| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.3 LAccepted-Finance | ₹46.3 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹48.2 L+₹2.0 L (4.24%)Accepted-Finance VILL PO GHANALWIN TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | ₹48.2 L+₹2.0 L (4.24%) | L2 | Accepted-Finance Accepted |
| 3 | L3₹49.0 L+₹2.8 L (5.97%)Accepted-Finance | ₹49.0 L+₹2.8 L (5.97%) | L3 | Accepted-Finance Accepted |
| 4 | Rejected-Technical HIMACHAL PRADESH HP | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | - | - | Rejected-Technical Rejected due to not fulfil the eligiblity. |
| Sl No | Description | Qty | Unit | Vishal Chauhan L3 | Rajni kumari L1 | mohitchandel L2 |
|---|---|---|---|---|---|---|
| 1.00Excavation in foundations, trenches etc., in earth work, lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of excavation & returning the stacked soil in 15 cm.layers,when required into plinths sides of foundations etc. consolidating each depositED layer by ramming & watering & then disposing of all surplus excavated earth as directed within a lead of 20 meters complete in all respect as per entire satisfaction of Engineer in Charge. (Pick Work) | ||||||
| 1.01 | Pick jumper work | 258.71 | Cum | 560 ₹1,44,877.6 | 547 ₹1,41,514.37 Lowest | 550 ₹1,42,290.5 |
| 2.00 | Providing and laying cement concrete 1:4:8 (1 cement: 4 sand: 8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in Foundation and Plinth | 8.82 | Cum | 6,400 ₹56,448 | 6,000 ₹52,920 Lowest | 6,200 ₹54,684 |
| 3.00 | Providing and laying cement concrete 1:3:6 (1 cemant:3 sand:6 graded stone aggregrate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | 6.14 | Cum | 6,800 ₹41,752 | 6,500 ₹39,910 Lowest | 6,700 ₹41,138 |
| 4.00Providing and laying cement concrete 1:1.5:3 (1 cemant:1.5 sand:3 graded stone aggregrate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | ||||||
| 4.01 | In foundation, footings, basis of columns and the like and mass concrete in all leads and lifts as per direction to the entire satisfaction of the Engineer-in-Charge. | 28.16 | Cum | 8,400 ₹2,36,544 | 8,200 ₹2,30,912 Lowest | 8,300 ₹2,33,728 |
| 4.02 | Walls (any thickness) but not less then 0.10 meter thickness including attached pilasters, buttresses, plinth and string courses etc. from top of foundation upto all floor level as per direction to the entire satisfaction of the Engineer-in-Charge. | 57.14 | Cum | 8,800 ₹5,02,832 | 8,500 ₹4,85,690 Lowest | 8,700 ₹4,97,118 |
| 4.03 | Floor four leve to floor five level | 6.53 | Cum | 8,750 ₹57,137.5 | 8,500 ₹55,505 Lowest | 8,700 ₹56,811 |
| 4.04 | Column,pillars,posts & struts upto floor two level floor two level to floor three level | 1.72 | Cum | 8,750 ₹15,050 | 8,500 ₹14,620 Lowest | 8,700 ₹14,964 |
| 4.05 | floor three level to floor four level | 1.27 | Cum | 8,750 ₹11,112.5 | 8,500 ₹10,795 Lowest | 8,700 ₹11,049 |
Tender Value
Refer Docs
EMD Value
₹90,200
Closing Date
22 Jun 2026, 5:00 pmClosed
Executive Engineer Jal Shakti Division Ghumarwin
Executive Engineer Jal Shakti Division Ghumarwin
Improvement and Augmentation of Lift Irrigation Scheme Chhat Himmer in tehsil Ghumarwin Distt. Bilaspur HP SH CO RCC Collection tank of 300000 liters capacity CO RCC Main Delivery tank of 40000 liters capacity CO overhead storage tank of 30000
2026_HPIPH_136705_1
GMR-BLP02-737(3107-55)Chatt
Open Tender
Civil Works
Item Rate
365 days
Ghumarwin
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
₹90,200
8 Sept 2026
15 Jun 2026
23 Jun 2026
15 Jun 2026
22 Jun 2026
15 Jun 2026
15 Jun 2026 - 22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation in foundations, trenches etc., in earth work, lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of excavation & returning the stacked soil in 15 cm.layers,when required into plinths sides of foundations etc. consolidating each depositED layer by ramming & watering & then disposing of all surplus excavated earth as directed within a lead of 20 meters complete in all respect as per entire satisfaction of Engineer in Charge. (Pick Work) | |||||
| 1.01 | Pick jumper work | 258.71 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:4:8 (1 cement: 4 sand: 8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in Foundation and Plinth | 8.82 | Cum | - | - |
| 3 | Providing and laying cement concrete 1:3:6 (1 cemant:3 sand:6 graded stone aggregrate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | 6.14 | Cum | - | - |
| 4Providing and laying cement concrete 1:1.5:3 (1 cemant:1.5 sand:3 graded stone aggregrate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | |||||
| 4.01 | In foundation, footings, basis of columns and the like and mass concrete in all leads and lifts as per direction to the entire satisfaction of the Engineer-in-Charge. | 28.16 | Cum | - | - |
| 4.02 | Walls (any thickness) but not less then 0.10 meter thickness including attached pilasters, buttresses, plinth and string courses etc. from top of foundation upto all floor level as per direction to the entire satisfaction of the Engineer-in-Charge. | 57.14 | Cum | - | - |
| 4.03 | Floor four leve to floor five level | 6.53 | Cum | - | - |
| 4.04 | Column,pillars,posts & struts upto floor two level floor two level to floor three level | 1.72 | Cum | - | - |
| 4.05 | floor three level to floor four level | 1.27 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Form8.pdf
Tender Documents • 0.86 MB
BOQ_202343.xls
BOQ • 0.31 MB
Condition.pdf
Additional Documents • 0.36 MB
Form6.pdf
Tender Documents • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .