| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-AOC | L1 | Accepted-AOC Since L1 Accepted | |
| 2 | L2₹35.1 L−₹2.3 L (6.16%)Rejected-AOC | L2 | Rejected-AOC Since L2 Rejected |
Tender Value
₹35.1 L
EMD Value
₹50,000
Closing Date
3 Sept 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Harbour Engineering Division,
Executive Engineer, Harbour Engineering Division, Kollam - 691002
Upgradation of coastal road from Sivasadanam to Nellettil Pazhaya Kadavu in ward 12 of Bhoothakkulam GP in Chathannoor LAC in Kollam District
2020_HED_378354_1
70/EE/KLM/2020-21/S
Open Tender
Civil Works - Roads
Item Rate
180 days
Bhoothakkulam GP in Chathannoor LAC
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,430
online
₹50,000
Yes
1 Jan 2021
20 Aug 2020
8 Sept 2020
20 Aug 2020
3 Sept 2020
20 Aug 2020
60 days
Amount
APPENDIX -A: ROAD WORK
2.1 : Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203I.P.C.C grade M 10(i)Nominal mix 1:3:6
11.4.3.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III.P.C.C. grade M 20 (i)Nominal mix (1:2:4)
GSB AND QUARRY MUCK
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
APPENDIX- B: PROTECTION WALL
11.1.1.1 : Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.I.Ordinary soil(i)Upto 3 m depth
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203I.P.C.C grade M 10(i)Nominal mix 1:3:6
11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20
12.5.3 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204For height upto 5 m III.R.C.C grade M 20
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Travancore Engineers And Technicians Labour Contract Co-operative Society Ltd.NO.Q1012
Bidder Name
Travancore Engineers And Technicians Labour Contract Co-operative Society Ltd.NO.Q1012
SAR CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_536311.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .