak or other durable wood with solid back impregnated
with varnish of approved quality with all joints dovetailed.
13.4 In large size medium voltage installations, before proceeding with the actual construction of the boards, a
proper drawing showing the detailed dimensions and design including the disposition of the mounting a
which shall be symmetrically and neatly arranged for arriving at the overran dimensions shall be prepare
and approved by the engineer-in-charge.
13.5 Recessing of Boards :
Where so specified the switch boards shall be recessed in the wall. The front shall be fitted with a hinged
panel of teak wood or other suitable materials, such as Bakelite, or with unbreakable glass doors in teak
wood frame with locking arrangement, the other surface off the doors being flush with the walls, ample
room shall be provided at the back for connection and at the front between the switchgear mountings.
13.6 Arrangement of Apparatus :
a) Equipment which is on the front of a switch board shall be so arranged that inadvertently personal contact
with live parts is unlikely during the manipulation of switches, changing of fuses or like operation.
b) No apparatus shall project beyond any edge of panel. No fuse body shall be mounted within 2.5 cm of any
edge of the panel and no hole other than holes by means of which the panel is fixed shall be drilled closer
than 1.3 cms from any edge of the panel.
c) The various live parts unless they are effectively screened by substantial barriers of non-hydroscopic, non-
inflammable insulating material, shall be so spaced that an are cannot maintain between such parts and
d) The arrangement of the gear shall be such that they shall be readily accessible and their connection to all
instruments and apparatus shall also be easily traceable.
e) In every case in which switches and fuses are fitted on the same pole, these fuses shall be so arranged that
the fuses are not alive when their respective switches are in the 'OFF' position.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
f) No fuses other than fuses instrument circuit shall be fixed on the back of or behind a switchboard panel or
13.7 Marking of Apparatus :
a) Where a boards is connected to voltage higher than 250 volts, all the apparatus mounted on it shall be
marked in the following colours to which the apparatus or its different terminal may have been connected.
Alternating Current Direct Current
Three-phase-red Three wire system-2 otherwise
Yellow & blue Positive red & negative blue
Natural-black Natural-black
Where fuse-wire three phase wiring is done, the neutral shall be in one colour and the other three wires
in another colour
b) Where a board has more than one switch shall be marked to indicate which section of the installation it
c) All markings required under the rule shall be clear permanent.
13.8 Main & Branch Distribution Board :
13.8.1 Main and branch distribution boards shall be any type mentioned in 13.1, 13.8.1. Main and branch
distribution boards shall be of any type mentioned in
13.8.2 Main distribution boards shall be provided with a switch or air circuit breaker on each pole of each circuit,
a fuse on the phase or live conductor and a link on the neutral or earthed conductor of each circuit. The
switches shall always be linked.
13.8.3 Branch Distribution Board :
13.8.3.1 Branch distribution boards shall be provided with a fuse of a miniature circuit breaker of both the
(adequate rating-setting chosen on the live conductor of each circuit and the earthed neutral conductor
shall be connected to a common line and be capable of being disconnected individually for testing
purposes. At least one spare circuit of the same capacity shall be provided on each branch distribution
13.8.3.2 In residential installations, lights and fans may be wired on a common circuit such sub circuit shall not
have [more than total after points of lights, fans and socket outlets/The load of such circuits shall be
restricted to 800 watts. If a separate Fan circuit is provided the number of fans in the circuit shall not
exceed ten. power sub-circuits shall be designed according to the load but in no case shall there be more
than two outlets on each sub-circuits
13.8.3.3 In industrial another similar installations requiring the use of group control of switching operation,
circuits, for (socket outlets may be kept separate from fans and lights. Normally fans and lights may be
wired on a common circuit, however, if need is felt separate circuits may be provided for the two. The road
on any low voltage sub circuit shall not (exceed 3000 Watts.) In case of new installation, all circuits and
sub-circuits shall be designed by making provision of 20 (percent increase in load due to any future
modification. Power sub-circuits shall be designed according to the load but in no case shall there be more
than four outlets in each sub-circuits
13.9 Installation of Distribution Boards :
13.9.1 The distribution fuse-boards shall be located as near as possible to the centre of the load they are intended
13.9.2 These shall be fixed on suitable stanchion or wall and shall be accessible for replacement of fuses.
13.9.3 These shall be of either metal-clad type, or all insulated type. But if exposed to weather or damp situations,
they shall be of the weather proof type and if installed where exposed to explosive dust, vapour or gas,
they shall be of flame proof type
13.9.4 Where two or more distribution fuse boards feed low voltage these distribution boards shall be
(1) Fixed not less than 2 m apart or
(2) Arranged so that it is not possible to open two at a time, namely they are interlocked and the metal
case is marked Danger 415 volts or
(3) installed in a room or enclosure accessible to only authorized person.
13.9.5 All distribution boards shall be marked lighting, power as the case may be and also marked with the
voltage and number of phases of the supply Each shall be provided with a circuits list giving details
of each circuit which it controls and the current rating of the circuit and size of fuse element.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
13.9.6 Triple pole distribution boards shall not be generally used for final circuit distribution unless specification
approval of Engineer-in-charge is obtained in special cases where use of Triple pole distribution boards
are inevitable they shall be of H.R.C. fuse type only.
13.10 Wiring and Distribution Board :
13.10.1 In wiring a branch board, total load of the consuming devices shall be divided as far as possible, evenly
between the number of ways of the boards leaving the spare circuit for future extension.
13.10.2 All connections between pieces of apparatus or between apparatus and terminalson a board shall be
neatly arranged in a definite sequence following the arrangement of the apparatus mounted thereon,
avoiding unnecessary crossing.
13.10.3 Cables shall be connected to a terminal only by soldered or welded or crimped lugs using suitable sleeve,
lugs or ferrules unless the terminal is such a form that it is possible to securely clamp them without the
cutting away of cable strands.
13.10.4 All bare conductor shall be rigidly fixed in such a manner that a clearance of at least 2.5 cms. is maintained
between conductor of opposite polarity or phase and between the conductors any material other than
insulating material.
13.10.5 If required a pilot lamp shall be fixed and connected through on independent single-pole switch and fuse
to the bus-bars of the board.
13.10.6 In a hinged type board, the incoming and outgoing cables shall be fixed at one or more points according to
the number of cables on the back of the board leaving suitable space in between cables and shall also, if
possible be fixed at the corresponding points on the switch board panel. The cables between these points
shall be arranged to form a "U" or "S" shaped loop which shall be of such length as to allow the switchboard
panel to swing through an angle of not less than
14. Capacity of Circuits :
14.1 Lights and fans may be issued on a common circuits and such a circuit shall not have more than a total of ten
points of lights, fan and socket outlets or a load of 800 watts whichever is less. The power circuits shall be
designed with a maximum of two outlets per circuits generally when load is not known or specified. In non-
residential buildings at important District centers however one outlet per circuit may be preferred. The
circuit shall be designed based on the loading of the
Circuit where not specified the load shall be taken as 1 kw per outlet, where the load is more than 1 kw it
should be controlled by a isolator switch or miniature circuit breeder.
15. Passing Through walls and floors :
15.1 Where conductors pass through walls one of the following methods shall be employed. Care shall be taken to
see that wires pass very freely through protective pipe of box and that the wires pass through in a straight
line without any twist of cross in wires, on other ends of such holes.
(a) A teak wood box extending through the whole thickness of the wall shall be buried in the wall and casings
or conductors shall be carried so as to allow 1.3 cms air space on three sides, of the casing conductor.
(b) The conductor shall be caned either in a rigid steel conduit conforming to *IS : 1653-1964 specification
for Rigid Steel conduits of Electrical wiring (Revised) or a rigid non - metallic conduit conforming to *IS :
2509-1963 specification of Rigid Non-Metallic conduits for Electrical Installations, or in a porcelain tube
of such size which permits easy drawing in. The end of conduit shall be neatly bushed with porcelain,
wood or other approved material.
(c) Insulated conductors while passing through floors shall be protected from mechanical injury by means
of rigid steel conduit (see *IS 1653-1964) to a height not less than 1.5 m above the floors and flush with
the ceiling below. This steel conduit shall be earthed and securely bushed.
15.2 Where a wall tube passed outside a building so as to be exposed to weather the outer end shall be belt
mounted and turned downwards and properly bushed on the open end.
16. Fixing to Walls and Ceilings :
Plugs for ordinary walls or ceilings shall be of while seasoned teak or other approved hardwood not less than
5 cm long 2.5 c.m. square on his inner end and 2 c.m. square on the outer end. They shall be cemented into
walls to within 7.5 mm of the surface, the remaining being finished according to the nature of the surface with
plaster of lime punning.
16.1 Where owing to irregular crossing or other reasons the plugging of the walls or ceiling with wood plugs
presents difficulties, the wood casing wood pattern, metal conduit or cleat (as the case may be) shall be
attached to the wall or ceiling in an approved manner in the case of new building wherever possible teak
wood plugs shall be fixed in the walls before they are plastered.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
16.2 To achieve neatness, plugging of walls or ceiling may be done by an approved type of asbestos metallic or a
fiber fixing plug.
17. Branch Switches :
Where the supply is derived from a three-wire of four-wire source, and distribution is done on the two wire
system all branch switches shall be placed in the outer or live conductor of the circuit and no single-phase
switch or use shall be inserted in the middle wire, earth or earthed natural conductor of the circuit. Single
pole switches (Other than for multiple control) Carrying not more than 15 amperes any be of tumbler type
which shall be 'ON' when the handle known is down.
Where conductors are required to be threaded through tubes or channels formed in the metal work of fittings
this must be free form sharp angles or projecting edges and such size that will enable them to be wired with
the conductors used for the final sub-circuits without removing the boarding taping or outer covering as far
as possible all tubes and channels should be of sufficient size of permit 'Looping bank' of wires cables and
flexible cords other than those designed for high temperature shall not be used for wiring fittings except for
portable fit limits. All fittings must have not less than a half inch male nipple Fittings and lamp holders for gas
filled lamps shall be adequately ventilated.
18.1 Where light fitting is supported by one or more flexible cords the maximum weight to which the twin flexible
cords may be subjected shall be as follows.
No. & Dia. inmm of Max. Permissibleweight
crosssectionalArea cord
18.2 No inflammable shade shall form a part of light fitting unless such shade is well protected against all risks or
fire. Celluloid shade or light fitting shall not be used under any circumstances.
18.3 Fitting of wire :
The use of fitting wire shall be restricted to the internal wiring and the lighting fittings. Where fitting wire is
used for wiring, for the sub-circuit loads shall be terminated in a ceiling zone or connector from which they
shall be carried into the fittings.
19. Lamp Holders :
Lamp holders for use on brackets and the like shall be in accordance with *IS : 1258-1967 specification for
Bayonet lamp holders and all those for use flexible pendants shall be provided with cord grips. All lamp
holders shall be provided with shade carriers. Where centre contact Edison screw lamp holders are used, the
outer or screw contacts shall be connected to the middle wire, the natural and the earthed conductor of the
20. Outdoor Lamps :
External and road lamps shall have weather proof fittings of approved design so as to effectively prevent the
admission of moisture. An insulating distance piece of moisture proof materials shall be inserted in the
fittings. Flexible cord and cord grip lamp holders shall not be used where exposed to whether in veranda’s
and similar exposed situations where pendants are used, they shall be of fixed rod type
All incandescent lamps, unless otherwise required an suitable protected, shall be hinge at a height of not less
than 2.5 m above the floor level. They shall be in accordance with IS: 418: 1957 specification for Tungsten
Filament General Service electric lamps
22. Fans, Regulators and Clamps
22.1 Ceiling fans :
Ceiling fans including their suspension shall conform to *IS 374-1960 specification for electric ceiling fans
and regulators (Revised) & to the following requirements
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
(a) All ceiling fans shall be wired to ceiling rouses or to special connector boxes to which fans rod wires shall
be connected and suspended from books or shackles with insulators between hooks and suspension rods.
There shall be no joint in the suspension rod. but if joints be avoidable then such joints shall be screwed
to special couplers of 5 cm minimum length and both ends of pipes shall touch together within couplers
and shall in addition be secured by means of split pins alternatively the two pipes may be welded.
(b) Fans clamps shall be of suitable design according to the nature of construction of ceiling on which these
clamps are fitted in all cases fan clamps shall be fabricated from tested new metal of suitable sizes and
they shall be as close fitting as possible Fan clamps for reinforced concrete roots shall be buried with the
casting and due care shall be taken that they shall serve the purpose. Fan clamps for wood beams shall be
of suitable flat iron fixed on two sides of the beam and according to the size and section of the beam one
or two mild steel bolts passing through the beam shall hold both flat irons together Fan clamps for steel
join shall be fabricated from tested flat iron to fit in rigidly to the bottom flange of the beam. Care shall be
taken during fabrication that the metal does not crack while hammering to shape. Other fan clamps shall
be made to suit the position, but in all cases care shall be taken to see that they are rigid and safe.
Note: All fan clamps shall be so fabricated that fans revolve steadily.
(c) Canopies on top and bottom of suspension rod shall effectively hide suspensions and connections to fan
motors, respectively.
(d) The lead-in wire shall be of nominal cross-sectional are a not less than 1.0 sq. mm with copper and 1.5 sq.
mm with aluminium and shall be protected from abrasion.
(e) Unless otherwise specified the clear distance between the ceiling fan and the floor shall be less than
22.2 Exhaust Fans :
For fixing of an exhaust fan a circular hole shall be provided in wall to suit the size of the fan which shall be
fixed by the means of rag-bolts embedded in the wall the hole shall be neatly plastered with cement and
brought to the original finish of the wall. The exhaust fan shall be connected to exhaust fan point which be
wired as neatto the hole as possible by means of a flexible cord, care being taken that the blades in the proper
23. Attachment of fittings and accessories :
23.1 In other than conduit wiring all ceiling crosses, brackets, pendants and accessories attached to watts or ceiling
shall be mounted on substantial teak wood block twice Varnished after all fixing holes are made in them.
Blocks shall be not less than 4 cms deep. Brass screws only shall be used for attaching finings and accessories
to their base blocks.
24. Interchangeability :
Similar part of all switches, lamp holder, distribution, fuse board, ceiling rouses, brackets, pendants, fans and
all other fittings of same type shall be interchangeable in each installation.
25. Conduit Wiring System :
25.1.1 Type and size of conduit - All conduit pipes shall be conforming to *IS: 1653-1964, furnished with
galvanised or stove enamelled surface. All conduit accessories shall be of threaded type and under no
circumstances pin grip type or clamp type accessories be used. No steel conduit less than 16 mm in
diameter shall be used. The number of insulated conductors that can be drawn into rigid steel conduit are
given in Table II.
25.1.2 Bunching of cables - Unless otherwise specified, insulated conductors of AC supply and DG supply shall
be bunched in separate conduits.
25.1.3 Conduit-Joints-Conduit pipes shall be joined by means of screwed couplers and screwed accessories only
Specification for Fittings for Rigid Steel Conduits for Electrical Wiring. In long distance stance straight runs
of conduit inspection type couplers at reasonable intervals shall be provided or running threads with
couplers and jam-puts (in the latter case the bare threaded portion shall be treated with anti - corrosive
preservative) shall be provided. Thread on conduit pipes in all cases shall be between 11 mm to 27 mm
long sufficient to accommodate pipes to full thread portion of couplers or accessories. Cut ends of conduit
pipes shall have no sharp edges nor any or buries left to avoid damage to the insulation of conductors
while pulling them through such pipes.
TABLE-II MAXIMUM PERMISSIBLE NUMBER OF 250-V GRADE
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
SINGLE CORE CABLES THAT CAN BE DRAWN INTO RIGID STEEL
(CLAUSE 6.5.1.1)
Size of cable Size of conduit (mm)
(No. of cable Max)
* For Cu. Conductors only
+ For Al Conductors only
Note-1 The cable shows the maximum capacity of capacity for the simultaneous drawing-in of cables. The table
applies to 250 volts grade able the columns heads 'S' apply to runs of conduit which have distance not exceeding
4.25 M between draw in boxes and which do not deflect from the straight by angle of more than 150. The columns
headed ‘B’ apply to runs of conduit which deflect from the straight by angle more than 15
Note-2 In case of inspection type draw-in-box has been provided and if the cables is first drawn through one
straight conduit, then through the drawn box, and then through the second straight conduit, such systems may be
considered as that of a straight conduit even if the conduit deflects through the straight by more than 15
25.1.4 Protection against dampness - in order to minimize condensation or seat in inside the tube, all outlets
of conduit system, shall be property drained and ventilated, but in such a manner as to prevent the entry
of insects as far as possible
25.1.5 Protection of conduit against rust - The outer surface of the conduit pipes including all bends, unions,
tees junction boxes, etc., forming part of the conduit system shall be adequately protected against rust
particularly when such system is exposed to weather in all cases no bare threaded portion of conduit pipe
shall be allowed unless such bare threaded portion is treated with anti-corrosive preservative or covered
with approved plastic compound.
25.1.6 Fixing of Conduit - Conduit pipes shall be fixed by heavy gauge saddles, secured to suitable wood plugs
or any other approved plug with screws in an approved manner at an interval of not one than one meter
but on either side of coppers or bends or similar fittings, saddles shall be fixed at a distance of 30 cm. from
the centre of such fittings.
25.1.7 Bends in conduit - All necessary bends in the system including diversion shall be done bending pipes, or
by insuring suitable solid or inspection type normal bends, elbows or similar fittings or by fixing cast iron
inspection boxes whichever is more suitable. Conduit fitting shall be avoided as far as possible. On conduit
system exposed to weather, where necessary, said type fitting shaft be used. Radius of such bends in
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
conduit pipes shall be not less than 7.5 cm. No length of conduit shall have more than the equivalent of
four quarter bends from outlet, the bends at the outlets not being counted.
25.1.8 Outlets - All outlets for fitting switches etc., shall be boxes, of .suitable metal or any other approved outlet
boxes for other surface mounting or flush mounting system.
25.1.9 Conductors - All conductors used in conduits wirings shall preferably be stranded. No single core cable
nominal Cross - sectional area greater than 130 mm shall be enclosed In a conduit and used for alternating
25.1.10 Erection and earthing of conduit - The conduit of each circuit or section shall be completed before
conductors are drawn in. The entire system of conduit and permanently” connected to earth conforming
the requirements specified under pipe in a workman like manner for a perfect continuity between each
wire and conduit. Gas or water pipes shall not be used as earth medium. If conduit pipes are liable to
mechanical damage, they shall be adequately protected.
25.2 Recessed Conduit wiring system with Rigid Steel conduits - Recessed conduit wiring system shall
comply with all the requirements for surface conduit wiring system specified in 6.5.1.1 to 6.5.1.10 and in
addition, conform to the requirements specified in 6.5.2.1 to 6.5.2.4.
25.2.1 Making of chase - The chase in the wall shall be neatly made and be of ample dimensions to permit the
conduit to be fixed in the manner desired In the case of buildings under construction chases shall be
provided in the wall, ceiling etc., at the time of their construction and shall be filled up neatly after erection
of conduit and brought to the original finish of the wall.
25.2.2 Fixing of conduit in chase - The conduit pipe shall be fixed by means of staples or by means of soft saddles
not more than 60 cm apart. Fixing of standard bends or elbows shall be avoided as far as practicable and
all curves maintained by bending the conduit pipe itself with a long radius which will permit easy drawing
in of conductors. All threaded joints of rigid steel conduit shall be treated with some approved
preservative compound to secure protection against rust.
25.2.3 Inspection boxes - Suitable inspection boxes shall be provided to permit periodical inspection and
tofacilitate removal of wires, if necessary. These shall be mounted flush with the wall Suitable ventilating
holes shall be provided in the inspection box covers.
25.2.4 Type of accessories to be used - All outlets such as switches and wall sockets, may be either of flush
mounting type of surface mounting type.
(a) Flush mounting type - All flush mounting outlets shall be of cast iron mild steel boxes with a cover of
approved insulating material or shall be a box made of a suitable’ insulating material.
The switches and other outlets shall be mounted on such boxes as would be approved. The metal box shall
be efficiently earthed with conduit by an approved means of earth attachment.
(b) Surface mounting type - If surface mounting type outlet box is specified, it shall be of any approved
insulating material and outlet mounted in an approved manner.
25.2.5 When crossing through expansion joints in buildings, the conduit sections across the joint may be through
flexible conduits of the same size as the rigid conduit.
25.3 Conduit Wiring System with Rigid Non-Metallic Conduits:
Rigid Non-Metallic conduits are used for surface recessed and concealed conduit wiring.
25.3.1 Type and size - All non-metallic conduits used shall conform to IS: 2509-1963 and shall be used with the
corresponding accessories (See IS: 3419-1965) specification for Fittings for Rigid Non - Metallic Conduits).
25.3.2 Bunching off cables - Conductors of AC supply and DC supply shall be bunched in separate conduits. The
number of insulated cables that may tie drawn into the conduits are ivory In Table III. In this table space
factor does not exceed 40 percent.
TABLE-III MAXIMUM PERMISSIBLE NUMBER OF 250 VOLTS GRADE SINGLE, CORE CABLE THAT MAY BE
DRAWING INTO RIGID NON-METALLIC CONDUITS
Size of cable Size of Conduits (mm)
Diameter in 16 20 25 32 40
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
(No. of cable Max)
*For copper conductors only
+For aluminium conductors only.
25.3.3 Conduit joints - shall be joined by means of screwed or plain couplers depending on whether the conduits
are screwed or plain. Where there are long runs of straight conduit. Inspection type couplers shall be
provided at intervals. For conduit fittings and accessories reference may be made to IS : 3419-1965.
25.3.4 Fixing of conduits - The provision of 25.1.6 shall apply except that the spacing between saddles or
supports is recommended to be 60 cms for rigid non-metallic conduits.
25.3.5 Bends in conduit - wherever necessary, bends or diversions may be achieved by bending the conduits
(See 6.5.3.9) or by employing normal bends, inspection bends, impaction boxes elbows or similar fittings.
25.3.6 Conduit fittings shall be avoided, as far as possible on outdoor system.
25.3.7 Outlets - All the outlets or fittings, switches, etc. shall be boxes of substantial construction. In Order to
mines is condensation or sweating inside inside the conduit, all outlets of conduit system shall be properly
drained and ventilated, but in such a manner as to prevent the entry of insects, etc. as far as possible.
25.3.8 For use with recessed conduit wring system the provisions of 6.5.2.1 to 6.5.2.4 shall apply
25.3.9 Heat may be used to soften conduit for bending and forming joints in case of plaint conduits. As the
material soften when heated fitting of conduit in close proximity to hot surfaces should be avoided.
Caution should be exercised in the use of the conduit in locations where the ambient temperature is 50 o C
or above Use of such conduits in place where ambient temperature is 60 o C or above is prohibited.
PVC INSULATED AND P.V.C. sheathed or T.R.S wiring SYSTEM
This system of wiring is suitable for low pressure installation and shall not be used in places exposed to sun and
rain nor in damp places. Provided they are sheathed in the special approved protective covering and well protected
to withstand dampness.
26.1 Attachment to walls and ceiling :
26.1.1 All cables on brick walls, stone or plastered walls and ceiling shall be run on well-seasoned perfectly
straight and well-seasoned, perfectly straight and well varnished on four sides, teak wood or any approved
hard wood battens not less than 10 mm finished thick, width of which shall be such as to suit total width
of cables laid on the batten, prior to election, these shall be painted with one coat of varnish or approved
paint of colour to match with surrounding. These battens shall be secured to wall and ceilings by flat head
wood screws to raw plug or Phil plug at an interval not exceeding 75 cm. Wood plug can be used only with
special approval of the Engineer in charge. The flat head wood screws shall be counter within
wood batten and smoothed down with file
26.1.2 Where wiring is to be carried out along the face of the rolled steel joints a wooden batten adequate width
shall first be laid on the same and dipped to it as inconspicuously as possible. The wiring should
then be fixed to this backing shall be suitable bushed to prevent the abrasion of the cables.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
26.1.3 Attachment to false ceiling: In no case, the open wiring shall be run above the false ceiling without the
approval of Engineer-in-charge
26.2 Link dips: Only aluminum alloy clips/joint clips shall be used. The thickness shall be 0.32 mm (30 SWG) for
lengths of 25 mm to 40 mm (28 SWG) for lengths of 50 mm to 80 mm. The width shall not be less than 8 mm
in all these cases. Link clips/joint clips shall be so arranged that one single clip shall not hold more than two
core or three single core TRS of PVC insulated and PVC sheathed up to 2.5 sq. mm above while-a single clip
shall hold a single twin core or two single core cables. The clips shall be fixed on varnished wood batten switch
iron pins and space at interval of 15 cm bet in the case of horizontal and vertical runs.
26.3 Bends in wiring: The wiring shall not in circumstances be bent so as to form and abrupt right angle but must
be rounded off at the corners to a radius not less than six times the overall diameter of the cable.
26.4 Protection of wiring from Mechanical Damage:
26.4.1 In cases where there are chances of any damage to wiring such wiring shall be drawn complying with all
the requirements of conduit wiring system.
26.4.2 Such protective covering shall in all cases be fitted on all down drops within 1.5m from the floor or from
floor level up to the switch board whichever is less.
26.5 Passing through floors: All cables taken through floor shall be enclosed in heavy gauge steel conduit
extending 1.5m above the floor or up to the switch board whichever is less and flush with the ceiling below
or by means of any approved type metallic covering. The ends of all conduits or pipes shall be neatly bushed
with porcelain wood or other approved material. The conduit pipes shall be security earthed.
26.6 Passing through walls: When conductors pass through walls, anyone of the following methods shall be
employed. Care should be taken to see that Wires pass very freely through protective pipe or box and that
wires pass through in a straight line without any twist or cross in wires on either ends of such holds.
(a) A box of teak wood or approved hard wood extended through the whole thickness of the wall shall be
buried in the wall and casings or conductors and casing or conductors shall be carried so as to allow
cm air space on the three sides of the casing or the conductor.
(b) The conductors shall be carried in. an approved heavy huge solid drawn or lap weld conduit or in a
porcelain tube of such a size that it permits easy drawing in, the end of conduit shall be neatly bushed
with porcelain, wood or other approved material. 26.6.1, Where a wall tube passed outside a building so
as to be exposed to weather, the outer end shall be mounted end turned downwards and property bushed
or the open end, the conduit shall be neatly arranged so that the cables enter them without bending.
26.7 Buried cables: Tile TRS or PVC sheathed cable shall not normally be burring directly in plaster, Where so
specified in the special in the specification they may be taken in task wood channeling of ample capacity or
conduit pipe buried in the wall.
26.8 Stripping of outer covering: While cutting and stripping of the outer covering of the cable care shall be taken
that the sharp edge of the cutting instrument does not touch the inner insulation of the conductors. The
protective outer covering of the cables shall be stripped off near connecting terminal and this protective
covering shall be maintained up to the close proximity of connecting terminals as far as practicable. Care shall
be taken to avoid hammering on link clips with any metal instrument after the cables are laid. Where junction
boxes are provided they shall be made moisture proof with a plastic compound.
27. PAINTING WORK IN GENERAL:
27.1 Paints: paints, oils varnishes etc. of approved make in original to the satisfaction of the Engineer -in charge
shall only be used.
27.2 Preparation of surface: The surface shell be thoroughly cleaned and dusted before painting is started. The
proposed surface shall be inspected by Engineer-in-charge or his authorized agent and shall have received
the approval before painting is commenced.
27.3 Application: Paint shall be applied with brush. The paint shall be spread as smooth & even as possible
particular care shall be paid to rivets, nuts bolts and cover lapping before drawing cut, it shall be continuously
starred, in the smaller containers with a smooth stick while it is being applied.Each coat shall be allowed to
dry out sufficiently before a subsequent coat is applied
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
27.4 Scope: painting on old surface is in/door Situations will not include priercoat except where specially
mentioned in the schedule of work or special specification. However, where rust has formed on iron and steel
surfaces the spots win be painted with one anti-rust primer coat.
27.5 Precautions: All furniture fixtures, glazing floors, etc. shall be protected by covering, all stains smears,
plashing, and dropping of every kind shall be removed. While painting of wiring etc. it shall be ensured that
painting of wall ceiling etc. is not spoiled in any way.
27.6 Painting of conduit and accessories: After installation surface of conduit pipes, fittings switch and regulator
boxes, etc. shall be painted with two coats of approved enamel I paint or aluminum paint as required to match
the finish of surrounding wall, trusses, etc.
28. Link clip: The clip for batten wiring shall be of Aluminum conforming to I.S. specification No. 2415-1975.
Important Clauses of Indian Electricity Rules, 1956. Following clauses of Indian
Electricity Rule, 1956 shall in particular be taken care of in the execution of electrical works.
3. Authorisation:
29. Construction, installation, protection, operation and maintenance of electric supply lines and apparatuses.
31. Cut-out on consumer’s premises.
32. Identification of earthed and earthed neutral conductors and position of switches and cut outs therein.
33. Earthed terminal on consumer’s premises.
34. Handling of electric supply lines and apparatus.
41. Distinction of circuits of different voltages.
42 Accidental charge.
43. Provisions applicable to protective, equipment.
44. Instruction for restoration of persons suffering from electric shock.
45. Precautions to be adopted by consumers, owner’s electrical contractors. Electrical workmen and
46. Periodical inspection and testing of consumer’s installation.
48. Precautions against leakage before connection
50. Supply to consumers.
51. Provisions applicable to medium high voltage installations.
58. Point of commencement of supply.
59. Precautions against failure of supply; Notice of failures.
61. Connection with earth, (low and Medium Voltage system.)
64. Use of energy at high and extra-high voltage system.
67. Connection with earth. (High & Extra-high voltage system)
68. General conditions as to transformation and control of energy.
All clauses under Chapter VIII on Overhead Lines.
137. Mode of entry.
138. Penalty for breaking seal.
139. Penalty for breach of rule
140. Penalty for breach of rule
141. Penalty for breach of rules.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Form of Completion Certificate
I/We certify that the installation detailed below has been installed by me/us and tested and that to the best of
my/our knowledge and belief, it complies with Indian Electricity Rules. 1956, as well as the C.P.W.D. General
Specification for Electrical Works,
Electrical Installation at Voltage and system of supply
(1) Particulars of works:
(a) Internal Electrical installation No. Total Load Type of system
(i) Light point
(iii) Plug point
(a) 3 pin 5 Amp.
(b) 3 pin 15 Amp.
(b) Others: Description HP/KW
(c) Other plants:
(d) If the work involves installation of overhead line/or underground cable:
(a) (i) Type & Description of overhead line.
(ii) Total length & No. of spans,
(iii) No. of street light & its description
(b) (i) Total length of underground cable & its size
(ii) No. of joint.
St. through joint :
(i) Description of earthing electrode
(ii) No. of earth electrodes:
(iii) Size of main earth lead:
(3) Test Results:
(a) Insulation Resistance:
(i) Insulation resistance of the whole system Megaohms.
Of conductors to earth.
(ii) Insulation resistance between the Phase conductors and neutral.
Between phase R and neutral. Mega ohms
Between phase Y and neutral Mega ohms
Between phase B and neutral Mega ohms
(iii) Insulation resistance between the phase conductors in case of poly-phase supply.
Between phase R & phase Y Mega ohms
Between phase Y & phase B Mega ohms
Between phase B & phase R Mega ohms
(b) Polarity Test:
Polarity of non-linked single pole braches switches.
(c) Earth continuity Test:
Maximum resistance between any point in the earth continuity conductor including metal conduits &
main earthing lead.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
(d) Earth Electrode Resistance Presence of each electrode.
(e) Lighting protective System:
Resistance of the whole of lighting protective system to earth before any bonding is effected with
electrode and metal in/on the structure.
Executive Engineer
Signature of contractor/s
(Mech.) Division
All Specification standard publication etc. specified mean the latest standards, publication etc. pertaining
to electrical and should conform to the following wherever applicable.
1) Indian Electricity Act. 1910 with its amendments.
2) Indian Electricity Rules 1956 and its amendments.
3) Indian Electricity supply Act
4) Regulation for Electrical Equipment in building by l.E.F. Landon.
5) The Factory Act, 1948 and its amendments.
6) I.S. 732* 1982 Part -1, II & III code of practice for Electrical wiring and fittings in buildings for low and
medium voltages
7) I.S. 4064-1976 H.D. Air break switches and fuses for-Voltages not exceeding 1100 volts.
8) I.S. 3043 - Earthing code of practice for
9) I.S. - 1554 Part-11970 PVC insulated (Heavy duty) Electrical Cables for working voltages upto and
including 110 volts
10) I.S. 694-1964 Part-II - PVC insulated cable with Aluminium conduits (revised) for voltages upto 110 volts.
11) I.S.: 5908 -1970 - Electrical installations in buildings method of measurements of.
12) I.S.: 4237 -1967 - General requirement for switchgear and control gear for voltage not exceeding
13) I.S.: 1653 -1964 - rigid steel conduits for electrical wiring (revised)
14) I.S.: 2509 -1973 - Rigid steel conduits for electrical installation (First revision)
15) I.S.: 1258 -1967 - Bayonet landholders (First revision)
16) I.S.: 418 -1957 - Tungsten - Filament General service-electric lamps (Third revision)
17) I.S.: 374 -1966 - Fans and Regulators, ceiling type, electric (second revision)
18) I.S.: 2667 -1964 - Filings for rigid steel conduits for electrical wiring.
19) I.S.: 3419-1976 - Fining for rigid non-metallic conduits (First revision)
20) National Electric Code,
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Abstract of the Wiring Rules of the Institution of
Electrical Engineer
(Referred to in the specification)
DEFINITIONS (See clause 2 of the specification)
All electrical system in which all the conductor and apparatus are electrically connected to a common
source of supply.
1) Earthed: Effectually connected, to the general mass of the earth. Solidly earthed without the Intervention
of a fuse, switch, circuit - breaker, resistor reactor or solenoid.
2) Un-insulated Conductor: A conductor without provision, by the Interposition of a dielectric or otherwise
for its insulation from earth.
3) Bare: Not covered with insulating material.
4) Dielectric: any material which offers high resistance to the passage of an electric current.
5) Bunch Conductor: When more than one conductor is contained within a single duct or groove or when
they are run enclosed and spaced and not spaced apart from each other;
6) Points: In wiring as per IS: 5908 -1970 - Method of measurements of electrical installation in buildings.
7) Switch board:An Assemblage pf switchgear with or without instruments, but the term does not apply to
a group of local switches in a final sub- circuit where each switch has its own insulating base.
Note: In the electricity (Factories Act) special regulations, 1908 and 1944 the term “Switchboard” includes
“Distribution board.’”
8) Single pole switch: A switch suitable for closing and or opening a circuit on one phase or pole only.
9) Linked switches: A switch the blades of which are so linked mechanically as to make break all poles
simultaneously or in a definite sequence.
10) Fuse Switch: A switch the moving part of which carries one or more fuses.
11) Three Wire System :
a) Outer Conductor: Those between which there is the greatest difference of potential. This use of the
word outer must not be confused with the use of the work when applied to the external conductor of
a concentric main.
b) Neutral Conductors: The term includes the neutral conductor of a 3 phase 4 wire system, the
conductor of a single phase or d. c. installation which is earthed by the supply undertaking (or
otherwise at the source of the supply) and the middle wire or common return conductor of a 3 wire
d.c. or single phase a.c. system.
12) Semi enclosed machine: One in which the ventilating openings in the frame are covered with -
a) Girds expanded metal or wire gauche, with openings of less than 1/4 Inch but not less than so as to
obstruct free ventilation.
b) Wire gauge. in which the openings are less than 1/4 inch but not less than 3/32 inch (diameter or
c) Screens with smaller openings than the above.
13) Totally - enclosed Machine:
One in which the enclosing case and bearings are dust proof and which does not allow circulation of air
between the inside and outside of the case.
14) Pipe Ventilated Machine: An enclosed machine in which, the frame is so arranged that the ventilating
air may be conveyed to it through a pipe attached to the frame the ventilation opening maintained by the
fanning action produced be the machine itself.
15) Forced draught machine: An enclosed machine in which the ventilating air supply is maintained by an
independent fan external to the machine itself.
16) Protected Machine: One having end shall bearings and in which is free access to the interior without
opening doors or removing covers.
SWICHES AND CIRCUIT BREAKERS
(See clause II of Specifications)
17) Switches and Circuits Breakers:
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Switches and circuit breakers (rules 2b. 36 and 37) whether fixed separately or combined with lamps,
holders of fittings, must comply with the following requirements:
(a) Overheating must not take place at the point of contract or elsewhere, when the full current flows
(b) They must be so constructed or arranged that the contracts cannot accidentally close when left open.
(c) The basis must be of incombustible, no conducting and moisture proof material.
(d) Circuit breaker as must be so arranged and placed that no combustible material is endangered by
(e) Unless placed an engine room or in compartment especially arranged .for the purpose, they must
their live parts covered. The covers must be incombustible material and, must be either non-
conducting or of rigid metal and clear of all internal mechanism. For more than 6 amperes, ai
pressures exceeding 125 volts metal covers must be lined with insulating material.
(f) In positions where they are liable to injure or come into contract with goods, they must be further
protected by an open fronted box or other suitable guard.
(g) Handles must be insulated so arranged that the hand cannot touch live metal, or be injured through
and adjacent fuse blowing.
(h) Switches having a handle protecting through an, open slot in the cover, must not be used.
Executive Engineer
Signature of contractor/s (Mech.)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
GENERAL REQUIREMENTS
1.1 Scope of works:
The work covered by electrical specification consists supplying and installing, electrical wiring system
complete in strict accordance with this specification and the applicable drawing and subject to the terms
and conditions of the contract. / It includes.
(a) Conduit and wiring system for fans, lighting points bells, clocks sockets, etc. including fixing of lighting
fixtures and fans etc. and miscellaneous points.
(b) Conduit and wiring system for exhaust fans, power sockets etc.
(c) Panel boards, distribution boards, switch fuse units.
(d) Complete power and lighting cable systems.
(e) Grounding system.
(f) Conduits system.
(g) Street lighting system.
(h) Other miscellaneous electrical work.
1.2 Completeness of Contract;
Any work fittings accessories or apparatus which may not have been specifically mentioned in the
specification but which are necessary in the equipment for efficient working of the plant should be
deemed to be included in the contract and should be executed and provided by the contractors. All plant
and apparatus should be complete in all the details, where such details, are mentioned in the specifications
Three prints and one permanent negative of each of the finally approved drawings incorporating all the
modifications proposed by the Department should be submitted. No modifications should be made in a
drawing already approved by the Engineer-in-charge without his prior consent.
Approval of the contractor’s drawing will not relieve the contractor of any part of his obligation to meet
all the requirements of .the contract.
The performance of all the equipment’s and the installation should be guaranteed at least a minimum
period of one year from the date of taking over the installation by the Department. All equipment’s must
comply with the relevancy IS-BS specifications.
1.4 Interchangeability:
All corresponding parts of similar plant and equipment should be interchangeable in every way.
All special tools required for dismantling and assembly of the equipment covered by the contract shall be
supplied as obligation under the contract.
A list of to be supplied by the Contractor should be submitted along with the tender.
Specifications for Electrical Installation in Buildings
1.1 These specifications relate to the electrical installations in the buildings of P.W.D. Electrical. The
specifications cover general requirements to be fulfilled. These general specifications are supplemented
by the specifications for the particular buildings separately attached.
1.2 These specifications are governed by the General conditions of the contract attached hereto.
1.3 APPLICABLE RULES AND REGULATIONS:
1.3.A Installation shall be carried out IN conformity with regulations for electrical equipment’s of buildings,
published by the Institute of Electrical Engineers London (14th Edition 1966 and as amended up to date)
herein after referred to as the I. E. E. wiring regulations Where these specifications, or the special
specifications for the particular building attached hereto are at variance with the I.E.E. regulation these
specifications or special specifications as the case may be,shall also be followed. The installation shall also
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
comply with the requirements of the Indian Electricity Act, 1910 as amended up to date rules issued there
under and also the regulations for the Electrical Association of India Where not specified otherwise, the
installation should generally follow the Indian standard codes of practice and in their absence the relevant
British Standard of practices. All the materials shall comply with the relevant Indian Standard of British
Standard specifications
1.4 DEFINITIONS:
1.4.A The definitions of terms in the I.E.E. Regulations shall apply in general.
1.5.A The preliminary drawings only indicate the general scheme of requirement. The exact position of all
points, control switch boxes, runs of wiring and/or conduits joint boxes, inspection boxes, Mains, and sub-
distribution boards, mains etc. shall be got approved Engineer-in-charge. All circuits shall be clearly
numbered in wiring diagrams and building plans. The detailed design of a switch-board, special fixture or
any other part of the electric installation as may be called for by the engineer-in-charge shall also be
supplied by the Contractor and should be got approved by the Engineer-in-charge. Three sets of
completion drawings and wiring diagrams showing the installations as executed shall be supplied by the
contractor along with the completion certificate.
All materials shall be new and of the best quality conforming to the relevant I.S.B.S. specifications. They
must be the products of reliable manufacturers of many years or standings. All like parts of materials shall
be interchangeable. In case of equipment’s such as circuit breakers; switch fuses etc. a descriptive and
illustrated literature shall accompany the tender. The names of manufacturers’ of various materials shall
be furnished in preform in Appendix-1. Samples of materials wherever required should be deposited with
the Engineer-in-charge. All materials shall be rust-proof or rendered rust proof by application of suitable
paints. The supply of all equipments, switchgears etc. shall be complete with accessories filings and
mountings as may be required for their proper performance, and as specified in the relevant IS-BS Code
of Practice and standards.
1.7 WORKMANSHIP:
1.7.A Good workmanship and neat finished appearance are the prerequisites for complying with the clauses of
these specifications. With a view to ensure fine workmanship the Tenderer shall employ licensed wiremen
with an experience of not less than 5 years in the type of work they are engaged. The work should be done
under supervisions of licensed Electrical Supervisors with good educational qualifications and
considerable experience.
1.7.B Tenderer shall furnish the names of Supervisor and their wiremen, who will be engaged in this work, with
details of their experience.
1.8 CO-OPERATIVE WITH CIVIL AND OTHER WORKS CONTRACTORS:
1.8.A The Tenderer after the award of the contract, shall co-operate with the civil and other contractors and
shall coordinate his work of the other contractors with the least amount of dislocation and interference to
the other works. Tenderer shall go through the drawings carefully and shall furnish the Engineer-in-
charge with all the details of openings in the walls etc. they may be required for concealing any of the
electrical equipments or accessories. Where the contractor fails to furnish such information as may be
required for the purpose of concealing the equipments etc. they shall be made at his (Contractor) cost and
expense. Any alteration to parts of the building shall be made good at the contractor’s expense and brought
to the original shape finish and colour.
The electrical contractor shall be completely responsible of the testing and commissioning of those
installations covered by these specifications in compliance with the standard procedure, in obtaining
permission of the Government Electrical Inspector. Any modification which is demanded by Government
Electrical Inspector shall have to be carried out within the scope of the contract. The contractor shall
submit four copies of drawings of installations as per regulations for shall be provided by the contractor
for carrying out the Installation work. All test shall be carried out in the presence of the Engineer-in-charge
or his authorized representative and his approval obtained for the test results.
1.10 COMPLETION CERTIFICATE AND MAINTENANCE GUARANTEE:
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
1.10.A After the completion of the installation and contractor should furnish a certificate in the preforma in
Appendix-III, at the time of taking over the installation by the Department. The installation shall be
guaranteed for period of 12 months from the date of taking over by the Department. During the period of
guarantee all defects in material or workmanship shall be rectified or replaced free of cost to the
1.11 TENDERER’S ABILITY :
1.11.A In order to enable the Department to assess the ability of the Tenderer to execute the work, the Tenderer
shall furnish evidence of his experience and capacity to carry out the magnitude and nature.
1.12.1. The rates of items shall include all traces, transport, loading and unloading charge and all such charges
that may be required to be incurred for the supply and installation of materials at site. The rates shall be
firm and variations in the market are not entertained Break up figure as required in the schedule of work
shall also be furnished. As far as possible indigenous materials only shall be included for supply. Where it
is unavoidable, imported items may be included and Tenderer should dearly indicate materials, quantity,
rate and amount of these items.
1.13 STORAGE SPACE:
No covered storage space will be provided-by the Department. The contractor has to make his own
arrangement. However, the Department may give an open space near the place of execution where the
contractor can build his own stores for executing the work.
1.14 DEPARTURE FROM SPECIFICATIONS:
The Tenderer should clearly indicate departure, if any from the specifications with reasons for the same.
1.15 EXTRA ITEMS:
Rates for extra items shall generally be derived from the rates already available in the schedule. Where it
is not possible, the rates shall be mutually agreed upon and contractor shall furnish a detailed analysis of
the rates claimed by him.
2. TECHNICAL SPECIFICATION:
2.1 Supply System:
The wiring installation shall be suitable for 3 phase 4 wire, 400-440 V 50 cycles system of supply Colour
code of different phase shall be followed as per standard.
2.2 Wiring for Light and Fans:
Looping system to wiring shall be adopted. No joints shall be made at intermediate runs of cables and
where they are unavoidable such joints shall be through approved mechanical connections.
2.2.1 Point wiring:
Point wiring shall consist to the branch wiring from the board together with the controlling switch or push
as far as and including the ceiling rose or any other approved connector or socket, outlets. In case of more
than one light being controlled by one switch, the wiring up to the ceiling rose of the first light including
the switch shall be considered as a Primary point. Loop wiring from light shall be considered as a’
Secondary’ point and rates shall be quoted separately, including final connections to fixtures and plugs.
2.2.2 Conductors:
No conductor for final sub circuit wiring for light and socket outlets shall across-section less than that of
2.5 sq.m (aluminium)
No final sub-circuit radiating from the fuse board of a sub-distribution board and wires with 25 sq. m. (AI)
cable shall carry more than 10 lights, fans or socket outlets or a connected load of 800 watts whichever is
greater. The following wattages may be assumed for estimating the load on each sub-circuit unless
otherwise known or specified.
Incandescent lamps 100 watts
Ceiling fans 60 watts
5-A Socket Outlets (lighting) 100 watts
4. ft. fluorescent tube 50 watts
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
5. ft. fluorescent tubes 100 watts
In each sub-distribution board at least-one way preferably two ways shall be left spare for future
requirement. A wiring diagram giving the exact Utilization of the ways shall be prepared and fixed in the
sub-distribution board itself or any other easily accessible place. The ways of sub distribution boards shall
be accordingly numbered.
2.2.4 Local Control Switches (General) :
Local control switches for circuit carrying net less than 5-5 shall be piano type and shall conform to
relevant I.S. Standards. The switch shall be ”ON’ when the knob is in the down position. All local control
switches shall be connected in the phase or live conductor only and not in the neutral conductor, switches
shall be fixed in iron clad box and shall is so placed that the Centre of the switch box is 1.3 Mtr. from the
finished floor level unless otherwise
stated. All switch boxes shall be provided with 1 /8" thick Perspex cover fixed to the switch box with
chromium plated counter sunk screws (brass).
2.2.5A Switches (Two Way) :
a) Two way swatches shall be piano type single pole, double throw, 250V, suitable for flush mounting
and of 5A capacity as per the drawings. All switches shall be recessed in an embedded metal box.
b) Each box shall have suitable outlet for fixing conduits directly.
c) Each box shall have Perspex cover painted inside with the wall color, if required.
d) Each switch shall have suitable for the position in a corridor stairway wiring.
2.2.5.B Switch Boxes (General)
Electrical circuits shall be written suitable on the cover of all switched boxes, as approved by the Engineer-
in charge (elect) whenever different phase are terminated in a switch box Bakelite partition shall be
provided. Each cash shall be provided with a G.I. Earth stud nut and washers for earth connectors.
2.2.5 Ceiling Rose:
Ceiling rose shall be used on circuits having a normally exceeding 200V. Only one flexible cord shall be
attached to a ceiling rose. Only 3-pin 5A socket outlet shall be provided in lighting circuits. All socket
outlets be provided with a control switch and they shall be mounted in switch boxes in an approved
2.2.6 Fittings:
These shall be of approved type as specified in the tender schedule. The sub circuits leads should
terminate in a ceiling rose or conductor in the fitting and internal connection made there from. Wherever
these fitting are suspended they shall be done so through the conduits and ball and socket joint. All fittings
shall be grounded by a G.I. conductor not less than 16 S.W.G.
2.2.7 Flexible wiring:
Flexible cords of not less than .23/0076 size be shall be used, The weight of suspension road shall be
governed by I.E.F. Regulations.
2.2.8 Ceiling Fans:
All ceiling fans shall be wired to ceiling rose and suspended from a hook shackle or clamp and insulated
from the same. All joints in the suspension, road shall be screwed and means of split pins. The fan clamps
supplied by the Contractor shall be suitable for the ceiling or proof member as the case may be For
concrete roofs, fan hooks shall be buried in concrete during concrete during construction in an approved
manner and secure bound to the reinforcement.
2.2.9 Conduits and Earthing:
All conduits feeding lighting and circuits shall be provided with earth continuity G.I. conductor as specified
for power wiring. All conduits shall be as specified for power wiring.
2.3.1 Point wiring:
Point wiring power shall be as defined under section 2.2.2 and shall include the switches and sockets.
All distribution board for power wiring shall be not less than 15 A per way. Loading per way shall not
exceed normally 100 watts. The following loads may be assumed if exact figure are not known.
3-Pin 15A Outlets 1.000 Watts
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
3-Pin 5A Outlets 100 Watts
2.3.3 Wiring for Motors :
2.3.3.1 Final sub-circuits loop in motors shall be connected to separate ways of the Distribution board even if the
current in the sub-circuit is less than 15A. No looping is permissible.
2.3.3.2 All wiring shall be carried in H.G. conduit as specified in I.S. specification for gauge for different sizes of
conduit. When the motor is resiliently mounted fixable with approved adopters shall be used for the last
few feet. Where cables are used sufficient loop shall be left.
2.3.3.3 All switch fuse units controlling circuits feeding motor .shall be provided with H.R.C. fuses or as specified:
2.3.3.4 The frame of every motor and its association contra gear shall be earthed by two separate and distinct
connections to earth connector shall be capable of earring 3 times the rating of fuse or 1.1/2 time the
setting or the circuit breakers but in no case than NO.8 S.W.G. or 7064" or equivalent cross section of
copper. Where practicable, the earth connections shall be visible for periodical inspection. Gas or water
pipes shall not be used for earth connections.
2.3.3.5 Socket Outlets and Control Switches f A and 15A :
All socket outlets shall be of 3 pin type, the third pin being connected to the earth stud of nearest
distribution board by separate earthing wire: The socket shall conform to I.S.: 1293/1938,’single pole,
piano type. Each socket pubets shall be provided with a control switch of appropriate rating and as
specified. The switch and socket shall be mounted inside the iron clad box provided with 1/8” Perspex
cover as directed by the Engineer-in-charge or as specified in schedule of quantities. Inside switch box
ample space shall be available around switches for connection wires to switches. All socket outlets for
power shall be mounted at the skirting level otherwise specified or as directed by the Engineer-in-charge.
The three phase plug receptacles shall have their earth terminals connected by independent earth wires
to ring main strip on the building. In buildings where explosion proof fixtures are installed single phase
plug receptacles as well as light points shall be connected to ring main ground bus installed in the building
by separate earth wires of approved size.
Socket outlet shall have some provision not to receive the matching plug unless the grounding pin is in
correct position. The grounding pin of the plug shall make the contract first and break the contract last at
the time of inserting or removing the plug respectively.
The grounding terminal shall be connected to the enclosed metal body providing G.I.Stud, nut washers
welded to the box.
Each unit shall be suitable for flush mounting as required and indicated in the applicable drawings.
Combination unit socket outlet and switch shall be complete with necessary internal wiring. The
switch/socket shall be mounted on M.S. bracket enclosed in a box.
2.4 Conduit Wiring:
2.4.1 Where conduit wiring is adopted type and size of the conduit shall be as indicated in the drawing. The
minimum of the conduit shall be 19 mm.
2.4.2 The contractor shall thoroughly study the structural arrangement of the buildings and wherever,
necessary shell in consolation with Department’s representatives at site, make suitable adjustments in the
cable routings, earthing arrangements, and location boxes, fitting etc. with a view to avoid interference
with any part of the building, structure, equipment or any other work in the building or to effect any
improvement in the arrangement.
2.4.3 Protection of conduit against rust:
Conduit shall be given two coats of oxide paint before they are placed in position. All exposed conduit shall
be planed after installation with the colour as approved by the Engineer-in-charge. This do not apply to
galvanized conduit.
2.4.3.A.Protection against insects arid damp:
In Order to minimize concentration or sweating inside the conduit, system shall be properly drained any
ventilated in such a manner as to prevent the entry of insects.
2.4.4 Conduit shall first be installed as a complete system without cables and shall be continuous from outlet to
outlet from fitting to fitting and mechanically and electrically connected to all boxes and fittings.
2.5 SPECIFICATION FOR POWER CONTROL AND TELEPHONE CABLES:
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
i. The specifications cover the supply and medium voltagePower and control cables either in ground or
trench depending on the conditions at sate including accessories for the same. The work in general,
consists of supplying, laying jointing terminating and connecting at. 1.1. KV APLSTS PVC power and
control cables.
ii. The contractor shall supply all accessories including jointing and terminating materials, compound,
tapes supporting materials, cleats cables lugs, concrete stable, bricks sand, cable-markers etc. as
required to make the installation work including digging and filling of the trenches as required.
2. SPECIFICATION:
i. All power cables to be supplied mentioned as ‘APLSTS’ in the Schedule should be mass impregnated,
non-draining, paper insulated lead sheathed, double steel tape armoured and must comply with the
latest IS1BS specifications.
ii. All cabling materials such as cable compound, cable lugs, taped shall be of approved quality acceptable
to the type recommended by the manufacture of the cable for which it is used and approved by the
iii. installation of all equipment shall also conform to the applicable. Codes and practice as per the IS and
shall be executed to comply with the latest Indian Electricity rules as regards the safely, payable of
equipments and other essential provisions specified therein.
iv. Only approved make of cable shall be used. ICC and CCI will be preferred,
v. The cables shall generally be laid as per is Code of practice.
3. GENERAL RULES CABLE LAYING:
i. Installation shall be carried out in a neat workmen like manner by skilled experienced and competent
workmen in accordance with the standard practices.
ii. Cables shall be laid preferably in one length to avoid joins. If straight joints are found-necessary, these
can be introduced with prior approval of the Engineer-in-charge. The cost of the straight joint
however, shall not be borne by the Department. But in no case joint shall be within the conduit G.I.
iii. Proper care should be exercised in handling the cable to avoid formation of kind etc. and should it
become necessary a cable be bent to a radius not less than 20 times the overall diameter of the cable.
iv. Method of installation, routing of cable etc. shall in every case be subject to the Department’s approval
and the contractors shall modify and or certificate no extra cost to the Department’s any portions of
the installation which do not meet with the Department’s approval. All damages to the civil and other
works on this account shall be made good by the contractor at no extra cost to the Department.
The electrical contractor while notifying the building contractor for such work shall furnish the
proper draws, dully explaining the work involved of indicate at suit actual work to be carried out as
may be required by the building contractor. The electrical of any such work as the electrical work
with this to the same has been completed.
v. Where cables pass through huge pipes, contractor shall fix hard wood bushed round the cables at the
ends of huge pipes. Where the cables pass through the floors or chambers and in such situation’s the
Engineer shall require, the contractor shall seal cable holes in a manner approved by Engineer-in-
charge. Where cable pass through roads nallahs etc. cables must be protected by class ‘A’ Hume pipe
of diameters not less than 6”. (15cms).
vi. The cable routs shall be the shortest and these shall be minimum inference with built up areas, lawns
vii. Care shall be exercised for providing suitable props other service lines on earth at the time of
excavation. Where cutting of a lawn inevitable it should be with the approval of the Engineers-in-
viii. Excavation of the trenches shall be executed with vertical sides and the trenches shall be kept as
straight as possible. The exact location of each trench shall be settled by the Engineer-in-charge. On
the site when the contract is in a position to commence each portion of the work.
The trench shall be not less than 1/2 meter wide and 90 cms deep. If more, cables are to be laid the
width should be suitably increased.
ix. After the cables are laid, the trench shall be filled in layers, the each layer being weal rammed by
spraying water and consolidated and sufficient alliance made for settlement. The extra earth over the
trench should be removed from the place of trench to a place as decided by the Engineer-in-charge at
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
x. Ends of cables shall be property sealed to prevent entry of moisture prior to installation.
xi. Where it is as specified as 1/2 core cables the 1/2 core shall be a neutral conductor having reduced
xii. For all multi core cables each core and tails shall be brought not, marked and or coloured in on
approved manner.
xiii. Cables termination shall be done with suitable compression brass glands in the case of PVC cables and
cast iron trifurcating boxes in the case of APLSTS cables. The Armour should be connected to the right
main earth building with duplicate earth wires as per the relevant IS/BS specification.
The core insulation over each conductor shall however be retained throughout the run of the
conductor up to the end where lung shall be fitted thereon for connections. The lungs shall by fitted
by means of approved solder and flux such as a leap and Eyre NO.7 liberally used. The joint shall be
mechanically strong and pressure tested.
2.6 DISTRIBUTION BOARDS AND PANELS.
General Requirements :
2.6.1 All distribution panels shall comply with IEE. Rules 60-61. A clear distance of 0.91 b meter in front of the
switch board shall be kept. Where bare connections of attachment are provided at the back of the switch
board the space behind the panel shall either less than 0.299 meter or more than 0.762 main width there
shall be a passage way from the furthest outstanding part of any attachment or conductor. If the space
behind the switch board exceeds 0.70 main width there shall be a passage way from either end of the
switch board clear to night of 1.928m width 0.299 m. All wiring connection shall be made neatly and
2.6.2 For crocoite’s carrying more than 10 Amps, tinned cable sockets shall be used, all connections shall be so
made as to form their own diagram Circuit shall be clearly numbered to correspond-to wiring diagram.
Names of the distribution boards shall be painted as directed by the Engineer-in-charge. All the switch
fuse units and isolators D.Bs. shall be complete with earthing studs lugs neutral bar ink. H.R.C. fuses and
of approved make.
2.6.3 Skeleton type panels shall have rigid form work adequately braced and supported. The switch and
distribution boards shall be neatly arranged in the frame. The details of the frame work and the
arrangement of switches shall be got approved by the Engineer-in-charge before the panel is fabricated.
2.6.4 All cubical type panels shall have rigid supporting frames adequately braced over which sheet metal shall
be nearly secured. All switches distribution boards etc. shall be neatly arranged on the panels and all
connections made from the back of switches. The panels shall be rendered dust and vermin-proof. The
interior of the panels shall not be accessible to unauthorized persons.
2.6.5 The recess type boards shall .be embedding wall in –a cupboard with a metal hinged door with locking
arrangement. In all recessed conduit work all distribution boards shall be recessed. Where recessing is
not possible, free standing panel may be provided as approved by the Engineer-in-charge.
2.6.6 All individual components i.e. switch fuse units D.Bs. etc. shall be connected by earth connected by earth
continuity wire of appropriate size with the main earth bus of the D.B.etc.The panel switches of D.Bs. shall
be earthed by the less than 2 distinctive paths to earth. Earthing of metallic parts of exposed metal shall
not be effected through any structural metal work which houses the installation. Where metallic parts are
not required to be earthed and are liable to become alive should the installation of the contractor become
defective such metallic parts shall be separated by durable non conducting
malarial from any structural work.
(a) Power panels shall be 3 phase, 4 wire, 400.230 volts for the distribution of 3 phase or single phase power
loads. Lighting panels shall be 3 phase 4 wire 400/230 volts for single phase lighting load distribution on
(b) All panels shall be done of protected front type with no mechanical or electrical defects.
(c) Bus bars shall be of electrolytic copper or aluminium as specified and the properly tinned sizes as
indicated on applicable drawings as required.
(d) All knock outs for branch circuits entries shall be drilled and filled as required, for lighting panels the top
and bottom cover plates shall be. removable type.
(e) Main disconnect device for all panel boards shall be of switches of disconnect type and of the size as
indicated shall be mounted directly below the panel or through a short thread conduit of required size.
(f) The main disconnect for all panel boards shall have an entry suitable for PVC armoured cable from bottom.
(g) All panel boards shall be provided with an earthing terminal and lug for connection to the grounding
(h) Temperature rise of all electrical parts shall not be more than 300c With full load amperes at room
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
(i) Buses shall be securely supported so that ordinary vibration will not cause any of the parts to become
(j) All barriers and supports of current carrying parts shall be of moisture resistant insulating material and
shall not be adversely affected by arcing.
(k) The locations of panels shown in the drawings are only tentative; panels may be located at a place
approved by the Engineer-in-charge.
(l) All civil works connected, with fixing such as grouting chasing and making good shall be the Tenderer
responsibility.
(m) Wires adequate capacity with proper size of lugs shall be used for inter connections.
(n) Panel should be self-supported on angle channel iron frame work. It should be preferably of bolted
construction in case of transportation and flexibility. The frames shall be of the required size for the
mounting of the equipment on it. It shall be bolted or grated rigidly after levelling and alignment.
(o) The cupboard and D. B. should be of such size so to be accommodated in the existing room as per I.S. rules
and I.S. codes of practice for installations of Medium voltage switchgear.
(p) Fabrication drawing showing the detailed dimensions and panels and its components indicating the frame
work, earthing positioning of switches. D.Bs. cable boxes, adopter chambers etc. shall be furnished to the
Engineer-in-charge for his approval. All material to be got approved by the Engineer-in-charge. Panel
should be guaranteed for satisfactory operations for a period of one year after handing over.
(q) The panel should be painted with anticorrosive paint suitable for humid and salty atmosphere on two
coast to primer.
SWITCH GEARS, POWERS PANELS D.B. AND S.F. U.S.
2.6.8 The main bus bar shall have continuous current rating as specified with neutral bar having half of full load
rating of the phase bus bar. The size of the bus bars shall be so selected that the current density in bar
does not exceed 150 amps. Per sq. m. for copper. The length of bus-bar chamber should be as suitable
length to fix all the switches etc. as per the prevailing standards, clear spacing of two adjacent buses shall
be 1 1/2" minimum bar should be taped all along with color coated 11KV grade PVC tape. The maximum
internal of support for each unsupported length shall exceed 600mm.
The bus bar shall be air insulated extensible type rectangular one. The bus bars chamber shall be dust
tight by providing gaskets secured property so as to tender it verity proof.
The combination fuse switch unit should comply with IS 4064 BS 861 and BBS 2510 wherever applicable.
It should be suitable to accommodate High Rupturing capacity cartridge Fuse links complying with IS
or BS 88 and having a certified rupturing capacity of not less than’ 35 MVA at 440 volts (AC5 duly). The
switch gear (pans D, Bs. etc. shall be installed generally as per is-Part -1 3072 and as specified and shown
All fuse switch units shall be provided with, non-deteriorating HRC fuse links complying with IS 2208-
1962 and having rupturing capacity of 35 MVA at 415 volts or as specified.
All switches above 60 amps, rating shall be provided with suitable size adapted boxes. All switches
mounted-on the top of the bus bars shall be provided with detachable type reverse entry adapter boxes.
Suitably engraved tables shall be provided for each circuits as well as for the board.
A meters sector switches and LMH meter shall be provided where. specifically mentioned. Small wiring
for the inter-connecting shall be colour coded and provided with numbered fuses for easy identification
(a) The distribution boards should be totally enclosed metal clad complying with B. S. 214. the M. S. sheet
steel enclosures for recessed D. Bs. shall be of not less than 14 gauge.
(b) The D. B. shall be with hinged door and the locking arrangements as approved by the Engineer-in-
(c) All the components shall be enclosed in the enclosure. The mounting of D. B. shall be got approved
by the Engineer-in-charge before carrying out the installation.
(d) The D. Bs shall have proper side-cut outs for conduits entry or cable entry as required and these shall
be made on site
(e) Adequate spacing shall be provided inside the D Bs. for easy removal of the fuses and carry out the
interconnection.
(f) A set of insulating barriers have to be provided between incoming breakers switches and fuses.
Switch fuse Units:
(a) All the D.P.T.P. and T. PN. Switch fuse units shall be totally enclosed iron a clad quick make, quick
break type to best Indian make conforming to the I.S. or S. 3185 specifications. All the switch fuse
units shall have mechanical Interlock with a door so that the door so that the door cannot be opened
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
when the swatches are in ON position. The switch should be of double break solution type to ensure
(b) Each T.P & T.PN switch fuse unit shall be earthed with two distinct each connections.
(c) Suitable insulator shall be provided between phase.
(d) There shall be suitable natural link in the fuse box.
(e) All T.P and T.PN: switch fuse units snail be rated for 500 volts and D.P, (required for single phase
supply) and S.PN. switches for 250 volts.
(f) The H.R.C. cat ridge fuse shall conform to H.S. 88 (1952).
The O.C.Bs. ACSB shall be suitable for 400/440 volts 3 phase 50 cycle supply capable of interrupting
a fault MVA of not less than 31. The circuit breaker shall conform to the BSS-936 1940. BSS 3659 with
such tripping arrangement as many as required under special specification is for the building.
Efficient and fool - proof mechanical interlocking shall be provided for the safe operation and
maintenance. The rate be inclusive of the first filling of oil.
2.7 Instrumentation:
Tile instruments and meters wherever necessary shall be housed in special sheet steel box located
between switch fuses units and bus bar chambers. The instruments etc. shall be mounted on the hinged
cover with heir dial flushed. All instruments shall have protective H. R.C. fuse links. All interconnections
and small wiring shall be neatly dressed arranged and duly colored 10r easy identification of circuits.
Meters shall be provided as required in the Schedule, Meters shall be dead head and be suitable for 400/
440 volt 3 phase 4 wire 50 cycle (in balanced load) supply.
Each selector switch shall be 3 point and of minimum 250 volts grade with silver tipped contact suitable
for metering circuits, current transformers shall be of 5VA burden and commercial metering accuracy.
Indication lamps shall be penal mounting type preferably of 250V grade. Every unit shall be prewired and
interconnected to the system for its required indicating performance. Indicating lamps shall have
independent circuit fuse.
2.8 FIXING OF LIGHTING FIXTURES:
1. Location of fixtures their manner of fixing mounting height etc. are indicated in relevant drawing.
Actual location and levels shall however be arrived at site in co-ordination with other service etc. and
prior approval of the Engineer-in-charge regarding the actual location Manner of fixing shall be
obtained before the work is taken up in hand.
2. In all cases the contractor shall provide necessary interconnection wiring earthing painting etc. all
necessary for complete installation. The contractor shall also test and commission the fixtures during
completion of the work.
3. General arrangement of fixtures layout is indicated in drawings. Care shall be taken to see that all light
fixtures are in a row in a room or particular area, are in absolute line and plump and are symmetrically
disposed with respect to finished surfaces of walls, columns beams etc.
4. The inter-connections wiring from the light outlet point up to the fixture shall be carried out by means
of flexible copper wire of section not less than 1.5 mm2.
5. All fixtures suspended by means of conduits shall be done with all and socket joints or as per approved
2.9 Telephone system:
1. Empty conducing shall be done recessed or exposed to surface along with pulls boxes, junction boxes
and telephone outlet boxes, in areas. and location as indicated in the relevant drawing as per materials
and methods as described in regard to conducting under section "Wiring in conduits” except the G.I.
pull wires of gauge not less than 20 SWG shall be dept. pulled through conduits in all sections so that
in future telephone wires can be pullet easy.
2. Location shown on the drawing are proximate and final location shall be decided in the field by the
Engineer-in - charge.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
SPECIFICATION FOR EARTHING & Installation of Earthing Plates:
All installation of earthing shall conform to Indian Electricity Rules, IS - 3043 latest edition and I.E.E. the
copper earth plates should be tinned before installation. the earth plates of copper 60 cm x 60 cm x 3.515 mm
thick size as mentioned in the schedule be in separate pits at least 150 cms to 300 cms. away from the building
at a depth necessary to reach moist earth surface but with a minimum depth of 2.5 Mtr from the finished
ground Level up to the top vertical dodge of earth electrode. The earth plate shall be thoroughly cleaned to
remove all dirt from the surface and be tinned property for electrical contact with the main ground. Each
earth pit should be provided with 38 mm. dia . G.!. pipe 2.5 Mtr .long or more depending up to the depth of
pit, put over the vertical edge of earth plate (with top end of pipe provided with a closed to couyler.)
Alternative layers of salt and coke shall be provided surrounding the plate. The pits shall be filled when the
plates are in position and with the approval of Engineer-in-charge.
To facilitate watering the pit, a concrete compartment should be made-with funnel with mesh and cover plate
as per rules provide in ISI regulation. The masonry endorser’s shall be 25 cm x 25cm x 25 cm (deep) with C.I,
lid of 23 cm x 30 cm x30 cms. size. After installation, the earthing resistance of each earth plate should be
measured by resistance meggar in the presence of Engineer-in-charge, three days after the completion of
earthing work, and the value should conform to regulations.
Executive Engineer (Mech.)
Signature of contractor/s
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Upgrade (S.I.T.C.) of 3 Nos. Elevators at GMB Complex, Jamnagar along with Lift Announcing solid state
system, minor building / civil works, dismantling of existing 3 nos of lifts, at GMB office complex
Jamnagar as mentioned in Price Bid- Schedule-B. This document along with standard specifications, and
installation standards and other related drawings / documents in this package will form part of the
contractor's scope of work.
1. Detail Scope of Work:-
The scope of work is defined in detail under the scheduled of quantities and technical specifications. The
various material covered under the scope of this tender are detailed below. The vendor is required to
carry out any other scope as per the site requirement within the items available under this tender.
1. Supplying, Erecting, Testing & Commissioning the passenger lift having 8 / 10 Passengers,. Ground
plus 7 upper floor with Rated Speed of 1.75/ 2.0 m/sec., as per detail showing in relevant page of tender
paper. Add for DUPLEX control for the lifts up to 7 upper floors.
2. Dismantling of the existing lift installation, including the lift car, machine, controller, guide rails,
landing doors, wiring, and all associated accessories, fixtures, tools, and equipment. The work shall
include careful removal of all components, collection and disposal of debris from the site, loading,
transportation, unloading, and shifting of the dismantled lift and salvaged materials to the location
specified by the Engineer-in-Charge, including all labour, tools, tackles, equipment, transportation, and
incidental charges, complete in all respects.
3. Required minor building works/civil works/white washing including scaffolding complete,
electrification with suitable size copper/aluminium cables, panel accessories like ELCBs, MCBs, DBs and
as per at site.
General Conditions
The work shall include the design, manufacture, supply, transportation, unloading, storage,
installation, and testing, commissioning, inspection, obtaining statutory approvals, and handing
over of complete elevator systems.
The contractor shall visit the site before quoting and verify all site conditions.
The quoted rate shall include all materials, labour, tools, tackles, transportation, insurance,
taxes, duties, testing, commissioning, and all incidental expenses required for satisfactory
completion of the work.
The contractor shall comply with the latest applicable provisions of the National Building Code
(NBC), IS Standards, Central Electricity Authority (CEA) Regulations, State Lift Act/Rules, and
other statutory requirements.
The scope shall include:
Supply and installation of complete elevator equipment.
Guide rails, machine, controller, VVVF drive, doors, landing fixtures, COP, LOP, wiring, travelling
cable, and accessories.
The offered elevators shall incorporate energy efficient technologies.
All electrical wiring from the elevator controller to all associated equipment.
Earthing of all elevator equipment.
Testing and commissioning.
Coordination with civil and electrical agencies.
Obtaining lift inspector approval and operating licence.
Training of owner's personnel.
Submission of operation and maintenance manuals.
Item Technical Specification:
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Upgrade of 3 Nos. Elevators at GMB Complex, Jamnagar along with Lift Announcing solid state system,
minor building / civil works, dismantling of existing 3 nos of lifts, at GMB office complex Jamnagar as
mentioned in Price Bid- Schedule-B.
Relevent IS code:
The passenger lift offered by the bidder shall be designed, manufactured, supplied, installed,
tested and commissioned in accordance with the latest applicable provisions of the Bureau of
Indian Standards (BIS) and all relevant Indian Standards, including IS 17900 (all applicable
parts) and other relevant standards governing lift safety, performance, electrical installation
and testing, as amended up to the execution of work.
Inspection and Testing
Factory inspection may be carried out by the Engineer-in-Charge or his appointed Third Party
Inspector before dispatch.
Site testing shall be carried out in the presence of the Engineer OR appointed TPI.
All safety devices shall be mandatorily tested and demonstrated.
Third-party inspection may be required if specified.
Warranty or Defect Liability Period
Minimum 12 months comprehensive warranty (DLP) including of regular free service for the
same from the date of successful commissioning or handing over.
Any defect during the warranty period shall be rectified free of cost.
Breakdown complaints shall be attended as mentioned in relevant self-declaration letter. Bidder
shall provide 24X7 breakdown service.
Completion Period
Supply, installation, testing, commissioning, and statutory approval shall be completed within
8 months for all 3 elevators from the date of work order (as applicable).
Documents to be Submitted
Technical catalogue.
Approved GA drawings.
Safety certificates for all safety equipment.
Load test report.
Power requirement.
Manufacturer's authorization certificate.
Inspection check list.
Type test certificates.
Warranty certificate.
Test certificates.
Returned back policy for old and to be recovered existing 3 nos of lifts.
The successful bidder shall dismantle, remove, and take back all three existing lifts from the GMB
complex. All dismantled scrap materials, including but not limited to lift equipment, wire ropes, motors,
guide rails, machine components, accessories, and other related items, shall be taken back by the
successful bidder from the GMB complex. No transportation, loading, unloading, labour, or any other
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
incidental charges shall be payable by GMB. All such expenses shall be borne solely by the successful
bidder. The bidder shall deposit the recovery value of the old lifts, as specified in the attached schedule,
into the concerned GMB account. The deposited amount shall include all applicable statutory charges
and taxes, such as GST, TCS, and any other levies, as applicable.
Training Requirements
The successful bidder shall provide operational and safety training to GMB personnel covering:
•Elevator operation.
•Emergency rescue procedures.
•Safety precautions.
•Routine checks.
Training completion certificates shall be provided.
Approved make of elevators
1) Mitsubishi 2) Kone 3) OTIS 4) Johnson 5) Schindler
Note: Any specialized technical requirements, if considered necessary during tender execution, may be
incorporated with the approval of the concerned EIC.
2. ATTENDING BREAKDOWN / RECTIFICATION WORKS:
After the installation and commissioning of the said three elevators and associated electrification works
in accordance with the prescribed norms, standards, and specifications, any breakdown calls received
from the concerned Officers during the warranty/guarantee period through e-mail, letter, or telephone
shall be promptly attended to by the agency. The agency shall arrange for necessary inspection,
rectification, and restoration of the elevator services within the stipulated time, as per the terms and
conditions specified in the relevant Self-Declaration Letter.
The contractor has to carry out the said work at GMB complex Jamnagar. Contractor is strongly advised
to visit the site and acquainted himself with the site condition its surrounding etc. in view of performing
the scope of tender.
document and should be got approved from EIC. All the items of work must have to execute as per
detailed Specification given in relevant chapter of this tender document. The entire work should be
carried out as per Electrical and Lift standard practice & up to satisfaction of TPI/EIC.
ACTION WHERE NO SPECIFICATIONS:
In case of any class of work for which there is no such specification mentioned above, then such work
shall be carried out in accordance with the specification as mentioned in PRICE-BID OR as mentioned in
Electric Tender form OR relevant IS specifications. In the event of there being no IS Specifications, then,
in such case the work shall be carried out in all respects in accordance with the instructions and
requirements of the Engineer-in-Charge OR concern DEE (Elec).
Signature of Contractor Executive Engineer (Mech.),
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Special Conditions during Installation of elevators
1. The contractor shall verify all civil dimensions of the lift shaft, pit, overhead clearance, and
machine room (where applicable), door openings, and embedded items before commencing
2. Installation shall be carried out only after obtaining written clearance from the Engineer-in-
Charge confirming that the lift shaft and associated civil works are ready.
3. The contractor shall coordinate closely with the civil, electrical, fire-fighting, and other agencies
to ensure smooth execution without affecting other ongoing works.
4. All lifting equipment, scaffolding, temporary supports, tools, and tackles required for installation
shall be arranged by the contractor at their own cost.
5. Adequate safety measures, including barricading of lift openings, warning signs, safety nets
(where required), and use of personal protective equipment (PPE), shall be provided throughout
the installation period.
6. The contractor shall comply with all applicable provisions of the Factories Act, Building and
Other Construction Workers (BOCW) Act, IS standards, National Building Code (NBC), State Lift
Rules, and other statutory safety regulations.
7. All workers deployed at site shall be trained and authorized for elevator installation work.
Personnel working at height shall use certified safety harnesses and fall protection systems.
8. The contractor shall be responsible for the safe custody and protection of all elevator materials
stored at site until handing over of the completed installation.
9. Any damage caused to the building, finishes, electrical installations, or other services during
installation shall be repaired or replaced by the contractor at no extra cost.
10. The contractor shall ensure proper earthing of all elevator equipment and verify the electrical
supply parameters before energizing the system.
11. The contractor shall not energize or operate the elevator until all safety devices have been
installed, tested, and certified.
12. The installation shall be carried out strictly in accordance with the approved General
Arrangement (GA) drawings, manufacturer's recommendations, and relevant Indian Standards.
13. Any deviation from approved drawings or specifications shall require prior written approval
from the Engineer-in-Charge.
14. The contractor shall maintain the site in a clean and orderly condition. Debris and packing
materials shall be removed regularly and disposed of as directed.
15. The contractor shall conduct pre-commissioning inspections of all mechanical, electrical, and
safety components before requesting final testing.
16. The contractor shall arrange all statutory inspections by the Lift Inspector and obtain the
operating licence before handing over the elevators.
17. The contractor shall provide comprehensive training to the employer's operating and
maintenance personnel before final acceptance.
18. The contractor shall submit the following before commissioning:
As-built drawings.
Wiring diagrams.
Operation and Maintenance (O&M) manuals.
Test certificates.
Warranty certificates.
Preventive maintenance schedule.
Spare parts list.
19. Temporary power, if provided by the employer, shall be used carefully. The contractor shall be
responsible for any damage caused due to misuse or overloading.
20. Installation activities shall be planned so as to minimize disruption to the functioning of the
office complex. Noisy or hazardous work shall be carried out only with prior permission from
the Engineer-in-Charge.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
21. The contractor shall ensure that no unauthorized person enters the lift shaft or installation area.
The lift shaft openings shall remain securely barricaded until commissioning.
22. Before handing over, the contractor shall demonstrate all operating modes and safety features,
Automatic Rescue Device (ARD)
Emergency alarm
Fireman's operation
Door safety sensors
Overload protection
Emergency lighting
Floor leveling accuracy
Emergency stop functions
23. The elevator shall not be considered complete until it has successfully passed all functional tests,
load tests, statutory inspections, and has been accepted by the Engineer-in-Charge.
24. The contractor shall maintain proper housekeeping during execution. All debris, dismantled
materials, packing materials, scrap, and waste generated during the work shall be regularly
removed from site and disposed of in accordance with applicable regulations.
Signature of Contractor Executive Engineer (Mech.),
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
INSURANCE &INSPECTION
The Bidder shall be responsible for any injury to the work or workmen to persons, animals or things
and for all damages to the structural and / or decorative part of property which may arise from the
operation or neglect of himself or any employees, whether such injury / damages arise from
carelessness, accident or any other causes whatsoever in any way connected with the carrying out of
this contract. The clause shall be held any damages to building whether immediately adjacent or
otherwise and any damages to roads, street, footpath or ways as well as damages to the buildings the
works forming the subject of this contract by rain, winds or inclemency of the weather.
The Bidder shall reinstate all damage or every sort mentioned in these clauses, so as to deliver the whole
of the contract works complete and perfect in every respect and so as to make good or otherwise satisfy
all claims for damages to the property or third parties.
The Bidder shall affect the insurance necessary and indemnify the GMB entirely from all responsibility
in this respect. The scope of insurance is to include damage or loss to the contract itself till this is made
over in a complete state.
The GMB shall be at liberty and is hereby empowered to deduct the amount of any damages,
compensations, costs charges and expenses arising or occurring from or in respect of any such claim of
damages from any sums due or to become due to the Bidder.
Third Party Inspection
The Bidder shall have to give intimation at least ten days before dispatching the materials. The tests as
per IS and as per specifications will have to be conducted by the supplier in their OEM laboratory, at the
site, or both, to the Executive Engineer (M), GMB or an authorized representative of the Board
(GMB)/Third Party appointed by GMB. The contractor has to provide the relevant certificates of the IS
codes for the material used/supplied for the work. GMB reserves the right to call for certificates for all
raw materials and equipment at any stage of manufacture to verify their quality and originality.
The representative of GMB for inspection shall be given full assistance in the form of necessary tools,
instruments, equipment, and qualified personnel, including to & fro fare and accommodation facilities,
to facilitate the inspection.
In the event of poor quality of goods being observed during the inspection by the representative of GMB,
GMB shall be at liberty to specify additional inspection procedures, if required, to ascertain the Bidder’s
compliance with the equipment specifications.
Even though inspection is carried out by GMB or its representative, such inspection shall not, however,
relieve the Bidder of all his responsibilities for furnishing equipment conforming to the requirements of
the contract, nor prejudice any claim, right, or privilege which the purchaser may have because of the
use of defective or unsatisfactory equipment.
A set of the latest prints of the approved drawings shall be kept available by the Bidder on the shop floor
for reference by the GMB representative during inspection.
Necessary inspection charges of the third party (other than the GMB representative) will be borne by
GMB, and its inspection report will be binding on the Bidder.
OEM factory testing will have to be conducted by the Bidder in the presence of GMB and its appointed
TPI agency for the main equipment or others as required by GMB or TPI. Necessary certificates, as
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
required by TPI, should be submitted by the Bidder. The Bidder or his authorized representative must
be present during the inspection at the OEM site or at the GMB site.
The necessary inspection report will be binding on the Bidder. The Bidder shall have to arrange a final
inspection after the completion of the work, through the TPI agency appointed by GMB. Prior intimation
must be given for this. Any suggestions regarding the work, if given by the TPI during their site visit,
should be rectified or corrected by the qualified contractor
Signature of Contractor Executive Engineer (Mech.),
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
SPECIAL CONDITION
1. Contractor shall have to inspect all the Electrical installation with GMB representative.
2. Contractor shall have to ensure the EIC the lights &other accessories attended by him are
working satisfactorily.
3. Before attending or starting the work contractor has to ensure the power shut down either from
department, electrical Forman/ electrician/ wireman/A.A.E/ A.E./D.E.E or GEB whichever is
4. Contractor shall have to remain present during works at site as responsible person and he will
only engage the qualified wireman/ lineman/ Electrician as applicable.
5. Contractor will have to carry out the work according to Indian Electricity Act and Rules as
amended time to time very strictly.
6. Any negligence which may cause and accident or fatal accident will be sole responsibility of the
contractor and GMB will not be responsible and no compensation will be made by the
7. The contractor will have to work with full safety & precautions with all pre-arrangement at site.
8. The required ladder/tower ladder trolley or vehicle mounted telescopic tower ladder including
any other tools/ tackles shall have to be provided by the contractor.
9. The payment shall be made for actual work done by the contractor and measurement shall be
taken As per sufficient quantum of work.
10. Any damages due to mishandling or carelessness of the work contractor to any item at site
occurs, it will be borne by the contractor by replacement or repairs at his own cost and risk.
11. The contractor shall have to furnish list of staff employed by him with passport size two nos.
photograph and obtain port entry pass/ identity card from port authority at own cost before
starting the work.
12. The contractor shall have to arrange own tools, tackles, testing and measuring instruments etc.
for repairing of said work.
13. The contractor shall have to arrange to ensure fully and adequately to meet claims under the
workman compensation act and under any amendments thereof and claim of damages whether
from injuries to any person.
14. During the contract period if it is found that the contractor received more than three letters from
GMB about unsatisfactory work and does not fulfill his obligation in respect of the work
entrusted to him GMB reserves the right to terminate the contract.
15. The persons engaged in repairing work shall be considered to be workers of the contractor and
not of GMB and GMB will not entertain any claim of workers engaged by the contractor.
16. In case of natural calamities like floods, cyclone, earth quake etc. contractor will be fully
responsible for damages occurring to the contractors’ personnel and tools and tackles.
17. The contractor shall have to maintain work report as per format given by EIC. Directional,
satisfaction. The record will be available for verification to EIC.
18. All testing charges for the materials required for test in govt. laboratory as on any of technical
institution shall be payable by the Contractor.
19. The contractor should obtain necessary insurance policy of adequate value to
cover the compensation for workers engaged by him.
20. The contractor shall also furnish a list of staff employed by him giving in brief qualification and
license for Electrical maintenance as required under Indian Electricity rules for carrying out the
21. The quantity of required materials mentioned in schedule-B is approximately; hence payment
will be made as on actual execution of work as per norms.
Signature of Contractor Executive Engineer (Mech.),
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
GENERAL CONDITION
1. The all instructions, general conditions, specifications and requirements given in tender booklet
for "Electrical Works" published by R & B Dept. Govt. of Gujarat and followed by GMB Shall be
strictly abided by the contractor.
2. The contractor has to execute the Electrical work by observing the Indian Electricity Act Rules
and Regulations as amended by the competent authority in Govt. of Gujarat/GMB.
3. Land for storing the contractor's materials and for labour hutments etc. shall be chargeable for
4. The contractor will provide all assistance labour and equipment for favour of work, wherever
required at his own responsibility of checking-up.
5. Work shall be executed with the regards to the prevailing local conditions and port regulations
and in any way not to cause hindrance to traffic or offices or Residence building etc.
6. If, in the opinion of the Executive Engineer (Mech.) ports, the contractor's representatives on
site of subordinate of workmen considered unfit or misbehave on order from the Executive
Engineer the contractor shall remove him from the work site from with failing which action will
be taken against him under clause of the contractor.
7. The contractor shall be deemed to be fully acquainted with the prevailing site condition assess
to the site nature of ground, underground water and the tidal condition covers and above wind
effect at this port site necessitate restricted hours of work of certain item so no claim will be
entertained by the department against losses on account of any of the above reasons.
8. Claim for variation in cost of labour of materials will not be permitted.
9. Port will not assure any supply of portable water to the contractor and contractor will have to
make his own arrangement.
10. The department may arrange to supply the Electric power to the contractor for
repairs/execution of work if possible otherwise agency has to arrange at own liability for
completion of the work.
11. Contractor shall have to provide licensed person at site to maintain Electric power supply lines,
apparatus, machineries, welding machines etc. and shall provide shock guard of ELCB and
proper earthing as per Indian Electricity Rules and Act in force as per instruction of Executive
Engineer (Mech.) or his authorized representative.
12. If any accident of any nature occurs to the labour employed by the contractor during the
execution of work, GMB will not be responsible for the same and compensation in this regard
will be not made by department. The contractor will be fully responsible for the same. Therefore
the contractor shall have to make suitable pre-arrangement for fully safety of labours employed
by him at site.
13. The contractor shall have to get the existing High Tension (11KV) OR Low Tension 415 Volts)
line/ cable clearance/ shut down either from GMB or GEB as applicable to observe the Safety
Rules and Regulations to start the work as applicable.
14. The GST will be applicable on the actual bill amount as per prevailing Government rules at the
time of payment. The Contractor has to submit the tax invoice for the same.
15. The contractor will be responsible for satisfactory performance, operation during contract
period. All the necessary arrangements required in this regard during maintenance period shall
be made by the contractor. The agency shall have to attend & clear the repairing in urgent within
1 day during the Maintenance/Guarantee period.
16. This is a work contract. The contractor shall take an open policy for the erection, insurance to
cover the risks by way of damages to property or person in the execution of the contract
including third party liability. This department will not be responsible for any damage or
accident that may occur during the execution of work. No compensation will be paid by this
department for any accident for work man or others in the employment of the contractor.
Signature of contractor Executive Engineer (Mech.)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
COMMERCIAL CONDITIONS
1. If the tender is taken in favour of a company a “Power of attorney” in favour of the person who can
sign the tender for the company must accompany the tender.
2. Prices to be quoted should be inclusive of all taxes, forwarding, packing insurance etc. & for
Destination basis but excluding GST.
3. Competent authority of GMB reserves rights to increase or decrease or cancel any or all the quantities
/ items as per actual requirement.
4. The quantities indicated in tender schedule of rates are tentative & likely to vary during execution &
the Bidder shall have no objection to such minor / major changes or deletion of the item. The Bidder
shall bind himself for execution of the items in future for which rates only (R.O.) are called in the
schedule of rates.
5. Liquidated Damages
The supply & installation shall have to be completed within 8 (Eight) months from the date of issue
of commencement date failing which compensation at the rate of 0.1 % per day shall be levied for the
delay will be imposed upon the Bidder up to the extent of 10% of the total contract value. (Not only
on the materials not supplied). Board shall have option to adopt one of the following options in
connection with delay. To cancel order without any liability on the part of Board. To get the work
executed at the risk & cost of the Bidder, through other agency.
Under warranty/guaranty period, the complaint shall have to be resolved within the time frame as
per tender stipulation failing which compensation at the rate of 0.01% per day of contract value shall
be levied for the delay will be imposed upon the bidder.
The Bidder shall quote the rates in Indian Rupees only as per price bid.
7. Payment Terms:
1. 60% after supply of materials at site. (According to per lift material supplied. If material is
supplied for one lift, payment shall be made for material of one lift only; similarly, if material is
supplied for two, three lifts, payment shall be made for material of two, three lifts.)
2. 30% after installation. (According to lift installation (same as above))
3. 10% after successful commissioning, testing, statutory approval, and handing over (For all
Signature of Executive Engineer (Mech.)
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Approved Make List
Sr. NAME OF EQUIPMENT/ MATERIAL APPROVED MAKE
1. Lift / Elevators 1) Mitsubishi 2) Kone 3) OTIS 4)
Johnson 5) Schindler
2. Switchgear like MCCB, MCB etc. C&S, Schneider, ABB , L&T, HAVELS
3. Contactor L&T , C&S , BCH , T.C., Alstom
4. PVC cable/XLPE cable RR kabel/ Finolex / Polycab / KEC/ALLCAB/
5. Earthing Electrode Standard approved make
1. The approved makes given above are applicable in general. However final approval has to
be taken from the GMB before execution of any item. GMB has the right to choose any of the
2. Another item will be as per concern SOR approval based. Contractor should bound for that.
Items that have been duly approved by the competent authority of the R&B Department
shall be considered, subject to the submission of the corresponding approval letter.
Signature of Contractor Executive Engineer (Mech.),
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Schedule for Amount to recover of scrap material Analysis
The old & recovered, replaced and non-use street light and electric scrap materials
generated during work. The contractor has to take this scrap material at following
rates at actual weightiest base/ no. base/ meter base as applicable with due
consultation of EIC and amount will have to deposit to GMB NON PLD Account with
tax (as applicable).
As aforesaid scrap and useless items should be kept given back to the concern agency
with purely unconditional with no any extra cost of transportation or weightiest
charges and "As it is where it is a condition."
Sr. No Item of work Rate Unit
1 1 Scrap value of 03 nos. existing lifts with all 84000.00 03 84000/-
accessories comprising lift machine, nos. For
geared/gearless motor, controller panel, Nos lift
guide rails, lift car, counter weight, landing scrap
doors, car doors, travelling cable and all
associated accessories complete
Note: - Above rates are consider as per prevailing norms.
Signature of Contractor Executive Engineer (Mech.),
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Lift shaft layout
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
GUJARAT MARITIME BOARD
Name of work: Upgrade 3 nos of elevators at GMB complex Jamnagar.
Office of The Executive Engineer (M)
Gujarat Maritime Board
Sector10 A, Opp. Air Force Station
Gandhinagar - 382
Email: [email protected]
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
Name of Work: Upgrade of 3 Nos. Elevators at GMB Complex, Jamnagar.
Item Qty. Unit Item description Rate Amount
1 Supplying, Erecting, Testing & Commissioning
the passenger / stretcher lift having following
3 Nos 8 / 10 Passengers,. Ground plus 7 upper floor ₹ ₹
with Rated Speed of 1.75/ 2.0 m/sec.,
(C) With General PLUS ADDITIONAL SPECIAL
FEATURES attached herewith. Prem. Cat.
2 1 Nos (e) Add for DUPLEX control for the lifts up to ₹ 80,000.00 ₹
General Description of Lifts
1] GEAR LESS LIFT DRIVE (MRL) comprising
of High Starting torque Lift 3 phase 440 V A. C.
Permanent Magnet Synchronous motor of
proper rating with high efficiency shall be
used.[2] Micro processor based / PLC,
ACVVVF, vector control drive with encoder
feedback closed loop system shall be used for
lift car and door operation which shall be full
collective selective operation hall call demand
response, UP/DOWN hall stops, Main, Up/
Down Contactor with overload and phase
reversal relay and safety controls.
[3] Car with M S platform with bracings of
adequate size and to sustain the impact load
cabin + passenger with safety factor of fire for
steel and side panels of Stainless steel of sheet
of grade 304 duty. Car ceiling will be S.S.
finishes with aesthetic appearance with LED
ceiling lights. Car flooring shall be of s/s
chaker plate design sugeested of engineer in
charge. of engineer in charge. Car doors shall
be of stainless steel grade 304, hairline finish
with centre opening / telescopic automatic
doors. Car panel will also be S.S. 304 finished
with emergency stop device, mechanical door
safety device, facility of auto/ attended mode.
All car panel buttons and all floor switches
must be with brail language as per lift act.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
[4] All landing doors must be fire rated for
hour shall be fully automatic centre opening/
telescopic opening made of hairline finish
steel grade of 304 with key holes and infrared
curtains with Unlocking facility from outside
[5] Appropriate battery operated emergency
light in the car along with alarm switch shall
be provided. Also, Emergency Light & Fan
should start immediately without any Time
Delay as soon as power fails.
[6] Digital scrolling indicator system for up-
down arrow along with floor position
indicator shall be provided inside the car and
[7] Full height infra red curtain with multiple
cross / crossing light beams shall be provided.
[8] Automatic Rescue Device (ARD) shall be
provided accordingly of passenger capacity
with Manual Rescue Operation ( Manual
Cranking Facility).
[9] Audio visual indication in the lift car
showing over loading shall be provided such
that doors kept open till excess load is
[10] Spring buffers/PU Buffers shall be
[11] Car fan as per passenger capacity with
automatic sleep timer shall be provided.
[12] Voice annunciator with suitable music
shall be provided in lift car.
[13] Self diagnostics system for operational
and safety parameters shall be provided in
[14] Mechanical over speed governor with
governor calibration as per actual site
parameters and submission of calibration
certificate submission, door key holes in the
floor doors, fireman switch shall be provided.
[15] Lift machine hoisting arrangement in the
lift machine room and monkey ladder for lift
pit should be provided by the lift agency,
along with the other steel structure works,
foundations for the machine etc…
[16] In the hoist way fascia plate shall be
provided without any extra cost, where ever
required as / if directed by engineer in charge.
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
[17] Permanent wiring with necessary safety
devices like RCCB in all circuit, Over Voltage
Under Voltage protection and THD eliminator
in circuit for lift machine room and lift well
with proper numbers of light points, with
fixtures, exhaust fan and plug points shall be
provided by the agency. Only 3 phase Power
Supply shall be made available by
department in lift machine room. Necessary
Earthing as per Lift Act/Rules shall be
arranged by Lift Agency.
[18] Any civil/ electrical works for additional
and alteration in lift shaft and machine room
related to erection of lift shall be made by lift
agency without any extra cost.
(granite/marble fixing around all landing
door openings are not in lift agency’s scope.)
[19] Agency has to provide all working
drawings and documents and liaison services
for obtaining all necessary permission from
lift inspector and other authorities. [20]
acrylic transparent licence/display A4 size
holder in lift car
20A] As per statutory requirement of Govt. Of
Gujarat lift & escalator act 2000, lift agency
has to provide 1. Car top safety barricade2.
Push & talk communication system.3.
Fireman's switch operation at Ground Floor.
4.carrying out third party lift inspection
during/after lift erection and provide report
by third party authorized by concern
licensing authority 5.agency has to provide
third party insurance upto completion of free
maintenance period and submit the
document for the same.
21] Car Panel Operating Buttons with floor
position indicator/buttons must be of Auto
Glow type clearly visible when view from
[22] For Physically Handicapped person Full
Length Handrails of hairline finish steel grade
of 304 should be provided at appropriate
height on the Rear & Side Wall Panels in Lift
Car. [23] With Necessary KVA rating voltage
controlled Stabilizer suitable for your
controller, drive and all equipments of lift.
[24] Necessary rating of DP Elcb and FP Elcb
required for lift is in scope of work which
rating is sugested by CEICED Department
(electrical Inspector)
(B) SPECIAL FEATURES DESCRIPTION OF LIFTS for
PREMIUM category
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
1. Advanced control system dual 64 bit
embedded microprocessor with CANBUS
Serial Communication mode including
Regenerative power efficient operation,on
site programming facility, Anti nuisance, Pte-
opening, BMS/RMS with necessary online real
time monitoring system having necessary
connectivity for remote monitoring & other
suitable supporting hardware & software
devices to fulfil the purpose.
2. Floor Indication LCD Display with call
registration & brail mark with arrival gong
and hall lantern & TFT Screen in the car with
MP3 Voice Announcer.
3. CAR Panel should be Scratch resistive SS
Moonrock finish / Hair Line / Honeycomb for
car and all Doors, All landing doors must have
fire rating up to 2 hours and car door must
have multi-level crisscross beam door
4. To & fro communication system & wiring
(i.e. car , control room & guard room ) and
Each elevator are equipped with remote
monitoring system.agency has to provide
mobile app and user id and password for
3 3 Nos Supplying & erecting approved make Lift ₹ 16,950.00 ₹
Announcing solid state system in the
Passenger/ Stretcher lifts having
AC2/ACVV/ACVF drives & automatic doors
only. The system comprising following
features & facilities.
(i) Announcing floor message, message to
close period.(ii) Announcing ‘Emergency
Message’ when lift is stuck between floors due
to power failure or any other reason.
(iii) Instrumental Music between floor
announcing.(iv) Announcement in English /
Hindi & Gujarati Languages..
(v) Flexible to accommodate special per-
programmed message such as name of the
building /office.(vi)Volume adjustment
4 3 Nos Dismantling of existing lift installation ₹ 1,50,000.00 ₹
comprising lift machine, geared/gearless
motor, controller panel, guide rails, lift car,
counter weight, landing doors, car doors,
COP/LOP, travelling cable, wiring, switches,
fixtures and all associated accessories
complete from lift shaft and machine room,
including disconnecting electrical
connections, lowering/removal of materials
safely, loading/unloading, shifting to
departmental store or disposal yard as
directed by Engineer-in-Charge, upto 10 KM
Upgrade 3 Nos. Elevators at GMB Complex, Jamnagar. 2026-27
lead including all labour, tools & tackles,
scaffolding, safety measures and making good
damages, complete as required.
Rupees sixty eight lakh fifty two thousand one hundred thirteen Only.
Prices should be excluding GST. The GST will be paid extra on the actual bill amount as per prevailing rate of GST
at the time of payment.
I/We am/are willing to carry out the work at___________% above/below the estimate amount put to tender. Total
amount of my/our tender work out as under.
Estimated Amount Put to tender Rs. Estimated Amount Put to tender Rs.
Add._____________% above Rs. Deduct ________% below Rs. __________________
Total Amount Rs. Net Amount Rs. ____________________________
Total Amount Rs. Net Amount Rs. ____________________________
Signature of Executive Engineer (Mech.)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender paper_ Upgrade of Lift at GMB complex at Jamnagar.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .